Text of the determination
Determination
Case number 854230
Financial firm Insurance Australia Limited
Determination | Case number: 854230 Page 1 of 11
Case number: 854230 7 November 2022
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (the insurer). The
complainant lodged a claim on the policy after the insured property’s lower level was flooded
on 10 May 2021 due to a sewerage pipe blockage.
The insurer accepted the claim but determined that the property ’s lower level had pre-existing
issues, including in relation to moisture, drainage and mould. Eventually, the insurer offered
to cash settle the complainant’s claim , including mould remediation costs, for $27,286.64,
‘less any appl icable deductions’ (later increased by 20% to $32,743.68 less deductions).
The complainant says the building work will cost around $27,000 and mould remediation
costs will exceed $34,000. She says mould has spread upstairs due to poor make safe work
by the insurer’s builder . The complainant also wants the insurer to pay for a deep clean of the
property, cover utility and other accounts and pay compensation for the stress it has caused.
The complainant is represented by family member, NC. The complainant and NC will be
referred to in this determination as ‘the complainant’, unless context requires otherwise.
1.2 Issues and key findings
Is the insurer required to pay more for the damage?
Yes. The repair scope of works (SOW) by the complainant ’s builder is generally preferred as
it is detailed and itemised. Further, the proximate cause of the spread of mould upstairs was
the way the insurer’s builder attended to make safe works. Given the property’s pre-existing
issues, the insurer is to cash settle, based on updated quotes plus a 20% uplift.
Is the insurer required to take any other steps?
Yes. The property requires deep cleaning before the complainant and her child can live in it
again. The insurer is to obtain a cleaning quote then pay the complainant that amount plus a
20% uplift. It is also to cover the cost of mould testing, filtration, pest inspection and electricity
the complainant reasonably incurred. Any contents claim is to be assessed under the policy.
The insurer is to stand by its recent offer for future temporary accommodation costs.
Is non-financial loss compensation payable?
Yes. The insurer has unreasonably caused the complainant significant stress and
inconvenience over an extended period. It is to pay her $5,400 in compensation.
Why is the outcome fair?
The complainant has sustained a loss covered by the policy. The mould issues have been
worsened by the insurer’s inadequate make safe works. Accordingly, it is fair that the insurer
covers the reasonable costs to reinstate the property to its condition prior to the claim event. It
is fair that the insurer pays $5,400 in compensation for the stress it has caused.
Determination | Case number: 854230 Page 2 of 11
1.3 Determination
This determination is in favour of the complainant.
If the complainant provides written notice of acceptance of the determination (notice), the
following steps are to be taken:
the complainant is to obtain from her builder, CR, an updated quote reflecting current
market costs, based on its SOW dated 12 July 2021 but excluding all items relating to
termite damage and waterproofing
the complainant is to obtain from her mould specialist, HR, an updated quote reflecting
current market costs, based on the works set out in its quote dated 17 September 2021 but
allowing for an inventory of all affected contents on both levels of the house
within 14 days of the complainant providing to the insurer the updated quotes of CR and
HR, the insurer is to pay her the total of the two quotes plus 20%, less the $300 excess (if
it is yet to be applied)
within 21 days of receiving the notice, the insurer is to obtain a quote for an ‘end of lease’
style deep clean of the insured property
within 14 days of receiving the cleaning quote, the insurer is to pay the complainant the
quote amount plus 20%
within 14 days of receiving invoices and proof of payment, pay the complainant a further
$28,768.52 for expenses incurred
the complainant may submit a claim for affected contents on both levels of the house, and
the insurer must make consider and determine that claim within two months of receiving
the claim with all necessary supporting material
within 14 days of receiving the notice, the insurer is to pay the complainant the $14,000
cash settlement it has offered for future temporary accommodation costs. It is also to pay
her current temporary accommodation costs until the cash settlement is paid
within 14 days of receiving the notice, pay the complainant $5,400 in non-financial loss
compensation.
Determination | Case number: 854230 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer required to pay more for the damage?
