Home / Strata Community Insurance Agencies Pty Ltd / Determination 851870

Determination 851870

Water damage claim cash settlement amount and scope of covered damage

FirmStrata Community Insurance Agencies Pty Ltd
Decided2023-01-31
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$136,355
Non-financial loss$2,000
Amount claimed$428,425
SourceAFCA PDF

Summary

The complainant, a strata lot owner and beneficiary, claimed about $428,000 for water leak damage including subfloor and drainage works. AFCA found the insurer's cash settlement offer reasonable with a 20% uplift, excluded the drainage and soil works, and ordered $2,000 for non-financial loss from delay.

The panel found a valid water leak claim but held that soil saturation and drainage improvements were not insured property damage and would amount to betterment, so the cash settlement offer plus 20% uplift reasonably reflected covered loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 851870 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 851870 Page 1 of 9 Case number: 851870 29 November 2022 1 Determination overview 1.1 Complaint The complainant is a beneficiary under residential strata insurance issued by the financial firm (insurer). The policy is issued to the body corporate of the building in which the complainant owns a unit. On 26 October 2020, a water damage claim was lodged on the complainant ’s behalf . It was established that a hot water pipe servicing the unit’s bathroom had ruptured. Over time, it was identified that there was also extensive damage to the subfloor and other parts of the unit. The insurer paid amounts under the policy and on 28 January 2022, offered the complainant around $110,000 to cash settle the cost to rectify leak related damage. However, it said it was not liable for rectification of the subfloor or associated drainage works. The insurer said these issues were pre-existing and involved gradual deterioration so were not covered by the policy. The complainant says the insu rer’s liability is much more extensive. He seeks payment of approximately $428,000. That includes amounts for legal and expert costs and interest. The complainant also wants to be compensated for the stress the insurer has caused him . 1.2 Issues and key findings Is the insur er’s cas h settlement offer reasonable? Overall, yes. As the insurer is cash settling the claim, it is required to apply a 20% uplift to its cash settlement offer to cover contingencies as set out in section 2.1 of this determination. Are any additional amounts payable? Yes. The insurer contributed to the delay experienced. This caused the complainant stress, so it is to pay $2,000 in non-financial loss compensation. The complainant also contributed to the delay, so interest is not payable. As the complainant’s expert and KA did not assist him to obtain a better outcome, the insurer is not required to pay more in professional costs. Why is the outcome fair? The complainant has not proven he is entitled to cover for the disputed damage. It would not be fair for the insurer to pay the cost to repair this damage when the policy does not require it. It is fair that the insurer pays compensation for the stress caused by its contribution to delay. 1.3 Determination This determination is partially in favour of the insurer. Within 14 days of the complainant accepting this determination, the insurer must pay the complainant:  $136,355.48 (the offered amount of $113,629.57 plus 20%)  the cost of a further 30 days of contents storage plus 20%  $2,000 in non-financial loss compensation. Determination | Case number: 851870 Page 2 of 9 2 Reasons for determination The complainant is represented by his lawyer, KA. The complainant and KA are referred to in this determination as ‘the complainant’ unless context requires otherwise. 2.1 Is the insurer’s cash settlement offer reasonable? Overall, yes. As the insurer is cash settling the claim, it is required to apply a 20% uplift to its cash settlement offer to cover contingencies as set out in section 2.1 of this determination. Complainant has established a valid claim under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a loss caused by a risk it is insured against under the policy. This is known as a valid, or prima facie, claim. The complainant is a beneficiary under a residential strata plan insurance policy issued by the insurer. The insurer first came on risk on 14 November 2019. Subject to the terms and conditions set out in the product disclosure statement and policy wording (PDS), the policy provides cover for Loss or Damage to insured property. ‘Loss or Damage’ is defined as ‘direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy’. The PDS also provides additional coverages for lot owners while their unit is unfit for occupation due to loss or damage. These include cover for:  loss of rent (LOR)/temporary accommodation (TA) costs - up to $299,250/12 months  contributions and levies they are required to pay - up to $2,000  reletting costs - up to $1,500  removal, storage and return of undamaged contents - up to $5,000. The insurer has made the following payments since the claim was lodged:  $622.32 – utility costs  $61,314.96 – TA costs to 1 February 2022  $10,840.00 – LOR to 30 November 2021  $450.00 – leak detection costs  $59,961.00 – remediation and expert costs. On 28 January 2022, the insurer offered a