Determination 852502

Stormwater ingress claim: insurer limited liability to accepted repairs and declined pre-existing building defect damage

FirmHollard
Decided2023-01-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under a home policy for ongoing water ingress after a February 2019 storm. AFCA found the insurer had accepted and repaired the storm damage but was not liable for ongoing damage from pre-existing waterproofing defects, and declined non-financial loss compensation.

Ongoing water damage was dominantly caused by pre-existing construction defects and absence of waterproofing, which the policy excludes, rather than a covered insured event.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 852502 Financial firm Hollard Insurance Partners Limited Determination | Case number: 852502 Page 1 of 6 Case number: 852502 13 January 2023 1 Determination overview 1.1 Complaint The complainants hold a home building and contents policy (policy) with the financial firm (insurer). On 7 February 2019, a claim was lodged for stormwater ingress damage to the insured building. The insurer accepted the claim. However, it has limited its liability to damage it has assessed to be consistent with the insured event. The insurer has declined cover for damage/issues that have been identified as being pre-existing building defects, which is excluded under the policy. The complainants remain dissatisfied with the insurer’s management of the claim and assessment of its liability. They say it has failed to identify the cause for the water ingress and associated damage to the insured building. 1.2 Issues and key findings Is the insurer’s assessment of its liability fair? Yes. The available information establishes, on the balance of probabilities, that the issues relating to the ongoing stormwater ingress from the external laundry door and the absence of waterproofing in wet areas, are not covered under the policy. Are the complainant’s entitled to compensation ? No. The insurer made adequate efforts to investigate the cause and extent of the damage to the insured building as well as address concerns raised by the complainants. It would not be fair in the circumstances to require the insurer to pay the complainants non-financial loss compensation. Whys is the outcome fair? The outcome is fair as the insurer has accepted and covered the complainant for the internal water ingress damage associated with the storm event giving rise to the claim. However, in line with the available information, it is fair that the insurer decline indemnity for costs associated with the rectification of pre-existing building defects and associated damage in line with the policy provisions. Further, it would not be fair in the circumstances to require the insurer to pay non-financial loss compensation given its overall management of the claim has been reasonable. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline cover for the cost to rectify the issues identified with the external laundry door and waterproofing of wet areas under the claim. The insurer is not required to pay the complainants non-financial loss compensation in line with the AFCA Rules. Determination | Case number: 852502 Page 2 of 6 2 Reasons for determination 2.1 Is the insu rer’s assessment of its liability fair? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Storm ’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). There is no dispute the insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Complainant bears the onus to establish a valid claim under the policy The insured has the onus to establish, on the balance of probabilities (that is, more likely than not) that the loss falls within the terms of the policy. Only if a valid claim is shown to exists, will the onus shift to the insurer to show, on balance, it is entitled to decline the claim in line with the policy provisions. There is no dispute the insured property suffered internal stormwater ingress in February 2019, which the insurer accepted under the claim. The repairs completed by the insurer’s appointed building consultants ‘Q’, were:  repaired kickboards in the laundry  linen cupboard shelving in the laundry  plasterboard in the laundry  replaced timber door jambs in the laundry  external laundry door  replaced the carpet in the bedroom 4. Given the above, I am satisfied the complainants have established a valid claim for some of the damage claimed. However, this does not mean that a valid claim exists for all the damage for which indemnity is sought under the claim. The complainants are also of the view the repairs completed by Q have resulted in further damage to the insured building. The insurer says it has accepted and completed all the damage that can reasonably be associated with the stormwater ingress event in February 2019. However, the issues identified with the laundry door sill, tiles in the laundry and waterproofing in wet areas within the laundry and main bathroom are not covered. This is because these are pre-existing issues which relate to the construction of the dwelling. As such, they are building defects which are excluded under the policy. Relevant information from the