Home / Allianz Australia / Determination 852246

Determination 852246

Settlement amount for internal impact damage repair

FirmAllianz Australia
Decided2022-05-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$32,120
Non-financial loss$750
Amount claimed$43,120
SourceAFCA PDF

Summary

After a third party drove into the complainant's garage, the insurer cash settled the garage door and some contents but offered $16,000 for internal wall and dining room damage. AFCA found the insurer's quotes inadequate and ordered settlement based on the complainant's $32,120 quote plus 15%, $750 non-financial loss, and completion of any required make safe.

Under the policy the insurer must pay the reasonable cost to repair damage to the same condition as when new, and the insurer did not establish that the complainant's itemised quote was excessive.

Issues

Subjects and remedies

home or building damagethird party authoritypay compensationpay non financial lossrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 852246 Financial firm Allianz Australia Insurance Limited Determination | Case number: 852246 Page 1 of 7 Case number: 852246 27 May 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy with the financial firm (insurer). On 27 October 2021 the complainant lodged a claim after a third party impacted her garage. The third-party drove into the garage door causing internal and external damage. The insurer cash settled the complainant for the damage to the garage door and some contents items. This is not in dispute. The dispute relates to the insurer’s settlement for the repair of the internal building damage. The complainant wants to be cash settled $43,120 including $32,120 for repair of the internal damage, $6,000 for temporary accommodation, $5,000 for a structural engineer, and additional costs to remove and store her contents. The insurer offered $16,000 for the repair of the internal damage. The complainant also raises concerns with the insurer’s overall handling of the claim and its lack of response to her concerns about the safety of the damaged wall and ceiling. 1.2 Issues and key findings Is the insurer’s settlement offer fair in the circumstances ? No. To meet its obligations under the policy the insurer must pay the reasonable costs to repair the damaged building to the same condition as when new. The insurer’s quotes do not include all the required work and do not establish a reasonable settlement amount. The complainant’s quote is consistent with the scope of works provided by the insurer’s engineer and the insurer has not established that this amount is excessive, unfair or unreasonable. It is also fair for the insurer to compensate the complainant for its delay in addressing the internal damage, and its failure to adequately respond to her safety concerns. 1.3 Determination This determination is in favour of the complainant. Upon notification of the complainant’s acceptance of this determination, the insurer is to:  settle the complainant for the internal impact damage based on her quote of $32,120 plus a 15% uplift; and  pay the complainant $750 in non-financial loss compensation; and  if it has not already done so, ensure any required make safe is completed to the l oad bearing wall and associated ceiling area. Determination | Case number: 852246 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer’s settlement offer fair in the circumstances? No. To meet its obligations under the policy the insurer must pay the reasonable costs to repair the damaged building to the same condition as when new. The insurer’s quotes do not include all the required work and do not establish a reasonable settlement amount. The complainant’s quote is consistent with the scope of works provided by the insurer’s engineer and the insurer has not established that this amount is excessive, unfair or unreasonable. It is also fair for the insurer to compensate the complainant for its delay in addressing the internal damage, and its failure to adequately respond to her safety concerns. Dispute relates to the cost to repair the internal wall and dining room damage The policy provides cover for impact damage to the insured home. There is no dispute an impact event caused damage to the complainant’s home . This damaged the external garage door, an internal wall and the adjoining dining room. The insurer offered $16,000 for the repair of the internal wall and damage to the dining room, which the complainant rejected. Policy outlines how the insurer will settle the claim The policy outlines how the insurer settles a building claim. It says: we will pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. This may involve the insurer authorising the repairs directly with a builder or paying the reasonable cost to the complainant in a cash settlement. The policy terms also outline that:  the insurer will not pay any additional costs to match materials to undamaged areas of the home  for fixed wall, floor and ceiling coverings the repair will be limited to the room, hall or passage where the damage occurred. Both parties provided their own repair quotes The complainant wants to be cash settled based on a quote from her preferred repairer (IM). IM inspected the damage on 18 November 2021 and provided an itemised quote for $32,120. The insurer provided two quotes from its own builders. The insurer ’s first nominated builder (JP) provided an itemised quote dated 1 November 2021 for $12,012. The insurer ’ second builder (BK) provided a quote for $14,600. BK’s quote is not dated or itemised with individual pricing for each scoped area of repair. It provides a brief summary of what would be included with a lump sum of $14,600. I am not satisfied BK’s