Home / QBE / Determination 851765

Determination 851765

Claim declined for storm damage on basis of maintenance/wear and tear exclusions; disputes over make safe works and claims handling

FirmQBE
Decided2023-05-05
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's strata unit was damaged in a June 2021 storm and the insurer declined the claim citing wear and tear. AFCA partly upheld the complaint, requiring an independent roof reinspection and reconsideration, rectification of unsafe make safe works, 50% reimbursement of the roofer's report and $2,500 non-financial loss.

The proximate cause of damage was unresolved given evidence of pre-existing maintenance issues, so reinspection was fair, but the insurer's unsafe make safe work and poor claims handling warranted rectification and compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay non financial lossreassess claimrepair or rectify

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 851765 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 851765 Page 1 of 18 Case number: 851765 23 March 2023 1 Determination overview 1.1 Complaint The complainant’s property was insured with the financial firm (insurer) under a strata insurance policy covering the period 4 April 2021 to 4 April 2022 (the policy). The complainant claimed for storm damage to his property following storms on 9-10 June 2021. The insurer declined the claim. It says the damage is due to maintenance or wear and tear issues with the roof, which the policy excludes. Disputes arose over multiple aspects of the claim and the insurer’s claims handling. The complainant maintains his property was storm damaged and seeks various outcomes, like:  that his property be repaired to its pre-loss condition  approval to engage a claims specialist or loss adjuster at the insurer’s cost  that the insurer properly completes make safe works to his property  the insurer retracts its roofer’s (SRS) report if it cannot supply a particular email  maximum compensation under AFCA rules for poor claims handling. The insurer has proposed an independent roof inspection at its cost to reconsider its claim denial. However, the parties cannot agree on the expert to be appointed for this purpose. 1.1 Issues and key findings Is it fair for the roof to be reinspected? It is fair for the roof to be reinspected to enable the insurer to reconsider its initial claim denial. While there are genuine concerns about the insurer’s current assessment information, there are also genuine concerns the claimed damage may not be covered under the policy. Further, the insurer was not given fair opportunity to consider the property’s pre -purchase inspection report before making its initial claim decision. What parties are to do to progress the claim? In the interest of progressing the claim, the parties are to take the steps outlined in section 2.2 of this determination. Is the complainant entitled to the claim preparation benefit? No. A roof reinspection and report should enable the insurer to determine if the claimed damage is covered or not covered under the policy. Given this, it is unnecessary for another claims specialist or loss adjuster to be appointed to the claim. Is the insurer’s make safe work satisfactory? No. The insurer’s make safe contractor (TBS) placed ridge tiles on the roof ridge without securing them. This is hazardous and unsafe. The insurer must take prompt steps to address this in the manner outlined in section 2.4 of this determination. Determination | Case number: 851765 Page 2 of 18 Is the complainant entitled to any other compensation? Yes. The complainant is entitled to 50% reimbursement of his roofer’s (HPG) report and some non-financial loss compensation for the way his claim was handled. Is the insurer required to retract SRS’s report? No. There is no basis for the report to be retracted just because an email is not provided. Why is the outcome fair? The parties remain in dispute whether the claim is covered under the policy. This issue is unresolved because of contributions by the insurer and the complainant. The insurer’s make safe work and aspects of its claims handling were also poor. Given this, it is fair:  a reinspection of the property’s roof occurs  the parties take the steps outlined in section 2.2 of this determination  the insurer rectifies its poor make safe works promptly, reimburses the complainant 50% of the cost of HPG ’s report, and pays some compensation for non-financial loss. 1.2 Determination This determination is partly in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of this determination:  the parties are to take the steps set out in section 2.2 of this determination to progress the property’s reinspec tion and the claim  the insurer is to: > take prompt steps to rectify its poor make safe works > reimburse the complainant 50% of HPG’s report cost > pay the complainant $2,500 compensation for non-financial loss. Determination | Case number: 851765 Page 3 of 18 2 Reasons for determination 2.1 Is it fair for the roof to be reinspected? It is fair for the roof to be reinspected to enable the insurer to reconsider its initial claim denial. While there are genuine concerns about the insurer’s current assessment information, there are also genuine concerns the claimed damage may not be covered under the policy. Further, the insurer was not given fair opportunity to consider the property’s pre -purchase inspection report before making its initial