Text of the determination
Determination
Case number 853890
Financial firm AAI Limited
Determination | Case number: 853890 Page 2 of 11
Case number: 853890 29 November 2022
1 Determination overview
1.1 Complaint
The complainant made a claim with the financial firm (insurer) after his fibreglass swimming
pool was damaged by a leaking pipe.
The insurer authorised replacement of the damaged pool to builder ‘AB’ and p ool builder ‘AW’
eventually replaced it with a concrete pool. The complainant covered the cost difference.
Several issues arose about the works and conduct of AB and AW over the course of repairs,
including the pool’s re build. These issues were mainly resolved between the parties except
for the pool’s rebuild.
The complainant says the pool was not built to the approved specification, so it is not safe for
children and costs more to maintain. The insurer denies responsibility for the build, saying:
the complainant privately engaged AW to build the concrete pool
the pool was built to Australian standards and tolerances in any event.
1.2 Issues and key findings
Is the insurer responsible for the new pool ’s build?
Yes. The insurer authorised AB to replace the damaged pool and AB arranged for AW to do
the work. The complainant only paid extra to use different materials in the pool’s rebuild and
this was with the insurer’s agreement. The insurer remains responsible fo r the workmanship
of the pool’s build notwithstanding the change to a concrete pool.
Was the new pool defectively built?
There is information suggesting the new pool was not built to specification or within
acceptable tolerances. While this suggests the pool is defectively constructed, there is no
expert confirmation of this at this stage. It is fair for the pool to be inspected by an
independent expert to confirm this before the insurer is required to take further action.
Why is the outcome fair?
The policy’s lifetime guarantee on repairs only responds if the new pool was defectively built.
As there is indication the new pool may be defectively built, but no expert confirmation of this,
it is fair for the pool to be inspected by an independent expert to confirm this before the
insurer is required to take further action.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of being notified of the
complainant’s acceptance of this determination, the insurer is to:
take steps to have t he pool’s build independently inspected and thereafter, take the actions
outlined in section 2.2 of this determination depending on the findings of this inspection
pay the complainant $1,000 as compensation for non-financial loss.
Determination | Case number: 853890 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer responsible for the new pool’s build ?
Yes. The insurer authorised AB to replace the damaged pool and AB arranged for AW to do
the work. The complainant only paid extra to use di fferent materials in the pool’s rebuild and
this was with the insurer’s agreement. The insurer remains responsible for the workmanship
of the pool’s build notwithstanding the change to a concrete pool .
No dispute damaged fibreglass pool was replaced with a concrete pool
There is no dispute the complainant has a valid claim for the damage to his fibreglass
swimming pool. There is also no dispute the insurer authorised replacement of the damaged
pool to AB and the pool was eventually replaced with a concrete pool by AW. The dispute is
about responsibility for the build quality of the replacement pool.
Insurer says it is not responsible for concrete pool ’s build quality
The insurer says it is not responsible for the concrete pool’s build quality. It says the p olicy’s
lifetime guarantee on repairs only applies to repairs it authorises, arranges and pays for. It
says it did not arrange or authorise AW’s work , so the complainant needs to address his
concerns about the pool ’s build directly with AW.
The insurer says it was only liable to replace the damaged pool with a fibreglass pool and had
authorised AB to do so. Following AB starting repairs, the complainant then asked if the pool
could be replaced with a concrete pool. The insurer says it advised the complainant it was
only liable to replace the damaged pool with a fibreglass pool. However, it agreed he could
privately engage a pool builder to build a concrete pool and cover the cost difference. It says
the complainant then engaged AW to complete the build and installation of a concrete pool
under a private contract.
Complainant says insurer authorised repairs to AB and AB engaged AW
The complainant maintains the insurer is responsible for the new pool’s build quality. He says
he never engaged AW to replace his damaged pool. Rather, the insurer authorised repairs to
AB which then subcontracted the work to AW.
