Determination 850734

Storm damage claim repairs quality and additional damage declined

FirmAllianz Australia
Decided2022-06-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant said the insurer's storm repairs to guttering, roof tiles and bedroom ceiling were defective and that further storm damage to the driveway, patio handrail and roof gable should be covered. AFCA found the repairs were to an acceptable standard, the additional damage was excluded or not caused by the insured event, and there was no delay.

Policy exclusions for wear and tear, lack of maintenance and inherent defects apply to the additional damage and overflowing gutter, and the repairs from the insured event were completed to an acceptable standard.

Issues

Subjects and remedies

home or building damagelanguage or cultural barriernatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 850734 Financial firm Allianz Australia Insurance Limited Determination | Case number: 850734 Page 1 of 16 Case number: 850734 9 June 2022 1 Determination overview 1.1 Complaint On about 9 February 2020, the complainant’s property was damaged in a storm even t where a tree fell onto it. The complainant submitted a claim with the insurer, who appointed loss adjuster (CC) and builder (SB) to attend and provide an assessment of the storm related damage. The insurer accepted the claim and conducted repairs to the bedroom ceiling, broken roof tiles, broken guttering and eaves. The complainant says the quality of work performed by the insurer’s builder is poor , in particular:  The guttering was not fixed correctly which has resulted in water overflowing the gutters and coming inside his home, including causing damage to his garage;  The ceiling in the bedroom is not flat; and  The new roof tiles are not the same colour as the existing roof. The complainant also says that additional damage occurred during the insured event which has been declined by the insurer, as follows:  Damage to the concrete driveway, which has now cracked;  Damage to the handrail and concrete on the front patio; and  The timber gable on the roof was not replaced and should have been. The complainant seeks that the insurer repair the guttering, roof tiles and ceiling to an acceptable standard and accept liability for the additional items claimed. The insurer says it has repaired all items arising from the insured event to an acceptable standard. The insurer says any further damage at the complainant’s property is excluded under the policy as it was caused by the insured event or because it is pre-existing damage, wear and tear, a lack of maintenance or design faults. Issues and key findings Have the repairs been completed to an acceptable standard? Yes. The insurer has completed the repairs arising from the insured event to an acceptable standard. Has the insurer assessed its liability for the additional damage correctly? Yes. The available evidence indicates that the additional damage claimed did not arise from the insured event or was excluded under the policy. Determination | Case number: 850734 Page 2 of 16 Was there a delay? No. The insurer assessed the claim and repaired the damage within an appropriate timeframe. Why is the outcome fair? The outcome is fair because the insurer has assessed the claim in accordance with the terms and conditions of the policy and conducted all repairs resulting from the insured event to an acceptable standard. The insurer is not liable for the additional damage alleged by the complainant. In addition, the insurer responded to the claim and arranged for repairs to be completed in a timely manner. 1.2 Determination The determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 850734 Page 3 of 16 2 Reasons for determination 2.1 Have the repairs been completed to an acceptable standard? Onus on the complainant to establish a valid claim The complainant carries the initial onus to establish on the balance of probabilities (that is more likely than not) the loss or damage claimed falls within the terms and conditions of the policy. This is commonly known as establishing a prima facie claim. Once established, the onus shifts to the insurer to show, on the balance of probabilities, the loss claimed falls within an exclusion of the policy or it is otherwise entitled to decline the claim. The policy contains exclusions The complainant holds a home and contents policy with the insurer, which includes cover for loss or damage caused by falling trees. There is no dispute the complainant received the Product Disclosure Statement. Cover under the policy is subject to various exclusions including if the damage is caused by wear, tear and lack of maintenance, gradual deterioration or faulty design or workmanship. The relevant terms of the policy are set out in section 3.2 of this determination. The insurer is required to complete repairs arising from the insured event In early February 2020, severe storms hit NSW where the c omplainant’s house is located. D uring the storms, a tree fell on the complainant’s house. On 13 February 2020, the complainant lodged a claim with the insurer because of water ingress in the bedroom ceiling. Following this, the insurer appointed CC to assess the claim and SB to report on the damage and prepare a scope of works. SB attended the property on 18 February 2020 and took some photos. On 19 February 2020, the complainant contacted the insurer again, because he noticed that there was also damage to the roof and guttering from the falling tree. SB attended again and took some further photos of the property. The insurer accepted liability for the claim and on CC’s recommendation, appointed SB to conduct the following:  Replace damaged roof tiles  Replace guttering impacted by the falling tree  Repair areas of the property where water had entered from the damaged roof. This included repairs to the bedroom ceiling. These works commenced on about 17 February 2020 and were completed on about 16 April 2020. The complainant’s son signed the completion of works on the complainant’s behalf, because the complainant does not speak English. Determination | Case number: 850734 Page 4 of 16 The complainant raised issues with the quality of repairs On 25 August 2021, the complainant contacted the insurer to advise that the repairs to the gutter were inadequate because water was entering his home. The complainant also stated that he had noticed further damage from the insured event which had not been assessed. The insurer organised for SB to reattend the property on 1 September 2021 to assess the damage. CC then attended the property to discuss the claim on 6 September 2021. CC noted the issues that the complainant had raised in its report dated 15 September 2021 as follows:  Timber handrail on the front porch stairs is loose  Front concrete steps and concrete patio are damaged  The newly installed gutter guard is too narrow  Replacement roof tiles