Home / Allianz Australia / Determination 853505

Determination 853505

Cash settlement amount for storm-free water damage claim, plus handling delays and communication

FirmAllianz Australia
Decided2022-09-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$396,329
Non-financial loss$3,000
Amount claimed$375,816
SourceAFCA PDF

Summary

The complainant claimed a home insurer should pay the full cost of storm-free water damage repairs, contents and accommodation after the insurer stopped repairs and offered a cash settlement of $225,001.28. AFCA found the settlement should be based on the complainant's fuller quote, ordered payments for building damage, contents, a benchtop, interest, non-financial loss and costs, and refused accommodation above the policy limit.

The insurer's limited builder quote did not show it would allow the complainant to complete all claim-related repairs, and its failure to provide the defects report in a timely way caused avoidable delay, so the fuller quote was adopted as the basis for settlement.

Issues

Subjects and remedies

pay claimpay compensationpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 853505 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 853505 Page 1 of 10 Case number: 853505 13 September 2022 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer). She lodged a claim on 4 June 2021 after discovering a burst pipe in the sub-floor under the laundry/bathroom area, which caused widespread water damage and mould. The insurer arranged for repairs, however identified certain deficiencies in the building which it said the complainant was responsible for remediating. The insurer said it could not undertake repairs until those deficiencies were addressed. On 18 January 2022, it offered to cash settle the complainant $225,001.28 for the claim-related repairs. The complainant is unhappy with the settlement offered and with the insurer’s handling of the claim overall. She says the insurer:  ceased all communication and involvement with the claim after identifying deficiencies/defects in the property  did not provide reports identifying those deficiencies, preventing her from rectifying them  failed to address the issue of damage to and loss of contents caused by its builders  caused avoidable delays, resulting in the policy limit for alternative accommodation being reached, and causing consequential financial and non-financial loss. 1.2 Issues and key findings How should the claim be settled? Claim-related repairs The claim for damage caused by the leak should be cash settled, using as a basis the complainant’s quote which is comprehensive and detailed, includes all scoped works, and is based on industry pricing guides. The final cash settlement amount should also include an allowance for contingencies and the transfer of risk to the complainant. It is not required to cover deficiencies/ defects identified by the complainant’s builder. Contents The insurer is required to pay the complainant $4,210.82 for missing/damaged contents items (except to the extent any or all are located/found to be in storage and are promptly returned undamaged to the complainant). It is also required to pay $5,825 for the damaged kitchen benchtop. Statutory interest is to be added to those amounts, calculated from 18 March 2022 to the date of settlement. Temporary accommodation The available evidence is not sufficient to show the complainant has incurred additional accommodation costs. The insurer is not liable for further accommodation costs beyond the policy limit, which has already been reached. Determination | Case number: 853505 Page 2 of 10 Compensation for non-financial loss The insurer has caused avoidable delays, resulting in significant avoidable stress and disruption for the complainant. $3,000 compensation for non-financial loss is warranted in the circumstances. Other costs The insurer is also liable for reimbursing the complainant’s cost in engaging an expert building specialist, who assisted in resolution of this complaint. The dispute is not so complex in itself as to reasonably require legal representation. However, the complainant’s legal representative did assist in clarifying and outlining the complainant’s position. It is fair in the circumstances that a contribution of $1,000 be paid towards the complainant’s legal costs. Why is the outcome fair? It is fair that the insurer’s cash settlement for repairs reasonably reflects the cost to the complainant of having the claim-related work completed, including an allowance for contingencies and the transfer of risk. The complainant’s quote is a fair and appropriate basis for that settlement in the circumstances. To date, the insurer has not specifically addressed the location and status of the contents being claimed. It is fair that the insurer be held liable for damaged/missing contents, unless it can show they are safely stored and undamaged, and are promptly returned to the complainant. The insurer’s handling of the claim is such that it is fair for compensat ion and certain other costs incurred in the course of this complaint (contributing to its resolution) to be paid. