Text of the determination
Determination
Case number 851870
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 851870 Page 1 of 9
Case number: 851870 29 November 2022
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under residential strata insurance issued by the financial firm
(insurer). The policy is issued to the body corporate of the building in which the complainant
owns a unit.
On 26 October 2020, a water damage claim was lodged on the complainant ’s behalf . It was
established that a hot water pipe servicing the unit’s bathroom had ruptured. Over time, it was
identified that there was also extensive damage to the subfloor and other parts of the unit.
The insurer paid amounts under the policy and on 28 January 2022, offered the complainant
around $110,000 to cash settle the cost to rectify leak related damage. However, it said it was
not liable for rectification of the subfloor or associated drainage works. The insurer said these
issues were pre-existing and involved gradual deterioration so were not covered by the policy.
The complainant says the insu rer’s liability is much more extensive. He seeks payment of
approximately $428,000. That includes amounts for legal and expert costs and interest. The
complainant also wants to be compensated for the stress the insurer has caused him .
1.2 Issues and key findings
Is the insur er’s cas h settlement offer reasonable?
Overall, yes. As the insurer is cash settling the claim, it is required to apply a 20% uplift to its
cash settlement offer to cover contingencies as set out in section 2.1 of this determination.
Are any additional amounts payable?
Yes. The insurer contributed to the delay experienced. This caused the complainant stress,
so it is to pay $2,000 in non-financial loss compensation. The complainant also contributed to
the delay, so interest is not payable. As the complainant’s expert and KA did not assist him to
obtain a better outcome, the insurer is not required to pay more in professional costs.
Why is the outcome fair?
The complainant has not proven he is entitled to cover for the disputed damage. It would not
be fair for the insurer to pay the cost to repair this damage when the policy does not require it.
It is fair that the insurer pays compensation for the stress caused by its contribution to delay.
1.3 Determination
This determination is partially in favour of the insurer. Within 14 days of the complainant
accepting this determination, the insurer must pay the complainant:
$136,355.48 (the offered amount of $113,629.57 plus 20%)
the cost of a further 30 days of contents storage plus 20%
$2,000 in non-financial loss compensation.
Determination | Case number: 851870 Page 2 of 9
2 Reasons for determination
The complainant is represented by his lawyer, KA. The complainant and KA are referred to in
this determination as ‘the complainant’ unless context requires otherwise.
2.1 Is the insurer’s cash settlement offer reasonable?
Overall, yes. As the insurer is cash settling the claim, it is required to apply a 20% uplift to its
cash settlement offer to cover contingencies as set out in section 2.1 of this determination.
Complainant has established a valid claim under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a loss caused by a risk it is insured against under the policy. This is
known as a valid, or prima facie, claim.
The complainant is a beneficiary under a residential strata plan insurance policy issued by the
insurer. The insurer first came on risk on 14 November 2019. Subject to the terms and
conditions set out in the product disclosure statement and policy wording (PDS), the policy
provides cover for Loss or Damage to insured property.
‘Loss or Damage’ is defined as ‘direct physical loss of, destruction of, or damage to property
from any sudden and accidental cause not otherwise excluded by this Policy’.
The PDS also provides additional coverages for lot owners while their unit is unfit for
occupation due to loss or damage. These include cover for:
loss of rent (LOR)/temporary accommodation (TA) costs - up to $299,250/12 months
contributions and levies they are required to pay - up to $2,000
reletting costs - up to $1,500
removal, storage and return of undamaged contents - up to $5,000.
The insurer has made the following payments since the claim was lodged:
$622.32 – utility costs
$61,314.96 – TA costs to 1 February 2022
$10,840.00 – LOR to 30 November 2021
$450.00 – leak detection costs
$59,961.00 – remediation and expert costs.
On 28 January 2022, the insurer offered a further $110,129.57 to cash settle the claim, being:
$95,936.50 for repairs covered by the policy
$6,784.80 for final mould remediation
$3,600.00 for LOR from 1 December 2021 to 28 February 2022
$3,808.27 for TA from 1 to 28 February 2022.
In addition, the insurer offered to cover the cost to store the complainant’s contents until 28
February 2022. On 28 April 2022, the insurer added to its offer $2,000 for contributions and
levies and $1,500 for reletting costs (being the applicable sums insured).
