Claim declined for storm damage on basis of maintenance/wear and tear exclusions; disputes over make safe works and claims handling
Text of the determination
Determination
Case number 851765
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 851765 Page 1 of 18
Case number: 851765 23 March 2023
1 Determination overview
1.1 Complaint
The complainant’s property was insured with the financial firm (insurer) under a strata
insurance policy covering the period 4 April 2021 to 4 April 2022 (the policy).
The complainant claimed for storm damage to his property following storms on 9-10 June
2021. The insurer declined the claim. It says the damage is due to maintenance or wear and
tear issues with the roof, which the policy excludes.
Disputes arose over multiple aspects of the claim and the insurer’s claims handling. The
complainant maintains his property was storm damaged and seeks various outcomes, like:
that his property be repaired to its pre-loss condition
approval to engage a claims specialist or loss adjuster at the insurer’s cost
that the insurer properly completes make safe works to his property
the insurer retracts its roofer’s (SRS) report if it cannot supply a particular email
maximum compensation under AFCA rules for poor claims handling.
The insurer has proposed an independent roof inspection at its cost to reconsider its claim
denial. However, the parties cannot agree on the expert to be appointed for this purpose.
1.1 Issues and key findings
Is it fair for the roof to be reinspected?
It is fair for the roof to be reinspected to enable the insurer to reconsider its initial claim denial.
While there are genuine concerns about the insurer’s current assessment information, there
are also genuine concerns the claimed damage may not be covered under the policy. Further,
the insurer was not given fair opportunity to consider the property’s pre -purchase inspection
report before making its initial claim decision.
What parties are to do to progress the claim?
In the interest of progressing the claim, the parties are to take the steps outlined in section 2.2
of this determination.
Is the complainant entitled to the claim preparation benefit?
No. A roof reinspection and report should enable the insurer to determine if the claimed
damage is covered or not covered under the policy. Given this, it is unnecessary for another
claims specialist or loss adjuster to be appointed to the claim.
Is the insurer’s make safe work satisfactory?
No. The insurer’s make safe contractor (TBS) placed ridge tiles on the roof ridge without
securing them. This is hazardous and unsafe. The insurer must take prompt steps to address
this in the manner outlined in section 2.4 of this determination.
Determination | Case number: 851765 Page 2 of 18
Is the complainant entitled to any other compensation?
Yes. The complainant is entitled to 50% reimbursement of his roofer’s (HPG) report and some
non-financial loss compensation for the way his claim was handled.
Is the insurer required to retract SRS’s report?
No. There is no basis for the report to be retracted just because an email is not provided.
Why is the outcome fair?
The parties remain in dispute whether the claim is covered under the policy. This issue is
unresolved because of contributions by the insurer and the complainant. The insurer’s make
safe work and aspects of its claims handling were also poor. Given this, it is fair:
a reinspection of the property’s roof occurs
the parties take the steps outlined in section 2.2 of this determination
the insurer rectifies its poor make safe works promptly, reimburses the complainant 50% of
the cost of HPG ’s report, and pays some compensation for non-financial loss.
1.2 Determination
This determination is partly in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of this determination:
the parties are to take the steps set out in section 2.2 of this determination to progress the
property’s reinspec tion and the claim
the insurer is to:
> take prompt steps to rectify its poor make safe works
> reimburse the complainant 50% of HPG’s report cost
> pay the complainant $2,500 compensation for non-financial loss.
Determination | Case number: 851765 Page 3 of 18
2 Reasons for determination
2.1 Is it fair for the roof to be reinspected?
It is fair for the roof to be reinspected to enable the insurer to reconsider its initial claim denial.
While there are genuine concerns about the insurer’s current assessment information, there
are also genuine concerns the claimed damage may not be covered under the policy. Further,
the insurer was not given fair opportunity to consider the property’s pre -purchase inspection
report before making its initial claim decision.
Property sustained roof and internal damage following a storm
The complainant’s property is part of a strata complex insured with the insurer under the
policy. The insured is the strata complex’s owners ’ corporation. The complainant is one of the
lot owners, having bought his unit in February 2021 and settled in May 2021.
The property faced a storm event on 9-10 June 2021. It suffered roof and internal damage,
and a claim for the damage was made on 12 June 2021.
Parties dispute assessment information and who should do a reinspection
The insurer declined the claim on 17 August 2021, saying the claimed damage was not
caused by a storm event. It says the damage was caused by maintenance or wear and tear
related issues, which the policy excludes. At the time, the insurer relied on information given
by its make safe contractor ‘TBS’, roofer ‘S R S’ and assessor ‘AG’ .
