Home / IAG / Determination 853101

Determination 853101

Water leak damage claim partially declined; cash settlement amount disputed

FirmIAG
Decided2022-08-16
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$2,000
Non-financial loss—
Amount claimed$137,775
SourceAFCA PDF

Summary

The complainant lodged a landlord insurance claim for water and building damage to his investment property, and the insurer offered a cash settlement covering 40% of the damage. AFCA decided the insurer need not cover more than 40%, but must obtain an updated repair quote, pay 40% plus a 15% uplift, and pay $2,000 towards costs; non-financial loss was refused.

The complainant must establish a valid claim under the policy, and the expert evidence supports covering only the 40% attributable to the bathroom leak, with cash settlement requiring an actionable quote and contingency uplift.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay compensationreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 853101 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 853101 Page 1 of 7 Case number: 853101 8 August 2022 1 Determination overview 1.1 Complaint The complainant holds a landlord building insurance policy with the financial firm (the insurer). On 24 September 2019, he lodged a claim for damage to the insured building. The insurer concluded that 40% of the damage was caused by a pipe leak, with the other 60% being not due to an insured event or excluded from cover. The insurer offered to pay the complainant a cash settlement based on 40% of UB’s quote for repair costs. The complainant says the insurer should pay at least 80% of his, more recent, repair costs quote. He also wants the insurer to pay him the cost of his expert reports and non-financial loss compensation for stress caused by its poor claim handling. 1.2 Issues and key findings Is the insurer required to cover more than 40% of the damage? No. The insurer’s of fer to cover 40% of the damage is reasonable. The complainant has not established that the other 60% is covered under the policy terms. Are further investigations required to enable settlement of the claim? Yes. The insurer has agreed to pay 40% of the cos t of repairs. However, UB’s quote is 18 months old so will not reflect current pricing. The insurer is to ask UB to update its quote, then pay 40% of that quote plus a 15% uplift for contingencies. Is the insurer to contribute to the complainant’s professional costs? Yes. The complaint and underlying claim involved complex issues. In line with its previous offers, the insurer is to pay $2,000 to the complainant in partial reimbursement of costs. Is the complainant entitled to non-financial loss compensation? No. Overall, the insurer has handled the claim in a reasonable and timely manner. Why is the outcome fair? 60% of the damage is not covered, so it would not be fair to require the insurer to cash settle for more than 40% of a current repair quote, plus a contingencies uplift. It is fair that the insurer pays the offered $2,000 in costs. Non-financial loss compensation is not payable. 1.3 Determination This determination is substantially in favour of the insurer. If the complainant gives written notice he accepts the determination (notice), the insurer is to:  within 14 days of receiving the notice, pay the complainant $2,000  within seven days of receiving the notice, ask UB to update its quote using current pricing  within 14 days o f receiving UB’s updated quote, pay the complainant 40% of t he quoted amount plus 15% of the 40% figure to allow for contingencies, less the policy excess. Determination | Case number: 853101 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer required to cover more than 40%? No. The insurer’s offer to cover 40% of the damage is reasonable. The complainant has not established that the other 60% is covered under the policy terms. The complainant must establish a valid claim under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not) that he suffered a loss caused by an insured event covered by the policy. This is known as a valid claim. The complainant holds a landlord insurance policy covering his investment property. Subject to its terms and conditions, the policy provides cover for loss or damage caused by the insured events listed in the product disclosure statement (PDS). One of the listed insured events is ‘Water and oil leaks’ (WL insured event). Relevantly, the WL insured event covers loss or damage caused by water leaking or escaping from pipes or sanitary fixtures like baths or toilets. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proof in establishing that an exclusion applies. The standard of proof is the balance of probabilities . The insurer relies on expert reports The insurer’s position on coverage is based on expert reports from UB (builder), TB (plumber) and RC and CE (both engineers). UB attended the property on 2 October 2019. It noted extensive bathroom wall tile cracking, brickwork movement cracking and uneven floor levels. UB concluded that the damage was due to long term water exposure, caused by a combination of a deteriorated shower/bath recess, a leaking shower recess waste pipe and a broken sewer pipe (adjacent to the bathroom). TB has provided a leak detection report dated 10 October 2019. TB agreed with UB, concluding that the damage to the bathroom was caused by a combination of the deteriorated shower/bath recess, and the leaking sewer pipe, which had been broken by tree root entry. RC inspected the property on 22 October 2019. In its report dated 31 October 2019, RC concluded: … the damage to the living room of the dwelling was caused by a combination of unevenly distributed rainfall, poor civil drainage and natural soil movement, resulting in cracking to masonry walls, as well as cracking and separation of