Dispute over cash settlement offer for water damage resultant damage and method of repair
Text of the determination
Determination
Case number 854986
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 854986 Page 1 of 7
Case number: 854986 13 October 2022
1 Determination overview
1.1 Complaint
On 9 November 2020, a claim was lodged for water damage to the insured building covered
under a home building policy (policy) held with the financial firm (insurer).
The insurer initially declined the claim. However, with the assistance of AFCA under
complaint 808758, the parties came to an agreement. The insurer accepted to cover the
resultant damage from the leaking bathroom shower recess subject to the complainant
allowing the insurer to arrange a fresh assessment.
This complainant arises from the complainant’s dissatisfaction wi th the insurer ’s cash
settlement offer after having loss adjusters ‘S’ and building consultant ‘C’ complete the fresh
assessment.
1.2 Issues and key findings
Is the insurer’s request to complete another assessment reasonable ?
Yes. Although, the complainant i s satisfied with the report from ‘C’, it is clear this report lacks
clarity regarding the damaged iron sheeting and whether the sheeting forms part of the
bathrooms concrete substrate. Also, C recommends a further assessment by an engineer or
a second opinion from a building consultant on the fair method of repair.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer ’s manage ment of the claim has been poor and has resulted in undue delays
as well as the complainant experiencing stress, anxiety and physical inconvenience. The
insurer is to pay the complainant $2,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances as it acknowledges the lack of persuasive
information relating to the fair method of repair to be accepted under the claim. The
determination also accepts the insurer will be liable to refurbish the bathroom, if the method to
repair the resultant damage included having to damage the concrete substrate. Finally, it is
fair in all the circumstances to require the insurer to pay the complainant non-financial loss
compensation in the circumstances.
1.3 Determination
This determination is in favour of the complainant.
The insurer is to be allowed to arrange a further assessment under the claim. The insurer is
to settle the on the basis of the fresh assessment and the mechanism of settlement provided
in section 2.1 of this determination.
The insurer is to pay the complainant $2,000 in non-financial loss compensation with 14 days
of the complainant’s acceptance of this determination.
Determination | Case number: 854986 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer ’s request to complete another assessment
reasonable?
Yes. It is fair in all the circumstances to permit the insurer to arrange one further assessment
of the damage to the insured building. This is to achieve clarity on the available methods of
repair and which will assist in clarifying the parties’ oblig ations and entitlements under the
claim.
No dispute the insurer has accepted to cover resultant damage
The policy covers the insured building against loss or damage caused by one or more of the
listed insured events specified in the policy including ‘ Bursting, leaking, discharging or
overflowing ’ of shower bases.
There is no dispute the insured building has suffered damage from water which has escaped
or leaked form the shower recess in the bathroom. The insurer has accepted to cover the
complainant for the resultant water damage but not the cost to repair the item from which the
water has escaped/leaked.
The insurer, based on reports from S and C, has offered to cash the complainant what the
insurer has assessed to be the cost to repair the resultant damage. This being $10,170.60
less the policy excess of $2,500.00, totalling $7,670.60. The complainant has declined this
offer and says the claim should be based on all the works quoted by C, which total over
$43,000.00.
The available information establishes the extent of resultant damage
I have carefully reviewed the information provided by the parties relating to the extent of
resultant damage to the insured building. I accept the parties differ in their positions on:
the extent of the resultant water damage
the method of repair; and
which of the parties will be liable for the cost to refurbish the whole bathroom, which may
be necessary to bring it in line with the current building Standards and Codes.
The available information establishes there is water damage to the bedroom and bathroom
below the upper level bathroom. The information also establishes that the iron sheets that sit
beneath the upper level bathroom floor’s concrete substrate are also water damaged.
Therefore, I accept the cost to repair/replace these damaged iron sheets is to form part of the
resultant damage to be accepted under the claim.
Consultants’ information not clear on fair method of repair
Having considered the available information from the consultants appointed to the claim, I am
not satisfied it provides clear information relating to:
whet her the quote from C includes the cost to repair/replace these iron sheets?
whet her these iron sheets form part of the upper level bat hroom’s concrete substrate?
whet her the only option to repair/replace the said iron sheets is by way of damaging the concrete
substrate?
I acknowledge a significant part of C’s quote relates to refurbishment of the upper level
bathroom. Further, that this relates to C’s view that th e concrete substrate would need to be
Determination | Case number: 854986 Page 3 of 7
damaged to access the iron sheets. Given, the age of the bathroom (constructed in around
1938), this damage would require stripping of the whole bathroom to repair it to the current
building Standards and Codes.
I accept this was C’s initial view and which is confirmed by ‘IS’ and ‘AI’, two of the
complainant’s representatives present at the time of C’s assessment. IS and AI also advise
that C made no mention that this refurbishment of the bathroom is maintenance related or
due a failure of the waterproofing as indicated by S.
I am not persuaded by S’s interpretation of C’s report and quote. I do not accept C
recommended a cash settlement based on concerns relating to wear and tear, a failure of the
waterproofing or ma intenance related issues. Rather, C’s recommendation relates to the fact
it would be difficult to source the required materials and fittings to restore the bathroom to its
pre-event condition.
As the property was constructed in around 1938 with no records of subsequent works in the
bathroom, I accept:
there is no persuasive information to support S’s comments that the tiles used in the
bathroom were not suitable for wet areas. It is clear the tiles have remained water tight and
capable for a very long period of time
there is not waterproofing membrane system installed, as it was not a requirement at the
time of construction. Therefore, S opinion that the damage is the result of a failure of the
waterproofing, in my view is inaccurate.
