Text of the determination
Determination
Case number 851579
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 851579 Page 1 of 10
Case number: 851579 6 September 2022
1 Determination overview
1.1 Complaint
The complainants hold a home insurance policy with the financial firm (the insurer) and
lodged a claim for storm related damage in March 2020. The insurer accepted the claim and
repairs commenced on 21 March 2021 but due to various issues have not been completed.
The complainants have now exhausted the temporary accommodation cover under the policy.
The insurer has agreed to settle the outstanding repairs for $165,726.64 and paid the
complainant $22,060.30 for damage to contents in bedroom 4, removal of asbestos affected
contents and clean up and damage to tiles. The complainant now seeks compensation for:
the cost of completing damage caused by EB
contents items in bedrooms 1,2,3 and 5, study and front foyer plus asbestos clean-up.
additional temporary accommodation costs incurred due to delays
each of their immediate family members due to the mishandling of the claim.
1.2 Issues and key findings
Are the complainants entitled to compensation for damage caused by EB?
No. The cash settlement of $165,726.64 includes rectification of the damage caused by EB.
Is the insurer obligated to cover further temporary accommodation?
Yes. It is fair the insurer pays for temporary accommodation due delays caused by its
handling of the claim and failure to complete the repairs. The insurer is to cash settle the as
set out in section 2.2 of this determination.
Is the insurer liable for additional contents claimed?
No. There is no evidence of any ongoing asbestos contamination.
Are the complainants entitled to non-financial loss compensation?
Yes. The insurer is to pay the complainants non-financial loss compensation of $5,400.
Why is the outcome fair?
The outcome is fair as it considers the terms of the policy, good industry practice and utmost
good faith.
1.3 Determination
This determination is partially in favour of the complainants. Within 21 days of the
complainant‟s acceptance of this determination the insurer is to pay the complainants:
$43,216 for temporary accommodation as set out in section 2.2 of this determination
$5,400 compensation for non-financial loss
The insurer has otherwise met its liability under the terms of the policy and need take no
further action.
Determination | Case number: 851579 Page 2 of 10
2 Reasons for determination
2.1 Are the complainants entitled to compensation for damage
caused by EB?
No. The agreed cash settlement of $165,726.64 includes the allowance for the rectification of
damage caused by EB during the repairs.
Complainants say EB caused further damage during course of repairs
The complainants say while conducting repairs, EB damaged the property. The complainants
also identified defective works, which it would like repaired. Twelve items were on their list of
“defective/damaged items”.
The complainants say they would prefer the items to be rectified and a separate cash
settlement provided for the remaining works. The insurer agreed to a separate cash
settlement for the front path tiles, which is now no longer in dispute.
Although it may be inconvenient to have to organise a builder to rectify another builder‟s faulty
works, the relationship between the complainants and EB has broken down. To continue to
have them interact would put both the complainants and the insurer at a disadvantage.
Insurer submitted a breakdown of the rectifications costs
EB says it was not refusing to complete the repairs, however, considered the remaining works
should be cash settled because of the ongoing concerns raised by the complainants. The
insurer provided a breakdown of costs for the rectification works totalling $5,243.39.
Neither the complainant or EB are disputing the rectification work required or the estimated
cost.
Insurer has provided a cash settlement for rectification works
The insurer initially offered the complainant a settlement of $138,105.54 including $5,243.39
in rectification costs plus a 15% contingency. The complainants later agreed to a cash
settlement of $165,726.64 representing the repair costs of $138,105.54, plus a 20%
contingency. I accept that the cash settlement breakdowns were provided and the cash
settlement, including the 20% contingency has already been settled with the complainants.
The insurer says the cash settlement and 20% uplift for repairs captures the rectification
works and additional repairs to finalise the repairs to the home. The complainants in a
response to AFCA on 23 May 2022 say the settlement does not respond to their claim for the
remedial works.
