A home insurance claim for water leak damage remained in dispute over additional benefits, flooring, and alleged negligent repairs. AFCA found the insurer's offer met the previous determination, rejected the negligence and professional fee claims, and ordered specified settlement payments plus $2,500 non-financial loss.

The complainant bears the onus to show losses fall within policy terms, and additional benefits are only paid on top of the sum insured where the wording allows, with consequential loss excluded.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay claimpay interestpay non financial lossprovide documents

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 854160 Financial firm Insurance Manufacturers of Australia Pty Ltd Case number: 854160 9 August 2022 Determination | Case number: 854160 Page 2 of 12 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer) and lodged a claim when his house was damaged by a leaking water pipe. A dispute over the extent of the insurer’s liability was previously determined under complain t 726407 (previous determination). The complainant says the insurer:  has not met the requirements of the previous determination  was negligent in its initial repair and drying work in 2017, resulting in additional damage to the property  caused him prejudice when accepting the previous determination as it refused to supply documents relevant to his decision  must compensate him for non-financial loss  must reimburse him for professional costs incurred while pursuing his claim and complaint. The insurer says its settlement offer meets the terms of the previous determination and the policy terms. It denies it is liable to the complainant beyond the offer it already made. 1.2 Issues and key findings Has the insurer met obligations of the previous determination? Yes. The insurer’s offer met its obligations. The parties are to settle the claim in line with this determination. Is the insurer liable for claimed negligent work? No. The information has not shown there was a loss due to the insurer error which went beyond the damage caused by the water leak. Is the insurer liable for alleged prejudiced acceptance? No. The complainant has not shown there was a loss stemming from his acceptance of the previous determination. Is the complainant entitled to any other compensation? Yes. The complainant is due compensation for non-financial loss as detailed within this determination.. Why is the outcome fair? This is a fair outcome as it has considered the available evidence and followed the causal chain of events to determine if the losses claimed stem from any errors shown. Where shown, reasonable compensation is awarded. 1.3 Determination This determination is in favour of the insurer. Determination | Case number: 854160 Page 3 of 12 Upon acceptance of this determination by the complainant the claim is to be settled as outlined in section 2 of this determination. Settlement is to occur within 14 days of the complainant providing the information necessary to resolve the claim. Determination | Case number: 854160 Page 4 of 12 2 Reasons for determination 2.1 Has the insurer met its obligations of the previous determination? Previous determination set the terms of settlement Section 2.2 of the previous determination set out the terms of further assessment and options to settle the claim. Summarised, the insurer was to:  assess the extent of the building damage and settle it with either repairs or a cash settlement  settle any additional benefits the complainant was entitled to under the policy  settle the cost of floor coverings under the contents sum insured limit based on the policy wording  pay interest in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) calculated from 24 June 2020 until date of payment. Settlement has not been completed The previous determination required the insurer to organise an independent engineer inspection and an actionable quote from a builder within 14 days of the determination being accepted. The panel notes this resulted in further dispute between the parties about what independent meant, and whether the insurer could arrange such an engineer. Ultimately, the guidance given from the ombudsman was for the complainant to organise an engineer (SM) and for the insurer to cover the costs involved. This was completed by the parties. The insurer agreed to settle the building side of the claim after receiving SM ’s report. There is still some dispute over the true cost of the repair work, but the insurer accepted the repair costs are likely to exceed the building sum insured. Accordingly, it offered to settle the claim. However, the settlement has not proceeded in full as the parties are not in agreement about the extent of additional benefits the complainant is entitled to, or the value of the flooring repair. The insurer is seeking additional information from the complainant to enable the settlement. Complainant has not shown he is entitled to his preferred settlement The panel is not satisfied the complainant is entitled to the additional costs he sought above the insurer’s offer. This is because the costs he claims in addition to the building sum insured include:  18 months temporary accommodation  synthetic grass replacement  solar panel replacement  demolition and removing debris  meeting building regulations  engineering, architect ’ s and surveyor’s fees. Determination | Case number: 854160 Page 5 of 12 The complainant has the initial onus to establish that the loss he is claiming falls within the terms of the policy. The panel has reviewed the policy documentation and does not accept the complainant is entitled to the amounts claimed. This is because while the policy covers additional benefits, only some additional benefits are paid in addition to the sum insured limits. The relevant wording is set out in section 3 of this determination. Accordingly, the insurer has met its liability for demolition, meeting building regulations, engineer ’ s, architect ’ s, and surveyor’s fees, on payment of the building sum insured. The panel is not satisfied the synthetic grass and solar panels should be paid as part of the contents sum insured as claimed by the complainant. Both fall within the definition of home improvements which the policy treats as part of the building. The solar panels are a permanently fixed addition to the building. The panel is also satisfied synthetic grass is, on balance, a permanent landscaping feature which also falls within the policy definition of home improvements. Finally, the policy is clear that liability for temporary accommodation is for a period of 12 months from when the listed event took place. This has expired