I note in a conversation with the insurer C has recommended that an engineer and/or a
second building consultant be appointed to provide opinion on the method of repair. This
includes whether the concrete substrate would require to be damaged to rectify the damaged
iron sheets.
For these reasons, although I accept the iron sheets are to be covered, I am not satisfied a
clear method of repair has been established. This is significant as it impacts on whether or
not, and if so, which party may be liable for the cost to refurbish the bathroom to meet the
required building Standard and Codes.
Insurer is entitled to arrange one further assessment under the claim
I acknowledge the complaint’s position that the insurer failed to arrange for a thorough
assessment of the damage and associated method of repair in the first instance. I accept this
further delayed resolution of the claim, which will be addressed in section 2.2.
However, the fact remains, the available information does not allow me to come to an
informed and fair decision as to what a fair settlement is under the claim. I am of the opinion,
it would be fair in all the circumstances to place liability for the cost to refurbish the bathroom
with either of the parties, given the lack of clarity surrounding method of repair options.
It is not entirely out of the question that the bathroom may not need to be completely
refurbished and the resultant damage can be repaired without further damage to the area.
Given this, I am satisfied it is reasonable to require the parties to cooperate and allow for a
further final assessment by a suitably qualified consultant to provide an opinion on the options
to repair the resultant damage.
I determine the complainant is to allow the insurer to arrange this final assessment so to
establish its liability under the claim.
Determination | Case number: 854986 Page 4 of 7
Insurer is to settle the claim having regard to below options of settlement
The available information shows a further assessment by the insurer could reasonably result
in one of the following scenarios:
there is no other alternative option but for the concrete substrate to be damaged to access
and repair/replace the damaged iron sheets; or
there is a more cost-effective option to complete the repair/replacement of the damaged
roof sheets that does not require damaging the concrete substrate and therefore a need to
refurbish the bathroom.
In the interest of clarity, I determine if the assessment determines there is no other option but
to damage the concrete substrate to repair the resultant damage. This will mean the insurer is
liable for and it is to include in its settlement all costs associated with bringing the bathroom
up to current building standards and Codes.
However, if this further assessment establishes that there is an option that allows the insurer
to rely on an actionable quote/scope of works that repairs all resultant damage without
damaging the bathroom, the insurer is entitled to rely on this option to settle the claim. For
clarity, if the need to refurbish the bathroom to meet current building Standards and Codes
arises from the repairs to leaking shower recess alone (this being excluded under the policy),
the insurer will not be liable for these additional costs.
Simply put, I determine if a requirement to refurbish the bathroom arises from the works
needed to repair all resultant damage, this expense falls to the insurer. However, if the need
to refurbish the bathroom arises from works required to repair the leaking shower recess
alone, the insurer is not liable for these costs.
2.2 Is the insurer required to pay compensation?
Yes, the insurer is to pay the complainant $2,000 in non-financial loss compensation in line
with the AFCA Rules.
Insurer to pay the complainant $2,000 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
The available information shows poor management of the claim by the insurer. This includes
an initial period of no activity from March 2020 to June 2020 after lodgement of the claim,
where the insurer misplaced the claim. Another example of unreasonable delay relates to the
insurer’s failure to arrange the appropriate assessment of the resultant damage after AFCA’s
involvement.
There have occurred further delays arising from the insurer’s initial decision to completely
deny complete liability under the claim. This decision being based on weak and/or
unpersuasive information from consultants appointed to the claim.
I am satisfied the insurer’s management of the claim has resulted in undue delays as well as
the complainant experiencing stress, anxiety and physical inconvenience.
Accordingly, I determine the insurer is to pay the complainant $2,000 in non-financial loss
compensation within 14 days if his acceptance of this determination.
Determination | Case number: 854986 Page 5 of 7
2.3 Why is the outcome fair?
The outcome is fair in all the circumstances as it acknowledges the lack of persuasive
information relating to the fair method of repairs to be accepted under the claim relating to the
resultant damage. The determination also recognises and confirms that the insurer is liable to
cover replacement of the bathroom, if the further assessment shows it is necessary to
damage the concrete substrate to access and/or repair the water damaged iron sheeting.
Finally, it is fair in all the circumstances to require the insurer to pay the complainant non-
financial loss in the circumstances.
Determination | Case number: 854986 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy provisions
You are insured against loss or damage caused directly by the following insured
events:
… (h) Bursting, leaking, discharging or overflowing of: fixed basins, shower bases,
or other fixed apparatus, fixed tanks or fixed pipes used to hold or carry liquid of
any kind. A bath, basin, sauna spa, shower base or shower wall, sink, toilet or
tiled floor that has drainage holes
...
Additional exclusions applying to this Policy
Determination | Case number: 854986 Page 7 of 7
These Additional exclusions apply to cover for your home, contents, legal liability,
additional benefits and valuables or malicious damage by tenants, tenant’s
visitors or family (if you have chosen these options).
This policy does not cover:
(b) loss or damage resulting from or caused by:
any gradual process,
wear, tear, rust, corrosion, depreciation or gradual deterioration
...
5. Extra costs of reinstatement
If this Policy insures your home, and it is damaged as a result of an insured event
and we agree to pay a claim, we pay the extra costs necessary to meet the
requirements of any statutory authority in connection with rebuilding or repairing
your home at the site .
3.3 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.