Given the cash settlement breakdown clearly includes the rectification costs I contacted the
complainants on 18 August 2022. I asked the complainants to clarify whether they now
accept the offer includes the cost of rectification of the damage caused by EB. They have
provided no further response.
I accept the settlement includes the cost to rectify the damage caused by EB. The settlement
finalises this aspect of the claim.
The complainants have also questioned the warranties provided with the repairs. Although
the policy is silent, for the works already completed by the insurer there is an implied
Determination | Case number: 851579 Page 3 of 10
guarantee as to the workmanship and quality of the works. Should issues arise in the future
with respect to those works, the complainant will be able to lodge a claim with the insurer.
For works completed by the complainants following the cash settlement any warranty on the
repairs will be between the repairer and the complainants.
2.2 Is the insurer obligated to cover further temporary
accommodation?
Yes. It is fair the insurer pays for temporary accommodation due delays caused by its
handling of the claim and failure to complete the repairs. The insurer is to cash settle the
claim for temporary accommodation until 17 January 2022 and for a further ten weeks as set
out in this determination.
Insurer says complainants exhausted temporary accommodation
The complainant s‟ policy includes an additional benefit for temporary accommodation if the
insurer agrees a property cannot be lived in because of an insured event. The relevant policy
wording is set out in section 3.2 of this determination.
Temporary accommodation is payable for a maximum period of 12 months up to 10% of the
building sum insured. The certificate of insurance shows the building sum insured as
$668,504. The maximum under the policy is therefore $66,850.40
Following assessment of the claim, the insurer approved temporary accommodation from 21
March 2021. It paid temporary accommodation until 1 October 2021 of $57,425.44 and a
further $8,998 on 29 September 2021. On or around 15 February 2022, the insurer paid a
final amount of $426.96 to reach the 10% limit of $66,850.40 under the policy.
This insurer does not dispute there have been delays. The damage occurred in March 2020.
The repairs did not commence until March 2021. The estimated time to complete the repairs
at that time was five weeks. The repairs have not been completed.
The complainants right to temporary accommodation under the policy is now exhausted. The
insurer says it will not pay any further temporary accommodation. The insurer denies liability
for the delays and says the delays were caused by Covid restrictions and lack of available
trades. It says the delays were outside its control.
Claim notes reveal delays
There is no dispute the repairs were no completed by the insurers builder EB.
The claim notes reveal the insurers loss adjuster „LA‟ was aware no repairs had taken place
for over a month as at 23 August 2021. It appears likely that in fact EB did not complete any
repairs from June 2021.
On 26 August 2021 LA notes that EB will need to start work otherwise the building will not be
habitable. While LA notes the complainants raised concerns on 29 June, 9 July and 30
August 2021 no reasonable explanation is provided for the delays.
On 21 September 2021 the insurer was aware that the maximum allowance for temporary
accommodation was fast approaching. It was aware that it would take another 8 weeks to
complete repairs. A request for an extension of the temporary accommodation until 1
December 2021 was made. No further enquiry appears to have been made by the insurer as
to the cause of the delays.
Determination | Case number: 851579 Page 4 of 10
The notes record that on 30 September 2021 the insurer claims it had not been advised of the
delays. This is inconsistent with the notes that indicate it was aware of the delays at least
from 23 August 2021 and likely through LA and EB from June 2021. Significantly the notes
record “so who is overseeing the trade”. The same claims notes records to case manager
noting “ Confirmed not our issue and needs to be escalated ASAP ” .
Despite clearly acknowledging a lack of supervision over the progress of the repairs the
insurer rang the complainants on 5 October 2021 and denied the request for temporary
accommodation to be extended. The insurer denied liability for the delays and suggested it
didn‟t control the trades.
At this stage no repairs had commenced. In fact, there is no mention of repairs although the
complainants are informed on 24 November 2021 that the insurer had received a cash
settlement figure and was urgently reviewing and validating the figures. Even though the
insurers IDR letter of 3 December 2021 refers to the repair work at the property being
ongoing. It wasn‟t.