quote is suff icient to determine the reasonable cost to repair the damaged part of the building to the same condition as when it was new. This is because:  it is not clear if BK attended the complainant’s home , or if the quote is based on a desk top assessment Determination | Case number: 852246 Page 3 of 7  it is not appropriately itemised and does not specify what area of damage it will cover  it does not show the cost of trade and materials, and it does not include additional costs the complainant will incur to organise the repair herself such as: > garage skirting tiling (as shown in the other two quotes) > insurance > site supervision > builder ’ s margin. I consider IM and JP’s quote to be sufficiently itemised and detailed to determine if they are fair and reasonable. However, it is clear there is a large discrepancy in the quoted amounts. The insurer therefore engaged an engineer (CR) to provide a scope of works for the repair of the impact related damage. Insurer’s engineer provided a scope of works for the repair of covered damage The insurer says CR confirmed:  the com plainant’s quote is excessive  JP and BK’s quotes are reasonable and include all the necessary claim related repairs  a provisional sum will need to be included for propping and repair of the stud wall. CR confirmed the following damage is consistent with the impact event: 4.1.1 Detachment and cracking of plasterboard wall linings to both sides of the wall; 4.1.2 Detachment and cracking of skirting boards in the dining room; 4.1.3 Cracking of tile skirting within the garage; 4.1.4 Displacement and fracturing of three timber wall studs; 4.1.5 Abrasion to the floating laminate flooring in the dining room. CR also confirmed the damaged internal wall is load bearing. It supports the garage roof trusses which will require propping during the repair process. However, I do no t agree CR’s report establishes that JP and BK’s quotes are reasonable or that the complainant’s quote is excessive. Neither does it establish that a settlement of $16,000 is a reasonable cost to repair the internal impact related damage. I have outlined above why I do not agree BK’s quote is sufficient to determine the appropriate cash settlement amount. It is not appropriately itemised and does not include all related damage and repair costs. It therefore cannot be compared to IM and JP’s itemised quote. Regarding JP’s quote, CR notes that it does not include the repair of the damaged flooring or repair of the stud wall. These are two of the main areas of the claimed damage, and two areas itemised by CR to be impact related. It is therefore not a complete and reasonable quote. CR says some of the abrasion damage to the floating flooring is not due to the impact event. CR clarifies that: Abrasion damage to the dining room floating floor is not entirely attributable to the impact event. Some damage is due to general wear-and-tear. Refer to the provided Scope of Works for the extent of damage considered attributable to the event. Determination | Case number: 852246 Page 4 of 7 While CR says IM’s quote is excessive, CR does not explain why. CR does not explain if IM has quoted for more floor repair than reasonably required. CR does not comment on the reasonableness of any of the listed items in IM’s quote other than to say it does not include the cost to prop roof trusses during repairs, which is required. Insurer has not established IM ’s repair quote is excessive due to the flooring The insurer was asked to provide further explanation about why IM’s quote is excessive. The insurer says IM estimates the flooring repair to be $1,500 but CR says not all the abrasion damage is consistent with the claimed impact event. I accept CR says this. However, as outlined above, CR also provides a scope of works for the claim related flooring damage. CR’s scope of works says to ‘Allow 22 m2 of flooring ’ in the dining room. It also confirms the nearest architectural break would be the dining room entry. IM’s quote itemises an allowance of 4.3m by 5m for damaged dining room flooring. This is approximately 21.5 square meters and less than that allowed by CR. Therefore, I am satisfied the area of flooring needing replacement, due to the claimed impact event, is consistent with the area of flooring quoted in IM’s report. CR does not comment on the amount of $1,500 quoted and the insurer has not explained why this amount is excessive. IM’s individual pricing cannot be compared to BK’s quote because BK has not itemised its pricing. It also cannot be compared to JP’s quote because JP does not include the dining room flooring at all. The policy says flooring repairs will be limited to the room of damage. This is the dining room area as confirmed by CR and quoted by IM. IM’s quote is therefore consistent with CR’s scope of works. For these reasons, I am not satisfied the insurer has established IM’s quote is excessive because of the flooring. Insurer has not explained why any other a spect of IM’s quote is unreasonable The policy says the insurer has the discretion to authorise repairs or provide a cash settlement. The insurer has not advised that it is willing to authorise repairs. I therefore consider that it elected to cash settle the repair of the internal damage. This requires the insurer to pay an amount to cover all the costs the complainant will reasonably incur in organising the repair of the covered damage. The insurer has not shown the costs submitted by the complainant are unreasonable due to the flooring cost, and it has not established that any other aspect of the complainant’s quote is unreasonable. For completeness, I have reviewed IM’s itemised repairs against CR’s scope of works. CR includes a