Yes. The repair SOW by the complainant’s builder is generally preferred as it is detailed and
itemised. Further, the proximate cause of the spread of mould upstairs was the way the
insurer’s builder attended to make safe works. Given the property’s pre -existing issues, the
insurer is to cash settle, based on updated quotes plus a 20% uplift.
Complainant has established a valid claim under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not) that she suffered a loss caused by a risk covered by the policy. This is known as a valid,
or prima facie, claim.
The complainant holds a home and contents policy issued by the insurer. Subject to its terms
and conditions, the policy covers loss and damage caused by the insured events listed in the
product disclosure statement (PDS). One of those insured events is ‘Water and oil leaks’.
In addition, the complainant elected to add optional accidental damage cover to the policy.
This means she has cover for accidental loss or damage to the insured property.
The complainant lodged a claim on the policy after the lower level of her home was flooded
with sewage on 10 May 2021 due to a sewerage pipe blockage. The insurer agreed to
indemnify the complainant for the resultant damage.
Accordingly, I am satisfied that the complainant has established a valid claim.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proving on the
balance of probabilities the application of the exclusion or condition.
Insurer says policy only covers limited amount of building damage
On 19 May 2021, the insurer obtained an assessment report from its builder, UB. After
inspecting the insured property on 14 May 2021, UB reported:
the sewage leak had caused damage to the lower wall linings, ensuite door and door
frame and the lower level bedroom’s floating floor and substrate
the continuing presence of a strong smell after initial clean up by the water service provider
gave rise to potential health hazard concerns, so UB removed the lower wall linings and
flooring and sanitised the rooms
significant white ant damage and unrelated mould was present in the surrounding walls
and timber wall frames
there were issues relating to external groundwater ingress and the ensuite’s waterproofing
the estimated cost to repair the resultant damage was $5,098 and the estimated cost to
repair the unrelated maintenance issues was $20,000
it could not warrant covered repairs until the maintenance related issues were rectified
it would treat then cover in plastic the mould on the walls as temporary make safe work
due to the ongoing, unrelated moisture issues, it would not proceed with drying attempts
and would remove all remediation equipment.
UB’s report refers to having provided the insurer with a resultant damage repair SOW
(replace all of the lower wall linings, the door and door frame to the ensuite, the floating floor
Determination | Case number: 854230 Page 4 of 11
and timber substrate and then paint repaired surfaces). However, the SOW has not been
submitted to AFCA.
In a report dated 20 May 2021, th e insurer’s internal technical assessor, JB, confirmed that he
had inspected the property with UB. JB said that UB had removed all building material
affected by the sewage and its restorers had treated the affected area. JB confirmed that UB
would not be able to attend to repairs:
The property is on a steep hill and it appears that the underside of the building is
allowing moisture seepage from the soils behind. There is also extensive termite
damage which prevents the builder doing repairs.
On 14 July 2021, the insurer obtained a leak detection report from SP, plumber. SP
determined that there was no mains supply leakage but that the following faults were present:
the ensuite’s waterproofing (grouting, tiles and seals) were allowing water to penetrate into
the areas surrounding the shower alcove
there was no overflow relief gully servicing the sewer m ain, meaning the ensuite’s floor
trap would be where overflow escaped
rising damp due to the age and construction of the house.
SP said that the water affected areas of the house would not dry out completely until the
identified faults were rectified.
The insurer also obtained a report dated 30 July from IE, engineers. IE:
concluded that the mould and termite damage to the property’s lower level was long term
and unrelated to the claim event
said that the lower level bedroom was not a compliant habitable space in accordance with
the National Construction Code and that the subfloor ventilation was not compliant
recommended the faults identified by SP be repaired as soon as possible to mitigate the
potential for further damage
said it had not prepared an SOW for repair of damage caused by the claim event as it was
uncertain of what damage the policy would cover.
In light of its various expert reports, the insurer says the amount of building damage covered
by the policy is limited to what UB included in its (unsighted) SOW. It has offered to cash
settle the building repair costs for $6,117.60, based on UB’s quoted $5098 plus 20%.