The complainant maintains his property was storm damaged. He says the insurer’s denial
was wrong as it was based on incorrect information given by its experts. He says he informed
the insurer about this before the claim was decided but it still went ahead to decline it. The
complainant provided a report from roofer ‘HPG’ to support that his claim is covered.
The opinions given by the various experts (including pre-purchase building inspector ‘RBI’ )
are briefly outlined in section 3.2 of this determination
The insurer agrees there are errors with aspects of its expert s’ reporting following a review of
the complainant’s complaint . However, it was unprepared to rule out their views on the cause
of the property’s damage , nor was it prepared to accept HPG ’s views on the matter. It says
there is evidence of maintenance or wear and tear issues, which it believes could have
caused or contributed to the claimed damage.
The insurer proposed an independent roof inspection. It says this should allay the
complainant’s concerns about its previous experts, while enabling it to confirm if the claimed
damage is covered under the policy. The parties agree to the reinspection but dispute who
should be appointed for this purpose.
Complainant must establish a valid claim
The complainant must establish, on the balance of probabilities, he suffered a loss covered
by the policy. This is known as a prima facie or valid claim. Once established, the onus shifts
to the insurer to prove, on balance, an exclusion or limitation applies if it seeks to deny or limit
its liability for the loss.
Determination | Case number: 851765 Page 4 of 18
Policy will only respond if proximate cause of damage is not an excluded cause
The policy terms are comprised within a policy schedule and product disclosure statement
(PDS). The relevant policy extracts are set out in section 3.3 of this determination.
In summary, the policy covers accidental damage not otherwise excluded by the policy. The
policy excludes loss or damage caused by the passage of time, lack of maintenance, wear
and tear, developing flaws, wet or dry rot.
This means the policy would only respond if the proximate cause of the claimed damage is
not an excluded cause. The proximate cause is not necessarily the first, last or sole cause of
a loss. It is the effective, dominant or operative cause of the loss.
The insurer is entitled to ascertain the proximate cause of the claimed damage. This, in turn,
would determine if the claim (or a part of it) is covered or excluded by the policy.
Insurer accepts its current assessment information has errors
That there are errors with some of the insurer’s assessment information have been
extensively ventilated in the exchanged information. The insurer accepts errors are present,
so it is unnecessary to set them out in any detail in this determination.
Evidence supports roof has maintenance or wear and tear issues before storm
While the complainant understandably doubts the insurer’s current assessment information,
there is nonetheless evidence his roof has maintenance or wear and tear related issues.
P hotos accompanying TBS’s 1 July 2021 email report show wood rot, separation of roof
timber and what appears to be a rusted nail at the damage location. These can be seen in
photos entitl ed ‘Image - 20210629155011.jpg’ and ‘Image - 20210629154622.jpg’. Other photos
show the roof’s original sisalation paper is old and deteriorated , which TBS describes as
‘already perished brittle paper’ .
The pre-purchase inspection report issued by RBI (RBI report) also identifies several ‘major
defects’ with the property, including with its roof. Although RBI was unable to thoroughly
inspect the main roof or roof space due to accessibility issues, it nonetheless identifies:
rust to some fixings and part s of the property’s lower roof
a few cracked pointing to the main roof’s ridge capping
a ‘moderate - high’ risk of undetected defects with the property (including the roof) and
strongly recommended further inspections.
Property is 40-50 years old, and its maintenance history is unclear
The property is apparently 40-50 years old and its maintenance history is unclear.
While TBS suggested the roof had some repointing works done ‘3 - 6 years ago’, the body
corporate manager apparently said it is unaware of any maintenance works being carried out
to the property since it began managing the strata complex in March 2011.
I understand the complainant has had some works done to the property before the storm
event. However, there is no specific information about any works done to the roof or its
structure between the complainant’s purchase and the relevant storm event.
Determination | Case number: 851765 Page 5 of 18
Property is the only unit in the strata complex that was damaged
While the Insurance Council of Australia declared the relevant storm event a catastrophe, the
property was the only unit within the strata complex that sustained damage. Given the units
are similarly constructed, it is not unreasonable or implausible that there could be issues
unique to the property that may have caused or contributed to its damage.
No evidence roof was affected by ‘negative air pressure’
There is also no evidence the property’s roof ridge was lifted and compromised by ‘negative
air pressure’. While th e complainant says SES suggested this might have occurred, there is
no report from SES or any other expert (including HPG) suggesting this.
I nsurer’s concern that claim may be excluded is not unfounded
On balance, these matters support the insurer’s conce rn the claimed damage may be caused
by excluded causes.