The insurer has at times said it payments and offer were made on a without prejudice and
commercial basis. However, it also sent the complainant an email on 3 December 2021
where it ‘accepted indemnity under the claim’ for some aspects, including ‘damages covered
under the policy’ . It has also confirmed that its previous payments were ‘policy benefits’.
Determination | Case number: 851870 Page 3 of 9
In the circumstances, the panel considers that the insurer has accepted the complainant has
established a valid claim under the policy (at least, to the extent of its payments and offer).
Even if the insurer has not done so, the panel is satisfied that a valid water leak claim has
been established.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proving on the
balance of probabilities the application of the exclusion or condition.
Th e primary issue in dispute between the parties is whether the insurer’s cash settlement
offer adequately reflects its liability under the policy. The complainant argues the insurer has
unreasonably limited its liability for the required repairs. The insurer says its scope of works
(SOW) encompasses its reasonable liability.
Insurer says its offer is appropriate
The insurer has obtained numerous reports from loss adjusters and various experts, copies of
which have been provided to the complainant. However, the insurer primarily relies on the
reports of AA and PA, engineers.
AA inspected the unit on 29 January and 10 February 2021. In its report dated 23 February
2021, AA said:
there were excessively elevated moisture conditions throughout the subfloor area,
affecting soils, base brickwork, concrete stumps, timber subfloor framing and flooring
the primary cause of this condition was a long term latent leakage that occurred via a hot
water supply line that serviced the bathroom
secondary contributory long term factors included a defective drainage connection, latent
leakage/overflow around the property’s exterior due to the condition of the stormwater
drainage system and landscape/drainage conditions allowing rainwater seepage ingress
there was evidence of some pre-existing timber subfloor framing deterioration, which
would have been adversely affected by the secondary factors
the hot water leakage had caused significant subfloor inundation (estimated at
approximately 37,000 litres over 307 days)
to ensure adequate long term performance of the sub-floor area, the site ’s landscape and
drainage conditions around the property would need to be improved to eliminate rainwater
runoff and seepage flow from penetrating the dwelling ’s sub-floor.
PA was retained to undertake geotechnical investigations. It inspected the property on 20
September 2021. In its report dated 27 September 2021, PA concluded:
it is our opinion that the water retention on site from the previous leak event is
largely due to levels of clay-sand interface on-site.
1. The sand-clay interface at BH1 is slightly higher than the levels at BH2 and
BH3 which are both relatively flat.
2. The lack of natural grade across the sand-clay interface levels would result in
water retention within the clay- sand interface underneath the structure’s footprint.
3. The depth and embedment of the footings are unknown at this stage and if it is
embedded into the silty clay material, the strip footing could also result in
preventing water from draining away from the clay-sand interface.
Determination | Case number: 851870 Page 4 of 9
We recommend that appropriate subsoil drainage be installed at the interface of
the sand and clay to drain from the ground.
We envisage that a drying out period of at least 12 months be commissioned to
allow for moisture equilibrium to occur.
The insurer notes that the complainant is claiming, amongst other things, cover for damage
related to the soil saturation and associated drainage improvement s .
The insurer says that its expert reports demonstrate that the predominant cause of (most of)
the damage claimed was not sudden or accidental. Rather, that damage has occurred
progressively over time due to gradual, long term causes.
The insurer submits this means that the policy’s insuring clause has not been triggered
because the damage was not due to a sudden and accidental cause and, further, must have
commenced prior to policy inception.
In addition, the insurer says that:
the PDS definition of ‘Indemnity Value’ is limited to the cost to rectify the property to its pre -
damaged state, but not to a better or improved condition
the PDS definition of ‘Insured Property’ does not include ‘gravel, shale, stones, clay or soil’
the PDS excludes cover for loss or d amage caused by:
> ‘ Wear, Tear … gradual deterioration or developing flaws’
> ‘ lack of maintenance or failure to maintain Your Insured Property in a reasonably good
state of repair ’
> ‘ non - rectification of an Insured Property defect, error or omission that You were aware
of, or should reasonably have been aware of ’
the first two exclusions apply given the gradually operating causes and the third because
the complainant is an engineer and was on notice from the available engineering reports
(including his own obtained in mid 2021) that drainage improvements were required.
Based on a SOW prepared by AA, the insurer obtained quotes dated 21 January 2022, from:
HO, builder, for covered building repairs, totalling $95,936.50
LR, restorers, for mould remediation, totalling $6,784.80.