further $110,129.57 to cash settle the claim, being:  $95,936.50 for repairs covered by the policy  $6,784.80 for final mould remediation  $3,600.00 for LOR from 1 December 2021 to 28 February 2022  $3,808.27 for TA from 1 to 28 February 2022. In addition, the insurer offered to cover the cost to store the complainant’s contents until 28 February 2022. On 28 April 2022, the insurer added to its offer $2,000 for contributions and levies and $1,500 for reletting costs (being the applicable sums insured). The insurer has at times said it payments and offer were made on a without prejudice and commercial basis. However, it also sent the complainant an email on 3 December 2021 where it ‘accepted indemnity under the claim’ for some aspects, including ‘damages covered under the policy’ . It has also confirmed that its previous payments were ‘policy benefits’. Determination | Case number: 851870 Page 3 of 9 In the circumstances, the panel considers that the insurer has accepted the complainant has established a valid claim under the policy (at least, to the extent of its payments and offer). Even if the insurer has not done so, the panel is satisfied that a valid water leak claim has been established. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Th e primary issue in dispute between the parties is whether the insurer’s cash settlement offer adequately reflects its liability under the policy. The complainant argues the insurer has unreasonably limited its liability for the required repairs. The insurer says its scope of works (SOW) encompasses its reasonable liability. Insurer says its offer is appropriate The insurer has obtained numerous reports from loss adjusters and various experts, copies of which have been provided to the complainant. However, the insurer primarily relies on the reports of AA and PA, engineers. AA inspected the unit on 29 January and 10 February 2021. In its report dated 23 February 2021, AA said:  there were excessively elevated moisture conditions throughout the subfloor area, affecting soils, base brickwork, concrete stumps, timber subfloor framing and flooring  the primary cause of this condition was a long term latent leakage that occurred via a hot water supply line that serviced the bathroom  secondary contributory long term factors included a defective drainage connection, latent leakage/overflow around the property’s exterior due to the condition of the stormwater drainage system and landscape/drainage conditions allowing rainwater seepage ingress  there was evidence of some pre-existing timber subfloor framing deterioration, which would have been adversely affected by the secondary factors  the hot water leakage had caused significant subfloor inundation (estimated at approximately 37,000 litres over 307 days)  to ensure adequate long term performance of the sub-floor area, the site ’s landscape and drainage conditions around the property would need to be improved to eliminate rainwater runoff and seepage flow from penetrating the dwelling ’s sub-floor. PA was retained to undertake geotechnical investigations. It inspected the property on 20 September 2021. In its report dated 27 September 2021, PA concluded: it is our opinion that the water retention on site from the previous leak event is largely due to levels of clay-sand interface on-site. 1. The sand-clay interface at BH1 is slightly higher than the levels at BH2 and BH3 which are both relatively flat. 2. The lack of natural grade across the sand-clay interface levels would result in water retention within the clay- sand interface underneath the structure’s footprint. 3. The depth and embedment of the footings are unknown at this stage and if it is embedded into the silty clay material, the strip footing could also result in preventing water from draining away from the clay-sand interface. Determination | Case number: 851870 Page 4 of 9 We recommend that appropriate subsoil drainage be installed at the interface of the sand and clay to drain from the ground. We envisage that a drying out period of at least 12 months be commissioned to allow for moisture equilibrium to occur. The insurer notes that the complainant is claiming, amongst other things, cover for damage related to the soil saturation and associated drainage improvement s . The insurer says that its expert reports demonstrate that the predominant cause of (most of) the damage claimed was not sudden or accidental. Rather, that damage has occurred progressively over time due to gradual, long term causes. The insurer submits this means that the policy’s insuring clause has not been triggered because the damage was not due to a sudden and accidental cause and, further, must have commenced prior to policy inception. In addition, the insurer says that:  the PDS definition of ‘Indemnity Value’ is limited to the cost to rectify the property to its pre - damaged state, but not to a better or improved condition  the PDS definition of ‘Insured Property’ does not include ‘gravel, shale, stones, clay or soil’  the PDS excludes cover for loss or d amage caused by: > ‘ Wear, Tear … gradual deterioration or developing flaws’ > ‘ lack of maintenance or failure to maintain Your Insured Property in a reasonably good state of repair ’ > ‘ non - rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of ’  the first two exclusions apply given the gradually operating causes and the