some time ago, however, as the damage is still present and not repaired, the panel accepts it is fair in the circumstances the complainant still receives this benefit in full under the policy. The panel is not satisfied the complainant has shown the wording allows for a period of 18 months. Accordingly, the complainant is entitled to 12 months temporary accommodation for himself and his family members living with him. He is also entitled to moving costs for his furniture to be moved between his house and the temporary accommodation and returned when he moves back into his home. However, this also means the panel accepts the insurer was unable to settle the claim in full on the information provided by the complainant. The quote for temporary accommodation is for 6 months more than he is entitled to. The claim for $43,859 of carpet replacement is based on an online calculator at a rate of $305 per square metre including installation. The panel accepts the insurer is entitled to ask for an actionable quote to validate the figure, which was not provided. Settlement to proceed on the available information The panel notes the difficulties the parties had when implementing the terms of the previous determination. Particularly the impact the complainant is experiencing while the complaint continues. Accordingly, the panel is not satisfied seeking further information to assess, is reasonable in these circumstances. The claim is to be settled on the available information. The panel also considered the complainant’s argument he should receive compensation for the loss of the lifetime repair guarantee. The insurer has already paid the maximum value under the policy for building repair work. Accordingly, no contingency is awarded for the building repair. The only exception to this is the floor coverings. The panel notes the previous determination located floor covering costs in the included evidence totalling $25,941.30. The panel accepts, on balance, this is the most accurate reflection of the cost of the flooring repair. Determination | Case number: 854160 Page 6 of 12 As the contents sum insured limit has not been reached, the panel accepts the insurer’s settlement should include a contingency for unforeseen costs and the loss of the lifetime repair guarantee due to the method of settlement. In this case, the panel awards an additional 20% uplift on the figure to ensure the complainant is fairly compensated. Accordingly, the panel accepts the insurer must pay the complainant:  $166 ,772.09 being the value of the complainant’s temporary accommodation quote adjusted down to 12 months  $3,500 for removalist costs  $31,129.56 for the cost of floor coverings. Interest is still to be paid in accordance with the previous determination. However, the panel is not satisfied the complainant is entitled to interest beyond the date of the building sum insured payment. The insurer has made a reasonable request for information relevant to its decision, and the panel is not satisfied it is fair the insurer remains liable for interest where the reason for the settlement delay was the insurer waiting on information from the complainant. 2.2 Is the insurer liable for claimed negligent work? On balance, the building is a total loss due to footing movement from the water leak The complainant has supplied a wealth of evidence with the cumulative effect of saying the insurer’s drying and sub floor repair efforts were inadequate. This is because the period of drying was too short and did not future proof the damaged area by treating the subfloor timber with antifungal spray. The panel has considered the submission but is not satisfied the complainant should be awarded additional loss on this basis. This is because the loss must stem from the alleged error the insurer made. The evidence does not point to this. SM agrees with the complainant’s previous engineer and says in its report: … the probable cause of the damage to the existing structure is as follows; • Water leak causing stump and strip footing subsidence. … The extent of damage to this house is severe, footings have subsided to the point of warping timber framing, leaning walls and causing doors to jam. Doors have continued to jam after shaving doors and door frames. A house that does not have working doors cannot be considered structurally sound. SM goes on to confirm the extent of footing deflection and warping of the timber frame means the repairing the property is an option of last resort. He considers the repair costs will likely exceed the property value, or in insurance wording, it is an economic total loss. This is supported by the complainant’s builder’s (SS) quote. Determination | Case number: 854160 Page 7 of 12 Complainant has not shown the insurer is liable for additional loss The panel has considered the evidence around mould occurring in the subfloor but is not satisfied it shows the insurer is liable for additional loss. This is because the complainant has the onus to show what additional loss has occurred due to the alleged negligent work. In this case it would involve either showing the damage would not have occurred but for mould, or clear evidence of the damage which would otherwise have been avoided. Having reviewed the available evidence, the panel is not satisfied the mould evidence is sufficient to hold the insurer liable for loss stemming from negligent repair work. This is because the evidence leads back to the cause of the damage being deflection and subsidence of the foundations. While there may have been weakness in the timber beams from mould working from within, this has only become visible recently. The report images and readings have not indicated an excessive level of deterioration of the beams, or in fact established what additional damage is only due to the sub floor timber being weakened. Further, the panel notes the water leak was substantial. 135,000L was released as noted in the previous determination, with the damage becoming noticeable two years after the event. None of the previous assessments have detected the mould now being relied upon by the complainant. Accordingly, the panel is satisfied, on balance, it is more likely the subsidence of the footings is the proximate cause of the total loss of the property. This means the insurer will meet its liability to the complainant when it settles the claim in line with section 2.1 of this determination. 