Home / Auto & General / Determination 855752

Determination 855752

Claim denial for kitchen damage from slow escape of liquid from a pipe

FirmAuto & General
Decided2022-08-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under a home insurance policy for kitchen damage from a leaking hot water pipe in the roof cavity, which the insurer denied. AFCA found the claim valid and ordered the insurer to pay 50% of the average of two actionable repair quotes plus 10% contingency.

Slow escape of liquid the insured could not reasonably be aware of is covered, and the insurer failed to establish gradual deterioration or defects exclusions, but damage occurring after the leak should have been evident is apportioned at 50%.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 855752 Financial firm Auto & General Services Pty Ltd Determination | Case number: 855752 Page 1 of 6 Case number: 855752 11 August 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under his home and contents insurance policy. This is for damage to his kitchen following an escape of liquid event. The insurer denied the claim on the basis:  the damage is progressive over a period of 12 months  the complainant has not provided a plumber’s report to confirm the cause of the leak  the policy excludes defects, structural faults/designs and gradual deterioration. The complainant disagrees and seeks indemnity under the policy. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. This is because:  the complainant has established a valid claim  on balance, the pipe has caused some of the damage which the complainant could not have been reasonably been aware of  the insurer has not established any exclusions apply  it is fair the insurer pays 50% of the claim. 1.3 Determination This determination is in favour of the complainant. The insurer is required to settle the claim in the manner set out in section 2.1. Determination | Case number: 855752 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? The policy provides cover for insured events subjects to exclusions The complainant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. If the complainant can establish a valid claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The complainant ’ s policy provides cover for loss or damage to his property caused by the insured events listed in the policy, subject to the conditions and exclusions. Escape of liquid is an insured event. Relevantly the policy provides cover for damage from liquid that has escaped slowly over time that an insured could not be reasonably aware of from a number of items, including pipes. The complainant says a leaking pipe has caused the resultant damage to the kitchen, flooring and tiles. On balance, leaking pipe has caused damage The insurer says the complainant did not provide a plumber’s report to show the cause of the leak and the complainant should have allowed the insurer to inspect the damaged pipe prior to arranging repairs. I do not accept this argument. I note in its acknowledgement email to the claim lodgement, the insurer asks the complainant to attend to the source of the leak as quickly as possible, however not to commence any structural repairs. Further, t he complainant provided a plumber’s report (AP) which states Appeared pipe was worn through time rubbing against brick work. Used form passing to cover pipe where it penetrates through brick work. The complainant provided two photographs. These show a section of the metal pipe replaced and a blue foam around the replaced section of the pipe protecting it from contacting the house bricks from either side. I note the insurer has not provided any evidence to refute APs’ findings. I accept there is a link between the leaking pipe and the resultant damage. Firstly, SH noted obvious water trails from the ceiling down the walls. I accept this is evident in the supplied photographs. Secondly, I accept the resultant damage is localised to one area of the kitchen. The insurer does not dispute this damage is right beneath the subject leaking pipe. Whilst SH notes the Determination | Case number: 855752 Page 3 of 6 resultant damage has been progressive in nature, he was unable to conclude the cause of the damage. The exchanged information shows the damaged pipe is a burst hot water pipe which is a high-pressure pipe. There is no information to show the duration, nature or the volume of the leak. The complainant described the nature of leak as spraying, I accept this indicates the leak is slow and continuous in nature. I accept the leak has been occurring for a while given the water had to travel through the roof cavity to manifest itself in the kitchen ceiling and walls. Further, the resultant damage has been occurring over a period of time and has been progressive in nature given the disintegrated nature of the walls, the pealed plaster and the presence of dry rot to the window sub frame. I note, SH says the wood rot and the damage underneath the dishwasher are not related to the event. However, SH has not provided any evidence to substantiate this conclusion. I accept there has been a time gap between when the water has initially manifested itself on the walls (such as staining) until its progression to a more serious nature of damage (e.g. mould). Complainant could not have been reasonably aware of some of the damage In noting the above, I accept some of the damage would have occurred whilst unknown to the complainant given the location of the pipe. The exchanged evidence shows the pipe is located in the roof cavity space underneath the roof tiles which is a concealed place. I accept when the pipe started leaking, there is no evidence the complainant was aware of the leak. On balance, the pipe would have caused damage before the complainant should have been aware of the existence of the leak. However, I accept the damage would have been eventually visible to the complainant before rot started to manifest on the window frame and the wood to erode to its current state. This is because the water was travelling from the ceiling down the walls and those water marks would have made it visible. It is fair the insurer pays 50% of the claim In denying the claim, the insurer seeks to reply on the following exclusions:  gradual deterioration  defects, structural faults or design faults. The policy clearly provides cover for damage as a result of liquid which has escaped slowly overtime which the complainant could not have been reasonably aware of. I accept this is the case here as outlined above. Further, I am not satisfied the insurer is entitled to rely on the gradual deterioration exclusion. I do not accept the damage has occurred during the normal course of events. It is clear the damage was caused by the leaking pipe. However, I do not accept all of the damage would have occurred before the complainant could have reasonably been aware of a leaking pipe. For instance, I do not accept mould would have occurred or the timber structure would have eroded so severely before it was evident there was a leak. Determination | Case number: 855752 Page 4 of 6 Whilst the insurer argues the cause of the tiles damage is the faulty adhesive, it has not provided any expert evidence to substantiate this assertion. I am not satisfied the insurer has shown it is entitled to rely on the defects exclusion either. I accept the complainant has established a valid claim for damage from a slowly escaped liquid that he could not have been reasonably been aware of. However, I do not accept the insurer is liable for the full extent of the claimed damage. This is because, for reasons explained above, I accept the leak would have been evident at a certain point in time. Following which, the insurer is not liable for that damage as it cannot be said to have been caused by a slow leak the complainant could not reasonably be aware of. Therefore, it is fair the insurer should only be liable for a proportion of the damage claimed that could be said to have been caused before the leak was evident. I consider it fair the insurer pays 50% of the damage claimed. This is because it is likely a fair degree of the damage would have occurred before the complainant could have reasonably been aware of the leak. At the same time, I accept some of the more serious damage (mould, rot) would have occurred after the complainant should have reasonably been aware of the leak. In the absence of more specific information as to when the leak should have been evident, a 50/50 proportion is fair in all the circumstances. The insurer is required to obtain two actionable quotes for the damage as a result of the leaking pipe and pay the complainant 50% of the average of those two quotes plus 10% for contingency. This contingency is based on the transfer of risk of any unforeseen damage and additional costs being passed to the complainant. To clarify, the quote is actionable if the builder is willing to undertake the repairs if engaged by the complainant for the quoted amount. 2.2 Why is the outcome fair? The complainant has established a valid claim with the terms and conditions of the polic y. I accept the complainant could have mitigated the extent of the damage. It is fair each party contributes towards the repairs. Determination | Case number: 855752 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 855752 Page 6 of 6 3.2 Policy Wording Clause Extract Escape of Liquid Loss or damage at the insured address caused by the sudden escape of liquid. You are also covered for damage from liquid that has escaped slowly over time that you couldn’t be reasonably aware of Defects, structural faults, or design faults You are not covered for loss, damage, or any legal liability you incur caused by a defect, a structural fault, or design fault that you knew about, or should reasonably have known about, and was either:  caused by you not taking reasonable care of the home or contents  not fixed by you within a reasonable time before the loss or damage occurred. Gradual deterioration You are not covered for loss or damage caused by rust, c orrosion, rot, mould, rising damp, mildew, wear, tear, fading, or other gradual det erioration.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.