Partial denial of storm claim: exploratory works to find cause of water ingress and plumbing maintenance
Text of the determination
Determination
Case number 855852
Financial firm Insurance Australia Limited
Determination | Case number: 855852 Page 1 of 12
Case number: 855852 28 February 2023
1 Determination overview
1.1 Complaint
The complainant holds an events-based home and contents policy with the financial firm
(insurer). On 25 November 2021 he lodged a claim for storm damage to his two-storey home
in Cardiff, New South Wales. The complainant says a storm caused water (including waste
water) to ingress into the downstairs laundry of the building and track into the adjacent games
room and gym area causing damage. This included damage to floor coverings, skirting
boards and walls.
The insurer accepted the claim for damage to the complain ant’s home caused by the storm.
However, it rejected the claim in relation to:-
additional exploratory works to identify the cause of the water ingress into the laundry
the costs associated with conducting plumbing maintenance to the property.
The complainant seeks to have the claim for further exploratory works accepted. He also says
that, should such exploratory works indeed find additional storm damage to plumbing,
waterproofing and or drainage infrastructure, the costs associated with the repair of that
additional storm damage should also be borne by the insurer.
During processing of the claim, the insurer failed to conduct make-safe works at the
complainant’s home in a timely manner. Consequently, the insurer offered to waive the $500
excess applicable to the policy. The complainant accepted this offer. I shall proceed on the
basis that this agreement is still in place and will continue.
1.2 Issues and key findings
Should the insurer provide coverage for plumbing maintenance?
No. The costs associated with plumbing maintenance works are excluded under the terms
and conditions of the policy. The insurer is entitled to rely upon the terms and conditions of
the policy to determine the extent of its obligations to the complainant regarding the claim.
Should the insurer provide coverage for further exploratory works to identify
and locate the cause of the damage?
Yes. The insurer is required to accept the claim for costs associated with further exploratory
works to locate and identify the cause of the damage and all storm-related damage should be
repaired.
Should the insurer provide coverage for the costs of meeting building
regulations?
Yes. If remedial works in relation to storm-damaged plumbing, waterproofing and drainage
infrastructure necessarily involves works specifically aimed at meeting current building
regulations, the insurer must also provide coverage for the costs associated with such works.
Determination | Case number: 855852 Page 2 of 12
Should the insurer provide non-financial loss compensation?
No. Non-financial loss compensation is not appropriate in this case.
Why is the outcome fair?
The outcome is fair because:-
- Defects or damage which are solely caused by a lack of maintenance are excluded
under the terms and conditions of the policy
- The policy requires the insurer to cover exploratory works to locate and identify the
cause of the storm damage to the complainant’s home
- The policy requires the insurer to cover the costs associated with the repair of all
storm-related damage
- Repairs of storm-related damage which also necessarily involve works aimed at
meeting current building regulations are also covered under the terms and conditions
of the policy
- An award of non-financial loss compensation is not appropriate in this matter.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer should settle the claim as set out in section 2.5, below.
Determination | Case number: 855852 Page 3 of 12
2 Reasons for determination
2.1 Should the insurer pay for plumbing maintenance?
Insurer and complainant agree about certain issues
The insurer accepts the complainant’s home was damaged by a storm which occurred on
about 25 November 2021 . Indeed, the insurer accepted the complainant’s claim to the extent
that it provided coverage for storm-related damage to carpets, skirting boards, door
architraves and an external shade sail that was ripped by the force of the storm.
In addition, the insurer does not dispute the following:-
the complainant’s home is about 60 years old
there is no evidence that water ingress into the downstairs laundry happened prior to
the storm of 25 November 2021
the property has stood for many years without sewer or drainage issues
there is no evidence the damage occurred over a period of time, as distinct from
during a ‘listed event’
there is no evidence that previous works by the complainant were inadequate in any
way or that such works contributed to the water ingress.
In short, the parties agree the storm caused water (including waste water) to enter the laundry
at the premises and cause damage to the downstairs area.
However, a dispute remains between the parties about the extent of coverage under the
policy for this storm event.
The insurer says, under the terms and conditions of the policy, it is not required to cover the
costs associated with exploratory works to discover the source(s) of the water ingress into the
laundry and to repair such sources. The insurer maintains:-
(AFCA’s) Preliminary Assessment requires [FF] to excavate or other wise carry
out invasive testing to locate any/all other possible causes of water ingress,
and to remediate them no matter whether the cause(s) are any other event
covered by the policy, or any event not covered by the policy. [FF] does not
accept this ….
