Determination 851340
Commercial strata property damage claim - windows, loss of rent, roof, air conditioning, bollards and mezzanine
Summary
A family company's commercial strata claim followed a fire, with disputes over window replacement, loss of rent, roof repairs, AC, bollards and a tenant mezzanine. AFCA ordered the insurer to pay for windows, loss of rent with interest, AC, bollards and an independent roof assessment and repair, but found the mezzanine not covered.
Under insurance law the insured must establish a claimable loss, and the insurer must then prove any exclusion; the SOW agreed windows replacement and the policy covers loss of rent and building damage, while the mezzanine as a tenant fixture is not insured property.
Issues
- Claim amount dispute primary · upheld
“The panel considers it fair in the circumstances that the insurer cash settles the claim for the windows based on MG's quote.”
- Claim denial secondary · not upheld
“The panel is satisfied the policy does not cover the damage to the mezzanine.”
- Delay secondary · upheld
“The complainant says it continued to suffer loss of rent until 28 July 2021 due to inadequate repairs.”
- Repairs or contractors secondary · upheld
“The insurer accepts, and the parties agree further works are required to rectify the issues to the roofing, which have continued to leak.”
Subjects and remedies
business interruptionhome or building damagelanguage or cultural barriernatural disasterpay claimpay interestreassess claimrepair or rectify
Text of the determination
Determination
Case number 851340
Financial firm Lloyd's Australia Limited
Case number: 851340 6 October 2022
Determination | Case number: 851340 Page 2 of 8
1 Determination overview
1.1 Complaint
The complainant, a family owned company, held a Commercial Strata insurance policy with
the financial firm which was let out to rent. A claim was lodged on 4 June 2019 after the
building was damaged in a fire. The insurer accepted liability and commenced repairs based
on an agreed scope of works (SOW). The insurer says it paid loss of rent until 5 April 2020
when repairs were completed.
The complainant says the repairs have not been completed as per the agreed SOW and it
continued to suffer loss of rent until 28 July 2021. The parties remain in dispute over issues
relating to the building repairs at the property and loss of rent.
1.2 Issues and key findings
Is the insurer liable for further damage claimed?
Yes. The panel is satisfied the insurer is liable to pay the complainant:
$49,296.50 to cover the cost to replace the windows including a 10% uplift for contingencies
$31,295.49 loss of rent for the period to 28 July 2021 plus interest from 10 January 2022
pursuant to section 57 Insurance Contracts Act 1984 (Cth) (the Act)
$5,390 including installation for the air conditioning unit (AC) if not already paid
$500 for the replacement bollards
In addition, the insurer is to arrange for a further assessment of the damage to the roof and
repair any identified defects including leaks as set out in section 2.1 of this determination.
Is the insurer liable to repair the mezzanine?
No. The policy does not extend to cover fittings and fixtures installed by the tenant.
Why is the outcome fair?
The outcome is fair as it allows for the finalisation of the complaint consistent with the terms
of the policy.
1.3 Determination
This determination is substantially in favour of the complainant. Within 14 days of the
complainant’s acceptance of this determination the insurer is to pay the complainant:
$49,296.50 in settlement of the damage claim
$5,390.00 including installation for the AC if not already paid
$31,295.49 plus interest pursuant to section 57 of the Act from 10 January 2022 in
settlement of the claim for loss of rent
$500 for the replacement bollards
The insurer is to appoint an independent roofer/builder to assess the roof damage and either
repair or cash settle the claim for the damage as set out in section 2.1 of this determination
The insurer is otherwise entitled to deny the claim for the damage to the mezzanine.
Determination | Case number: 851340 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer liable for the further damage claimed?
Yes. The panel is satisfied the insurer is liable to pay the complainant:
$49,296.50 to cover the cost to replace the windows including a 10% uplift for contingencies
$31,295.49 loss of rent for the period to 28 July 2021 plus interest from 10 January 2022
pursuant to section 57 Insurance Contracts Act 1984 (Cth) (the Act)
$5,390 including installation for the air conditioning unit if not already paid
$500 for the replacement bollards
In addition, the insurer is to arrange for a further assessment of the damage to the roof and
repair any identified defects including leaks.
Complainant has the onus to establish a valid claim
It is established insurance law that an insured has the onus of establishing, on the balance of
probabilities (that it is more likely than not), that the loss or damage claimed falls within the
terms of the policy. This is commonly called a prima facie claim.
If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of
probabilities, the application of any condition or exclusion it relies on to reduce its liability.
Policy covers accidental loss or damage subject to exclusions and conditions
The complainant ’ s Commercial Strata Insurance policy covers the insured building against
accidental loss or damage subject to various conditions and exclusions. The policy includes
cover for loss of rent of up to 36 months where the building damage claim is accepted.
