Determination 853934

Flood damage to footings; insurer limited liability to left-hand side and offered cash settlement

FirmIAG
Decided2022-08-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a flood claim for home footings but limited its liability to the left-hand side and offered a cash settlement at half cost. AFCA decided the insurer must replace all footings via a cash settlement based on an amended scope and quote with a 25% contingency, continue temporary accommodation, and pay $2,000 non-financial loss.

The insurer could not show the policy exclusions limiting liability applied, as the footings must be replaced as a single system to repair the flood damage and the building regulations exclusion was not proven.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagemental healthnatural disasterpay claimpay compensationpay non financial lossreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 853934 Financial firm Insurance Australia Limited Case number: 853934 15 July 2022 Determination | Case number: 853934 Page 2 of 9 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). On 26 March 2021, the complainant lodged a claim for flood damage to her property. This included damage to the footings on the left-hand side of the property. The insurer appointed an engineer to assess the damage and provide a report and scope of works. The engineer reported the footings used are not appropriate and recommended they should be replaced to meet current standards. The engineer also recommended the insurer limit its liability to only pay half the cost to replace the footings given only the left-hand side was affected by the storm. Based on this, the insurer has elected to cash settle the claim and limit its liability to the left- hand side area. The complainant disputes the insurer’s position. She also wants the insurer to repair the damage. 1.2 Issues and key findings Has the insurer correctly determined its liability? No. The available information shows the insurer has not fairly assessed the cost of repairs. This is because the complainant will not be able to repair the claim related damage with the insurer’s proposed cash settlement. Should the insurer pay non-financial loss? Yes. There were aspects of the insurer’s claims handling that led to unreasonable delays. Given this, and the impact it would have caused, it is fair for the insurer to pay $2,000 in non- financial loss. 1.3 Determination This determination is in favour of the complainant. The insurer is to settle the claim and dispute in the manner set out in section 2.1. Determination | Case number: 853934 Page 3 of 9 2 Reasons for determination 2.1 Has the insurer correctly determined its liability? Information provided shows there are issues with the footings The insurer engaged an engineer (IC) to provide a scope of works. IC noted there was damage to the concrete footings and the connected steel posts due to inundation by flood water. IC states it appears the buoyancy tanks may have caused the floor to be lifted up by the flood waters and pulled the footings out of the ground. Upon inspecting the concrete footings, IC determined that they were approximately 450 deep and 500 wide circular/oval shape. IC states footings of this size are nominal for normal sites but are non-compliant in regard to the requirements for housing in flood prone areas. In this regard, IC referred to a publication in 1975 (although a copy was not provided). IC states, in its opinion, the existing steel support frame does not appear to be structurally adequate for the normal applied dead, live and wind loads. Further, it has the appearance of not being built to a design expected to be used. IC made these comments, based on designing similar sized buildings in the past. IC accepts there was damage to the concrete footings and connected steel posts due to rising flood water. This lifted the building up and pulling the footings out of the soil. IC states the extent of the damage has been increased due to the non-compliant and poor-quality constructions of the building. Insurer is entitled to limit its liability Having carefully reviewed the available information, the panel notes the following. The insurer has accepted liability for the claim. Therefore, whilst it has referred to a policy exclusion for faulty workmanship, it is inconsistent with the fact it accepted liability. Also, the available information shows the flood has clearly resulted in the damage to the footings. The panel accepts the damage to the footings is limited to the left-hand side. The only expert who has provided a scope of works to repair this damage is IC. IC says the damaged footings need to be replaced to current standards. However, this can only be done if all the footings are replaced to current standards. There is no expert evidence to refute these scope of works are necessary to repair the claim related damage. Neither is there any indication the damaged footings can be repaired in any other legitimate way. The insurer has relied on various provisions to limit its liability to the left-hand side. One of which is the following: we only repair the damaged part(s) of your home. We don’t pay for materials to match the undamaged parts of your home to create a uniform appearance The panel does not accept this is applicable for several reasons. First, it is clear the only way to repair the claim related damage is to replace all the footings. Therefore, the scope of works is limited to repairing the damaged part of the home. Second, the panel does not accept the Determination | Case number: 853934 Page 4 of 9 footings of a property can be segregated into different parts. Instead, it is clear it operates as a single system (i.e. part) used to secure the property. The policy does provide a benefit where the insurer will cover the costs to meet current building regulations. However, the insurer relies on this exclusion in that benefit which it says is applicable: Not covered  costs to meet building regulations: o that were already in place when your home was built, renovated or altered o for undamaged parts of the home – for example, installing insulation in ceilings there were not damaged The panel has already dealt with the second point. For the first one, the insurer has not provided any evidence to show what the building regulations were at the time the footings were done. Whilst IC has referred to a published guideline in 1975, this was not provided. Further, IC’s scope of works includes standards applicable in 2012. However, there is no dispute the footings were installed in 2009. No information has been provided to show:  what the standards were in 2009, or  to what extent the current