The insurer based the cash settlement offer it made on 28 January 2022 on the quotes from
HO and LR. It says those quotes were realistic and actionable.
Further, it says the offer to cover in effect another month of LOR, TA and contents storage
was reasonable because that was a realistic estimate of how long covered
repairs/remediation would have taken if the complainant had attended to the required soil
saturation requirements and drainage improvements.
It has also confirmed that it has offered the maximum amounts payable for the
contributions/levies and reletting costs additional benefits.
Complainant says the insurer’s liability is more extensive
The complainant has also obtained a number of expert reports, which have been exchanged
with the insurer.
The complainant’s position has been substantively outlined i n a letter of demand dated 31
March 2022 from KA to the insurer. Amongst other things, KA says:
Determination | Case number: 851870 Page 5 of 9
there is no evidence that the leak was occurring before policy inception. AA does not say
this. The complainant’s engineer, RL, has concluded the leak began in April-May 2020
‘A small fracture to a pipe…can have a sudden and accidental cause. The consequent
damage to the Property is also thus sudden and accidental’
the insurer has not accurately described the full scope of the definition of ‘Insured
Property’, a nd that definition does not exclude damage to soil
‘Any attempt to exclude from indemnity the costs of remediating the Property’s subfloor to
remove latent water will not ever allow for the repair of the Property to a condition
substantially the same as its condition at the time of loss’
the drainage problems were not a substantial cause of the damage; the operative cause of
damage was the leaking pipe, which was not observable by the complainant
the insurer had not acted in accordance with its duty of utmost good faith in its approach to
the claim.
KA’s letter of demand sought payment of $428,425.47, comprised of:
$233,428.48 - repairs (based on a quote from MD, builder)
$39,712.20 - subsoil drainage work (based on a quote from SF, plumber)
$30,000.00 - mould remediation costs (based on an estimate from SZ, restorer)
$57,235.00 - TA, LOR, contributions/levies and reletting costs
$10,000.00 - contents storage
$10,000.00 - landscaping
$16,044.00 - contaminated fixtures and furnishing
$4,400.00 - expert costs
$10,140.00 – legal costs
$17,465.79 – interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth).
On 21 June 2022, the complainant provided an updated SOW/quote from MD totalling
$363,105.71. He noted that this did not include any amount for drainage work. His
discussions with a plumber suggested that work would cost at least $45,000. For comparison,
the co mplainant also provided an ‘ inclusive q uote’ from HS, builders, totalling $462,954.80.
Insurer’s offer is generally reasonable
The finding that the complainant has established a valid water damage claim means that the
panel does not accept that the insurer’s argument that there was no damage from a sudden
and accidental cause or that the damage commenced prior to the policy’s incepti on.
However, this does not mean the insurer is required to cover all of the claimed damage.
The panel is not satisfied that the insurer is liable for the work required to damage related to
the soil saturation and any associated drainage improvement beca use:
soil is not listed as part of the definition of Insured Property (the existence of a specific
exclusion of soil on paths, driveways, tennis courts or gardens does not establish that soil
in any other location amounts to part of a Building)
the saturation of soil with water cannot reasonably be said to be damage
the moisture retention is a drainage issue
there is no evidence that the water leak caused the drainage issue
there is evidence that there are pre-existing and unrelated causes for the drainage issue
if the insurer was to cover the drainage improvement works, the complainant would receive
a betterment, that is, the property would be improved when compared to its state
immediately before the water leak was discovered.
Determination | Case number: 851870 Page 6 of 9
As the parties’ relationship has significantly deteriorated and given the insurer’s entitlement to
do so under the policy, it is reasonable for the insurer to cash settle the claim. To do so, it
must have an actionable quote and must allow an uplift for contingencies and the loss of
warranty applying to insurer authorised repairs.
Overall, the panel is satisfied that the quotes the insurer obtained from HO and LR
reasonably reflect the cost to rectify the damage covered by the policy. The panel considers
the quotes the complainant has provided include works well beyond claim related repairs,
meaning they are not actionable quotes for the work required to repair the covered damage.