The extent of (the insurer’s ) liability under this storm claim is to remediate, or
pay the fair and reasonable cost to remediate, the damages caused by the
listed event (the storm) (see email from the insurer to AFCA dated 11 April
2022).
The insurer has therefore formally denied the balance of the claim on the basis that damage
pertaining to infrastructure suc h as pipes, drains and waterproofing amount to ‘maintenance
issues ’ and not storm damage.
Insurer must show it is entitled to rely on a policy exclusion
Once the complainant has established a valid claim for storm damage under the policy, which
he has, the onus falls upon the insurer to prove, on balance (that is, more likely than not) that
it may rely upon one or other of the policy exclusions to deny the claim, or part of it.
Determination | Case number: 855852 Page 4 of 12
The terms and conditions of the policy are set out in the Policy Disclosure Statement (PDS).
Coverage for storm damage is listed on page 30 of the PDS. ‘S torm ’ is defined as:-
…. rain, thunderstorm, hail, snow, violent wind, cyclone, tornado.
General exclusions are set out on pages 65-66 of the PDS, including:-
What we don’t cover :-
Loss, damage, injury or death arising from:
- rust, corrosion, gradual deterioration, depreciation, wear or tear
We don’t cover loss, damage, injury or death arising from:
- faulty design or workmanship
- you not maintaining your home in good repair and condition – this
means that your home must be watertight, structurally sound,
secure and well maintained
- you not maintaining your site in good repair and condition.
The insurer says it is not required to cover the costs associated with investigating, identifying
and repairing any faults or defects in the plumbing and drainage infrastructure of the property
which may have played a part in enabling the storm water to enter the laundry. This is
because such faults or defects amount to maintenance issues and:-
Maintenance is not covered under the insurance contract the complainant holds ….
And as such (the insurer) will not extend cover to the recommended maintenance
related plumbing…. [see the insurer’s External Dispute Resolution Response (EDR)
dated 11 February 2022].
I agree with the insurer in this regard if such faults or defects are clearly shown to be caused
by, for example, a ‘lack of mainten an ce’ and not the storm. Loss or damage that occurs
because of a lack of appropriate maintenance on the part of the complainant are excluded
under the terms and conditions of the policy.
2.2 Should the insurer provide coverage for further exploratory
works to identify and locate the cause of the damage?
Policy provides coverage for exploratory works
As mentioned, the complainant says the insurer should complete further exploratory works to
locate and identify the cause of the damage – in other words, during the storm of 25
November 2021, and in the absence of previous similar problems, the insurer should
investigate what caused the water to ingress into the downstairs laundry.
However, the insurer says that:-
There is no coverage under the complainant’s insurance contract with (the insurer) for
additional or further exploratory work to identify the cause of the damage (see the
insurer’s External Dispute Resolution Response dated 11 February 2022).
I disagree.
Page 42 of the PDS states:-
Determination | Case number: 855852 Page 5 of 12
Locating the cause of damage
If a listed event causes loss or damage to your home and you need to confirm that it
was caused by a listed event.
Covered under Buildings Insurance
• the reasonable costs you have paid to find the cause of damage if the loss or
damage was caused by a listed event.
Conditions
the costs must relate directly to the part of your home that suffered the
loss or damage
we must agree to pay the costs before you make any arrangements.
In other words, the insurer has an obligation to meet the costs of exploratory works to find the
cause of the damage. This obligation takes the form of reimbursing the complainant for such
costs if the exploration works relate to part of the complainant’s home that was damaged by
the storm and the complainant has obtained agreement from the insurer to pay for the works
before they are undertaken.
The property has been examined by several experts
As well as meteorological data about the severity of the storm of 25 November 2021, the
parties have obtained reports from several appropriately qualified trades and experts.
MM (Plumbers) inspected the property on 29 November 2021 and reported the following:-
On inspection found mass amounts of builder’s waste within drain.
No fixtures were running when line had overflowed.
No further blockages present on onsite.
It is possible that floor waste is not connected to sewer and recommend for a smoke
test to be conducted to confirm
PL (Plumbers) inspected the property on 28 December 2021 and again on 13 January 2022.