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required, within 14 business days of the compl ainant’s a cceptance of this determination, to:  pay the complainant $385,292.85 for the claim-related damage (being $366,945.57, as claimed, based on QA’s quote, less identified defect costs and the policy excess, then increased by 5% to allow for contingencies and risk transfer)  pay $4,210.82 for missing/damaged contents, together with statutory interest on that amount calculated from 18 March 2022 (the date of the complaint’s lawyer’s letter to the insurer in which they proposed a reasonable settlement) until the date of payment – to be adjusted, as appropriate, if the insurer locates and returns any/all of the claimed items in undamaged condition within 14 business days  pay $5,825 for the damaged benchtop, plus statutory interest from 18 March 2022  pay $3,000 compensation for non-financial loss  pay $1,000 towards the complainant’s legal costs  reimburse the complainant’s expert report fee s (up to $5,000) within 14 days of the complainant supplying the relevant invoice. Determination | Case number: 853505 Page 3 of 10 2 Reasons for determination 2.1 How should the claim be settled? Insurer accepted claim but identified deficiencies/defects in construction The complainant lodged a claim on 4 June 2021 for water and moisture damage. The insurer identified an ongoing leak which had damaged the subfloor across the entire home. There is no dispute there was an insured ‘escape of liquid’ event during the period of cover. The insurer accepted liability for the claim-related damage. The complainant was also advised to vacate the property because of the health risks associated with the high moisture and mould readings in the building, and the insurer agreed to cover temporary accommodation costs (a benefit under the policy). The insurer engaged engineer AA to provide a scope of work for the damage attributable to the leak, and to conduct an inspection of the existing sub-floor framing to determine its suitability to support a new floor. In their report dated 21 October 2021, AA referred to instances of poor building practices, primarily in relation to the construction of the sub-floor. AA considered the floor was defective, and reinstatement and repair of the other claim-related damage should not take place until those deficiencies were rectified. The deficiencies identified by AA included:  short floor joists which are unlikely to meet load-bearing requirements  deficient wall framing, including breaches in fire rates walls and inadequate support  a large ridge beam supported only by a timber stump which is inadequately connected to a timber lintel  the subfloor being lower than the surrounding ground and not adequately ventilated  various issues with the subfloor, such as substandard timber packing, rotted packers, excessive joist spans and untreated pine used as a packer. It is relevant that AA does not explicitly reference relevant building codes and standards to support their assessment of the deficiencies, but does describe the subfloor in particular, as littered with issues. The panel accepts A A’s view that it is unlikely a builder would warrant repairs which are reliant on this subfloor for support. The insurer subsequently ceased work, on the basis the complainant would need to rectify the deficiencies before it could recommence. In January 2022, the insurer elected to cash settle the complainant (despite the complainant’s initial preference that the insurer complete the repairs) and on 9 February 2022 it ceased paying alternative accommodation on the grounds the complainant had not rectified deficiencies. Insurer deprived complainant of opportunity to promptly rectify deficiencies The complainant disputed the insurer’s decision to stop repairs and accommodation payments. She asked that it provide clear guidance on the obstacles preventing it from carrying out repairs. She says that despite several requests, she was not provided with a copy of the AA report which outlined the deficiencies, and so was unable to comply with the insurer’s request to rectify these. Determination | Case number: 853505 Page 4 of 10 The AA report was not included in initial submissions to AFCA, nor in response to a request from AFCA to the insurer on 4 April 2022 for all reports, quotes and scopes. It was first made available to the complainant and AFCA on 6 May 2022. While a copy had been sent to the complainant in November 2021, that was sent by post to the insured property which was, by then, unoccupied in direct response to the insurer’s recommendation that the complainant should vacate. By failing to provide a copy of the AA report to the complainant in a timely and appropriate manner, the insurer deprived the complainant of the opportunity to consider and rectify the deficiencies, which in turn prevented it from continuing repairs. This meant there were significant avoidable delays and ongoing upset and inconvenience to the complainant. Insurer based cash settlement on quote which lacks detail The insurer’s subsequent cash settlement offer for the cost of claim-related repairs (made because the complainant had not dealt with the building deficiencies) is based on a quote from its builder BB, dated 20 December 2021. BB ’s quote in turn is based on AA’s scope of works dated 22 October 2021. The AA scope is detailed, with a room by room breakdown of repairs required, room and repair dimensions, materials required, and so forth. AA stipulates that any quote should also allow for:  appropriate and