The complainants raised concerns about any cash settlement and this appears to have led to
a cash settlement offer made on 17 January 2022.
Statutory duty of utmost good faith extends to claims handling
In my view the insurers claims handling has breached the duty of utmost good faith.
Section 13 of the Insurance Contracts Act 1984 (the Act) requires each party to a contract of
insurance to act towards the other party with utmost good faith. This extends to all aspects of
the insurance relationship including claims handling. It encompasses notions of fairness,
reasonableness and community standards of decency and fair dealing.
While I accept that some delays will be associated with Covid restrictions and trades
availability. The presence of asbestos will also lead to delays, but the insurer was aware of
this from very early in the claim. These issues do not explain the lack of progress with the
repairs from June 2021. Questions by the complainants as to the scope of works should not
have prevented repairs progressing. Remediation of any asbestos issue should not have
prevented the completion of repairs estimated to take up to eight weeks from being
completed before the maximum payment had been reached.
It appears the insurer had outsourced the supervision of the repair process the LA. The 7 th
report from LA is dated 28 May 2021 while the 8 th report is 17 September 2021. The reports
highlight the repairs were not completed. If further reports were provided they have not been
exchanged. The insurer did not respond or make further enquiry of LA despite notes that the
repairs had stopped. In its own words “so who is overseeing the trades” .
In my view the insurer had failed to properly supervise the repair process. It failed to monitor
the repairer EB, LA or investigate the delays. It failed to manage the claim or take
responsibility. Again, in its own words it “confirmed this is not our issue . ”
There is no notion of fairness or reasonableness in the insurers handling of the claim. The
insurers denial of any responsibility for the delays and claim it did not control the trades when
it had contracted LA and EB is simply not correct. The comments in its IDR letter that repairs
were proceeding even though LA had notified the complainant that the insurer was urgently
reviewing and validating figures for a cash settlement confirms the insurer was not
supervising the process. In my view the insurer has failed to handle the claim fairly,
reasonably or with a sense of community standard of decency or fair dealing.
Determination | Case number: 851579 Page 5 of 10
Complainants entitled to additional temporary accommodation
Section 14 of the Act provides that if reliance on provision of a contract would be to fail to act
with utmost good faith then a party cannot rely on the provision. Reliance on the terms of the
policy that limit liability for temporary accommodation would in my view be a failure to act with
utmost good faith.
I acknowledge the complainants exhausted its policy requirements, however, the
complainants were not in a position to appoint another builder to privately complete the works
until the decision to make a cash settlement was made.
The insurer paid temporary accommodation costs totalling $ 57,425.44 from 21 March 2021
to 1 October 2021. I calculate that to be 194 days at a daily rate of $296.00. The insurer paid
the balance of $9,424.96 ($8,998 on 29 September 2021 and $426.96 on 15 February 2022).
Using the daily rate of $296.00 I calculate that to be a further 32 days or bringing the
temporary accommodation payment up to 2 November 2021.
The complainant was still in temporary accommodation and no reasonable offer was made to
the complainant until 17 January 2022. This is a further 76 days. In my view it is fair the
insurer pays for the temporary accommodation of $22,496 during this period calculated at
$296 per day.
I accept the complainant could have agreed to a partial settlement of the claim at that time
that would have allowed the complainants to commence the repairs. The repair period has
been estimated at up to 8 weeks. Allowing the complainant time to appoint a repairer, I think it
is fair the insurer pays temporary accommodation for a further ten-week period totalling
$20,720 again calculated at $296 per day.
It is fair in the circumstances the insurer pays the complainant a further $43,216 to cover
temporary accommodation costs.