Circumstances of loss
The complainant ’ s claim follows a fire that caused extensive damage to the insured building
which is leased. The insurer accepted the claim however a dispute has arisen as to the
agreed repairs, the quality of repairs and a claim for additional loss of rent.
The insurer arranged a builder (MB) and loss adjustor (PE) to report on the issues in dispute.
The complainant has not arranged any expert evidence and relies on the reports from MB
and PE to support the claim. The complainant has provided a very detailed list of issues
which remain in dispute and for consideration.
In the circumstances it is appropriate for the panel to consider each issue individually.
Insurer is liable to replace the windows
The complainant says the windows at the property need to be replaced due to sustaining
damage from the fire or damage caused by the authorised builder (TBS) when completing
repairs to the window grating.
The complainant says the full replacement of the windows was included in the SOW and
quotations arranged during the tendering process with builder (BB) and TBS. The
complainant and TBS signed an authority to commence work and SOW on 31 October 2019.
The scope of works at item 28 provides:
Commercial Windows: Factory 1…
Determination | Case number: 851340 Page 4 of 8
Was (sic) down and detail clean x4 new aluminium framed windows to the
western elevation and x 2 to the southern elevation which incorporated shop front
doors
The scope of works from BB includes:
“ COMMERCIAL WINDOWS: FACTORY 1 - Supply and install of x4 new aluminium framed
windows to the western elevation and x2 to the southern elevation which incorporated shop
front doors
The insurer does accept the windows were in the initial SOW prepared by its loss adjustor
and quoted on by builder (BB). The insurer does not accept the windows were damaged by
the fire, saying the damage and constant water ingress is due to the deteriorated seals of the
window. The panel notes the complainant provided an email from the former tenant dated 2
September 2020 where he says the windows did not leak prior to the fire.
The insurer appointed an experienced loss adjustor PE and building consultant MB to review
the claim.
MB says the internal and external front windows could not be cleaned and brought to an
acceptable standard after cleaning by the building contractor. MB considered these
commercial grade windows defective and require replacement to protect the premises of
further water ingress.
MB says the commercial grade windows to the front southern and western elevation of the
building had deteriorated and required replacement prior to the fire event. Sections to the
window and ad hoc repairs had been undertaken to prevent water ingress prior to the fire
event. Despite the glazing being smoke stained and damaged. These windows required
replacement before the fire event. The windows have reached their serviceable life.
MB did not consider the window replacement works or full replacement to be fully undertaken
by TBS as per his tender quotation and building scope of works. This should have been
cleaned only by the building contractor and assessed for replacement prior to works being
undertaken.
PE says it was reasonable the complainant expected the windows to be replaced as they
were included in the SOW and tendering process, which included a quotation being arranged
for the replacement windows.
PE says the insurer has not shown at any time it clearly explained to the complainant the
diversions from the original replacement method. PE says the issues of the windows being
replaced is likely to fall in the complainant’s favour.
The panel agrees the window replacement was included in the signed SOW. Subject to any
agreed variations that was the contract. The panel considers it likely the heat of the fire would
have caused damage to the window seals given the evidence of smoke damage on these
windows.
The panel is also persuaded by th e complainant’s tenants email which shows they were not
leaking before a serious fire occurred. The evidence shows cleaning the windows was not a
sufficient solution.
The complainant provided a quote from (MG) dated 3 May 2022 of $44,815 to replace the
windows. The quote was valid to 4 June 2022. MG had provided the original quote on 7
Determination | Case number: 851340 Page 5 of 8
October 2019 that was agreed to in the SOW. The panel considers it fair in the circumstances
that the insurer cash settles the claim for the windows based on MG’s quote. A 10% uplift
($4,481.50) to cover contingencies should be allowed bringing the cash settlement for the
windows to $49,296.50.
Insurer is liable for loss of rent claimed
The insurer says the property was released around March 2021, approximately one year after
it ceased paying rent and says:
Several (specified and addressed) disputed items fall outside the ambit of Policy Coverage
and are therefore ineligible for any consideration of any Loss of Rent
Outstanding items which it agreed to consider do not / did not render the premises as
being unfit for occupancy or their intended purpose
Re-occupancy was largely delayed due to on-going COVID-19 restrictions which were
enforced by the Victorian Government rather than being attributable to any Insured cause
or event
The complainant is seeking, based on her real estate agent ’ s (ML) statement, loss of rent of
$31,295.49 until 28 July 2021, on the basis the inadequate repairs are the primary reason the
property could not be relet, saying the insurer ’ s contracted building works have not been
completed, are defective and are not to an appropriate standard.