claim decision. Property sustained roof and internal damage following a storm The complainant’s property is part of a strata complex insured with the insurer under the policy. The insured is the strata complex’s owners ’ corporation. The complainant is one of the lot owners, having bought his unit in February 2021 and settled in May 2021. The property faced a storm event on 9-10 June 2021. It suffered roof and internal damage, and a claim for the damage was made on 12 June 2021. Parties dispute assessment information and who should do a reinspection The insurer declined the claim on 17 August 2021, saying the claimed damage was not caused by a storm event. It says the damage was caused by maintenance or wear and tear related issues, which the policy excludes. At the time, the insurer relied on information given by its make safe contractor ‘TBS’, roofer ‘S R S’ and assessor ‘AG’ . The complainant maintains his property was storm damaged. He says the insurer’s denial was wrong as it was based on incorrect information given by its experts. He says he informed the insurer about this before the claim was decided but it still went ahead to decline it. The complainant provided a report from roofer ‘HPG’ to support that his claim is covered. The opinions given by the various experts (including pre-purchase building inspector ‘RBI’ ) are briefly outlined in section 3.2 of this determination The insurer agrees there are errors with aspects of its expert s’ reporting following a review of the complainant’s complaint . However, it was unprepared to rule out their views on the cause of the property’s damage , nor was it prepared to accept HPG ’s views on the matter. It says there is evidence of maintenance or wear and tear issues, which it believes could have caused or contributed to the claimed damage. The insurer proposed an independent roof inspection. It says this should allay the complainant’s concerns about its previous experts, while enabling it to confirm if the claimed damage is covered under the policy. The parties agree to the reinspection but dispute who should be appointed for this purpose. Complainant must establish a valid claim The complainant must establish, on the balance of probabilities, he suffered a loss covered by the policy. This is known as a prima facie or valid claim. Once established, the onus shifts to the insurer to prove, on balance, an exclusion or limitation applies if it seeks to deny or limit its liability for the loss. Determination | Case number: 851765 Page 4 of 18 Policy will only respond if proximate cause of damage is not an excluded cause The policy terms are comprised within a policy schedule and product disclosure statement (PDS). The relevant policy extracts are set out in section 3.3 of this determination. In summary, the policy covers accidental damage not otherwise excluded by the policy. The policy excludes loss or damage caused by the passage of time, lack of maintenance, wear and tear, developing flaws, wet or dry rot. This means the policy would only respond if the proximate cause of the claimed damage is not an excluded cause. The proximate cause is not necessarily the first, last or sole cause of a loss. It is the effective, dominant or operative cause of the loss. The insurer is entitled to ascertain the proximate cause of the claimed damage. This, in turn, would determine if the claim (or a part of it) is covered or excluded by the policy. Insurer accepts its current assessment information has errors That there are errors with some of the insurer’s assessment information have been extensively ventilated in the exchanged information. The insurer accepts errors are present, so it is unnecessary to set them out in any detail in this determination. Evidence supports roof has maintenance or wear and tear issues before storm While the complainant understandably doubts the insurer’s current assessment information, there is nonetheless evidence his roof has maintenance or wear and tear related issues. P hotos accompanying TBS’s 1 July 2021 email report show wood rot, separation of roof timber and what appears to be a rusted nail at the damage location. These can be seen in photos entitl ed ‘Image - 20210629155011.jpg’ and ‘Image - 20210629154622.jpg’. Other photos show the roof’s original sisalation paper is old and deteriorated , which TBS describes as ‘already perished brittle paper’ . The pre-purchase inspection report issued by RBI (RBI report) also identifies several ‘major defects’ with the property, including with its roof. Although RBI was unable to thoroughly inspect the main roof or roof space due to accessibility issues, it nonetheless identifies:  rust to some fixings and part s of the property’s lower roof  a few cracked pointing to the main roof’s ridge capping  a ‘moderate - high’ risk of undetected defects with the property (including the roof) and strongly recommended further inspections. Property is 40-50 years old, and its maintenance history is unclear The property is apparently 40-50 years old and its maintenance history is unclear. While TBS suggested the roof had some repointing works done ‘3 - 6 years ago’, the body corporate manager apparently said it is unaware of any maintenance works being carried out to the property since it began managing the strata complex in March 2011. I understand the complainant has had some works done to the property before the storm event. However, there is no specific information about any works