2.3 Is the insurer liable for alleged prejudiced acceptance? No evidence of financial loss stemming from insurer’s actions The panel has considered the complainant’s basis for seeking an award o f loss because he was not provided with information relevant to his decision on the previous determination. The panel accepts the insurer did not provided the information requested and accepts the complainant may have chosen to reject the determination had it done so. However, as noted in the preceding sections, the panel is not satisfied the complainant has suffered a financial loss because of this conduct. This has not resulted in him being prejudiced in relation to the building repair costs. It has also not resulted in him being prejudiced by incurring costs to pursue his claim. Had the information been provided, it would not have prevented further pursuit, the panel accepts it would have encouraged it. Accordingly, the loss and costs incurred do not stem from the insurer ’s decision around providing information or not. Therefore, the panel does not make an award of financial loss. 2.4 Is the complainant entitled to any other compensation? AFCA cannot award consequential loss in these circumstances The panel considered the additional losses the complainant claimed which are:  uninsurability of the property Determination | Case number: 854160 Page 8 of 12  loss of member discount  loss of lifetime guarantee The panel notes the claimed losses are the direct result of the claim being settled by the insurer paying the limit under the policy for the repair. Therefore, they are a consequence of the insured event. The policy excludes cover for consequential loss stemming from an insured event in all circumstances, meaning AFCA cannot consider an award for it under our rules. No award for professional fees incurred The complainant seeks a contribution by the insurer of $25,000 for his expert and legal fees while pursuing his complaint. AFCA ’s Rules limit compensation to $5,000, unless special circumstances apply. AFCA provides a free service for complainants. It is not usually necessary for either party to be legally represented. If the complainant chooses to be represented, they will usually have to cover their legal fees themselves. Although there is no automatic right to professional costs AFCA can decide if it is fair the insurer should contribute to the costs. AFCA can also consider if the expert report fees incurred were reasonably necess ary and contributed to the complainant’s outcome. When considering whether to require the insurer to make a legal cost contribution, we consider the complexity of the complaint and whether the complainant needed to incur the cost to understand or establish the claim. The panel acknowledges the claim involves a significant amount of money for the complainant. However, this complaint does not involve complex factual issues or legal issues. The incurred report fees have not assisted the complainant in this case. Accordingly, the panel is not satisfied compensation for professional fees is warranted. Insurer to pay compensation for non-financial loss Under AFCA’s Rules, we may award compensation (capped at $5,400) for non -financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, we adopt a conservative approach to the award of compensation for non-financial loss. We expect complainants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. The onus is on the complainant to establish he has suffered a loss because the insurer mishandled the claim. In this instance non-financial loss was already considered in the previous determination, with none awarded. Accordingly, this determination can only consider non-financial loss since the previous determination. The panel is satisfied there are grounds to award non-financial loss. The information has shown the property was damaged to the level of a total loss by the escape of water event. The insurer has settled this; however, the complainant has incurred an unusual level of effort to prove the extent of the damage renders his property beyond repair. This included taking on Determination | Case number: 854160 Page 9 of 12 the insurer’s responsibility to provide an independent assessment by an engineer when the insurer was not able to do so. Further, the panel notes there were documents relevant to the complainant’s decision on the previous determination which were not supplied to him until the new complaint was lodged. The panel accepts this has interfered with the complainant’s enjoyment of peace of mind and should also attract a compensation award. Therefore, upon acceptance of this determination by the complainant, the insurer is to pay the complainant $2,500 compensation for non-financial loss. 2.5 Why is the outcome fair? This is a fair outcome as it has considered the available evidence and followed the causal chain of events to determine if the losses claimed stem from any errors shown. Where shown, reasonable compensation is awarded. Determination | Case number: 854160 Page 10 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 854160 Page 11 of 12 3.2 Relevant policy wording The buildings we insure Under Buildings Insurance, we cover loss or damage to the buildings that you own and live in. Your home Your home includes: …  home improvements at your site – for example, garage, carport or in-ground pool  fixtures or items permanently attached of fixed to your home – for example, light fixtures, built in wardrobes, kitchen cupboards and floating floorboards. … To see how we define key words like ‘home’, ‘home improvements’ and ‘fixtures’ see pages 92 to 96 Definitions The following words have special meaning. … Home improvements are any permanent additions at your site that add to the cost of rebuilding or repairing your home, such as a garage, in-ground pool, above ground pool (when enclosed by decking, carport, pontoon, boat jetty and permanent landscaping features. We do not consider soil or brushland to be home improvements. Other benefits and your sum insured Your Buildings sum insured or Contents sum insured is the most we’ll normally pay when you make a claim. However, for these items, we’ll pay on top of your sum insured:  Temporary accommodation for home owners  … Temporary accommodation for home owners If a listed event causes loss or damage to your home and we agree you can’t live in it and you need to move out so it can be repaired or rebuilt. We pay this benefit on top of your Buildings sum insured. Covered under Buildings insurance  costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site  any additional living expenses we agree are appropriate  costs to remove and store your contents and then return them to your home. … Determination | Case number: 854160 Page 12 of 12 We pay these costs for the reasonable time we agree it should take to repair or rebuild your home for up to 12 months from when the listed event took place

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.