consultants appointed to the claim The complainants have provided reports from building consultants ‘AW’ and ‘DP’, as well as, various photos and videos, which they say support their position. In its report dated 12 May 2022, AW says there was some evidence of moisture under the bath in the main bathroom. However, this appears to be recent given the minimal staining present on the bottom plate and support timbers at shower end. At the other end of the bath, near the laundry door, the moisture levels of the bottom plate were high and close to being saturated. Determination | Case number: 852502 Page 3 of 6 In summary, AW believes the water ingress to bedroom 4 is possibly by water pooling on the tiles at the laundry door threshold. The distance between the laundry door and corner of bedroom 4 is only around 1200mm. Therefore, pooling in bedroom 4 would occur reasonably quickly during a rain event. In their report 6 September 2022, DP say the water appears to be entering through the laundry door jambs and tracks in both directions. The timber jambs appear to be going down to the house slab instead of sitting on top of the floor tiles. DP says the tiles to the external side of the laundry door sill have moved because of water breaking down the tile adhesive and are now sloping towards the dwelling. Given pooling of water only occurs during rain, this indicates the issue is not related to a leak in the bathroom or laundry. The insurer relies on assessments and associated reports completed by building consultants ‘DK’ and ‘Q’ as well as plumbers ‘OT’, ‘SK’ and engineers ‘S’. I am satisfied the information from the plumbers shows there were no leaks in the laundry and bathroom plumbing which could reasonably be t he cause for the damage. I also accept Q’s positi on that the issues giving rise to the water ingress and associated damage were present before it completed repairs authorised by the insurer under the claim. DK, the first consultants appointed to the claim, completed its assessment in February 2019. DK determined the cause of damage to the laundry door, door frame and carpet in bedroom four was water ingress via the rear laundry door. DK notes the external tiles to the laundry door were not sealed and water was likely to be tracking under the door to related areas. DK says the damage appeared to have been occurring from before the February 2019 storm event. Engineering consultants S provided a forensic investigation report dated 29 July 2021. S noted extremely high moisture readings to the floor tiles in the laundry (southern end) with the moisture levels dropping significantly towards the northern end of the room. The laundry door sill tiles fall inwards towards the room. Inspection inside the laundry built-in cupboard revealed floor and skirting tiles at the south east corner to be wet with very high moisture readings. Similarly, very high moisture levels were recorded to the floor tiles near the shower recess and bath hob in the main bathroom. The further away (to the north) the testing was done, the drier the tiles became. Moisture testing of the tiled timber framed bath hob revealed extremely high moisture levels, especially at the wall abutting, and forming, part of the shower recess. S found the following:  one of the causes of elevated moisture to the floor tiles throughout the laundry and bathroom is a leaking shower recess. Water is saturating the bath hob each time the shower is used. This water is also seeping in behind the bath hob, saturating the timber hob frame, and migrating across the concrete floor, before seeping under the tile bed of the adjacent laundry  the shower recess should have been sealed/waterproofed by installation of a compliant waterproof membrane in accordance with Australian Standard 3740-2010 Waterproofing of domestic wet areas . A compliant waterproof membrane has not been installed to the shower recess and water has been escaping and seeping into the surrounding substrates  the other source of saturation to the floors and walls is due to rainwater ingress through the laundry door area. The incorrectly installed floor tiles (tiles falling back in toward the room) are facilitating the saturation of the tile bed  rainwater is able to seep into the tile bed through the junctions of the timber door frame and the screw fasteners of the door seal track. The rainwater is contributing to the saturation of the floor tile bed and surrounding substrates Determination | Case number: 852502 Page 4 of 6  the saturation and water migration within the tile beds is also causing saturation of the south-eastern corner of bedroom four. As with the shower recess, there has not been a compliant waterproof membrane installed to the laundry. If compliant membranes had been installed, moisture would not have been able seep past the waterproofed wall to floor junctions of the bathroom and the laundry S recommends that the complainant rectify the poorly installed tiles at the laundry door entrance and install weatherproofing features to the door and door opening. S says the above supports the complainants’ position that moisture ingress to bedroom four occurs during and after rain events. S concludes