After initial contact from AB, the complainant says he asked AB if the damaged pool could be
replaced with a concrete pool and whether the insurer would be fine with it. AB told him it was
fine and that he should to speak to AW as it was appointed to do the works.
The complainant further says he was never told or given any option to choose a pool builder.
He was also not told he would lose the policy’s lifetime guarantee on repairs by changing to a
concrete pool. Nor was he paid a cash settlement for his damaged pool.
Insurer is responsible for the quality of rebuilds it authorised
The complainant’s policy is made up of a certi ficate of insurance and product disclosure
statement (PDS), which form the terms of his cover. The relevant policy extracts about claims
settlement and the lifetime guarantee on repairs are set out in section 3.2 of this
determination.
Determination | Case number: 853890 Page 4 of 11
In summary, the policy entitles the insurer to decide how it wants to settle the pool damage
claim. It can choose to authorise repairs or rebuild the pool, or cash settle the cost of doing
so. If the insurer authorises a rebuild, which it did in this instance:
there seems to be no term that entitles the complainant to choose a builder
the insurer is normally obliged to rebuild the damaged pool back to the same type,
standard and specification as it was when new
the insurer is responsible for the quality of the r ebuild for the pool’s lifetime.
Policy allows complainant to make changes subject to insurer’s agreement
Where the insurer elects to the rebuild the pool, the policy also allows the complainant to
make a design change or an upgrade. This is not an automatic entitlement, as the insurer
must agree to the proposed change or upgrade and the complainant must bear the extra cost
involved. Relevantly, the PDS says:
Changes to the building
If you want to change the design of the building
When repairing or rebuilding the building, if we agree, you can choose to change
the design of the building or upgrade parts of it, providing you pay the extra costs
of doing this.
Insurer has given inconsistent versions of the events that transpired
The insurer has given inconsistent versions of the events that transpired.
In its 3 February 2022 notice of response, the insurer said:
the complainant asked for a concrete pool following AB starting repairs
it advised him it was only liable to replace the damaged pool with a fibreglass pool, but he
could privately engage a pool builder and cover the cost difference for a concrete pool
the complainant subsequently engaged AW to complete the build and installation of the
concrete pool under a private contract.
In its 22 March 2022 submission, the insurer says the complainant engaged AW prior to AB
starting repairs and this was not discussed with AB until repairs had begun . This version
a ppears to stem from a 17 March 2022 email from ‘SD’, who was the supervisor appointed by
AB to oversee the repairs to the complainant’s pool . SD says:
[The complainant] paid [AW] approximately $7000 for the private works to
upgrade from fibre glass pool to concrete and all engineering required. This was
completed before the old pool was even removed from the backyard and was not
discussed with [AB] until repairs had started.
No evidence insurer ‘advised’ complainant of its position on the change
I do not accept either of the insurer’s stated positions.
Apart from its assertion, the insurer has not shown when it had the alleged discussion with
the complainant, where it reportedly ‘advised’ him of its position on the change to a concrete
pool. I am unable to find anything in the insurer’s claim notes or other exchanged material
that shows such a discussion ever occurred.
Determination | Case number: 853890 Page 5 of 11
AB was involved in discussions and aware of change to a concrete pool
The exchanged information shows SD was copied into preliminary emails sent by AW to the
complainant in March 2021. SD was also included in AW’s 9 April 2021 email to the
complainant, which attached the preliminary design plan for the pool. The plan clearly
provided for a concrete pool at the outset.
Further, AB’s ‘Repair Schedule’ already identified AW’s involvement in the pool’s rebuild
since March 2021. It shows AW would be undertaking all relevant pool works with AB
providing supervision. SD also emailed a link to the repair schedule to the complainant under
AB’s letterhead on 2 March 2021, with comments appearing to describe AW as ‘our trades’ .
AB’s ‘Repair Schedule’ also indicates repairs would begin on 10 May 2021, so the above
events clearly occurred before repairs began.
These matters are inconsistent with suggestions AB was never involved in discussions about
a change to a concrete pool or was unaware of the change until after repairs began. They are
also inconsistent with suggestions the complainant privately engaged AW to rebuild his pool.
