Determination 854986

Dispute over cash settlement offer for water damage resultant damage and method of repair

FirmQBE
Decided2022-11-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed$43,000
SourceAFCA PDF

Summary

The complainant disputed the insurer's cash settlement offer for water damage following a fresh assessment by loss adjusters and a building consultant. AFCA allowed the insurer one further assessment to settle the claim, and ordered $2,000 non-financial loss compensation for poor claim management and delay.

Under the policy's leaking shower base cover and the AFCA Rules, the insurer may arrange a further assessment to clarify method of repair, and non-financial loss is payable given unusual inconvenience and delay caused by poor claim management.

Issues

Subjects and remedies

home or building damagepay non financial lossreassess claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 854986 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 854986 Page 1 of 7 Case number: 854986 13 October 2022 1 Determination overview 1.1 Complaint On 9 November 2020, a claim was lodged for water damage to the insured building covered under a home building policy (policy) held with the financial firm (insurer). The insurer initially declined the claim. However, with the assistance of AFCA under complaint 808758, the parties came to an agreement. The insurer accepted to cover the resultant damage from the leaking bathroom shower recess subject to the complainant allowing the insurer to arrange a fresh assessment. This complainant arises from the complainant’s dissatisfaction wi th the insurer ’s cash settlement offer after having loss adjusters ‘S’ and building consultant ‘C’ complete the fresh assessment. 1.2 Issues and key findings Is the insurer’s request to complete another assessment reasonable ? Yes. Although, the complainant i s satisfied with the report from ‘C’, it is clear this report lacks clarity regarding the damaged iron sheeting and whether the sheeting forms part of the bathrooms concrete substrate. Also, C recommends a further assessment by an engineer or a second opinion from a building consultant on the fair method of repair. Is the complainant entitled to non-financial loss compensation? Yes. The insurer ’s manage ment of the claim has been poor and has resulted in undue delays as well as the complainant experiencing stress, anxiety and physical inconvenience. The insurer is to pay the complainant $2,000 in non-financial loss compensation. Why is the outcome fair? The outcome is fair in all the circumstances as it acknowledges the lack of persuasive information relating to the fair method of repair to be accepted under the claim. The determination also accepts the insurer will be liable to refurbish the bathroom, if the method to repair the resultant damage included having to damage the concrete substrate. Finally, it is fair in all the circumstances to require the insurer to pay the complainant non-financial loss compensation in the circumstances. 1.3 Determination This determination is in favour of the complainant. The insurer is to be allowed to arrange a further assessment under the claim. The insurer is to settle the on the basis of the fresh assessment and the mechanism of settlement provided in section 2.1 of this determination. The insurer is to pay the complainant $2,000 in non-financial loss compensation with 14 days of the complainant’s acceptance of this determination. Determination | Case number: 854986 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer ’s request to complete another assessment reasonable? Yes. It is fair in all the circumstances to permit the insurer to arrange one further assessment of the damage to the insured building. This is to achieve clarity on the available methods of repair and which will assist in clarifying the parties’ oblig ations and entitlements under the claim. No dispute the insurer has accepted to cover resultant damage The policy covers the insured building against loss or damage caused by one or more of the listed insured events specified in the policy including ‘ Bursting, leaking, discharging or overflowing ’ of shower bases. There is no dispute the insured building has suffered damage from water which has escaped or leaked form the shower recess in the bathroom. The insurer has accepted to cover the complainant for the resultant water damage but not the cost to repair the item from which the water has escaped/leaked. The insurer, based on reports from S and C, has offered to cash the complainant what the insurer has assessed to be the cost to repair the resultant damage. This being $10,170.60 less the policy excess of $2,500.00, totalling $7,670.60. The complainant has declined this offer and says the claim should be based on all the works quoted by C, which total over $43,000.00. The available information establishes the extent of resultant damage I have carefully reviewed the information provided by the parties relating to the extent of resultant damage to the insured building. I accept the parties differ in their positions on:  the extent of the resultant water damage  the method of repair; and  which of the parties will be liable for the cost to refurbish the whole bathroom, which may be necessary to bring it in line with the current building Standards and Codes. The available information establishes there is water damage to the bedroom and bathroom below the upper level bathroom. The information also establishes that the iron sheets that sit beneath the upper level bathroom floor’s concrete substrate are also water damaged. Therefore, I accept the cost to repair/replace these damaged iron sheets is to form part of the resultant damage to be accepted under the claim. Consultants’ information not clear on fair method of repair Having considered the available information from the consultants appointed to the claim, I am not satisfied it provides clear information relating to:  whet her the quote from C includes the cost to repair/replace these iron sheets?  whet her these iron sheets form part of the upper level bat hroom’s concrete substrate?  whet her the only option to repair/replace the said iron sheets is by way of damaging the concrete substrate? I acknowledge a significant part of C’s quote relates to refurbishment of the upper level bathroom. Further, that this relates to C’s view that th e concrete substrate would need to be Determination | Case number: 854986 Page 3 of 7 damaged to access the iron sheets. Given, the age of the bathroom (constructed in around 1938), this damage would require stripping of the whole bathroom to repair it to the current building Standards and Codes. I accept this was C’s initial view and which is confirmed by ‘IS’ and ‘AI’, two of the complainant’s representatives present at the time of C’s assessment. IS and AI also advise that C made no mention that this refurbishment of the bathroom is maintenance related or due a failure of the waterproofing as indicated by S. I am not persuaded by S’s interpretation of C’s report and quote. I do not accept C recommended a cash settlement based on concerns relating to wear and tear, a failure of the waterproofing or ma intenance related issues. Rather, C’s recommendation relates to the fact it would be difficult to source the required materials and fittings to restore the bathroom