The insurer otherwise relies on general exclusions set out on pages 54 and 55 of the PDS,
which state the insurer does not cover loss or damage arising from:
atmospheric conditions or extreme temperature
mould
faulty design or workmanship
previous damage that has not been repaired
an insured not maintaining their home in good repair and condition (meaning the home
must be water tight, structurally sound, secure and well maintained)
an insured not maintaining their site in good repair and condition.
Complainant says the covered damage is more extensive
On 12 July 2021, the complainant obtained an SOW and quote from CR, builder, for ‘works to
the downstairs area impacted by water event’. The SOW is detailed and itemises the time
required for and cost of each step to be undertaken, room by room. The total amount quoted
is $26,798.60.
Determination | Case number: 854230 Page 5 of 11
The complainant emphasises that CR was asked to quote on ‘the removal and replacement
of any and all materials that came in direct contact with level 3 water’ due to the claim event.
The complainant accepts that there was pre-existing mould and rising damp, but says she
was not and could not reasonably have been aware of those issues. In support of her
position, she has provided a copy of a pre-purchase inspection report by AB, builders, dated
16 November 2012. The complainant notes that AB reported ‘there is no concerning rising
damp (salt damp) and the polythene DPC (damp proof course) is correctly installed’.
According to the complainant, UB should not be regarde d as independent as it was UB’s
inadequate make safe works that led to the spread of mould upstairs. She also suggests that
little weight should be given to the reports of SP and IE as they were prepared two months
after the claim event, by which time the property had deteriorated further.
The complainant also notes that despite repeated requests, the insurer has not provided:
a detailed and itemised SOW and quote for the repairs it says it will cover, in response to
that of CR, and/or
a list of the items within CR’s quote it says it wi ll not cover and its reasons for excluding
those items.
Insurer is required to cover more of the building damage
The insurer relies on UB’s estimate of covered repair costs at $5,098 set out in its report
dated 19 May 2021. While UB says it prepared an SOW as well, that has not been provided.
On the other hand, the complainant relies on CR’s detailed and itemised SOW and quote
dated 12 July 2021.
The insurer has been given multiple opportunities to respond to CR’s quote through a detailed
and itemised SOW and quote of its own or by describing what items in CR’s quote are
excluded and why. It has not done so.
In the circumstances, it is reasonable to adopt CR’s SOW/quote as the starting point in
undertaking a reasonable assessment of the repair work required due to t he claim event.
However, I am satisfied that CR’s SOW includes items that are not related to the claim event.
There are items that concern termite damage and there is specific allowance for
waterproofing. I accept the insurer’s evidence tha t those items were pre-existing and
unrelated. Accordingly, they are excluded from cover.
The complainant’s argument that she did not and could not reasonably have known of these
issues does not assist her. The application of the exclusions relied on by the insurer is not
depende nt on an insured’s knowledge or that of a reasonable person in their position.
I also do not accept that as they were prepared two months after the claim event, the reports
of SP and IE should be given little weight. There are many photos showing the mould, rising
damp and termite damage, including photos taken within days of the sewage overflow.
Also, I am not satisfied it is reasonable for the complainant to object to the reports of SP and
IE on the basis of timing when CR’s SOW/quote was also prepared in July 2021.
As the parties’ relationship has significantly deteriorated and given that the insured property
has both covered and uncovered damage, it is reasonable for the insurer to cash settle the
building repair claim. To do so, it must have an actionable quote and must allow an uplift for
contingencies and the loss of warranty applying to insurer authorised repairs.
Determination | Case number: 854230 Page 6 of 11
As noted above, it is reasonable to use CR’s SOW/quote as a starting point. However, it is
now over 15 months old, so will not reflect current pricing. Further, it contains excluded items.
Accordingly, the complainant is to obtain from CR an updated quote reflecting current market
costs, based on its SOW dated 12 July 2021 but excluding all items relating to termite
damage and wat erproofing. Once the complainant provides CR’s updated quote to the
insurer, it is to pay the quoted amount plus a 20% contingency uplift. The insurer is entitled to
deduct the $300 policy excess if it is yet to be applied.
The parties disagree on what has caused the mould to spread
The parties d isagree on whether UB’s make safe work was the proximate cause of the mould
spreading upstairs and on the reasonable cost of remediation.
Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be
last in time or the sole cause. It is a question of fact that depends on the circumstances of
each case. It requires a common sense evaluation of the evidence.
The complainant engaged HR, mould specialist. On 27 May 2021, HR reported:
part of the lower level timber subfloor had been removed (by UB) and not closed or sealed,
allowing for potential mould spores to cross contaminate and rodent ingress
due to ‘the condition of the house with moisture and microbial issues, termite and roden t
infestation’ it very strongly suggested the comp lainant and her child not live there before
those issues were rectified, particularly given their respiratory illnesses
there was evidence of building faults, including the damp course and drainage
mould remediation would be required once the moisture ingress issues were resolved
remediation work would include mould testing, installation of HEPA filtration, removal of
lower level carpets and impacted building materials and treatment of remaining building
materials and contents within the area.
In its subsequent reports dated 8 June 2021 and 22 June 2021, HR confirmed its view that
UB’s make safe work potentially caused secondary damage to the property and contents. It
said ‘ overall, the make safe was perhaps not successful or complete and has led to
proliferation of mould spores ’ .
HR’s analysis of samples taken on 8 and then 22 June 2021 showed:
airborne mould levels within the property’s lower level were ‘incredibly high’
some of the mould genres were allergens, two potentially produced mycotoxins so were a
serious health concern and a number were water damage indicators
mould had spread to the upstairs level of the house.
HR noted that mould proliferation was assisted by the property not being lived in, lack of
ventilation and lack of sunlight due to closed blinds. HR recommended the installation of
ZipWall containment doors to prevent possible cross contamination and detailed cleaning with
the aid of HEPA filtration. It noted the importance of urgent action to prevent continued mould
proliferation and contamination.
The insurer obtained a desktop report dated 14 July 2021 from VA, hygienist. VA concluded:
All the provided evidence suggests the mould issues existed within the lower
levels of the home prior to the wastewater overflow event, however, the
subsequent remediation activities conducted by [UB] have allowed for the
released and spread of fungal particulates, primarily within the lower-level, but
also to the upper-level.
Determination | Case number: 854230 Page 7 of 11
VA estimated:
at least 95% of the lower level bedroom mould was pre-existing/unrelated to the claim
50% of the one allergen mould genre outside the bedroom involved cross contamination
100% of the mycotoxin producing genres outside the bedroom was from cross
contamination.
On 25 August 2021, the insurer obtained a report from RC, occupational hygienists. RC
acknowledged that the make safe works may have led to cross contamination of adjacent
lower level areas with non-claim related mould. It said it did not appear that the upper level
had been affected by the lower level contaminants. However, RC concluded:
In summary, regardless of what event caused the water damage and mould in
different areas, we recommend that all affected materials are addressed. It does
appear that there are two distinct events in this case and all damage caused by
the bathroom event should be addressed by the insurer. All damage caused by
the unrelated event should be addressed by the insured.
RC reinspected the property on 15 October 2021. RC reported that the overall mould level
throughout the upper storey was not considered to be high. It suggested that mould was
associated with long term water issues and that sampling did not show the mould types
typically seen in cases of cross contamination from inadequate containment. However, it also
said ‘ no differentiation can be made between mould spores from mould growth on materials
caused by excess moisture from sewage water or any other type (category) of water ’ .
HR was present during the 15 October 2021 inspection. It said that samples taken just
centimetres apart could vary greatly but that RC and it both found extremely high spore
counts downstairs and elevated to high counts upstairs. HR said:
There is nothing in the most recent testing that would disrupt the long held view
that spores would likely have travelled upstairs after the subfloor to the lower level
bedroom was removed and the wet subfloor and joists was exposed as there was
no containment to the flooring, room or staircase to prevent cross contamination.
The complainant says the insurer is liable for UB’s make safe works under the lifetime
guarantee the policy provides for repairs it has authorised. She says th at as UB’s make safe
works resulted in mould contaminating other areas of the house, the insurer is responsible for
all remediation required.