standards replicate those previous ones. Therefore, the panel is not persuaded the insurer has shown the building regulations currently in place that need to be met were also applicable when the footings were constructed. This means the insurer has not shown the above exclusion applies. Insurer cannot limit its liability Given all this, the panel does not accept the insurer has shown it is entitled to limit its liability to replace only the left hand side of the footings. Instead, the insurer is liable to replace all the footings given:  it has accepted liability for the claim  the available information shows this is the only viable method to repair the claim related damage  the policy does include a benefit to meet the cost of current building regulations  the provisions or exclusions relied upon by the insurer are not applicable. Claim and dispute should be resolved in this way Given the property has sustained further damage due to a recent flood event, it is clearly not possible for the insurer to undertake the repairs. Therefore, the panel accepts the only viable settlement method is a cash payout for the repairs. This is to be calculated in the following way:  IC is to provide an amended scope of works that: > includes replacement of the footings that meets current standards > addresses all outstanding repairs – this should include the likely additional damage that may be caused to the structure whilst replacing the footings Determination | Case number: 853934 Page 5 of 9  the insurer is to obtain an actionable quote based on these scope of works – the contractor who provides this quote should also include an estimate of the time needed to complete the repairs  the insurer is to base a cash settlement on this quote with a 25% contingency – this higher contingency is to address the real likelihood that replacement of the footings will result in further damage  no interest is payable given the cash settlement should be based on current rates  the insurer is to continue to pay the complainant’s temporary accommodation costs until the earliest of the following: > 12 months has passed since the insurer received notification that this determination is accepted by the complainant, or > the estimated time period of repairs has lapsed – this period only begins from when the insurer issues its cash settlement The panel acknowledges the policy contains a 12 month limit for temporary accommodation and the insurer has been paying for this benefit during the claim and dispute. However, the panel does not accept this limit applies in circumstances when these costs have been incurred due to the insurer’s conduct rather than the claim. The panel considers the former applies because:  the insurer has incorrectly assessed its liability under the policy, and  the complainant has spent a significant amount of time in temporary accommodation whilst challenging the insurer’s position (and ultimately done so successfully). Therefore, the panel consider it fair the temporary accommodation limit should only apply once the insurer has begun assessing the full extent of works required to repair the claim related damage. This will be when it receives notice the complainant accepts this determination. 2.2 Should the insurer pay non-financial loss? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $2,000 in non-financial loss The panel accepts there were aspects of the insurer’s claims handing that led to unreasonable delays. Of significance, the insurer’s engineer had provided an initial report on 19 July 2021 which was then revised abou t three months later and led to the insurer’s partial settlement. The insurer has not explained the basis of this delay. It is clear this would have resulted in the complainants suffering a substantial degree of inconvenience and interference given:  they are vulnerable given their age, mental health and physical illness  they had been subjected to a fairly significant loss, and  this delay was impacting their temporary accommodation benefit. Determination | Case number: 853934 Page 6 of 9 Therefore, the panel accepts it is fair the insurer pays $2,000 in non-financial loss. Determination | Case number: 853934 Page 7 of 9 3 Supporting information 3.1 AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. W e have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in general insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 853934 Page 8 of 9 3.2 Relevant policy wording Flood – page 27 If loss or damage is caused by a flood and/or rainwater run-off. Covered  Flood Meeting building regulations – page 42 If a listed event causes loss or damage to your home and you need to meet current building regulations to repair or rebuild the part of your home that was damaged. Covered under Buildings Insurance the costs to meet current building regulations to repair or rebuild the part of your home that was damaged. Not covered  costs to meet building regulations  that were already in place when your home was built, renovated or altered  for undamaged parts of your home – for example, installing insulation in ceilings that were no damaged. Conditions  we must agree to pay the costs before you make any arrangements General exclusions for all covers and benefits – page 66 The exclusions set out in this section apply to all covers and benefits under your policy. Maintaining and occupying your home We don’t cover loss, damage, injury or death arising from:  faulty design or workmanship How we settle your buildings claim – page 73 We will choose to settle your claim for los s or damage to your home and any ‘other benefits’ in one of the following ways. … 2. Pay you the reasonable cost to repair or rebuild your home We can choose to:  pay you  pay your nominated repairer, supplier or builder, or  provide you with store credits from one of our nominated suppliers. Determination | Case number: 853934 Page 9 of 9 How we settle certain things – page 78 When we pay your claim, we settle certain things in line with the information shown in this section. Matching materials Under Buildings Insurance  we only repair the damaged part(s) of your home. We don’t pay for materials to match the undamaged parts of your home to create a uniform appearance. 3.3 Further flood damage Further flood damage to be considered in accordance with the policy During the AFCA process, the complainant advised of further flood damage in early March 2022. The complainant advised the flood level was higher than the previous flood. The insurer advised AFCA the complainant is yet to lodge further claims for flood damage. The further flood damage is to be considered in accordance with the policy once the complainant has lodged a claim for it.