They also limit the persuasiveness of H PG’s suggestion s that:
there were no signs of rotted timber in the roof
the complainant was unaware of any existing maintenance issues before the storm
the relevant storm was the proximate cause of the claimed damage.
Insurer was not given fair opportunity to consider pre -purchase report
Finally, the insurer was not given fair opportunity to review the RBI report before its initial
claim decision, or during its internal dispute resolution stages. The report was only made
available in February 2022, nearly seven months after it was first asked for.
Fair for roof reinspection to occur in this instance
Considering these matters, I am satisfied it would not be fair to require the insurer to accept
the complainant’s claim based on the available information.
I accept it is fair in all the circumstances for a roof reinspection to occur in this instance. I
accept this should allay the complainant’s concerns about the insurer’s current assessment
information, while enabling the insurer to reconsider if excluded causes were proximate
causes of the claimed damage.
2.2 What parties are to do to progress the claim?
In the interest of progressing the claim, the parties are to take the steps outlined in section 2.2
of this determination.
Parties dispute who should reinspect the roof
As noted earlier, the parties have agreed that the roof should be reinspected but cannot
agree on the expert to be appointed for this purpose.
The insurer initially said the inspection should be done by a specialist roofer and its choice
was ‘CR’ . The complainant was uncomfortable with CR’s independence, noting TBS
recommended this roofer for advice in its report . He nominated roofer ‘OER’ instead.
However, the insurer is not satisfied OER is appropriately qualified. It says it asked OER for
several pieces of information , including ‘builders/professional licence and registration
numbers’, but it has not given the information.
Determination | Case number: 851765 Page 6 of 18
The insurer has also since suggested a building consultant should be appointed, and such
person should have a ‘building inspector licence’, public liability and workers compensation
insurance, and ‘no complaints or issued registered’ against that person with a governm ent
authority. The insurer has proposed several building consultants.
The complainant believes the insurer is arbitrarily imposing a licence requirement for his
chosen expert. He says OER has ‘decades of roofing experience’ and is as qualified as CR
and TBS. He says CR has roof plumbing qualifications, which HPG also has but whose
opinion the insurer rejected on the basis HPG is a plumber. He also says TPG has confirmed
the roof tiler it sent to his property did not need a licence to carry out the relevant work.
Best person to confirm their expertise are the relevant experts themselves
An expert is typically a person who has extensive knowledge and experience about a subject
matter. Such knowledge and experience are usually gained through education, training and
work experience. These are the main factors that determine if a person can appropriately be
considered an expert on a subject matter.
The relevant expert is usually the best person to confirm his or her expertise on a subject
matter, rather than the parties. Having reviewed the exchanged information, I am unable to
find any information from either OER or CR about their respective expertise and experience.
Nor am I able to find any information about the expertise and experience of the other experts
the insurer has proposed.
Given this, I am unable to propose the expert that should conduct the reinspection and report
on the proximate cause of the claimed damage.
Insurer is to provide a list of three experts and complainant can choose one
In the interest of progressing the claim, I consider it fair in all the circumstances that the
parties take the following steps.
The insurer is to propose a list of three experts who have had no prior involvement in the
claim and are not on its panel of experts. The complainant can choose one of them. Once the
expert is selected, the insurer is to:
take steps to have the expert inspect the property and issue its report within 30 days
pay for the expert’s report
provide the complainant with a copy of the expert’s repor t within three days of receipt
reconsider and decide the claim within 10 business days of receipt.
Parties bear their own expert cost if complainant still wants his own expert
If the complainant still wants the roof inspected by his chosen expert, then:
the parties are free to choose their own experts
the parties are to bear the cost of their selected expert’s reports
the parties are to exchange their expert reports with each other within three days of receipt
the insurer is to reconsider and decide the claim with 10 business days of receiving the last
of these expert reports.
If the complainant is dissatisfied with the claim outcome in either situation, he is free to lodge
a fresh AFCA complaint about it for AFCA’s consideration.
Determination | Case number: 851765 Page 7 of 18
2.3 Is the complainant entitled to the claim preparation benefit?
No. A roof reinspection and report should enable the insurer to determine if the claimed
damage is covered or not covered under the policy. Given this, it is unnecessary for another
claims specialist or loss adjuster to be appointed to the claim.
Parties dispute whether complainant is entitled to a claim preparation benefit
The complainant says the policy provides a claim preparation benefit. He believes he should
be allowed access to the benefit because of issues and complexities with the claim and the
insurer’s assessment. He says :
a claims specialist or loss adjuster would ‘help him wade through the complexity of this
incredibly difficult and complex claim’
the benefit will ensure an independent and transparent assessment of his claim.