The complainant notes that on 17 September 2021, HR provided three remediation quotes:
$12,581.80: Lower level full remediation (if undertaken at a different time than upstairs)
$25,795.00: Upper level full remediation (if undertaken at a different time than downstairs)
$34,107.70: Full house remediation (if undertaken simultaneously).
She says the insurer should cover the simultaneous full remediation costing.
The insurer disagrees. It says that there is no doubt that there were pre-existing mould issues
affecting the house. It notes that one of the mycotoxin producing moulds that has spread was
pre- existing in the lower bedroom’s cupboard. It has accepted liability for HR’ s lower level
remediation costing. However, it relies on a further quote from HR dated 28 October 2021 for
$6,606.60 relating to the upper level, based on a reduced ‘wipe down’ level of remediation.
Determination | Case number: 854230 Page 8 of 11
Insurer is required to pay to remediate all mould
The available information establishes that the proximate cause of the mould spreading from
the lower level to other areas of the house was the inadequate containment measures UB
adopted in attending to the make safe work. The insurer has acknowledged this at least in
relation to the lower level given it has agreed to cover HR’s lower level remediation quote.
In relation to the upper level, the insurer has accepted it is partially liable and has agreed to
cover HR’s wipe down quote.
In an email dated 1 April 2022, HR said a wipe down solution was no longer appropriate. The
wipe down quote had been prepared prior to receiving RC’s second report and that report
plus its own testing in October 2021 confirmed mould had spread upstairs due to cross
contamination. HR also said the mould had been present for so long that such an approach
would not succeed, leaving a potential risk to health and upstairs contents.
In the circumstances, I am satisfied that the insurer is liable for the full remediation costs
proposed by HR. As with the building repairs, it is appropriate for the insurer to pay a cash
settlement. As HR’s full remediation quote is more than 12 months old, the complainant is to
obtain an updated version reflecting current market prices. The insurer is to pay the
complainant the updated quote amount plus a 20% contingencies uplift.
2.2 Is the insurer required to take any other steps?
Yes. The property requires deep cleaning before the complainant and her child can live in it
again. The insurer is to obtain a cleaning quote then pay the complainant that amount plus a
20% uplift. It is also to cover the cost of mould testing, filtration, pest inspection and electricity
the complainant reasonably incurred. Any contents claim is to be assessed under the policy.
The insurer is to stand by its recent offer for future temporary accommodation costs.
Deep cleaning is required
The complainant says that the property requires an ‘end of lease’ style deep clean. She says
this should be covered by the insurer because UB’s in adequate make safe work resulted in
the property being infested by vermin. She also notes that due to the ongoing mould issues
the property has been uninhabitable and has therefore become very dusty.
The complainant notes that the insurer previously paid for an initial inspection and two
treatments by MP, pest controllers. She refers to a report from MP dated 20 September 2022,
in which MP said there was heavy rodent activity throughout the home, making it unhygienic.
The insurer’s position appears to be th at the complainant has contributed to the deterioration
of the property by not attending to maintenance and not accepting payments it has offered.
Nevertheless, it will consider this aspect of the claim upon proof a deep clean is necessary.
I am satisfied that there is sufficient expert evidence to show that the a deep clean is required
as a result of UB’s make safe work and the property not being occupied for an extended
period. I do not accept that the complainant is materially responsible for this given her
respiratory issues, the worsening mould problem, her limited finances and as she understood
the insurer’s offers to be ‘in full and final settlement’ of her claim.
The insurer is to obtain a quote for an ‘end of lease’ style deep clean of the property then pay
the complainant that amount plus a 20% uplift.
Determination | Case number: 854230 Page 9 of 11
Insurer is to pay expenses incurred by the complainant
The complainant wants the insurer to reimburse/pay the following:
HR invoice dated 16 November 2021, $1,908.50 - further report and testing (paid by her)
HR invoice dated 23 March 2022, $9,092.88 - HEPA filtration (unpaid)
HR invoice dated 2 November 2022, $15,637.88 - HEPA filtration (unpaid)
Electricity account dated 17 March 2022, $577.64 – running HEPA filters, fridge and
freezer (paid by her)
Electricity account dated 15 June 2022, $627.32 – as above (paid by her)
Electricity account dated 18 September 2022, $726.30 – as above (paid by her)
MP invoice dated 20 September 2022, $198.00 – rodent inspection/report (paid by her)
The total amount in expenses the complainant seeks is $28,768.52.