done to the roof or its structure between the complainant’s purchase and the relevant storm event. Determination | Case number: 851765 Page 5 of 18 Property is the only unit in the strata complex that was damaged While the Insurance Council of Australia declared the relevant storm event a catastrophe, the property was the only unit within the strata complex that sustained damage. Given the units are similarly constructed, it is not unreasonable or implausible that there could be issues unique to the property that may have caused or contributed to its damage. No evidence roof was affected by ‘negative air pressure’ There is also no evidence the property’s roof ridge was lifted and compromised by ‘negative air pressure’. While th e complainant says SES suggested this might have occurred, there is no report from SES or any other expert (including HPG) suggesting this. I nsurer’s concern that claim may be excluded is not unfounded On balance, these matters support the insurer’s conce rn the claimed damage may be caused by excluded causes. They also limit the persuasiveness of H PG’s suggestion s that:  there were no signs of rotted timber in the roof  the complainant was unaware of any existing maintenance issues before the storm  the relevant storm was the proximate cause of the claimed damage. Insurer was not given fair opportunity to consider pre -purchase report Finally, the insurer was not given fair opportunity to review the RBI report before its initial claim decision, or during its internal dispute resolution stages. The report was only made available in February 2022, nearly seven months after it was first asked for. Fair for roof reinspection to occur in this instance Considering these matters, I am satisfied it would not be fair to require the insurer to accept the complainant’s claim based on the available information. I accept it is fair in all the circumstances for a roof reinspection to occur in this instance. I accept this should allay the complainant’s concerns about the insurer’s current assessment information, while enabling the insurer to reconsider if excluded causes were proximate causes of the claimed damage. 2.2 What parties are to do to progress the claim? In the interest of progressing the claim, the parties are to take the steps outlined in section 2.2 of this determination. Parties dispute who should reinspect the roof As noted earlier, the parties have agreed that the roof should be reinspected but cannot agree on the expert to be appointed for this purpose. The insurer initially said the inspection should be done by a specialist roofer and its choice was ‘CR’ . The complainant was uncomfortable with CR’s independence, noting TBS recommended this roofer for advice in its report . He nominated roofer ‘OER’ instead. However, the insurer is not satisfied OER is appropriately qualified. It says it asked OER for several pieces of information , including ‘builders/professional licence and registration numbers’, but it has not given the information. Determination | Case number: 851765 Page 6 of 18 The insurer has also since suggested a building consultant should be appointed, and such person should have a ‘building inspector licence’, public liability and workers compensation insurance, and ‘no complaints or issued registered’ against that person with a governm ent authority. The insurer has proposed several building consultants. The complainant believes the insurer is arbitrarily imposing a licence requirement for his chosen expert. He says OER has ‘decades of roofing experience’ and is as qualified as CR and TBS. He says CR has roof plumbing qualifications, which HPG also has but whose opinion the insurer rejected on the basis HPG is a plumber. He also says TPG has confirmed the roof tiler it sent to his property did not need a licence to carry out the relevant work. Best person to confirm their expertise are the relevant experts themselves An expert is typically a person who has extensive knowledge and experience about a subject matter. Such knowledge and experience are usually gained through education, training and work experience. These are the main factors that determine if a person can appropriately be considered an expert on a subject matter. The relevant expert is usually the best person to confirm his or her expertise on a subject matter, rather than the parties. Having reviewed the exchanged information, I am unable to find any information from either OER or CR about their respective expertise and experience. Nor am I able to find any information about the expertise and experience of the other experts the insurer has proposed. Given this, I am unable to propose the expert that should conduct the reinspection and report on the proximate cause of the claimed damage. Insurer is to provide a list of three experts and complainant can choose one In the interest of progressing the claim, I consider it fair in all the circumstances that the parties take the following steps. The insurer is to propose a list of three experts who have had no prior involvement in the claim and are not on its panel of experts. The complainant can choose one of them. Once the expert is selected, the insurer is to:  take steps to have the expert inspect the property and issue its report within 30 days  pay for the expert’s report  provide the complainant with a copy of the expert’s repor t within three days of receipt  reconsider and decide the claim within 10 business days of receipt. Parties