The insurer says there is no need for another claims specialist or loss adjuster to be
appointed in this instance. It says it has agreed to:
have the roof independently inspected at its cost
base its claims decision on this expert ’ s findings, given the complainant’s concerns with its
previous experts.
Policy covers claim preparation cost if it is necessary
There is no dispute claim condition 4 provides up to a $30,000 benefit for claims preparation
costs and fees. The benefit is not automatic. It requires the insurer’s written consent and is
meant to only cover costs that are necessary to prepare a claim. It is not intended to cover
advocacy cost or cost incurred to potentially challenge the insurer’s assessment.
Another claims specialist or loss adjuster is not necessary
I accept the insurer’s explanation that a roof reinspection negates the need for another claims
specialist or loss adjuster to assist with the claim.
I further note there is essentially nothing required to prepare the claim. The claim was already
made, and the only critical question at this stage is whether it is covered under the policy.
This hinges on whether maintenance or wear and tear issues identified with the roof are
proximate causes of the claimed damage. A fresh roof inspection is enough to settle this.
Given this, I accept the insurer is not required to accommodate the complainant’s request for
a claims specialist or loss adjuster to assist him with the claim.
2.4 I s the insurer’s make safe work satisfactory?
No. The insurer’s make safe contractor (TBS) placed ridge tiles on the roof ridge wi thout
securing them. This is hazardous and unsafe. The insurer must take prompt steps to address
this in the manner outlined in section 2.4 of this determination.
Evidence shows TBS’s make safe works were unsatisfactory
The exchanged information shows the State Emergency Services (SES), contract or ‘SPM’
and TBS had attended the property for make safe works.
SES and SPM appear to have limited their work only to covering and securing the damaged
area with tarps. TBS says it did these works during its attendance:
resecured existing timber battens along the top two rows of roof tiles and ridge cap tiles
Determination | Case number: 851765 Page 8 of 18
reinstalled existing roof tiles back in place as required and secured them with new fixings
mortared existing ridge cap tiles and replaced broken or missing ones as required.
SRS and HPG inspected the roof after TBS’s attendance . Both confirm there are unsecured
ridge capping tiles on the roof. TBS has since admitted it did not mortar bed the ridge tiles it
put in place, despite billing the insurer for such work.
Finally, SPM confirms this was unsafe as strong winds could blow the tiles off.
Given this, I accept TBS’s mere placement of ridge tiles back on the roof ridge without being
secured was unsafe and unsatisfactory make safe work.
Insurer seeks to cash settle cost to mortar bed eight ridge tiles
The insurer has since agreed to cover the cost to mortar bed eight ridge tiles to address the
issue. It asked the complainant for a quote for this work. The complainant disputes this,
saying there are more than eight unsecured ridge tiles.
I have several issues with this.
Inappropriate for insurer to cash settle its poor make safe works
First, having undertaken the responsibility of conducting make safe works, it is inappropriate
for the insurer absolve itself of responsibility for its poor make safe work with a cash
settlement. The insurer should correct its unsatisfactory unsafe work.
Evidence supports there are likely more than eight unsecured ridge tiles
Second, HPG reports there are five linear metres of unsecured ridge tiles on the roof
following a roof inspection. SPM acknowledges the eight ridge tiles it identified was an
‘arbitrary number’ which it drew based on limited information and some photos.
Given this, I consider HPG’s report about the extent of unsecured ridge tiles to be more
accurate than SPM’s view. The insurer is responsible for making safe all unsecured ridge
tiles, and not just an arbitrary eight tiles.
Make safe repairs does not extend to repairing damage that is part of the claim
Third, make safe repairs are ordinarily intended to temporarily secure a damaged location in
way that prevents further damage and risk of injury to people, while preserving the area for a
claim assessment or decision. It is not ordinarily meant to repair damage that forms part of a
claim that has not been decided or is in dispute.
Dislodged or fallen ridge capping tiles are part of the damage being claimed under the policy.
The parties are also in dispute whether the claim is covered and have agreed for the roof to
be reinspected. If the ridge tiles are to be mortar bedded now, this would essentially:
mean the insurer is repairing part of the claimed damage that is currently in dispute
jeopardise the fresh roof inspection that is meant to occur.