The policy provides cover for loss of rent and allows for adjustments to be made where the
indemnity period exceeds 12 months.
ML confirmed via email to the complainant that they attempted to relet the property prior to
the repairs being completed or rectified as a show of good faith towards the insurer.
ML says they had more than 15 inspections and most prospective tenants were concerned
about when the property was going to be ready, when the windows would be replaced and if
there would be any disruptions from the insurers builder. Loss adjustor PE advised the insurer
it should consider a contribution to the rent, also noting the effects COVID-19 had reletting the
property.
The panel acknowledges the impact of COVID-19 but is not satisfied the loss of rent arises
from COVID-19. The panel is of the view that most likely the property would not have been
tenantable until the repairs were completed. This is particularly so given the leaking windows
and issues with the roof.
In the absence of information to dispute the calculations provided by ML, the panel considers
it fair the insurer pays the loss of rent claimed being $31,295.49 plus interest on this sum from
the date of the IDR letter being 10 January 2022.
Insurer to appoint independent roofer/builder to rectify roof issues or cash
settle claim
The insurer accepts, and the parties agree further works are required to rectify the issues to
the roofing, which have continued to leak.
The reports exchanged confirm a roof inspection should take place.
The panel considers it fair that the insurer appoints an independent roofer/builder to conduct
a roof inspection and prepare a SOW and actionable quote to cover the repairs. The insurer
can then determine whether to complete the repairs or cash settle the claim. If the insurer
cash settles the claim it should add a 10% uplift to the quote to allow for contingencies.
Determination | Case number: 851340 Page 6 of 8
Insurer to settle AC unit and bollards if it has not already done so
The insurer accepts it failed to settle the AC unit and offered a sum of $4,900 excluding GST.
The insurer has not cash settled this part of the claim.
The panel considers it fair in the circumstances that the insurer allows a 10% uplift to cover
potential contingencies in the purchase and installation of the AC unit. The insurer should
cash settle the claim for the AC unit for $5,390.
In relation to the bollards, the available information shows the insurer accepted liability in
relation to these items and were prepared to settle $250-$500, subject to a quotation being
provided. No quotation has been provided. The panel considers the insurer is to pay the
complainant $500 to finalise this aspect of the complaint.
Other issues raised
In the complainant’s response to AFCA, it has raised items 18, 38-39, 42, 58-59 were not
agreed adjustments to the Statement of Works (i.e., cleaned rather than replaced with new as
agreed) and have not been quality inspected. However, given these issues are not
compromising the structure, security or safety of the property there is less concern about the
status of these items.
Considering the information at hand, the items in question appear to be reused as it was
determined this was a suitable approach to the repairs. In the absence of any expert evidence
showing these repairs were faulty or inadequate, the panel is not satisfied any further action
is not required for these items.
2.2 Is the insurer liable to repair the mezzanine?
No. The policy does not extend to cover fittings and fixtures installed by the tenant.
The insurer is liable for further mezzanine works
The complainant is seeking the costs of having an engineer certify the works and have the
relevant approvals obtained from the Council in relation to the mezzanine.
The insurer says that it was a tenant fixture and not part of the insured property. The insurer
says its builder T completed minor remedial works to the mezzanine, however the insurer
says its does not form part of the insurer property and therefore it is under no obligation to
incur any additional costs regarding the further investigation or rectification to the structure.
PE in summary says the mezzanine was a tenant installation and not insured property as per
the signed lease agreement and entitlement to works never existed. PE says minor works
were undertaken in good faith by T, however concludes the mezzanine is the tenant’s
responsibility and the insurer should therefore not be liable for any further works.
It appears that the mezzanine was not approved nor compliant. The complainant has not
provided any evidence that it was a Council approved structure, although it formed part of the
SOW (being remedial works).
The policy includes cover for any additions ‘You’ make after the start of the current year of
cover and covers the unit owners fitting and fixtures. ‘You’ is defined to be each legal entity
that is shown in the schedule as the insured. The tenant was not the insured shown in the
schedule.
Determination | Case number: 851340 Page 7 of 8
The panel is satisfied the policy does not cover the damage to the mezzanine. The insurer is
not required to do anything further in relation to the mezzanine. If the staircase which was
repaired by the insurer’s bu ilder were to be removed, the complainant would be no worse off
as it wasn’t part of the insured property .
2.3 Why is the outcome fair?
There is no dispute that the insurer has provided the complainant with the relevant policy
documents.
The complainant and insurer had reached agreement as to the SOW based on the
understanding of the damage and terms of the policy.
The outcome of this determination is fair as it allows for the finalisation of the complaint
consistent with the terms of the policy and agreed SOW.
Determination | Case number: 851340 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. W e have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the general insurance industry
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.