2.3 Is the insurer liable for additional contents claimed?
No. There is no evidence of any ongoing asbestos contamination
Complainants say the contents items should be removed and replaced
The complainants have acknowledged the insurer has since offered settlement for all soft
furnishings, window coverings and contents for bedroom four. The complainants have since
accepted this cash settlement offer of $22,459.37.
The complainants raised concerns about the asbestos testing conducted at their home and
advised there were items which cannot be decontaminated and certified free of asbestos.
These items were as follows:
linen cupboards
bedroom five (which was proven asbestos positive)
study (where items from bedroom four were moved into)
bedroom three (where asbestos-contaminated contents from bedroom four were moved
into)
bedroom two
bedroom one
front foyer rug.
Determination | Case number: 851579 Page 6 of 10
Asbestos testing was conducted by several specialists
Several reports were produced from asbestos specialists.
On 9 June 2021, LRM were appointed by EB to collect and analyse material suspected of
containing asbestos. The results were „no asbestos detected‟. However, samples appeared to
have only been collected from bedrooms three and four.
On 25 July 2021, EHS were appointed by C following on-going concerns of asbestos raised
by the complainants. Samples were collected from the kitchen, master bedroom and two
bedrooms. Various other samples were collected from contents items.
EHS concluded no further action was required to the contents and/or within the conditioned
living space of the property from an asbestos perspective.
On 29 November 2021, EP were appointed by the complainants, who only advised a positive
test in bedroom four.
A scope of works was submitted by another asbestos cleaner (ASC) on 21 March 2022. This
included removal and disposal of the contaminated items, HEPA vacuum bedroom on first
floor and provide a clearance certificate once completed. The complainants have since been
cash settled for these works. The insurer maintains bedroom four was the only room which
tested positive for asbestos contamination.
No evidence of further contamination
I acknowledge the complainants have raised concerns regarding the listed items, however
there is no evidence to indicate asbestos exposure to these items.
The complainants say they did not request the testing of all items. Rather, they wanted
removal and replacement of soft furnishings which could not be successfully decontaminated.
They say there are continual health risks which asbestos will cause if the removal and
replacement is not completed. The complainants submitted documentation to show the
method of testing within their home is flawed and the sampling taken from the home is not an
accredited method of testing.
Four organisations have conducted asbestos testing within the home. None have identified
asbestos contamination in the study, linen cupboards, bedrooms three, two, one or the front
foyer rug.
In the absence of further information, I do not consider it necessary for the insurer to conduct
any further asbestos testing as there is no evidence of asbestos contamination.
2.4 Are the complainants entitled to non-financial loss
compensation?
Yes. The complainants are entitled to compensation for non-financial loss of $5,4000
AFCA may award compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We
will only award this type of compensation if you suffer an unusual degree of physical
inconvenience, or delay because the insurer mishandled your claim.
Determination | Case number: 851579 Page 7 of 10
We recognise that making a claim can be stressful and time-consuming, even if the insurer
handles the claim correctly. We will not award compensation for the ordinary degree of
inconvenience that comes with making a claim.
Non-financial loss compensation is warranted
Some of the main concerns raised by the complainants were as follows:
the insurer did not inform them of the asbestos testing in the home
the insurer sent out a cleaning company who were unlicensed to remove asbestos, and
the overall handling of asbestos items contributed to the delays
the insurer provided little warning to extend temporary accommodation on various dates
the change in project managers contributed to miscommunication and delays
the insurer withheld information, and this was a failure of utmost good faith
the insurer was aware of the defective works and took time to compile a scope of works.
Due to ongoing delays, the complainants are seeking non-financial loss for each four
members of their family. AFCA are unable to award compensation to individuals who are not
parties to the complaint.
The failure to monitor the repairs and continual declined of temporary accommodation once
the option in the policy was exhausted would have caused significant stress. This occurred in
a setting where the insurer failed to expedite repairs to assist the complainants in reducing
these costs.