Insurer must take steps to rectify its poor make safe works by other means
Given this, I do not consider it appropriate for the unsecured ridged tiles to be mortared in
place pending a roof inspection and review of the claim decision, unless the insurer can
ensure this does not jeopardise the reinspection that is to occur. I consider other appropriate
steps must be taken to make safe the area pending these matters.
Determination | Case number: 851765 Page 9 of 18
The insurer is to consult its experts on the appropriate steps to be taken. It must take those
steps promptly given issues of safety are involved. The complainant is to provide access to
his property for this occur.
2.5 Is the complainant entitled to any other compensation?
Yes. The complainant is entitled to 50% reimbursement of his roofer’s (HPG) report and some
non-financial loss compensation for the way his claim was handled.
AFCA can award non-financial loss compensation and cost
AFCA can award a complainant compensation for non-financial loss under its rules. This is
usually considered where the insurer takes an unusual amount of time to resolve a situation,
causes unusual inconvenience or unusually interferes with the complainant’s expectation of
enjoyment or peace of mind. Compensation is capped at $5,400.
AFCA takes a conservative approach to compensation for non-financial loss. AFCA generally
expects complainants to be moderately robust and bear the usual degree of stress and
inconvenience experienced during an insurance claim or in ordinary dealings with an insurer.
AFCA’s ability to award compensation is not intended to penalise an insurer just because it
made some errors, or its service may not have been perfect. AFCA cannot award punitive or
exemplary damages.
AFCA can also require an insurer to contribute to professional costs incurred by a
complainant during a complaint. This is capped at $5,000 unless special circumstances apply.
Fair for insurer to reimburse 50% of HPG’s report cost
While I am not persuaded by some of HPG’s views (for reasons set out in section 2.1), its
report was nonetheless necessary and crucial to rebut the insurer’s initial position that TBS’s
make safe works were satisfactory . HPG’s report also assisted in ascertaining the extent of
unsecured tiles on the roof is greater than SPM’s speculation .
Given this, it is fair the insurer reimburses the complainant 50% of the cost of this report.
Complainant says maximum compensation for non-financial loss is warranted
Turning to the claims handling, the insurer acknowledges there are issues with aspects of its
claims handling. It offered $2,000 as compensation for the delay, stress and inconvenience it
has caused.
The complainant says he is entitled to the maximum amount under AFCA’s rules. He
provided several extensive submissions, outlining multiple concerns about the insurer’s
claims handling and that it has not acknowledged (or very lately acknowledged) those
concerns. He says this caused him significant delay, stress, frustration and inconvenience, so
the ‘maximum penalty available should be levied’ .
Fair for insurer to pay $2,500 as compensation for non-financial loss
I accept there were many aspects of the claim that were poorly handled. This includes AG’s
misreporting of several facts, the insurer’s failure to consider factual errors when alerted to
them before the initial claims decision, TBS’s unsatisfactory make safe works, the insurer’s
failure to address such poor make safe works and denying it did not appoint TBS when the
evidence shows it did.
Determination | Case number: 851765 Page 10 of 18
I accept these matters contributed to the delays that have occurred. I also accept these
matters caused the complainant unusual stress, frustration and inconvenience.
Considering the complainant’s overall poor claims experience, I am satisfied it is fair the
insurer pays him $2,500 as compensation for non-financial loss.
Not fair to require the insurer to pay maximum amount under AFCA rules
I am not satisfied the maximum amount available under AFCA rules is fair or warranted.
The complainant has contributed to the delays and difficulties with the claim by failing to
provide the RBI report for an extended period. The complainant was first asked to supply the
report in July 2021 but only supplied it in February 2022, nearly seven months later.
The complainant says he never refused to supply the RBI report. Rather, the report was not
given earlier because AG never gave him an acceptable explanation on its relevance.
However, the evidence shows the complainant sent AG an email on 26 July 2021. In this
email, the complainant said he never agreed to provide the report and that he had made this
clear in two earlier discussions.
Even if I accept AG may not have explained the report’s relevance during their discussions,
the exchanged information shows the complainant received AG’s first preliminary report on 4
August 2021. This was before the initial claim denial, and the report shows AG was seeking
the RBI report due to ‘suspected pre - existing issues’.
As noted in section 2.1 earlier, the RBI report did identify some maintenance issues with the
roof and warned of a risk of undetected defects.
Given this, it is difficult to accept the complainant was unaware of the report’s relevance to
the insurer’s assessment. Further, the complainant did not supply the report even after the
insurer sent several other correspondences that explained the report’s relevance.
2.6 Is the insurer required to retract its roofer’s report ?
No. There is no basis for the report to be retracted just because an email is not provided.