The complainant claims $10,000 for landscaping due to:
‘Disrepair to the deck when the floorboards i nside the property were stripped and thrown
onto same’
‘Concrete at the rear of the property has been cracked by the tradesmen, likely when the
skip bin was being loaded. The concrete will need to be repaired and resealed’
‘The lawn has not been able to be maintained due to the works and delays and has
perished’.
In addition, the complainant claims $16,044 in damaged contents.
The panel agrees with the insurer that the landscaping and contents claims have not been
substantiated.
The position regarding the extent to which additional contents storage costs have been
incurred and who has paid for them is unclear. However, the panel accepts that some
allowance should be made, noting the insurer offered in January 2022 to cover some
additional storage costs.
Based on HO’s estimate of how long the covered repairs will take (after the non -covered soil
saturation requirements and drainage improvements are attended to by the complainant), the
panel is satisfied that the insurer’s offer for additional LOR, TA and c ontents storage is also
reasonable. That offer amounts to slightly more than another month of each.
The panel acknowledges that the position regarding contents storage costs
In all the circumstances, the panel considers 20% to be a reasonable contingencies uplift to
be applied to the insurer’s updated cash settlement offer made on 28 April 2022.
Accordingly, the insurer is to pay the complainant:
$136,355.48 (the sum offered of $113,629.57 plus 20%)
the cost of a further 30 days of contents storage plus 20%.
2.2 Are any additional amounts payable?
Yes. The insurer contributed to the delay experienced. This caused the complainant stress,
so it is to pay $2,000 in non-financial loss compensation. The complainant also contributed to
the delay, so interest is not pa yable. As the complainant’s expert and KA did not assist him to
obtain a better outcome, the insurer is not required to pay more in professional costs.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
Determination | Case number: 851870 Page 7 of 9
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer to pay $2,000 in non-financial loss compensation
The complainant says that the insurer has taken an unreasonable approach to the claim and,
particularly, has caused significant delay in its progression. He says that this has put him in a
difficult financial and emotional position. He says the insurer’s actions have taken a toll on his
health and emotional wellbeing.
The panel accepts the matter could and should have been resolved earlier. The exchanged
material shows both parties have materially contributed to this issue. Nevertheless, the panel
considers the insurer did not cite reasonable grounds to deny the claim when the first reports
were to hand or properly identify the cause of the loss. It ’ s reasons for denying the claim were
imprecise and frustrated the complainant, as well as delaying the claim ’s progression .
Accordingly, the panel is satisfied an award of compensation is appropriate. It is fair in the
circumstances that the insurer pays the complainant $2,000 in non-financial loss
compensation of $2,000, reflecting its contribution to the delays experienced.
Interest is not payable
AFCA may require an insurer to pay interest on an amount it determines is owed to a
complainant. Interest is typically payable from the date it was unreasonable for the insurer to
have withheld payment of the amount it was liable to pay.
Having carefully considered the available information, the panel is not satisfied that an award
of interest should be made in this complaint. This is because:
the underlying circumstances became increasingly complex as the claim progressed and
the insurer required time to complete its investigations
the complainant has materially contributed to the delays experienced
the complainant has steadfastly rejected the insurer’s cash settlement offer made in
January 2022
the 20% uplift the panel requires to be made to that offer is in part designed to bring the
underlying quotes in line with current pricing.
AFCA may require insurer to contribute to a complainant’s professional costs
The AFCA rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes
into account the complexity of the complaint and whether the particular complainant needed
to incur costs to understand or establish their claim.
Complainant not entitled to costs
In KA’s letter of demand dated 31 March 2022, the complainant sought $4,400 in expert fees
charged by RL and mould remediator, BH, and $10,140 in legal fees.
However, the panel is not satisfied that the re ports of RL and BH or KA’s legal representation
have assisted the complainant in establishing a more extensive entitlement to indemnity. The
panel also notes the complainant’s engineering qualifications and apparent ability to
understand the claim and engage in meaningful dialogue with the insurer without external
assistance.
Determination | Case number: 851870 Page 8 of 9
Accordingly, the panel is not satisfied that it is reasonable to require the insurer to contribute
to the complainant’s legal and further professional costs.
2.3 Why is the outcome fair?
The complainant has not proven he is entitled to cover for the disputed damage. It would not
be fair for the insurer to pay the cost to repair this damage when the policy does not require it.
It is fair that the insurer pays compensation for the stress caused by its contribution to delay.
Determination | Case number: 851870 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.