bear their own expert cost if complainant still wants his own expert If the complainant still wants the roof inspected by his chosen expert, then:  the parties are free to choose their own experts  the parties are to bear the cost of their selected expert’s reports  the parties are to exchange their expert reports with each other within three days of receipt  the insurer is to reconsider and decide the claim with 10 business days of receiving the last of these expert reports. If the complainant is dissatisfied with the claim outcome in either situation, he is free to lodge a fresh AFCA complaint about it for AFCA’s consideration. Determination | Case number: 851765 Page 7 of 18 2.3 Is the complainant entitled to the claim preparation benefit? No. A roof reinspection and report should enable the insurer to determine if the claimed damage is covered or not covered under the policy. Given this, it is unnecessary for another claims specialist or loss adjuster to be appointed to the claim. Parties dispute whether complainant is entitled to a claim preparation benefit The complainant says the policy provides a claim preparation benefit. He believes he should be allowed access to the benefit because of issues and complexities with the claim and the insurer’s assessment. He says :  a claims specialist or loss adjuster would ‘help him wade through the complexity of this incredibly difficult and complex claim’  the benefit will ensure an independent and transparent assessment of his claim. The insurer says there is no need for another claims specialist or loss adjuster to be appointed in this instance. It says it has agreed to:  have the roof independently inspected at its cost  base its claims decision on this expert ’ s findings, given the complainant’s concerns with its previous experts. Policy covers claim preparation cost if it is necessary There is no dispute claim condition 4 provides up to a $30,000 benefit for claims preparation costs and fees. The benefit is not automatic. It requires the insurer’s written consent and is meant to only cover costs that are necessary to prepare a claim. It is not intended to cover advocacy cost or cost incurred to potentially challenge the insurer’s assessment. Another claims specialist or loss adjuster is not necessary I accept the insurer’s explanation that a roof reinspection negates the need for another claims specialist or loss adjuster to assist with the claim. I further note there is essentially nothing required to prepare the claim. The claim was already made, and the only critical question at this stage is whether it is covered under the policy. This hinges on whether maintenance or wear and tear issues identified with the roof are proximate causes of the claimed damage. A fresh roof inspection is enough to settle this. Given this, I accept the insurer is not required to accommodate the complainant’s request for a claims specialist or loss adjuster to assist him with the claim. 2.4 I s the insurer’s make safe work satisfactory? No. The insurer’s make safe contractor (TBS) placed ridge tiles on the roof ridge wi thout securing them. This is hazardous and unsafe. The insurer must take prompt steps to address this in the manner outlined in section 2.4 of this determination. Evidence shows TBS’s make safe works were unsatisfactory The exchanged information shows the State Emergency Services (SES), contract or ‘SPM’ and TBS had attended the property for make safe works. SES and SPM appear to have limited their work only to covering and securing the damaged area with tarps. TBS says it did these works during its attendance:  resecured existing timber battens along the top two rows of roof tiles and ridge cap tiles Determination | Case number: 851765 Page 8 of 18  reinstalled existing roof tiles back in place as required and secured them with new fixings  mortared existing ridge cap tiles and replaced broken or missing ones as required. SRS and HPG inspected the roof after TBS’s attendance . Both confirm there are unsecured ridge capping tiles on the roof. TBS has since admitted it did not mortar bed the ridge tiles it put in place, despite billing the insurer for such work. Finally, SPM confirms this was unsafe as strong winds could blow the tiles off. Given this, I accept TBS’s mere placement of ridge tiles back on the roof ridge without being secured was unsafe and unsatisfactory make safe work. Insurer seeks to cash settle cost to mortar bed eight ridge tiles The insurer has since agreed to cover the cost to mortar bed eight ridge tiles to address the issue. It asked the complainant for a quote for this work. The complainant disputes this, saying there are more than eight unsecured ridge tiles. I have several issues with this. Inappropriate for insurer to cash settle its poor make safe works First, having undertaken the responsibility of conducting make safe works, it is inappropriate for the insurer absolve itself of responsibility for its poor make safe work with a cash settlement. The insurer should correct its unsatisfactory unsafe work. Evidence supports there are likely more than eight unsecured ridge tiles Second, HPG reports there are five linear metres of unsecured ridge tiles on the roof following a roof inspection. SPM acknowledges the eight ridge tiles it identified was an ‘arbitrary number’ which it drew based on limited information and some photos. Given this, I consider HPG’s report about the extent of unsecured ridge tiles