Complainant seeks copy of SRS ’s email to AG which attached the roof report
The complainant sought a copy of SRS’s email to AG which attached the former’s report. The
insurer apparently asked AG for the email and was told neither AG nor SRS had retained a
copy of the email.
Complainant wants SRS’s report retracted if insurer cannot supply the email
The complainant considers this unacceptable. He says:
he has reasons to believe AG and SRS are known to each other in an ‘informal and
friendly way’ and were in a ‘conflict -of- interest’
the insurer is refusing to provide the email, is not acting in good faith and is prejudicing his
ability to progress his complaint.
Given this, he contends that the insurer supplies the relevant email or retracts SRS’s report.
Determination | Case number: 851765 Page 11 of 18
No basis for SRS report to be retrac ted just because an email is not supplied
While I acknowledge the complainant has strong suspicions about the insurer and its
representatives, he cannot tell the insurer what information it can or cannot rely on.
The complainant can tell the insurer the SRS report has errors and should not be relied upon.
It is up to the insurer to consider his concerns about the report. However, I do not accept the
report must be retracted just because an email cannot be produced. Further, the insurer has
indicated it would review its initial claim denial based on the reinspection report.
I am not satisfied the insurer is required to retract the SRS report.
Determination | Case number: 851765 Page 12 of 18
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the extensive information they have
given for the complaint, and each party has had the opportunity to address all issues raised. I
have reviewed and considered all information the parties have provided.
While the parties have raised many issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant assessment communications and reports
Record Key points
Pre - purcha se building
inspector ( RBI )
Inspection report
19 February 2021
Property is 50 years old
Roof construction is concrete tile and timber frame
Inspected building interior and exterior, roof exterior and space,
subfloor space, site and fences
Roof exterior ins pected from ground only due to height restrictions
and roof pitch
P arts of roof space not inspected due to accessibility
Rated risk of undetected defects as ‘moderate - high’ due to level of
accessibility for inspection and presence of obstructions
Strongly r ecommend ed further inspection s once obstructions are
removed and access is gained to all areas
‘Major Defects’ to several ceilings, internal and exterior walls
(movement cracks)
‘Major Defects’ to window timbers, external door, fascia/barge
(weathered, aged and deteriorated ’
‘Major Defects’ to roof – rusted fixings and rust to parts of a lower
roof, few cracked pointing to ridge capping on main roof
Widespread wood rot to fences, fascia and barges
Report supplement by phot os
Determination | Case number: 851765 Page 13 of 18
Record Key points
Make safe contractor ( SPM )
Email to body corporate
manager
15 June 2021
Attended property (13 June 2021) to try and improve make safe
works done by SES
Owner installed extra tarp to cover more dislodged roof tiles
Adjusted tarp a little to get a bit more coverage and tied tarp down
to roof truss to prevent it blowing away
Water may still get in a little just at the top of the ridge
Cannot access roof without a scissor lift or scaffolding
Make safe contractor ( TBS )
Email to insurer and body
corporate manager
15 June 2021
Roof is abo ut 10 - 13 metres high with no safe access to the area
Roof tiler attended on 15 June 2021 to inspect, scope and arrange
materials for repairs
Will return as soon as possible to complet e roof repairs when
weat her is better given roof pitch
Property sustained minor int ernal paint/plaster damage, which will
be assessed/repaired under the claim after roof repairs
Make safe contractor ( TBS )
Email to insurer and body
corporate manager
1 5 Ju ne 2021
Ask s for SES’s report where it reportedly said roof ridge may have
been lifted and compromised by ‘negative air pressure’
Reports /explains :
> n egative air pressure (‘lift and dump’) will generally see tiles
settle back down out of alignment, dislodged etc
> have not really seen this based on prelim inary inspection
> ridge tiles were lifted , which can be wind related only or due to a
combination of pointing being in a pre - existing deteriorated
condition and the wind basically finishing them off
> will inspect remainder of roof when it return s for any other
dam age and general condition and report further
> will also return today to check remove (where
possible/accessible) any loose roof tiles that may be in danger
of furt her collapse
> a provided photo shows a ridge tile which could fall to the
ground and was not noticed during its inspection
Determination | Case number: 851765 Page 14 of 18
Record Key points
M ake safe contractor ( TBS )
Email to insurer and body
corporate manager
1 July 2021
Reports (after 29 June 2021 attendance):
Entire roof needs ‘major upgrade’ as :
> roof is old, deteriorated, and has pre - existing issues