After smoke-testing to determine various drainage connections, PL concluded:-
Found to be Broken or collapsed pipe in slab. Looks as if Stormwater is connected to
floor waste (illegal to have stormwater connected to sewer). Nothing in Laundry is
connected to floor waste. If anything else outside of Laundry is connected, That is
Also Illegal. Plunged and Pulled out Fragments of Broken PVC. Water is filling up the
drain and pit …. and then seeping through into the sewer pipe.
HB (builders) inspected the property on 1 December 2021. HB’s report pursuant to that
inspection is comprehensive and logical and is supported by helpful photographs. HB
reported that:-
Water was noticed coming from the laundry floor waste and damaged carpet and
timber skirtings and door architraves. The Plumbing Report has identified that there
was mass amounts of builder’s waste within drain. There were n o further blockages
identified or any storm related damage. Therefore this component of the claim is a
resultant of a water leak and not a storm event. A concern was raised that It is
Determination | Case number: 855852 Page 6 of 12
possible that the floor waste is not connected to sewer. We recommend the insured
undertake further investigation to ensure the plumbing is adequately installed and
undertake any necessary maintenance repairs to ensure drainage is functional. As per
policy, it is the Insurer’s responsibility to repair or replace the item that the water
leaked or escaped from. The internal repairs will be pending this recommendation.
SL (leak detectors) inspected the complainant’s property on 27 January 2022. SL’s report
pursuant to that inspection is logical and well-structured and appears to be the most
comprehensive report obtained in relation to this matter. Thus, it is helpful to set out SL’s
main observations forthwith:-
- The property is situated on a tiered block and the ground floor is in a low-lying
geographical area. The ground floor has an open plan layout and some sections are
located below or partially below ground level. Due to its low position, groundwater and
surface rain runoff may occur toward the affected section of the residence during a
storm event.
- Upon turning the internal services off, the water meter was inspected and flow tested
and it appears to be operating correctly without damage, leaking or continuous flow.
Thus, a pipe leak seems unlikely at this stage.
- The stormwater on the western side of the property has been installed over the top of
the sewer gully, which is not in accordance with AS/NSZ 3500:2018 Plumbing and
Drainage, however, the non-compliance is unlikely to be the cause of the escape of
water from the gully. Nonetheless, if the deemed to comply provisions are not met,
this may pose a risk to meet functional requirements for the site conditions.
- To diagnose potential issues with the 100 mm PVC drainage system, the lines were
traced with the Ridgid locator via the remote transmitter sonde whilst attempting to
survey in tandem with the CCTV camera system:-
o Several unsuccessful attempts were made to survey the pipework on the
northern side, however, the drain appears to be blocked or has back fall
downstream. In turn, the line could only be surveyed approximately 1 meter
downstream from the Inspection Opening IO beside the gully;
o Approximately 2 meters downstream from the Inspection Opening of the
partially redundant kitchen pipework on the eastern side of the property.
Groundwater was observed dripping through imperfections on the
underground 100 mm PVC sewer pipe. Although the imperfections are unlikely
to be the sole causation of the discharge from the laundry floor waste, the
blockage and/or the likely back fall in the line further downstream, is likely to
be causing the service to overflow during storm events due to the excess
ground water entering the pipework.
- The concrete path and the ground on the eastern elevation were flood tested.
Approximately 15 minutes after commencement of testing, tracer dye started to fill and
overflow through the floor waste in the laundry. Although during testing no water
ingress was observed permeating through the surrounding walls into the laundry and
downstairs section of the property, seepage is likely to occur inside this low point of
the property during a storm event due to a combination of the following factors:-
o Galvanised roof sheets have been installed around the perimeter of the lower
ground including the laundry which would not be deemed to be waterproofed
or watertight;
o Limited sealing, or lack of, waterproofing of the low section of the surrounding
walls and foundations;
Determination | Case number: 855852 Page 7 of 12
o Low-lying geographical position and natural land slope towards the residence,
directing surface and groundwater rain runoff to the low points;
o Excess ground water has the potential to be trapped behind the subfloor and
lower perimeter walls, subsequently seeping through the building materials
inside the lower section of the property.
- Although the aforementioned items are not a direct cause of the overflowing of the
laundry floor waste, these are likely to be contributing factors during a storm event.
SL concluded that greater volumes of water may potentially infiltrate the sanitary drainage
due the pipework imperfections, putting the drainage under increased pressure and resulting
in the reported discharge from the lowest point, in this case the laundry floor waste.