to be more accurate than SPM’s view. The insurer is responsible for making safe all unsecured ridge tiles, and not just an arbitrary eight tiles. Make safe repairs does not extend to repairing damage that is part of the claim Third, make safe repairs are ordinarily intended to temporarily secure a damaged location in way that prevents further damage and risk of injury to people, while preserving the area for a claim assessment or decision. It is not ordinarily meant to repair damage that forms part of a claim that has not been decided or is in dispute. Dislodged or fallen ridge capping tiles are part of the damage being claimed under the policy. The parties are also in dispute whether the claim is covered and have agreed for the roof to be reinspected. If the ridge tiles are to be mortar bedded now, this would essentially:  mean the insurer is repairing part of the claimed damage that is currently in dispute  jeopardise the fresh roof inspection that is meant to occur. Insurer must take steps to rectify its poor make safe works by other means Given this, I do not consider it appropriate for the unsecured ridged tiles to be mortared in place pending a roof inspection and review of the claim decision, unless the insurer can ensure this does not jeopardise the reinspection that is to occur. I consider other appropriate steps must be taken to make safe the area pending these matters. Determination | Case number: 851765 Page 9 of 18 The insurer is to consult its experts on the appropriate steps to be taken. It must take those steps promptly given issues of safety are involved. The complainant is to provide access to his property for this occur. 2.5 Is the complainant entitled to any other compensation? Yes. The complainant is entitled to 50% reimbursement of his roofer’s (HPG) report and some non-financial loss compensation for the way his claim was handled. AFCA can award non-financial loss compensation and cost AFCA can award a complainant compensation for non-financial loss under its rules. This is usually considered where the insurer takes an unusual amount of time to resolve a situation, causes unusual inconvenience or unusually interferes with the complainant’s expectation of enjoyment or peace of mind. Compensation is capped at $5,400. AFCA takes a conservative approach to compensation for non-financial loss. AFCA generally expects complainants to be moderately robust and bear the usual degree of stress and inconvenience experienced during an insurance claim or in ordinary dealings with an insurer. AFCA’s ability to award compensation is not intended to penalise an insurer just because it made some errors, or its service may not have been perfect. AFCA cannot award punitive or exemplary damages. AFCA can also require an insurer to contribute to professional costs incurred by a complainant during a complaint. This is capped at $5,000 unless special circumstances apply. Fair for insurer to reimburse 50% of HPG’s report cost While I am not persuaded by some of HPG’s views (for reasons set out in section 2.1), its report was nonetheless necessary and crucial to rebut the insurer’s initial position that TBS’s make safe works were satisfactory . HPG’s report also assisted in ascertaining the extent of unsecured tiles on the roof is greater than SPM’s speculation . Given this, it is fair the insurer reimburses the complainant 50% of the cost of this report. Complainant says maximum compensation for non-financial loss is warranted Turning to the claims handling, the insurer acknowledges there are issues with aspects of its claims handling. It offered $2,000 as compensation for the delay, stress and inconvenience it has caused. The complainant says he is entitled to the maximum amount under AFCA’s rules. He provided several extensive submissions, outlining multiple concerns about the insurer’s claims handling and that it has not acknowledged (or very lately acknowledged) those concerns. He says this caused him significant delay, stress, frustration and inconvenience, so the ‘maximum penalty available should be levied’ . Fair for insurer to pay $2,500 as compensation for non-financial loss I accept there were many aspects of the claim that were poorly handled. This includes AG’s misreporting of several facts, the insurer’s failure to consider factual errors when alerted to them before the initial claims decision, TBS’s unsatisfactory make safe works, the insurer’s failure to address such poor make safe works and denying it did not appoint TBS when the evidence shows it did. Determination | Case number: 851765 Page 10 of 18 I accept these matters contributed to the delays that have occurred. I also accept these matters caused the complainant unusual stress, frustration and inconvenience. Considering the complainant’s overall poor claims experience, I am satisfied it is fair the insurer pays him $2,500 as compensation for non-financial loss. Not fair to require the insurer to pay maximum amount under AFCA rules I am not satisfied the maximum amount available under AFCA rules is fair or warranted. The complainant has contributed to the delays and difficulties with the claim by failing to provide the RBI report for an extended period. The complainant was first asked to supply the report in July 2021 but only supplied it in February 2022, nearly seven months later. The complainant says he never refused to supply the RBI report. Rather, the report was not given earlier because AG never gave him an