third because the complainant is an engineer and was on notice from the available engineering reports (including his own obtained in mid 2021) that drainage improvements were required. Based on a SOW prepared by AA, the insurer obtained quotes dated 21 January 2022, from:  HO, builder, for covered building repairs, totalling $95,936.50  LR, restorers, for mould remediation, totalling $6,784.80. The insurer based the cash settlement offer it made on 28 January 2022 on the quotes from HO and LR. It says those quotes were realistic and actionable. Further, it says the offer to cover in effect another month of LOR, TA and contents storage was reasonable because that was a realistic estimate of how long covered repairs/remediation would have taken if the complainant had attended to the required soil saturation requirements and drainage improvements. It has also confirmed that it has offered the maximum amounts payable for the contributions/levies and reletting costs additional benefits. Complainant says the insurer’s liability is more extensive The complainant has also obtained a number of expert reports, which have been exchanged with the insurer. The complainant’s position has been substantively outlined i n a letter of demand dated 31 March 2022 from KA to the insurer. Amongst other things, KA says: Determination | Case number: 851870 Page 5 of 9  there is no evidence that the leak was occurring before policy inception. AA does not say this. The complainant’s engineer, RL, has concluded the leak began in April-May 2020  ‘A small fracture to a pipe…can have a sudden and accidental cause. The consequent damage to the Property is also thus sudden and accidental’  the insurer has not accurately described the full scope of the definition of ‘Insured Property’, a nd that definition does not exclude damage to soil  ‘Any attempt to exclude from indemnity the costs of remediating the Property’s subfloor to remove latent water will not ever allow for the repair of the Property to a condition substantially the same as its condition at the time of loss’  the drainage problems were not a substantial cause of the damage; the operative cause of damage was the leaking pipe, which was not observable by the complainant  the insurer had not acted in accordance with its duty of utmost good faith in its approach to the claim. KA’s letter of demand sought payment of $428,425.47, comprised of:  $233,428.48 - repairs (based on a quote from MD, builder)  $39,712.20 - subsoil drainage work (based on a quote from SF, plumber)  $30,000.00 - mould remediation costs (based on an estimate from SZ, restorer)  $57,235.00 - TA, LOR, contributions/levies and reletting costs  $10,000.00 - contents storage  $10,000.00 - landscaping  $16,044.00 - contaminated fixtures and furnishing  $4,400.00 - expert costs  $10,140.00 – legal costs  $17,465.79 – interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth). On 21 June 2022, the complainant provided an updated SOW/quote from MD totalling $363,105.71. He noted that this did not include any amount for drainage work. His discussions with a plumber suggested that work would cost at least $45,000. For comparison, the co mplainant also provided an ‘ inclusive q uote’ from HS, builders, totalling $462,954.80. Insurer’s offer is generally reasonable The finding that the complainant has established a valid water damage claim means that the panel does not accept that the insurer’s argument that there was no damage from a sudden and accidental cause or that the damage commenced prior to the policy’s incepti on. However, this does not mean the insurer is required to cover all of the claimed damage. The panel is not satisfied that the insurer is liable for the work required to damage related to the soil saturation and any associated drainage improvement beca use:  soil is not listed as part of the definition of Insured Property (the existence of a specific exclusion of soil on paths, driveways, tennis courts or gardens does not establish that soil in any other location amounts to part of a Building)  the saturation of soil with water cannot reasonably be said to be damage  the moisture retention is a drainage issue  there is no evidence that the water leak caused the drainage issue  there is evidence that there are pre-existing and unrelated causes for the drainage issue  if the insurer was to cover the drainage improvement works, the complainant would receive a betterment, that is, the property would be improved when compared to its state immediately before the water leak was discovered. Determination | Case number: 851870 Page 6 of 9 As the parties’ relationship has significantly deteriorated and given the insurer’s entitlement to do so under the policy, it is reasonable for the insurer to cash settle the claim. To do so, it must have an actionable quote and must allow an uplift for contingencies and the loss of warranty applying to insurer authorised repairs. Overall, the panel is satisfied that the quotes the insurer obtained from HO and LR reasonably reflect the cost to rectify the damage covered by the policy. The panel considers the quotes the complainant has provided include works well beyond claim related repairs, meaning they are not actionable quotes for the work required to repair the covered damage. The complainant claims $10,000 for landscaping due to:  ‘Disrepair to the deck when the floorboards