The storm is the proximate cause of the damage
The proximate cause (that is, the effective, dominant and operative cause) of the water
ingress into the laundry (and the resultant damage) is the storm of 25 November 2021.
However, the reports detailed above demonstrate there may be other factors which have also
played a causal role. And, given the storm of 25 November 2021 was the first time the
property was damaged in this manner, it is logical to propose that some of the faults and
defects listed in the reports above constitute storm damage.
In other words, given the property’s his tory and the magnitude of the storm, such faults and
defects in the plumbing and drainage infrastructure may have been, effectively, caused by the
storm – that is, they did not just suddenly come into existence because of a lack of
maintenance immediately prior to or during the storm.
All causes of the damage need to be further investigated and all storm-related
damage should be repaired
As mentioned, the insurer has accepted the claim for storm damage to carpets, skirting
boards, door architraves and an external shade sail. However, the sudden onset of water
ingress during the storm of 25 November 2021, and the absence of any such problems at the
property previously, indicate the storm has likely caused additional damage to parts of the
property ’s infrastru cture. This includes, amongst other things, drainage systems, piping and
waterproofing structures.
The insurer and the complainant have both engaged experts. The experts have speculated
about the following possible defects and faults that have potentially played a part in enabling
the storm and waste water to ingress into the laundry:-
a large amount of buil der’s waste within a drain (see the MM and HB reports)
the possibility the floor waste system is not connected to the sewerage (see the MM
report)
groundwater dripping through imperfections in an underground 100 mm PVC sewer
pipe (see the SL report)
waterproofing around the low point of the property having been rendered ineffective
(see the SL report)
(as stated in the PL reports) ‘Looks as if Stormwater is connected to floor waste (illegal
to have stormwater connected to sewer). Nothing in Laundry is connected to floor
waste ’ .
However, neither the experts nor the insurer have yet been able to accurately identify
whether, and to what extent, the storm damaged the infrastructure items listed above.
Determination | Case number: 855852 Page 8 of 12
Further, there appears to be a level of speculation in the reports generally (see, for example,
the report of MM compared to the reports of PL).
For instance, the insurer is unable to say whether builder’s waste within a drain that is
blocked came to be in the drain because of, for instance, a lack of maintenance or whether
such waste was effectively washed into the drain by excessive volumes of water during the
storm.
Another example involves the possibility that the floor waste system is not connected to the
sewerage system. The available information does not show if the two systems are, in fact,
disconnected and, if so, how they became disconnected.
Further, it is unclear if defects identified in the underground 100 mm PVC sewer pipe that
were mentioned in the SL report was caused by a lack of maintenance or by the storm itself.
Surely, greater volumes of water during the storm may have potentially infiltrated the sanitary
drainage due the pipework imperfections, putting the drainage under increased pressure and
resulting in the reported discharge from the lowest point, in this case the laundry floor waste.
In regard to the waterproofing around the low point of the property (as described in the SL
report), it is not clear if this was rendered ineffective because of a lack of maintenance or
because of the storm forces.
For the insurer to successfully rely upon a policy exclusion such as a ‘ lack of maintenance ’ it
must be sure, on the balance of probabilities, that defects or faults in the infrastructure of the
property were indeed caused by a lack of maintenance. Given the content of the expert
reports and the degree of speculation expressed in them, I am of the opinion the insurer has
not done so in this matter.
It therefore follows it is fair and reasonable for the insurer to meet the costs of further
exploratory works to locate and identify all causes of the water ingress into the laundry and to
repair any and all additional storm-related damage discovered during those exploratory
works.
2.3 Should the insurer provide coverage for the costs of
meeting building regulations?
Page 43 of the PDS includes the following:-
Meeting building regulations
If a listed event causes loss or damage to your home and you need to meet current
building regulations to repair or rebuild the part of your home that was damaged.
Covered under Buildings Insurance
• the costs to meet current building regulations to repair or rebuild the part of
your home that was damaged.
Conditions
• we must agree to pay the costs before you make any
arrangements.
Commentary in some of the expert reports indicate that some infrastructure elements are not
up to current building standards and regulations. Given the content of the PDS, it follows that
any remedial works to storm-damaged plumbing, waterproofing and drainage infrastructure
that necessarily involves works specifically aimed at meeting current building regulations
must also ultimately be borne by the insurer.