provisional amount of $2,500 for building permits for the demolition and reinstatement of the load bearing wall. It is not clear if this is included in IM’s costing for the repair of th at wall. CR’s report includes propping the roof trusses. IM’s report does not itemise this. The only additional costings I can see in IM’s quote (which are not in CR’s scope of works) are for: building management, a building surveyor, an engineer and the removal/return of furniture. Determination | Case number: 852246 Page 5 of 7 I consider building management costs to be reasonable and expected. They are usually included in a building quote. JP’s itemised quote also lists an engineer and the removal/return of furniture as necessary. I therefore consider these to be reasonable costs. I also accept, on balance, the building surveyor is required especially given the permits and planning required for the load bearing wall. The insurer has not provided any information to establish otherwise. In conclusion, I am satisfied IM’s quote is fair, reasonable and consistent with the work required to repair the claim related damage. The insurer has not established otherwise. Insurer to apply uplift of 15% to IM’s quote The insurer’s election to cash settle the complainant for the reasonable cost of repairs means she does not have a ccess to the insurer’s repair guarantee . If the insurer authorised repairs, it must guarantee the quality of its repair work. It would be liable to rectify any unsatisfactory repairs and to cover any additional damage identified during the repair process. Given the complainant is receiving a cash settlement for repairs, this risk passes to her. It is clear there is a very real possibility further costs will be incurred regarding the load bearing wall (such as permit and propping costs). I therefore consider it fair in all the circumstances for the insurer to apply a 15% uplift on IM’s quote . Insurer not required to cover accommodation, storage or additional engineering The complainant also requested for the insurer to pay $6,000 for temporary accommodation, $5,000 for a structural engineer, and additional costs to remove and store her contents. The complainant says her builder estimated that the repairs would take three months and she is concerned about the safety of being in the house while repairing a load bearing wall. The policy says the insurer will cover alternative accommodation costs if the loss or damage means the home is unable to be lived in. The policy outlines that ‘unable to be lived in’ means when it is so damaged that normal domestic activities such as cooking, sanitation and personal hygiene cannot take place. In this instance, the damage is to the garage and dining room. While inconvenient, there is no damage to the kitchen, bathroom or bedroom areas. T he complainant’s quote does no t substantiate an expected three-month repair timeframe. I am therefore not satisfied the complainant has established the need for alternative accommodation during the repair process. The complainant’s quote already includes costings for ‘Working & drawing & engineering’. I am not satisfied the complainant has established a further $5,000 for an additional engineer is required. The complainant’s quote includes costings for removing (and storing elsewhere in the home) and returning furniture to the garage and dining room once repairs are complete. The policy only covers offsite storage costs when the home is unable to be lived in. As outlined above, I am not satisfied the home is unable to be lived in and I therefore do not consider it appropriate for the insurer to cover any further costs for storage. Insurer to compensate the complainant $750 for her non-financial loss The complainant raises concerns with the insurer’s overall handling of the claim and delays in offering a settlement for the internal damage. The complainant says her family have been at risk of the damaged wall and surrounding ceiling collapsing and the insurer did not complete a make safe to this area. Determination | Case number: 852246 Page 6 of 7 The complainant contacted the insurer on 25 January 2022 to ask why the internal wall was not included in the insurer’s initial settlement offer for the impact damage. It is not clear why the insurer did not offer a settlement for the internal damage at the same time it offered to settle the garage door damage. E specially as JP’s quote h ad already been prepared. The insurer provides no explanation for the delay from claim lodgement, on 27 October 2021, to the complainant raising a complaint about it on 25 January 2022. The complainant has also raised concerns about the safety of the ceiling and the damaged load bearing wall for some time, at least since March 2022. The insurer did not appropriately act on these concerns. It did not confirm if a make safe had been completed until 12 May 2022 when it confirmed only the garage door had a make safe, but it would urgently request one for the internal wall. The complainant’s correspondence shows she became increasingly distressed and frustrated about this. Her concerns continued to escalate, and this was avoidable in the circumstances. AFCA can award compensation when there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectations of enjoyment or peace of mind. I am satisfied the insurer’s handling of the claim, and its lack of a timely or thorough response to the complainant’s valid concerns, caused the complainant inconvenience greater than that reasonably expected in the circumstances. For this reason, I consider an award of $750 non- financial loss compensation is appropriate. Determination | Case number: 852246 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.