adequate supervision, protection, security, and safety measures including 'Worksafe ’ requirements  appropriate contracts, insurances, implied warranties, and realistic timeframe schedules  adequate allowances for specifications, plans, and permits as required  adequate allowances to carry out all required works described in the scope and working drawings where applicable  appropriate straightening of retained floor, wall, and/or ceiling framing where required. The BB quote lacks useful detail. It includes 14 items with a total cost for each: carpentry at $23,099, painting at $11,356, and so forth. It includes no breakdown of these costs to align it clearly and explicitly with AA’s scope . BB allows $8,900 for prelims and $5,000 for supervision. It is unclear whether prelims include relevant insurances, protection, security, safety measures, specifications, plans, permits and drawings. There appears to be no allowance for straightening of floor, wall and ceiling framing. The panel is not satisfied, on the available information, the BB quote adequately addresses the necessary scope of work and is sufficient to allow for repair of all damage caused by the leak. In particular, it is not clear that the quote is one which would be actionable by the complainant as a retail customer. In other words, BB’ s quote of $225,551.28 has not been shown to be sufficient to allow the complainant herself to finalise all claim-related repairs and return the property to its pre-loss condition. Complainant supplied alternative quote for claim-related damage The complainant supplied a comprehensive report dated 4 February 2022 from builder QA. QA describes itself as a specialist in litigation claims for building and construction. The panel is satisfied QA is appropriately qualified and experienced to address the issues. The QA report includes a scope of works and quote, supported by a room by room examination of the property with photographs and commentary. Determination | Case number: 853505 Page 5 of 10 QA says floor joists have been installed short in the lounge, kitchen and dining room area and may not be sufficiently load-bearing. QA also identified missing insulation in floors and walls, although is uncertain whether this was omitted by the insurer’s contractors or the original builders. QA says these issues constitute defects, however identified no other defects across the property. The other available evidence (including AA’s comments) is not otherwise conclusive that additional defects/deficiencies apply and should be excluded from cover. QA considered the quote from BB insufficient based on current rates. QA utilised the Rawlinson’s Construction Costs Guide 2020 (RCG) and its own experience to arrive at an estimate of $383,125.99 for all repairs (which did include approximately $14,256 for identified and accepted defects/deficiencies). Complainant does not require insurer to rectify defects The panel notes the insurer provided a letter to AFCA dated 6 February 2022, which said a cash settlement offer (based on BB’s quote) had been made, and which incorrectly stated that the complaint had been resolved with the complainant. The complainant promptly advised that offer had not been accepted. The complainant’s preference was initially for the insurer to carry out repairs. Following a relationship breakdown between the parties, the complainant engaged solicitor, WL, to assist with the claim. WL wrote to the insurer on 18 March 2022 requesting that it cash settle the claim based by reference to the cost of the QA quote, and also reimburse the complainant’s other costs. The available evidence addresses the issue of deficiencies and the complainant is not disputing her responsibility for those , based on QA’s report . Cash settlement for building damage should be based on complainant’s quote As noted, the panel is concerned that the BB quote is not actionable by the complainant. It is also important to acknowledge that in making a cash settlement, the insurer is transferring the risk involved in the work to the complainant, including the possibility of related unforeseen issues and other contingencies. The report and quote from QA is specific, detailed and persuasive, and was prepared for the complainant as the customer. The report compellingly addresses the insurer’s expert evidence, and the quote clearly explains how costings were arrived at, and references RCG, a cost guide which includes price indices, identifies detailed prices for various trades and services, and labour costs for major items of work. It also identifies those costings which apply to defects/deficiencies, for which the insurer is not liable. Having regard to all the available evidence, the panel considers it is fair and appropriate in the circumstances that settlement for building damage be based on the scope and quote from QA. That is because, on balance, it more accurately reflects the likely cost to the complainant of returning the property to its pre-loss condition; while acknowledging building deficiencies. The quote from QA already allows 10% for price increases since 2020. Given the quote was prepared in February 2022, the volatility of the building industry, potential delays which may result from staffing/material shortages, and so on, the panel is concerned the price may further increase by the time the complainant