the ongoing moisture issues is defective building work. If the original builder had installed compliant waterproof membranes, the existing moisture issues would not have occurred. Evidence from insurer ’s co nsultants is the more persuasive The insurer is entitled to limit its liability to the damage it has accepted and repaired under the claim. I am persuaded by S’s investigations and findings. That is, on balance, the dominant cause for the ongoing issues and damage is not due to an insured event (escape of liquid). Rather, on balance, the ongoing issues and damage is because of pre-existing issues relating to the absence of waterproofing dating back to the construction of the dwelling. The policy includes the following policy exclusions: Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; 4. wear and tear, rust, corrosion and/or deterioration (except in some instances relating to 'Sudden escape of liquid' and 'Legal liability' claims), but we will only apply We will also not cover: 35. gradual loss or damage of any kind; I am satisfied it is fair to accept the available information, and more specifically the engineers, show the repeated instances of water damage to the insured building relate to pre-exiting building defects, and not any single insured event. Further, although the insurer has repaired the February 2019 event related damage, this does not mean it is now liable to cover repeated water ingress damage. This is because it has not been established this damage arises from circumstances covered under the policy. Rather, on balance, the ongoing issues and damage is because of pre-existing issues relating to the absence of waterproofing dating back to the construction of the dwelling. The insurer is entitled to limit cover for the damage under the policy Given the above, I do not accept it would be fair or consistent with the policy provisions to require the insurer to rectify the pre-existing issues identified with the insured building and resultant damage. This is because it has not been shown to be due to a sudden single event or from the insurer’s authorised repairs. Determination | Case number: 852502 Page 5 of 6 Rather, the ongoing issues and associated damage relates to pre-existing building defects, which is excluded under the policy. Accordingly, I determine the insurer is entitled to limit its liability to the repairs already accepted and completed under the claim. The insurer is not required to take any further action under the claim. 2.2 Are the complainants entitled to compensation? No. The insurer’s overall management of the claim and assessment of its liability under the claim were reasonable in the circumstances. The complainants are not entitled non-financial loss compensation The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. In this in stance and considering AFCA’s approach to compensation, I am not satisfied the degree of inconvenience meets the requirements for an award of compensation. I acknowledge the complainants’ opinion that the insurer failed to arrange adequate assessments and investigation into the cause of the damage, which has caused unreasonable delays. However, on reviewing the available information, I am of the opinion that the insurer has over the life of the claim acknowledged and made reasonable attempts to address the complainants’ concerns. This includes its assessments and investigations into the cause for the damage and associated repairs. I accept the insurer did not in the first instance appoint engineering consultants to the claim. However, I accept this is consistent with accepted industry practice and that the more qualified consultants are not usually appointed until such time that their becomes necessary. It was only after repeated similar instances of water ingress and the building/plumbing consultants’ failure to identify the issue, that it became evident engineers would be needed. I am satisfied that the insurer attempted to address and appointed numerous experts in the investigation of the ongoing water ingress issues. This is despite the onus resting with the complainants to show, on balance, the damage noted was due to an insured event or that their assertions regarding Q’s repairs were accurate. I acknowledge these issues and the time elapsed has been frustrating and stressful for the complainants. However, I am not of the opinion it would be fair in the circumstances to place the blame for this with the insurer or to require it to pay non-financial loss compensation in line with the AFCA Rules. Why is the outcome fair? The outcome is fair as the insurer has accepted and covered the complainant for the internal water ingress damage associated with the storm event. However, in line with the available information, it is fair that the insurer decline indemnity for costs associated with the rectification of pre-existing building defects and associated damage in line with the policy provisions. Further, it would not be fair in the circumstances to require the insurer to pay non- financial loss compensation given its overall management of the claim. Determination | Case number: 852502 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.