to its pre-event condition. As the property was constructed in around 1938 with no records of subsequent works in the bathroom, I accept:  there is no persuasive information to support S’s comments that the tiles used in the bathroom were not suitable for wet areas. It is clear the tiles have remained water tight and capable for a very long period of time  there is not waterproofing membrane system installed, as it was not a requirement at the time of construction. Therefore, S opinion that the damage is the result of a failure of the waterproofing, in my view is inaccurate. I note in a conversation with the insurer C has recommended that an engineer and/or a second building consultant be appointed to provide opinion on the method of repair. This includes whether the concrete substrate would require to be damaged to rectify the damaged iron sheets. For these reasons, although I accept the iron sheets are to be covered, I am not satisfied a clear method of repair has been established. This is significant as it impacts on whether or not, and if so, which party may be liable for the cost to refurbish the bathroom to meet the required building Standard and Codes. Insurer is entitled to arrange one further assessment under the claim I acknowledge the complaint’s position that the insurer failed to arrange for a thorough assessment of the damage and associated method of repair in the first instance. I accept this further delayed resolution of the claim, which will be addressed in section 2.2. However, the fact remains, the available information does not allow me to come to an informed and fair decision as to what a fair settlement is under the claim. I am of the opinion, it would be fair in all the circumstances to place liability for the cost to refurbish the bathroom with either of the parties, given the lack of clarity surrounding method of repair options. It is not entirely out of the question that the bathroom may not need to be completely refurbished and the resultant damage can be repaired without further damage to the area. Given this, I am satisfied it is reasonable to require the parties to cooperate and allow for a further final assessment by a suitably qualified consultant to provide an opinion on the options to repair the resultant damage. I determine the complainant is to allow the insurer to arrange this final assessment so to establish its liability under the claim. Determination | Case number: 854986 Page 4 of 7 Insurer is to settle the claim having regard to below options of settlement The available information shows a further assessment by the insurer could reasonably result in one of the following scenarios:  there is no other alternative option but for the concrete substrate to be damaged to access and repair/replace the damaged iron sheets; or  there is a more cost-effective option to complete the repair/replacement of the damaged roof sheets that does not require damaging the concrete substrate and therefore a need to refurbish the bathroom. In the interest of clarity, I determine if the assessment determines there is no other option but to damage the concrete substrate to repair the resultant damage. This will mean the insurer is liable for and it is to include in its settlement all costs associated with bringing the bathroom up to current building standards and Codes. However, if this further assessment establishes that there is an option that allows the insurer to rely on an actionable quote/scope of works that repairs all resultant damage without damaging the bathroom, the insurer is entitled to rely on this option to settle the claim. For clarity, if the need to refurbish the bathroom to meet current building Standards and Codes arises from the repairs to leaking shower recess alone (this being excluded under the policy), the insurer will not be liable for these additional costs. Simply put, I determine if a requirement to refurbish the bathroom arises from the works needed to repair all resultant damage, this expense falls to the insurer. However, if the need to refurbish the bathroom arises from works required to repair the leaking shower recess alone, the insurer is not liable for these costs. 2.2 Is the insurer required to pay compensation? Yes, the insurer is to pay the complainant $2,000 in non-financial loss compensation in line with the AFCA Rules. Insurer to pay the complainant $2,000 in non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The available information shows poor management of the claim by the insurer. This includes an initial period of no activity from March 2020 to June 2020 after lodgement of the claim, where the insurer misplaced the claim. Another example of unreasonable delay relates to the insurer’s failure to arrange the appropriate assessment of the resultant damage after AFCA’s involvement. There have occurred further delays arising from the insurer’s initial decision to completely deny complete liability under the claim. This decision being based on weak and/or unpersuasive information from consultants appointed to the claim. I am satisfied the insurer’s management of the claim has resulted in undue delays as well as the complainant experiencing stress, anxiety and physical inconvenience. Accordingly, I determine the insurer is to pay the complainant $2,000 in non-financial loss compensation within 14 days if his acceptance of this determination. Determination | Case number: 854986 Page 5 of 7 2.3 Why is the outcome fair? The outcome is fair in all the circumstances as it acknowledges the lack of persuasive information relating to the fair method of repairs to be accepted under the claim relating to the resultant damage. The determination also recognises and confirms that the insurer is liable to cover replacement of the bathroom, if the further assessment shows it is necessary to damage the concrete substrate to access and/or repair the water damaged iron sheeting. Finally, it is fair in all the circumstances to require the insurer to pay the complainant non- financial loss in the circumstances. Determination | Case number: 854986 Page 6 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions You are insured against loss or damage caused directly by the following insured events: … (h) Bursting, leaking, discharging or overflowing of: fixed basins, shower bases, or other fixed apparatus, fixed tanks or fixed pipes used to hold or carry liquid of any kind. A bath, basin, sauna spa, shower base or shower wall, sink, toilet or tiled floor that has drainage holes ... Additional exclusions applying to this Policy Determination | Case number: 854986 Page 7 of 7 These Additional exclusions apply to cover for your home, contents, legal liability, additional benefits and valuables or malicious damage by tenants, tenant’s visitors or family (if you have chosen these options). This policy does not cover: (b) loss or damage resulting from or caused by:  any gradual process,  wear, tear, rust, corrosion, depreciation or gradual deterioration ... 5. Extra costs of reinstatement If this Policy insures your home, and it is damaged as a result of an insured event and we agree to pay a claim, we pay the extra costs necessary to meet the requirements of any statutory authority in connection with rebuilding or repairing your home at the site . 3.3 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.