cornices and plasters. … the previously reported leakage from the shower/bath waste, sewer, and the shower hob is one of the causes of the damage to the rest of the dwelling including cracking to masonry walls, cracking and separation of cornices, as well as cracking to the tiling and the vanity unit in the bathroom. Other causes include Determination | Case number: 853101 Page 3 of 7 poor civil drainage, natural soil movement, as well as deterioration of hob and recess in the bathroom. Accordingly, RC did not consider any of the living room damage to be related to a water leak. RC provided an apportionment of the cause of the observed damage to the rest of the building. It said that only 40% of the damage was due to the leakage from the shower/bath waste, sewer, and the shower hob. RC also identified a broken section of a partially exposed stormwater pipe. However, RC said it was not relevant as it conducted a leak test using a garden hose for ten minutes and there was no water back up/escape. RC recommended a six month drying out period before the commencement of major repairs . Upon reinspection on 3 April 2020, RC said there had been no real change to floor levels and the subfloor continued to show dampness. Therefore, the drying out had not been completed. CE inspected the property on 17 November 2020. The drying out was 80% complete so the building was still not ready for repairs. CE confirmed that there was a section of stormwater pipe exposed at ground level. It said that indicated works had been conducted in a non- tradesman like manner. CE also said its observations and assessment of causation were congruent with RC’s findings. On 9 February 2022, CE reattended the property and confirmed that drying out was complete. CE said the property has been subjected to damaging foundation movement from a range of causes including poor surface drainage, internal plumbing damage and external stormwater pipe damage. CE also compared the findings of RC and SS, the comp lainant’s expert engineer (SS’s report is discussed below). CE said that both considered that ‘40% of damage within the zone of influence of the bathroom has been caused by the bathroom leak’. CE also noted that 40% of the damage was associated with the damaged stormwater pipe and 20% with poor general surface drainage. CE said that ‘these are rational percentages that can be used to proceed the claim based on the Insureds policy’. The insurer says the policy only covers 40% of the damage In light of its expert reports and given that SS said the stormwater pipe was accidently damaged and left unrepaired for years, the insurer says that 40% of the damage claimed is covered. It says that is the only damage referrable to the WL insured event. The insurer says the remaining 60% of the damage is not covered because:  the WL insured event section specifies that it does not cover water leaking or escaping from a shower recess or base  nor does it cover the cost to repair/replace the item from which water has leaked or escaped  the PDS contains general exclusions that mean the policy does not cover loss or damage arising from: > gradual deterioration, wear and tear > erosion > atmospheric conditions > faulty design or workmanship an insured knew or should reasonably have known about > previous damage that has not been repaired > failing to maintain the property in good repair and condition Determination | Case number: 853101 Page 4 of 7  the PDS also contains a general exclusion stating the insurer will not cover settling, shrinkage or expansion in buildings, foundations, walls or pavements. The complainant disagrees with the insurer The complainant disagrees with the insurer, relying on expert reports he obtained. The complainant engaged OG, engineers, to provide a structural report. In that report, dated 2 January 2020, OG says:  the most serious damage is located on the east and south brick walls which suffered movement leading to wall crack  although the actual reason for the ground movement at the east side is not certain, it can be fairly estimated that moisture imbalances have caused soil movement leading to destabilisation of foundations  the moisture addition in the soil is considered to have occurred due to leakages  at the north side, it remains almost certain that the foundation movement was caused by the bathtub leakage and broken sewer pipe (that had recently been repaired). The complainant has also provided a report dated 26 November 2021, from SS, engineer. SS says that the damage to the property was due to:  the broken storm water pipe 40%  the leak under the bathroom 40%  the sewer pipe blockage and other drainage issues 20%. In relation to the broken storm water pipe, SS said the complainant had reported that it had been accidently damaged by a lawnmower and left unrepaired for years. SS also said that RC’s water leak testing of the pipe was inadequate. SS was satisfied that ‘the severe ea stern wall movement is caused ingress of water from the broken pipe which continued unrepaired for long period’. In the circumstances, and noting the content of CE’s second report, the complainant considers that the insurer should cover at least 80% of the damage (40% from the bathroom leak and 40% from the broken stormwater pipe). The insurer is not required to cover more than 40% of the damage Having carefully considered all of the available information, I am satisfied that the insurer is not required to cover more than the 40% offered for the damage to the property. The reasons for my determination include:  40% is the proportion of the damage that all of the experts agree was caused by the leaks in the vicinity of the bathroom  the opinions o f the insurer’s experts are consistent and logical  UB, TB and RC each inspected the property within a month of claim lodgement whereas the complainant’s