i nside the property were stripped and thrown onto same’  ‘Concrete at the rear of the property has been cracked by the tradesmen, likely when the skip bin was being loaded. The concrete will need to be repaired and resealed’  ‘The lawn has not been able to be maintained due to the works and delays and has perished’. In addition, the complainant claims $16,044 in damaged contents. The panel agrees with the insurer that the landscaping and contents claims have not been substantiated. The position regarding the extent to which additional contents storage costs have been incurred and who has paid for them is unclear. However, the panel accepts that some allowance should be made, noting the insurer offered in January 2022 to cover some additional storage costs. Based on HO’s estimate of how long the covered repairs will take (after the non -covered soil saturation requirements and drainage improvements are attended to by the complainant), the panel is satisfied that the insurer’s offer for additional LOR, TA and c ontents storage is also reasonable. That offer amounts to slightly more than another month of each. The panel acknowledges that the position regarding contents storage costs In all the circumstances, the panel considers 20% to be a reasonable contingencies uplift to be applied to the insurer’s updated cash settlement offer made on 28 April 2022. Accordingly, the insurer is to pay the complainant:  $136,355.48 (the sum offered of $113,629.57 plus 20%)  the cost of a further 30 days of contents storage plus 20%. 2.2 Are any additional amounts payable? Yes. The insurer contributed to the delay experienced. This caused the complainant stress, so it is to pay $2,000 in non-financial loss compensation. The complainant also contributed to the delay, so interest is not pa yable. As the complainant’s expert and KA did not assist him to obtain a better outcome, the insurer is not required to pay more in professional costs. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation Determination | Case number: 851870 Page 7 of 9  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer to pay $2,000 in non-financial loss compensation The complainant says that the insurer has taken an unreasonable approach to the claim and, particularly, has caused significant delay in its progression. He says that this has put him in a difficult financial and emotional position. He says the insurer’s actions have taken a toll on his health and emotional wellbeing. The panel accepts the matter could and should have been resolved earlier. The exchanged material shows both parties have materially contributed to this issue. Nevertheless, the panel considers the insurer did not cite reasonable grounds to deny the claim when the first reports were to hand or properly identify the cause of the loss. It ’ s reasons for denying the claim were imprecise and frustrated the complainant, as well as delaying the claim ’s progression . Accordingly, the panel is satisfied an award of compensation is appropriate. It is fair in the circumstances that the insurer pays the complainant $2,000 in non-financial loss compensation of $2,000, reflecting its contribution to the delays experienced. Interest is not payable AFCA may require an insurer to pay interest on an amount it determines is owed to a complainant. Interest is typically payable from the date it was unreasonable for the insurer to have withheld payment of the amount it was liable to pay. Having carefully considered the available information, the panel is not satisfied that an award of interest should be made in this complaint. This is because:  the underlying circumstances became increasingly complex as the claim progressed and the insurer required time to complete its investigations  the complainant has materially contributed to the delays experienced  the complainant has steadfastly rejected the insurer’s cash settlement offer made in January 2022  the 20% uplift the panel requires to be made to that offer is in part designed to bring the underlying quotes in line with current pricing. AFCA may require insurer to contribute to a complainant’s professional costs The AFCA rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Complainant not entitled to costs In KA’s letter of demand dated 31 March 2022, the complainant sought $4,400 in expert fees charged by RL and mould remediator, BH, and $10,140 in legal fees. However, the panel is not satisfied that the re ports of RL and BH or KA’s legal representation have assisted the complainant in establishing a more extensive entitlement to indemnity. The panel also notes the complainant’s engineering qualifications and apparent ability to understand the claim and engage in meaningful dialogue with the insurer without external assistance. Determination | Case number: 851870 Page 8 of 9 Accordingly, the panel is not satisfied that it is reasonable to require the insurer to contribute to the complainant’s legal and further professional costs. 2.3 Why is the outcome fair? The complainant has not proven he is entitled to cover for the disputed damage. It would not be fair for the insurer to pay the cost to repair this damage when the policy does not require it. It is fair that the insurer pays compensation for the stress caused by its contribution to delay. Determination | Case number: 851870 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.