> battens have rotted, have come loose due to old, rusted or
deteriorated fixings and have disconnected from rafters due to
weight/gravity and the roof pitch
> several areas across the roof are in similar condition
> there is poor quality pointing work as it has cracked, fallen or
gone missing although only repoint ed 3 - 6 years ago
> there is old, perished and brittle sisalation paper
> sisalation paper was not finished up and over the main rid ge
Suspects roof of other units may be in a similar condition
Storm ‘just assisted’ with dislodging pre - existing loose or
deteriorated tiles
Storm did not damage the sisalation paper and just blew around
already perished brittle sisalation paper
Recommend s insurer:
> appoints an assessor and roofer ‘CR’ to confirm its findings
> directs unit owners to have their units’ roofs checked for
preventive maintenance or upgrade works
it limited make safe works only to reinstating loos e or deteriorat ed
tiles
Email supp lemented by several photos showing the identified
defects and poor pointing work
M ake safe contractor ( TBS )
Invoice
19 July 2021
Mainly r epeats the information given in its 1 July 2021 email report
and adds:
Roof tiler attended property on 15 and 29 June 2021
Roof is old and in deteriorat ed condition and b elieves only ridge
cap tiles may have shifted due to strong winds/storm
Make safe works done:
> loose roof tiles in danger of furt her collapsed have been
removed, where possible/accessible
> only repaired loo se shifted ridge tiles only on 29 June 2021
> resecured existing timber battens along the top two rows of roof
tiles and ridge capping as required
> reinstalled and secured existing roof tiles back in place with new
fixings
> reinstalled and mort ared in plac e existing ridge cap tiles and
replaced broken/missing tiles as required
Provided no warranty/guarantee on temporary repairs given
poor/deteriorated condition of roof, battens and pointing etc.
Report supplemented by photos
Determination | Case number: 851765 Page 15 of 18
Record Key points
Insurer ’s a sse ssor ( AG )
First pre liminary r eport
23 July 2021
Complainant bought property o n 20 February 2021 and took
possession o n 20 May 2021
Body corporate manager confirms only complainant’s property
sustained damage
Proximate cause of claimed loss is yet to be determined and is sti ll
being investigated
Complainant was asked to supply his pre - purchase inspection
report due to the suspected pre - existing issues identified by TBS,
but it has experienced some resistance and reluctanc e
It has engaged a specialist roofing contractor to inspect and
provide a roof report
Report supplemented by a phot o and the property’s layout
R oofer ( SRS )
Assessment r eport
On/around 26 July 2021
Inspected property on 26 July 2021
Reports:
> property is ‘very steep pitched, multi level+’
> roof tiles were already been repositioned, although capping tiles
were not secured or re - bedded/ repointed
> n ew Sisalation membrane has been installed beneath the roof
tiles and battens in a section along the top ridge line where the
alleged damage had occurred (East elevat ion)
> cannot confirm if wind damage had occurred, or capping/roof
tiles had simply slipped away due to frame movement
> t here is evidence of separation bet ween uppermost battens,
rafters, and ridge board, which has resulted in the bedding
compound cracking an d widening under the capping tiles
> this is shown by recent repointing works attempting to cover the
large gaps in the existing bedding/mort ar
> i f wind damage occurred, this suggest s capping tiles were
already loosened by the above issue which is maintenance
> entire ridge line of this and adjoining units appear very
undulated and suspect s that batten, rafter, and ridge board
separation may be occurring along the entire ridge.
> property has very high and steep pitched roof frames , where the
‘ roof weight ’ to ‘ floor size ’ ratio is very high
> have witnessed occasions where sheer weight of thes e type of
roofs ha ve placed excess pressure on rafters and perimeter
walls, sometimes causing separation in frame members
> lower corner of one front roof dormer window (West e levation)
has gaps where water may be able to enter.
> r oof material: concrete tile
> Internal damage: stains to plaster ceiling in upper bedroom
directly under dislodged roof tiles
> r oof cavity was not inspected
> l eaf litter is built up on the lower sections o f the roof in the
valleys and gutters. The lead flashing has some cracking
beneath the window frames
Report supplemented by photos
Determination | Case number: 851765 Page 16 of 18
Record Key points
Insurer ’s a sse ssor ( AG )
Progress r eport 2
4 August 2021
Reports:
SRS’s findings indicat e roof damage are pre - existing maintenance
issues attributed to age, wear and tear
R oof inspection found n o evidence of damage directly caused by
storm or wind
C ement roof tiles would ordinarily withstand the winds
experienced i f not for ill - maintained rafters and rotted timbers
D islodged tiles and resultant damage w ere deemed to be caused
by separation between the uppermost battens, rafters and ridge
board, resulting in bedding compound cracking and widening
under the capping tiles which were unsecured.