On balance, I accept these matters show the complainant’s versi on of the events is more
likely the correct version.
Given this, I do not accept the complainant privately engaged AW to rebuild his pool. I accept
it was AB that engaged AW to undertake the pool replacement work. I also accept:
AW was the insurer’s appointed pool builder, since AB engaged it to do the pool works
AB was aware of the change to a concrete pool from the outset and had agreed to it
the insurer was constructively aware of AW’s appointment and the change to a concrete
pool at a minimum, since AB was its authorised builder in this instance
the insurer had agreed to the change since AB was its authorised representative.
Complainant only paid extra cost to use a different material for pool rebuild
The policy’s lifetime guarantee on repairs provision says the insurer is responsible for the
quality of materials and workmanship it authorises, arranges and directly pays a builder for.
AW’s 5 June 2021 invoice shows the complainant only paid $6,760 for ‘change orders to
scope’, which is essentially for an ‘upgrade’ to a concrete pool and some material. The
invoice does not show the complainant paid for anything else to do with the pool’s build other
than the extra cost to use the identified upgraded materials. He did not pay for other materials
or the labour required to rebuild the pool. The invoice does not also indicate the complainant
paid for the required ‘engineering’ , as suggested by SD.
Insurer is responsible for quality of AW’s workmanship
The complainant’s concerns about the new pool’s build does not involve the quality of the
upgraded materials he paid for. I t relates to the quality of AW’s workmanship in building the
pool. He says AW did not build the pool according to the agreed and approved design plan.
This aspect of the pool’s build remained the insurer’s responsibility, since it authori sed the
pool’s replacement to AB which, in turn, arranged for AW to do the work.
I am satisfied the insurer is responsible for ensuring the pool’s build met the approved design
plan, notwithstanding the change to a concrete pool. This means it is responsible for the
quality of AW’s workmanship under the policy’s lifetime guarantee on repairs.
Determination | Case number: 853890 Page 6 of 11
Determination | Case number: 853890 Page 7 of 11
2.2 Was the new pool defectively built?
There is information suggesting the new pool was not built to specification or within
acceptable tolerances. While this suggests the pool is defectively constructed, there is no
expert confirmation of this at this stage. It is fair for the pool to be inspected by an
independent expert to confirm this before the insurer is required to take further action.
Complainant says pool was defectively built
The complainant says the new pool was defectively built. He says:
the pool is not level and was built deeper than the agreed and approved plan
the pool is unsafe because children cannot touch the bottom at the shallow end
the pool ’s skimmer box was installed too deep
tiles installed around the pool are not level, causing water to drain back into the pool
a drain grate installed nearby is unconnected to anything, which results in overflows.
The complainant also says he has incurred (and will continue to incur) extra cost to maintain
the pool since it has more water than planned.
The complainant provided the pool’s design plan and some photos purporting to show the
issues he had identified. He also refers to page 51 of the Queensland ‘St andards And
Tolerances Guide’ (T olerance Guide), which relevantly states:
16.1 Concrete pools and spas
Concrete pools and spas are defective if they are not installed in accordance with
AS 2783 including Amendments 1 and 2 - Use of Reinforced Concrete for Small
Swimming Pools and with the relevant engineer’s design.
…
16.3 Variations from documented dimensions in concrete pools
Departures from the documented set out for concrete pools are defects if they
exceed L/100, where L is the documented dimension, or 5mm, whichever is the
greater and such deviation adversely affects the safe use or reasonable amenity
of the pool or spa.
16.4 Variations from documented datum in concrete pools and spas
Set outs that depart from documented levels by more than 40mm, are defective if
such deviation adversely affects the safe use or reasonable amenity of the pool or
spa.
Insurer says pool was built within ‘Australian Standards and Tolerances’
The insurer says the pool was built within ‘ Australian Standards and Tolerances ’ . It relies on
compliance certificates (forms 12 and 16) issued by a firm identified as ‘M S ’ and the
statements of AB and AW to support its position.