is able to arrange for the work to be done. The panel also notes the complainant does not gain the benefit of a repair guarantee from the insurer when the claim is cash settled. Given this, the panel considers it fair and appropriate Determination | Case number: 853505 Page 6 of 10 that the insurer pays $385,292.85 for the claim-related damage (being $366,945.57, as claimed and based on QA’s quote, less identified defects/deficiencies and the policy excess, then increased by 5% to allow for contingencies and risk transfer). The complainant also says the insurer’s contractors failed to clean the prope rty after ceasing repairs. She wants the insurer to pay $1,060 for the cost of a skip bin. However, the QA scope and quote already allows $4,158.00 for a commercial clean after repairs are complete. In the circumstances, the insurer is not liable for the additional $1,060 cost claimed. Insurer liable for missing/damaged contents The complainant says that because the insurer’s contractors left the premises unsecured, certain contents items were stolen. She has provided invoices for the individual costs of the claimed missing items, totalling $4,210.82. The insurer says that all items were placed in storage, and no theft has occurred. Despite having had the opportunity to do so, the insurer has not, however, provided confirmation of the location of the storage unit, or of exactly what contents are being stored. In the circumstances, it is fair that the insurer be liable for the claimed cost of $4,210.82, together with statutory interest on that amount. If, however, the insurer promptly locates and returns all/any of the claimed items to the complainant in undamaged condition, then that amount is to be adjusted accordingly. The complainant also says (and photographs confirm) a concrete kitchen benchtop was left exposed to the elements on a rear deck area. The complainant says it suffered irreparable damage. She says a white bathtub was also damaged. Replacement of the benchtop is included in the AA scope, although with no price. It is not included in the QA quote and scope. The complainant has supplied quotes for replacement of the benchtop ranging between $3,950 to $7,700 (depending on the stone used and profile edge). It is unclear which of the quotes represents a like-for-like replacement for the damaged concrete benchtop. In the circumstances, it is fair that the insurer pays the complainant $5,825 for the damaged benchtop (being the mid-point between the lowest and highest quotes submitted), plus statutory interest. Complainant says insurer should cover accommodation above policy limit The policy includes an allowance for emergency accommodation costs (up to a set limit) if the home is unliveable because of an insured event. However, that expense will only be paid if the complainant actually incurs costs for emergency accommodation. There is no dispute the property was unliveable. The available benefit is the lesser of 10% of the sum insured (equating to $57,500) or 12 months accommodation cost (at $3,911 per month, equating to $46,932). The insurer has paid this amount in full, plus an additional 72 days. The complainant says if the insurer had supplied the AA report sooner, she could have rectified defects and avoided further delay in getting back into the home. She says she has incurred accommodation costs above the policy limit as a result of the insurer’s error. Determination | Case number: 853505 Page 7 of 10 No evidence complainant incurred additional accommodation costs The complainant supplied a copy of a residential rental agreement in support of her claim. The agreement indicates it was signed and dated on 8 February 2022, and notes a weekly rental amount of $600. The document is an electronic PDF file and includes metadata which indicates the file was created on 7 April 2022. The evidence also shows the complainant has an ownership interest in the property. The complainant was asked to provide further proof, including evidence of bank transfers, to show rent payments were being made. To date, this information has not been supplied. The submissions made and the evidence provided by the complainant do not establish she has incurred additional accommodation costs as a result of delays by the insurer, so as to justify payments over and above the policy limit. That means the insurer is not liable for further accommodation costs. Compensation for non-financial loss is warranted The complainant has provided extensive submissions regarding her concerns with the insurer’s handling of the claims, including that:  the insurer failed to provide reports relating to the claims, and in doing so the insurer caused avoidable delays  the insurer’s contractors were disrespectful and caused property damage  the insurer failed to notify the complainant of any objections to completing all repairs  communication was poor. On 16 November 2021 the insurer instructed the complainant to obtain a quote to repair the deficiencies identified by AA, but that notification was sent to the address where she was no longer living. It failed to provide a copy of the AA report, even after a copy was requested by the c omplainant’s solicitor in December 2021. The report was not supplied until May 2022. The panel is satisfied, on balance, the complainant would have promptly taken steps to rectify deficiencies if she had been supplied with the AA report and it had been clear exactly what they were. Th e insurer’s errors led to the complainant having to devote considerable additional time and resources to the complaint. She engaged a solicitor to assist with the matter, and engaged building specialist QA to provide a scope and quote. Had the matter been resolved earlier, this would likely have been unnecessary. Under our Rules, we can award up to $5,400 compensation for non-financial loss. We may award compensation if a complainant has suffered an unusual degree of physical inconvenience, time taken to resolve the situation or interference with his or her expectation of enjoyment or peace of mind due to the insurer’s handling of the claim. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. However, in this case the insurer has caused avoidable delays, resulting in significant stress and disruption for the complainant. It should pay the complainant $3,000 compensation for this non-financial loss. Determination | Case number: 853505 Page 8 of 10 Appropriate that certain professional fees be covered by insurer Under our Rules, AFCA is also able to consider a claim for indirect financial loss caused by the insurer’s actions . AFCA will consider whether the costs were reasonable and whether they helped resolve the complaint. As well, the policy allows a benefit for professional and legal costs that might be necessary for the repair or replacement of the insured property following an insured event. QA’s quote and scope was of direct assistance in resolving the complaint, by clarifying the likely costs to the complainant of having the claim-related work completed. It was reasonable (and necessary) in the circumstances that the complainant engaged QA. The cost (claimed as $3,600) could likely have been avoided if the insurer had ensured the complainant received the list of deficiencies in November 2021. Given this, on provision of an invoice confirming the complainant’s payment , the insurer is required to reimburse QA’s fee, up to a maximum of $5,000. AFCA tries to make our service accessible and understandable, without any need for legal representation. If a complainant chooses to be legally represented, they will generally have to pay for this themselves. However, we may still require the insurer to contribute to legal costs if the complaint raised complex legal issues. Unless there are exceptional circumstances, AFCA will not require an insurer to contribute more than $5,000 to these costs. Having considered the issues in dispute between the parties, the panel does not consider these were overly complex, or necessarily required legal representation. In this particular case, however, the lawyer’s correspondence did clearly and reasonably summarise the complainant’s position and assist in identifying a fair settlement. The panel considers it fair in the circumstances that the insurer contribute $1,000 towards the complainant’s legal fees in pursuing the claim and complaint. The complainant also claims indirect financial loss because the time devoted to the claim meant she was unable to continue with her regular income-earning activities. The submissions made do not include any evidence that the complainant’s income was affected , or if so, to what extent. It is also unclear how the complainant’s involveme nt would need to be such that it would prevent her from earning income. The panel is not satisfied the complainant has established the insurer should be held liable for lost wages/income. 2.2 Why is the outcome fair? An insurer is typically entitled, under the terms of a policy, to choose whether to carry out repairs or to pay the complainant the cost of repairs. AFCA expects that the insurer will exercise discretion reasonably in making this decision. In these circumstances, where defects or deficiencies would prevent a builder from warranting works, the panel accepts it is reasonable for the insurer to refuse to carry out repairs. It was fair and reasonable for the insurer to offer to continue with repairs if the complainant rectified defects. However, in failing to present the complainant with a list of those defects, it prejudiced her ability to arrange rectification, leading to a dispute over reasonable repair costs. It would not be fair in these circumstances if the complainant was left out of pocket for the repairs. Determination | Case number: 853505 Page 9 of 10 The insurer has based its offer on a very limited quote. It is unclear from this quote whether the insurer’s offer would enable the complainant to complete all necessary repairs. On the other hand , the complainant’s quote allows for all wor ks included in the scope of repairs upon which it is based. The quoted amounts are based on industry costing guides. It is fair, in the particular circumstances, that settlement is based on this more complete quote provided by the complainant ’s expert . Giv en the insurer’s handling of the claim has contributed to delays and caused the complainant to incur avoidable costs, it is fair and reasonable that the insurer meet these costs. As the complainant has not established this caused her to incur accommodation costs, it would not be fair to require the insurer to pay for this. Determination | Case number: 853505 Page 10 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.