main expert, SS, did not do so until more than 12 months later  the more serious damage to the property is on its south and east sides, and none of the experts suggest that damage is due to the bathroom leaks  even if it is accepted that the broken stormwater pipe has caused the south/east damage, the pipe was installed too close to ground surface and the damage to it was left unrepaired for years. Accordingly, that damage is excluded under the policy  the drainage issues are not linked to any insured event listed in the policy and appear to involve faulty design or workmanship of which the complainant should have been aware Determination | Case number: 853101 Page 5 of 7  RC, with whom CE agrees, says its 40% leakage allocation includes the leaking shower hob. The WL insured event does not cover water leaking from a shower recess or base. Therefore, it is arguable the insurer is in fact liable for less than 40% of the damage. 2.2 Are further investigations required to enable settlement? Yes. The insurer has agreed to pay 40% of the cost of repairs. However, UB’s quote is 18 months old so will not reflect current pricing. The insurer is to ask UB to update its quote, then pay 40% of that quote plus a 15% uplift for contingencies. Cash settlement should be based on an actionable quote and include an uplift When an insurer cash settles a claim, it transfers to the insured the risk that the cost of repairs may unexpectedly increase and/or that additional works not quoted are required. The insured also loses the insurer’s warranty that would apply to repairs arranged by the insurer. In the circumstances, there is a reasonable expectation that when cash settling a claim an insurer will base its offer on a recent quote that is actionable for a retail customer. Further, it should increase (uplift) the quoted figure by applying a fair percentage, to allow for the transfer of risk, conti ngencies and loss of access to the insurer’s repair warranty. The insurer has offered to cash settle the complainant based on UB’s SOW and quote as varied on 15 February 2021. That quote is now 18 months old so will not reflect current pricing, particularly given the rapid increase in the cost of building materials and labour over the last year or so. This means UB’s quote is not actionable. Accordingly, the insurer is to obtain from UB an updated quote, based on its SOW but using current pricing. It is to pay the complainant 40% of the quoted amount plus a further 15% of the 40% figure to allow for contingencies, transfer of risk and loss of warranty. The complainant wants the insurer to base its cash settlement on the quote dated 10 April 2022 from his builder, SQ, totalling $137,774.96. However, the PDS does not require the insurer to use an insured’s preferred builder or adopt their quote. Further , SQ’s quote appears to involve works not associated with the claim. I am also satisfied that once UB updates its earlier quote, the quote will reflect the current reasonable cost of repairs. 2.3 Is the insurer to contribute to the complainant’s costs ? Yes. The complaint and underlying claim involved complex issues. In line with its previous offers, the insurer is to pay $2,000 to the complainant in partial reimbursement of costs. AFCA may require insurer to contribute to complainant’s professional costs The AFCA rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Determination | Case number: 853101 Page 6 of 7 Insurer is required to partially reimburse the complainant’s costs The complainant has incurred costs of around $2,365 in obtaining expert reports. He wants the insurer to reimburse him. The compl ainant’s expert report s have not assisted him in getting more of his claim covered. However, I accept that the complaint and the underlying claim involved issues of some complexity. Further, I note that the insurer has previously offered on a number of occasions to pay the complainant $2,000 for his out of pocket expenses. In the circumstances, despite the fact the complainant’s experts did not assist him in securing an entitlement to have more of the claim covered, I am satisfied that it is reasonable that the insurer pays $2,000 to the complainant in partial reimbursement of professional costs. 2.4 Is complainant entitled to non-financial loss compensation? No. Overall, the insurer has handled the claim in a reasonable and timely manner. AFCA may award non-financial loss compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer is not required to pay non-financial loss compensation The complainant says the claim has taken an unreasonably long time. He says the insurer ‘ wasted a lot of my time and caused a lot of stress and disappointment, where I have had to organize tradesmen and engineers to carry out work, in which I had to meet in person .’ I acknowledge that the claim has taken much longer than would typically be anticipated. However, I am mindful that drying out periods have been required, which have necessarily delayed progress. Based on the available information, overall, the insurer appears to have progressed this claim in a reasonable manner and consistently with the time frames set out in the General Insurance Code of Practice. I am therefore not satisfied that an award of non-financial loss compensation is warranted. 2.5 Why is the outcome fair? The exchanged information shows at least 60% of the damage is not covered. Given this, it is not clear if the policy responds to the loss as the other factors are not covered. Therefore, it would not be fair to require the insurer to cash settle for more than 40% of a current repair quote, plus a contingencies uplift. It is fair that the insurer pays the offered $2,000 in costs. Non-financial loss compensation is not payable. Determination | Case number: 853101 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.