AB says:
the concrete pool was installed as per AS 2783 –1992 and within ‘Australian standards and
tolerances’ with regards to the depth of 1300mm shallow end height
the plan states 1200mm to water height and ‘as per Australian standards’, the tolerances
‘are up to <150mm in concrete pool construction’
Determination | Case number: 853890 Page 8 of 11
the skimmer box is positioned in the ‘ correct spot for the water height, as per standards
and tolerances with regards to pool builds as per AS 2783 –1992’
the sloping of the surrounding paved area towards the pool ‘is standard to get all residual
drainage water when people are using the pool to run off and it is actually positioned level
and as per QBCC standards and tolerances over 1m, as up to 2mm variation is allowed in
all flooring’.
AW says:
there were ‘collapses’ that has slightly altered the internal shape of the pool however
nothing is ‘outside of tolerances’
the skimmer box is ‘absolutely perfect’ and in line with every other swimming pool it built
the shallow end is ‘ actually 1300 at waterline which is how measurements are taken this is
8% variance and to be expected in spots’
the deep end is ‘actually 1.9m and 5% variance also to be expected in spots’
based on its reading of the drawings, ‘the water level is meant to be 100 below the top of
the coping and based on the waterline this seems right’
the skimmer is not a defect as it is located right at the top of the pool, however it has a
50mm bedding on top of it which is required to level the top of the pool shell
every single swimming pool that goes in will have a bedding on top, so the coping sits flush
at natural height, bedding is anywhere from 10mm to 60mm and in this case, it was 50mm
‘everything is miles within construction tolerances’ .
Insurer’s builders’ have not shown build was within acceptable tolerances
I note MS has certified that the pool was ‘constructed generally in accordance with the design
intent’ . However, AB and AW ’s statements about the standards and tolerances they rely on
are difficult to understand, if not inconsistent.
Referring to the pool’s shallow end, AB says the plan ‘states 1200mm to water height’ and ‘as
per Australian standards ’, the tolerances ‘are up to <150mm in concrete pool construction’.
On the other hand, AW says the shallow end is ‘ actually 1300 at waterline which is how
measurements are taken this is 8% variance and to be expected in spots’.
AB also says the sloping of the paved area towards the pool is apparently ‘standard to get all
residual drainage water … to run off’. At the same time, it says ‘it is actually positioned level’ ,
which somewhat suggests it does not have a slope which it earlier said was ‘standard’.
Importantly, AB and AW have not identified or supplied the relevant build standards and
tolerances they rely on. They only made broad-based claims the pool was installed ‘as per AS
2783 –1992’ , within ‘Australian standards and tolerances’ and ‘miles within construction
tolerances’ . It is difficult to accept their comments in these circumstances, especially when it
is their work that is being called into question.
Evidence suggests pool may have been rebuilt outside acceptable tolerances
Ultimately, a photo supplied by the complainant shows the pool ’s shallow end water level is
somewhere between 1320mm and 1330mm. As AB says the water height was meant to be at
1200mm at this end, this appears to be a 120-130mm (i.e. 10%-11%) deviation from the plan.
If AW is correct – that the water level is ‘actually 1300 at waterline’ – then the deviation would
be 100mm or 8% as it already pointed out.
The Tolerance Guide supplied by the complainant seems to be applicable standard and
tolerance guide for Queensland. It does not appear to say build tolerances for pools are up to
‘<150mm’, ‘ 5% ’ or ‘ 8% ’, or anything like this, as suggested by the insurer’s builders .
Determination | Case number: 853890 Page 9 of 11
Rather, the Tolerance Guide says a concrete pool is defective if it:
is not installed in accordance with AS 2783 and with the relevant engineer’s design
varies from its documented dimension by the greater of its documented dimension divided
by 100 or 5mm , and such deviation adversely affects the ‘ safe use or reasonable amenity ’
of the pool (section 16.3)
departs from documented levels by more than 40mm , and such deviation adversely affects
the ‘ safe use or reasonable amenity ’ of the pool (section 16.4).