Property’s f ormer owners a ppear to have made some makes hift
repairs to the roof prior to their sale of the property :
> n ew si salation was installed along the claimed damage area is
estimated to be only six 6 months old
> t here is also r ec ent repointing works to cover large gaps in
exi sting bedding/mortar
Uncertain if complainant was aware of pre - existing roof
maintenance issues , given his reluctance to provide t he Pre -
Purc hase Building Inspection Report
TBS found rotted and loose timber battens due to old, rusted
and deteriorated fixings , which:
> it attributed to the roof’s pitch , with weight and gravity causing
battens to disconnect from the rafters
> is consistent with SRS’s findings
P roximate cause of the reported loss and damage is :
> not is not related to an isolated storm event
> at tributable to pre - existing maintenanc e , gradual deterioration
and inherent vice (typical of the roof’s pitch and style) issues
to the roof and its timber frames
TBS originally attended to make - safe works, but have limited
their works to reinstating the loo se and deteriorated roof tiles
R ecommends claimed be declined bas ed on general exclusions
1 ( b ), 3 (b) and 3(c )
Body corporate manager:
> confirmed it has been managing the strata complex since March
2011 and only units 2 and 7 have had private roof maintenance
works carried out during that time
> advis ed it is unaware of works carried out to the property’s roof
before its sale
R oofer ( HPG )
Report
25 November 2021
Property is 40 - 50 years old with cement roof tiles
Unable to see ‘clear visible signs of rotted timber and/or battens’
through a visual inspection of the timber internally
Some rectific ation works had taken place as new sisalation paper
had been installed ac ross the top row if tiles
Inspection of roof shows:
> multiple roof tiles have been re plac ed
> 5 linear metres of ridge capping is sitting unsecured across the
Determination | Case number: 851765 Page 17 of 18
Record Key points
ridge line
Although ridge pointing has wear and tear due to the age of the
building, does not believe this could be a contributing factor to
numerous tiles becoming dislodged
Believes the tiles have become dislodged due to extremely high
winds in conjunction with the roof’s pitch causing the tiles to slide
out of position
Does not believe there are any pre - existing maintenance issues
that the owner would have been aware of prior to the extreme
weat her event
Report supplemented by photos
Insurer ’s a sse ssor ( AG )
Amended r eport
19 October 2021
Mainly repeats most of the information in AG’s prior reports but
some factual corrections
3.3 Relevant policy wordings
Policy 1 – Insured Property
We insure You up to the Sum Insured shown in the Schedule for Policy
1 – Insured Property for Damage to Your Insured Property (Building and Common
Area Contents) that occurs during the Period of Insurance not otherwise excluded
in the Policy.
…
General Definitions
…
Damage, Damaged
means any partial or total accidental physical loss of, or destruction of property
from any sudden and accidental cause not otherwise excluded by this Policy.
…
Event, Events
means a happening or an incident not intended to happen which occurs during a
particular interval of time and causes or results in Damage or series of Damage
happening from that one Event, that is claimable under this Policy.
…
Wear and Tear
means Damage or a reduction in value through age, ordinary use or lack of
maintenance.
…
Determination | Case number: 851765 Page 18 of 18
Claims Conditions
…
4. Claim preparation costs and fees
We will pay up to $30,000 for the reasonable cost of fees You necessarily incur
with Our written consent in the preparation of a claim under this Policy.
Claims Condition 4 - Claim preparation costs and fees does not apply to Policy 4 -
Workers Compensation and Policy 9 – Government Audit Costs, Appeal
Expenses and Legal Defence Expenses.
…
Policy 1 - Insured Property
What We insure
If selected and shown in the Schedule, We will insure You up to the Sum Insured
shown for Policy 1 – Insured Property in the Schedule against Damage to Your
Insured Property which occurs during the Period of Insurance.
…
Exclusions
1. We will not pay for Damage caused by or arising directly or indirectly from:
…
b. lack of maintenance, rust, oxidation, corrosion, mould, Wear and Tear, fading,
concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or
gradual deterioration or, failure to maintain Your Insured Property in a
reasonably good state of repair. This includes when the damage to the
Insured Property is caused by light, air, sand, the climate (which includes wind
or rain) or the passage of time;
…
3. We will not pay for:
…
b. Damage caused by non-rectification of an Insured Property defect, error or
omission that You were aware of, or should reasonably have been aware of;
c. the cost of rectifying faulty or defective materials or faulty or defective
workmanship, design or specification;