acceptable explanation on its relevance. However, the evidence shows the complainant sent AG an email on 26 July 2021. In this email, the complainant said he never agreed to provide the report and that he had made this clear in two earlier discussions. Even if I accept AG may not have explained the report’s relevance during their discussions, the exchanged information shows the complainant received AG’s first preliminary report on 4 August 2021. This was before the initial claim denial, and the report shows AG was seeking the RBI report due to ‘suspected pre - existing issues’. As noted in section 2.1 earlier, the RBI report did identify some maintenance issues with the roof and warned of a risk of undetected defects. Given this, it is difficult to accept the complainant was unaware of the report’s relevance to the insurer’s assessment. Further, the complainant did not supply the report even after the insurer sent several other correspondences that explained the report’s relevance. 2.6 Is the insurer required to retract its roofer’s report ? No. There is no basis for the report to be retracted just because an email is not provided. Complainant seeks copy of SRS ’s email to AG which attached the roof report The complainant sought a copy of SRS’s email to AG which attached the former’s report. The insurer apparently asked AG for the email and was told neither AG nor SRS had retained a copy of the email. Complainant wants SRS’s report retracted if insurer cannot supply the email The complainant considers this unacceptable. He says:  he has reasons to believe AG and SRS are known to each other in an ‘informal and friendly way’ and were in a ‘conflict -of- interest’  the insurer is refusing to provide the email, is not acting in good faith and is prejudicing his ability to progress his complaint. Given this, he contends that the insurer supplies the relevant email or retracts SRS’s report. Determination | Case number: 851765 Page 11 of 18 No basis for SRS report to be retrac ted just because an email is not supplied While I acknowledge the complainant has strong suspicions about the insurer and its representatives, he cannot tell the insurer what information it can or cannot rely on. The complainant can tell the insurer the SRS report has errors and should not be relied upon. It is up to the insurer to consider his concerns about the report. However, I do not accept the report must be retracted just because an email cannot be produced. Further, the insurer has indicated it would review its initial claim denial based on the reinspection report. I am not satisfied the insurer is required to retract the SRS report. Determination | Case number: 851765 Page 12 of 18 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the extensive information they have given for the complaint, and each party has had the opportunity to address all issues raised. I have reviewed and considered all information the parties have provided. While the parties have raised many issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant assessment communications and reports Record Key points Pre - purcha se building inspector ( RBI ) Inspection report 19 February 2021  Property is 50 years old  Roof construction is concrete tile and timber frame  Inspected building interior and exterior, roof exterior and space, subfloor space, site and fences  Roof exterior ins pected from ground only due to height restrictions and roof pitch  P arts of roof space not inspected due to accessibility  Rated risk of undetected defects as ‘moderate - high’ due to level of accessibility for inspection and presence of obstructions  Strongly r ecommend ed further inspection s once obstructions are removed and access is gained to all areas  ‘Major Defects’ to several ceilings, internal and exterior walls (movement cracks)  ‘Major Defects’ to window timbers, external door, fascia/barge (weathered, aged and deteriorated ’  ‘Major Defects’ to roof – rusted fixings and rust to parts of a lower roof, few cracked pointing to ridge capping on main roof  Widespread wood rot to fences, fascia and barges  Report supplement by phot os Determination | Case number: 851765 Page 13 of 18 Record Key points Make safe contractor ( SPM ) Email to body corporate manager 15 June 2021  Attended property (13 June 2021) to try and improve make safe works done by SES  Owner installed extra tarp to cover more dislodged roof tiles  Adjusted tarp a little to get a bit more coverage and tied tarp down to roof truss to prevent it blowing away  Water may still get in a little just at the top of the ridge  Cannot access roof without a scissor lift or scaffolding Make safe contractor ( TBS ) Email to insurer and body corporate manager 15 June 2021  Roof is abo ut 10 - 13 metres high with no safe access to the area  Roof tiler attended on 15 June 2021 to inspect, scope and arrange materials for repairs  Will return as soon as possible to complet e roof repairs when weat her is better given roof pitch  Property sustained minor int ernal paint/plaster damage, which will be assessed/repaired under the claim after roof repairs Make safe contractor ( TBS ) Email to insurer and body corporate manager 1 5 Ju ne 2021  Ask s for SES’s report where it reportedly said roof ridge may have been lifted and compromised by ‘negative air pressure’  Reports /explains : > n egative air pressure (‘lift and dump’) will generally see tiles settle back down out of alignment, dislodged etc > have