I am satisfied that these expenses have reasonably been incurred by the complainant and it
appears the insurer was aware the expenses were being incurred on an ongoing basis.
I am not satisfied the insurer is entitled to object to the expenses on the grounds of delay for
the reasons set out above regarding the deep cleaning costs. I also note that it was only on
28 October 2022, at the complainant’s instigation, that the insurer offered a part payment to
enable the complainant to begin remediation, pending completion of the AFCA process.
I am unsure of whether all of the invoices have been provided to the insurer. Upon the
complainant providing the invoices to the insurer and proof of payment for those previously
paid, the insurer is to pay her the amounts in question. As the accounts are addressed to her,
she will be responsible for paying the providers the outstanding amounts.
Any contents claim is to be assessed under the policy
HR’s l ower level remediation quote dated 17 September 2021 included an allowance for
‘entering lower level of property to inventory all contents and subsequently dispose’. The
insurer previously accepted that quote and informed the complainant that it would revi ew the
resulting inventory of non-salvageable items and negotiate a settlement for them.
Mould has spread to the upper level and there are concerns that it has or may impact on
contents located there. As I have determined that the insurer is responsible for the upper level
contamination by mould and vermin, I am satisfied that it is to take the same approach to
contents on both levels of the house.
In updating its remediation quote, HR is to make allowance for entering both levels of the
property to inventory affected items.
The insurer is entitled to assess the resulting contents claim under the terms of the policy. It
must complete its assessment within two months of the claim being submitted with all
necessary supporting material.
The insurer is to stand by its recent temporary accommodation offer
On 28 October 2022, the insurer offered the complainant a cash settlement of $14,000 for
future temporary accommodation costs.
In all the circumstances, I consider it is reasonable that the insurer pays what it has offered.
Until the payment is made, it must continue to pay the complainant’s current temporary
accommodation costs as it appears her accommodation options are limited.
Determination | Case number: 854230 Page 10 of 11
2.3 Is non-financial loss compensation payable?
Yes. The insurer has unreasonably caused the complainant significant stress and
inconvenience over an extended period. It is to pay her $5,400 in compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has unreasonably caused stress and inconvenience
The complainant says that the insurer’s claim handling, delays and poor communication has
caused her significant stress, inconvenience and financial strain.
She says that she and her teenage daughter have experienced levels of anxiety sufficient to
require medical attention and medication and that they have been forced to give away their
dog given they have been living in cramped and regularly changing temporary
accommodation.
The complainant refers to repeated instances of the insurer delaying extension of the
temporary accommodation arrangements, at times forcing her to sleep in her car or at her
parents’ aged care facility. She notes that the ongoing deterioration of her home has caused
her great distress. This has been in the context of her advanced pregnancy.
Having reviewed the available information, I accept that the insurer has unreasonably caused
the complainant significant stress and inconvenience, including periods of homelessness. The
insurer has not acted in a manner consistent with the General Insurance Code of Practice. It
has not sought to proactively sought to resolve the claim and at times its approach has
bordered on adversarial.
I acknowledge that the insurer has paid temporary accommodation costs well above the
policy limit. However, the manner in which it has managed that aspect of the matter has, if
anything, heightened the complainant’s anxiety and concerns.
I am satisfied that the insurer’s approach to the claim and delays have had a very serious
impact on the complainant over more than a year. The insurer is to pay her $5,400 in non-
financial loss compensation.
2.4 Why is the outcome fair?
The complainant has sustained a loss covered by the policy. The mould issues have been
worsened by the insurer’s inadequat e make safe works. Accordingly, it is fair that the insurer
covers the reasonable costs to reinstate the property to its condition prior to the claim event. It
is fair that the insurer pays $5,400 in compensation for the stress it has caused.
Determination | Case number: 854230 Page 11 of 11
3 Supporting information
3.1 AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.