I also acknowledge the complainants may have been stressed by the asbestos testing
arranged by the insurer. I accept however that the insurer had acted appropriately in
arranging the testing. The insurer has confirmed WorkSafe did not impose any fines on EB or
the insurer over this.
I accept the complainants have suffered and unusual degree of physical inconvenience and
time taken to resolve the claim because of the insurers handling of the claim. This has in turn
caused a considerable degree of stress which in my view is at the higher end of the scale. It
is fair in the circumstances the insurer pays the complainant $5,400 compensation for non-
financial loss.
2.5 Why is the outcome fair?
This outcome is fair because it applies the terms of the policy, good industry practice and
utmost good faith.
Although the complainants exhausted temporary accommodation, under the policy this was in
my view largely caused by the way in which the insurer handled the claim and its failure to
properly supervise the repair process. This left the complainant without temporary
accommodation benefits. It would be unfair to not continue to pay temporary accommodation
benefits in these circumstances.
Determination | Case number: 851579 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
How we will settle your buildings claim
1. At our opinion, we will:
a. Repair or rebuild the damaged part of your building to the same
condition as when it was new; or
b. Pay you the reasonable cost of repairing or rebuilding any damaged
part of your building to the same condition as when it was new; or
c. Pay you up to the amount of the sum insured.
Determination | Case number: 851579 Page 9 of 10
If we pay you the reasonable cost of repair or rebuilding, this means the cost of
repairing or rebuilding less any discount available to us were we to repair or
rebuild.
[…]
3. Unless we have agreed in writing, repair or rebuilding of your buildings must
commence within six months of the loss or damage. If repair or rebuilding of your
buildings is not commenced within six months of the loss or damage or any
extended period to which we have previously agreed in writing, we will not be
liable for any costs beyond the repair or rebuilding costs as at the date the loss or
damage occurred.
Page 43-45
Other Benefits we will provide
17. Removal of debris, professional fees and extra costs
When the buildings have been destroyed or damaged by an insured event and we
have agreed to pay your claim, we will also pay the reasonable and necessary
costs of:
a. demolition and removing debris from your risk address;
b. architects‟, engineers‟, surveyors‟ and solicitors‟ fees; and
c. meeting the requirements of any statutory authority.
We will only pay these costs if they relate directly to the destroyed or damaged
part of the buildings and we have agreed to do so before they are incurred.
The maximum combined total amount we will pay under this benefit and “Rental
costs after an insured event” on pages 44 to 45 is 10% of t he sum insured on the
buildings plus the balance of any sum insured remaining after payment of your
claim for damage to your buildings.
When your contents have been destroyed or damaged by an insured event and
we have agreed to pay your claim, we will also pay the cost of removing debris
from your risk address.
The maximum combined total amount we will pay under this benefit and
“Additional cost of temporary accommodation” on pages 32 to 33 is 10% of the
sum insured on your contents plus the balance of any sum insured remaining
after payment of your claim for damage to contents.
[…]
18. Rental costs after an insured event
Determination | Case number: 851579 Page 10 of 10
(Applicable only when you have buildings cover)
If the buildings are damaged by an insured event to such an extent that you or
your tenant cannot live in them, we will pay your rental costs for:
• the length of time which we agree is necessary to reinstate your buildings, or
• up to a maximum period of 12 months, whichever period of time is the lesser.
[…]
The maximum combined total amount w e will pay under this benefit and “Removal
of debris, professional fees and extra costs” on pages 43 to 44 is 10% of the sum
insured on the buildings. Any payment we may make under this benefit will be in
addition to any amount we pay on buildings.
Page 52-54
When we will not pay a claim under your policy
2. Unless we state differently in your policy, we will not pay for:
[…]
e. loss of damage which is caused directly or indirectly by:
• insects or birds,
• vermin (other than loss or damage caused by fire),
• rust, corrosion, algae, mould or mildew,
• any process of cleaning, repairing or restoring which involves the use of
chemicals
;[…]
j. consequential loss.