not really seen this based on prelim inary inspection > ridge tiles were lifted , which can be wind related only or due to a combination of pointing being in a pre - existing deteriorated condition and the wind basically finishing them off > will inspect remainder of roof when it return s for any other dam age and general condition and report further > will also return today to check remove (where possible/accessible) any loose roof tiles that may be in danger of furt her collapse > a provided photo shows a ridge tile which could fall to the ground and was not noticed during its inspection Determination | Case number: 851765 Page 14 of 18 Record Key points M ake safe contractor ( TBS ) Email to insurer and body corporate manager 1 July 2021 Reports (after 29 June 2021 attendance):  Entire roof needs ‘major upgrade’ as : > roof is old, deteriorated, and has pre - existing issues > battens have rotted, have come loose due to old, rusted or deteriorated fixings and have disconnected from rafters due to weight/gravity and the roof pitch > several areas across the roof are in similar condition > there is poor quality pointing work as it has cracked, fallen or gone missing although only repoint ed 3 - 6 years ago > there is old, perished and brittle sisalation paper > sisalation paper was not finished up and over the main rid ge  Suspects roof of other units may be in a similar condition  Storm ‘just assisted’ with dislodging pre - existing loose or deteriorated tiles  Storm did not damage the sisalation paper and just blew around already perished brittle sisalation paper  Recommend s insurer: > appoints an assessor and roofer ‘CR’ to confirm its findings > directs unit owners to have their units’ roofs checked for preventive maintenance or upgrade works  it limited make safe works only to reinstating loos e or deteriorat ed tiles  Email supp lemented by several photos showing the identified defects and poor pointing work M ake safe contractor ( TBS ) Invoice 19 July 2021 Mainly r epeats the information given in its 1 July 2021 email report and adds:  Roof tiler attended property on 15 and 29 June 2021  Roof is old and in deteriorat ed condition and b elieves only ridge cap tiles may have shifted due to strong winds/storm  Make safe works done: > loose roof tiles in danger of furt her collapsed have been removed, where possible/accessible > only repaired loo se shifted ridge tiles only on 29 June 2021 > resecured existing timber battens along the top two rows of roof tiles and ridge capping as required > reinstalled and secured existing roof tiles back in place with new fixings > reinstalled and mort ared in plac e existing ridge cap tiles and replaced broken/missing tiles as required  Provided no warranty/guarantee on temporary repairs given poor/deteriorated condition of roof, battens and pointing etc.  Report supplemented by photos Determination | Case number: 851765 Page 15 of 18 Record Key points Insurer ’s a sse ssor ( AG ) First pre liminary r eport 23 July 2021  Complainant bought property o n 20 February 2021 and took possession o n 20 May 2021  Body corporate manager confirms only complainant’s property sustained damage  Proximate cause of claimed loss is yet to be determined and is sti ll being investigated  Complainant was asked to supply his pre - purchase inspection report due to the suspected pre - existing issues identified by TBS, but it has experienced some resistance and reluctanc e  It has engaged a specialist roofing contractor to inspect and provide a roof report  Report supplemented by a phot o and the property’s layout R oofer ( SRS ) Assessment r eport On/around 26 July 2021  Inspected property on 26 July 2021  Reports: > property is ‘very steep pitched, multi level+’ > roof tiles were already been repositioned, although capping tiles were not secured or re - bedded/ repointed > n ew Sisalation membrane has been installed beneath the roof tiles and battens in a section along the top ridge line where the alleged damage had occurred (East elevat ion) > cannot confirm if wind damage had occurred, or capping/roof tiles had simply slipped away due to frame movement > t here is evidence of separation bet ween uppermost battens, rafters, and ridge board, which has resulted in the bedding compound cracking an d widening under the capping tiles > this is shown by recent repointing works attempting to cover the large gaps in the existing bedding/mort ar > i f wind damage occurred, this suggest s capping tiles were already loosened by the above issue which is maintenance > entire ridge line of this and adjoining units appear very undulated and suspect s that batten, rafter, and ridge board separation may be occurring along the entire ridge. > property has very high and steep pitched roof frames , where the ‘ roof weight ’ to ‘ floor size ’ ratio is very high > have witnessed occasions where sheer weight of thes e type of roofs ha ve placed excess pressure on rafters and perimeter walls, sometimes causing separation in frame members > lower corner of one front roof dormer window (West e levation) has gaps where water may be able to enter. > r oof material: concrete tile > Internal damage: stains to plaster ceiling in upper bedroom directly under dislodged roof tiles > r oof cavity was not inspected > l eaf litter is built up on the lower sections o f the roof in the valleys and gutters. The lead flashing has some cracking beneath the window frames  Report supplemented by photos Determination | Case number: 851765 Page 16 of 18 Record Key points Insurer ’s a sse ssor ( AG ) Progress r eport 2 4 August 2021 Reports:  SRS’s findings indicat e roof damage are pre - existing maintenance issues attributed to age, wear and tear  R oof inspection found n o evidence of damage directly caused by storm or wind  C ement roof tiles would ordinarily withstand the winds experienced i f not for ill - maintained rafters and rotted timbers  D islodged tiles and resultant damage w ere deemed to be caused by separation between the uppermost battens, rafters and ridge board, resulting in bedding compound cracking and widening under the capping tiles which were unsecured.  