Determination | Case number: 855852 Page 9 of 12
2.4 Should the insurer pay non-financial loss compensation?
Under the AFCA rules, non-financial loss compensation (capped at $5,400) may be awarded
in circumstances where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the
part of the insurer.
I accept the complainant and his family have suffered a significant degree of physical
inconvenience and interference with their expectation of enjoyment and peace of mind. This
matter has been ongoing for a significant period and has been stressful for the complainant.
However, I am cognisant of the complainant’s wishes as expressed in his appl ication to
AFCA:-
I have no desire for compensation as I believe this is not appropriate. I have 6 policies
with the NRMA and have overall had positive experiences with them. However on this
occasion I seem to be hand balled for want of a better word from the NRMA to HBI to
Hunter Water to Local Council and back to the NRMA. A complaint has been lodged
and to be fair we just want the problem identified and the issue fixed.
The lack of communication and accountability on all parties is disappointing however I
believe in a fair go and thus my reason for the complaint with AFCA today. I don't wish
for anyone to be fired or sacked - we just want our home repaired so our kids can play
downstairs without the sewerage entering the laundry and exposing them to any
potential biological contaminants.
I am therefore of the opinion that non-financial loss compensation is not appropriate in these
circumstances.
2.5 The claim should be settled in this way.
Within 21 days of receiving notice the complainant accepts this determination, and subject to
the complainant providing reasonable access to the property, the insurer must engage an
engineer, builder, specialist plumber and any other suitably qualified expert to draw up a
scope of works (SOW). The SOW should be compiled by the engineer. In compiling this
SOW, the following should be factored in:-
All further investigations required to locate and identify all causes of the water ingress
into the laundry due to the following factors:-
o t he builder’s waste within the drain , and whether the waste flowed into the
drain because of increased water volumes during the storm
o whether the floor waste system is, in fact, disconnected from the sewerage
system and, if so, was it likely to have become disconnected because of
increased water volumes during the storm
o whether defects identified in the underground 100 mm PVC sewer pipe that
were mentioned in the SL report were caused by storm-related factors
Determination | Case number: 855852 Page 10 of 12
o whether storm forces in any way disturbed or damaged waterproofing
structures and seals around the low point of the property, as described in the
SL report
o whether increased volumes of storm-water caused ground water to become
trapped behind the subfloor and lower perimeter walls, subsequently seeping
through the building materials inside the lower section of the property
All repairs required to any and all storm-related damage discovered during the
aforementioned exploratory works, as well as the other damage accepted by the
insurer
The costs associated with any remedial works to storm-damaged plumbing,
waterproofing and drainage infrastructure that necessarily involves works specifically
aimed at meeting current building regulations.
Within 14 days of receipt of the SOW, the insurer is to obtain at least one actionable quotation
based upon the scope of works, either by way of a tender process or otherwise.
Within seven days of receipt of the SOW and associated quotation(s), the insurer must elect
to either:-
- Commence the necessary repairs and associated works, or
- Offer a cash settlement to the complainant comprising a sum equal to the total of the
preferred actionable quotation, plus a 20% contingency on top of this to factor in the
risks of the works passing to the complainant and the likely possibility that further
works may be required.
Finally, the PL report dated 28 December 2021 was obtained by the complainant at a cost of
$900. In my opinion, amid all the machinations of this matter, this was a reasonable course of
action of the part of the complainant. Thus, the insurer should also provide coverage for the
cost of this report.
Determination | Case number: 855852 Page 11 of 12
2.6 Why is the outcome fair?
Determine if the outcome is fair
The outcome is fair in all the circumstances because:-
The complainant has established a valid claim regarding storm damage
The insurer is not required to provide coverage for defects and damage caused by a
lack of maintenance
The insurer has not discharged its responsibilities under the terms and conditions of
the policy, in that it has not yet properly identified whether various defects in plumbing,
drainage and waterproofing infrastructure which may have contributed to the damage,
were caused by a lack of maintenance or by reason of the storm of 25 November
2021
The costs associated with further exploratory works to locate and identify the cause of
the damage must be met by the insurer
The costs of repairing all storm-related damage must be met by the insurer
The policy provides coverage for the costs associated with meeting building
regulations
The complainant’s procu rement of the PL report was a reasonable course of action in
the circumstances
The payment of non-financial loss by the insurer is not appropriate in this matter.
Determination | Case number: 855852 Page 12 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.