If the relevant tolerance standard is section 16.3, then variances of 100-130mm appear to be
clearly outside acceptable tolerances. This is because 1200mm (i.e. the documented
dimension) divided by 100 would only allow for 12mm deviation. If the relevant tolerance
standard is section 16.4, 100-130mm deviations are clearly more than 40mm.
Fair for the pool’s rebuild to be independently inspected
Having said that, I consider an appropriately qualified engineer or expert must confirm that
the pool was defectively built before the insurer is required to take any action. This is because
the Tolerance Guide indicates deviations must affect a pool’s ‘safe use or reasonable
amenity’ for a build to be defective. There is no expert confirmation of this in the exchanged
information. There is also no clear information about the applicable standards and tolerances
for the pool’s paving tiles and the skimmer box installation depth.
Given this, and the complainant’s legitimate concern about the pool’s safety for children, I
consider it appropriate and fair that the insurer appoints an appropriate and independent pool
engineer to review the pool’s entire build and report on whether it was defectively built. The
insurer is to bear the cost of this report and the relevant expert must have no prior
involvement in the claim, the pool’s build and its previous certifications.
The relevant expert must identify and confirm:
all relevant standards and tolerances that apply to the pool’s build, including those that
apply to the laying of its surrounding tiles, the depth of the skimmer box and the
unconnected drainage grate the complainant has identified
if these matters were constructed according to the approved plan and within applicable
standards and tolerances, including whether the pool was built level
if the pool (or any part of it) could ultimately be considered defectively built.
Whether insurer is required to act depends on independent expert’s findings
If the expert confirms the pool was not defectively built, the insurer is not required to take any
further action in relation to the claim or complaint. If the expert confirms the pool was
defectively built, then the insurer must:
fairly reconsider this aspect of the complainant’s c omplaint, including his claim for the extra
costs he says he has incurred (and will incur) because of the defective build
take all required steps to remedy the defective build under its lifetime guarantee on repairs.
Insurer is to pay $1,000 as compensation for non-financial loss
In the meantime, it is fair the insurer pays the complainant $1,000 as compensation for non-
financial loss. This is to account for its failure to fairly consider his concerns about the pool’s
build quality and safety at the outset, by appointing an independent expert to review the build.
This caused (and will cause) unusual delay in resolving his concerns and unusually interfered
with his peace of mind.
Determination | Case number: 853890 Page 10 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy wordings
How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building, we will decide
if we will:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building;
…
If we rebuild (or pay you what it would cost us to rebuild), we will do so on a `new
for old’ basis.
…
We will not:
…
pay extra to repair or rebuild the building to a better standard, specification or
quality than it was before the loss or damage occurred except as stated in the
meaning of ‘new for old’;
…
‘New for old’ means:
…
• Same type, standard and specification as when new
we replace or repair to the same type, standard and specification (but not
brand) as when new. If the same is not available, it means of a similar type,
Determination | Case number: 853890 Page 11 of 11
standard and specification (but not brand) when new. We can replace with a
different brand.
‘New for old’ does not:
…
• mean of a better standard, specification or quality than when new.
…
Changes to the building
If you want to change the design of the building
When repairing or rebuilding the building, if we agree, you can choose to change
the design of the building or upgrade parts of it, providing you pay the extra costs
of doing this. If you want to downsize the building for less cost than you are
entitled to claim, we will not pay more than it costs us to rebuild the downsized
building.
…
Lifetime guarantee on building repairs
When we repair or rebuild the building, we guarantee the quality of materials and
workmanship of that work for the lifetime of the building if we:
• authorise;
• arrange; and
• pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the workmanship to be free of
defects. If a defect arises in the lifetime of the building as a result of poor quality
workmanship or use of incorrect materials, then we will rectify the problem. It is a
condition of our guarantee that we reserve the right to decide who will undertake
the rectification work.
This guarantee does not apply:
• to repairs you authorise or make yourself;