Property’s f ormer owners a ppear to have made some makes hift repairs to the roof prior to their sale of the property : > n ew si salation was installed along the claimed damage area is estimated to be only six 6 months old > t here is also r ec ent repointing works to cover large gaps in exi sting bedding/mortar  Uncertain if complainant was aware of pre - existing roof maintenance issues , given his reluctance to provide t he Pre - Purc hase Building Inspection Report  TBS found rotted and loose timber battens due to old, rusted and deteriorated fixings , which: > it attributed to the roof’s pitch , with weight and gravity causing battens to disconnect from the rafters > is consistent with SRS’s findings  P roximate cause of the reported loss and damage is : > not is not related to an isolated storm event > at tributable to pre - existing maintenanc e , gradual deterioration and inherent vice (typical of the roof’s pitch and style) issues to the roof and its timber frames  TBS originally attended to make - safe works, but have limited their works to reinstating the loo se and deteriorated roof tiles  R ecommends claimed be declined bas ed on general exclusions 1 ( b ), 3 (b) and 3(c )  Body corporate manager: > confirmed it has been managing the strata complex since March 2011 and only units 2 and 7 have had private roof maintenance works carried out during that time > advis ed it is unaware of works carried out to the property’s roof before its sale R oofer ( HPG ) Report 25 November 2021  Property is 40 - 50 years old with cement roof tiles  Unable to see ‘clear visible signs of rotted timber and/or battens’ through a visual inspection of the timber internally  Some rectific ation works had taken place as new sisalation paper had been installed ac ross the top row if tiles  Inspection of roof shows: > multiple roof tiles have been re plac ed > 5 linear metres of ridge capping is sitting unsecured across the Determination | Case number: 851765 Page 17 of 18 Record Key points ridge line  Although ridge pointing has wear and tear due to the age of the building, does not believe this could be a contributing factor to numerous tiles becoming dislodged  Believes the tiles have become dislodged due to extremely high winds in conjunction with the roof’s pitch causing the tiles to slide out of position  Does not believe there are any pre - existing maintenance issues that the owner would have been aware of prior to the extreme weat her event  Report supplemented by photos Insurer ’s a sse ssor ( AG ) Amended r eport 19 October 2021  Mainly repeats most of the information in AG’s prior reports but some factual corrections 3.3 Relevant policy wordings Policy 1 – Insured Property We insure You up to the Sum Insured shown in the Schedule for Policy 1 – Insured Property for Damage to Your Insured Property (Building and Common Area Contents) that occurs during the Period of Insurance not otherwise excluded in the Policy. … General Definitions … Damage, Damaged means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy. … Event, Events means a happening or an incident not intended to happen which occurs during a particular interval of time and causes or results in Damage or series of Damage happening from that one Event, that is claimable under this Policy. … Wear and Tear means Damage or a reduction in value through age, ordinary use or lack of maintenance. … Determination | Case number: 851765 Page 18 of 18 Claims Conditions … 4. Claim preparation costs and fees We will pay up to $30,000 for the reasonable cost of fees You necessarily incur with Our written consent in the preparation of a claim under this Policy. Claims Condition 4 - Claim preparation costs and fees does not apply to Policy 4 - Workers Compensation and Policy 9 – Government Audit Costs, Appeal Expenses and Legal Defence Expenses. … Policy 1 - Insured Property What We insure If selected and shown in the Schedule, We will insure You up to the Sum Insured shown for Policy 1 – Insured Property in the Schedule against Damage to Your Insured Property which occurs during the Period of Insurance. … Exclusions 1. We will not pay for Damage caused by or arising directly or indirectly from: … b. lack of maintenance, rust, oxidation, corrosion, mould, Wear and Tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain Your Insured Property in a reasonably good state of repair. This includes when the damage to the Insured Property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time; … 3. We will not pay for: … b. Damage caused by non-rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of; c. the cost of rectifying faulty or defective materials or faulty or defective workmanship, design or specification;

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.