are the incorrect colour  Debris was not cleaned and removed correctly  The newly installed bedroom ceiling is not flat  The ceiling fan was replaced but the wall control switch was not  The paint colour in the bedroom is different to what was there  The new front gutter is overflowing  Timber at gable end of the roof was not replaced. The insurer sent SB and later CRD to assess the repairs. Relevant extracts from these reports are set in section 3.4 below. I will address each of the items raised by the complainant relating to the defective repairs here and additional items claimed in 2.2 below. Guttering The complainant says the guttering was not repaired properly because he is now suffering water ingress into his house. The complainant says this has never happened in the 20 years he has lived at the house. CC, SB and CRD have all reported on this issue. Please see section 3.4 below for extracts of each of their reports. SB state that the new gutter was installed at the same height as the old gutter. It conducted investigations to confirm that the fall of the gutter was towards the downpipe. It is not in dispute that the length of the total gutter is 13 metres and when the damage was occurring there was one downpipe. Since that time, a further downpipe has been installed (by SB) but only as a temporary measure. SB say that the gutter is not working correctly because of the power connection to the house, which is hindering backflow towards the downpipe. SB did not replace this section of the gutter. CRD recommend that the entire gutter be replaced because it is not in accordance with building codes and only having one downpipe is contributing to its failure. CRD agree that the power connection is hindering backflow. The complainant has not provided any expert evidence to support his claim that the gutter has not been repaired to an acceptable standard. Based on the available information, I am satisfied that gutter has been installed correctly by SB and the ongoing issues with the gutter overflowing are as a result of faulty design or an inherent defect which are excluded under the policy. Determination | Case number: 850734 Page 5 of 16 On that basis, the additional damage caused by the overflowing gutter are also excluded, being damage to the veranda eaves, living room architrave, and garage ceiling. Roof tiles being incorrect colour It is not in dispute that the insurer replaced 20 roof tiles on the complainant’s house which are a slightly different colour than the original tiles. On page 60 of the policy, it states that if original materials cannot be sourced, the insurer can use a close match. The insurer says it found the best possible colour match available for the roof tiles. The insurer also offered (as a gesture of goodwill) for the new roof tiles to be painted the same colour as the old tiles, which the complainant declined. I find the insurer has satisfied its obligations under the policy and is not required to take any further action. Ceiling in the bedroom The complainant says the ceiling in the bedroom is not flat. He has not provided any evidence in support of this. The investigations of SB and CC determined that the ceiling was level and constructed within Australian Standards and tolerances. On that basis, I am satisfied that the bedroom ceiling was repaired to an acceptable standard. I also note that the ceiling fan switched has been repaired. Removal of debris and gutter guard The complainant said that debris was not removed at his property following the repairs. The report from CC dated 15 September 2021 says there is no evidence of any remaining debris. As the complainant has not provided any evidence to show the presence of debris, I am satisfied that debris has been removed. The complainant also raised that the gutter guard was too short. SB agreed with this and reinstalled the gutter guard. On that basis, I find that this issue has been resolved. 2.2 Has the insurer assessed its liability for the additional damage correctly? The complainant made a claim for additional damage As indicated above, the complainant has raised that additional damage occurred in the insured event, in particular:  Damage to the concrete driveway, which has now cracked;  Damage to the handrail and concrete on the front patio; and  The timber gable on the roof. The insurer has denied liability for the additional damage. The additional damage is excluded under the policy I will address each of the complainant’s additional claims individually. Determination | Case number: 850734 Page 6 of 16 Concrete driveway The complainant says the tree fell on the concrete driveway and cracked it. He did not immediately notify the insurer because it was not apparent at the time. The insurer had SB and CRD assess the driveway. Both parties said that damage to the driveway was not as a result of the insured event but had occurred gradually over time. The complainant has provided no evidence that the tree damaged the driveway after the insured event. I consider this would have been apparent immediately following the tree fallin g on the driveway if this has occurred. I accept the evidence of SB and CRD that it is more likely that the driveway has been cracking over time and did not occur as a result of the insured event. On that basis, any damage to the concrete driveway is not covered under the policy. Timber rail and concrete on front patio The complainant says that the tree fell on the handrail of the front patio and damaged it. The insurer says SB and CRD could not find any evidence of any impact damage to the patio or handrail. The insurer says any damage to the front patio and handrail has been caused by a lack of maintenance or wear and tear which is excluded under the policy. In support of its assertion, the insurer relies on reports from SB and CRD which say the wooden handrail has evidence of woot rot and the handrail fixing bolts have expanded due to corrosion and have caused the concrete step to crack. There is evidence that some cracks have previously been painted over supporting that the damage occurred before the insured event. I accept the insurer’s arguments that the damage to the front patio and handrail were not caused by the insured event and are due to a lack of maintenance or wear and tear. Timber gable The complainant says the timber gable was damaged in the insured event and should have been replaced. SB inspected the gable and says that it has been affected by wood rot. There are a number of photographs that support this assertion. The insurer denied liability for this additional damage on the basis that it was excluded under the policy resulting from a lack of maintenance and/or deterioration. I accept the insurer’s submission and find the insurer is not liable for this additional damage. 2.3 Was there a delay? Information does not show the insurer delayed the claim The insurer has provided a timeline of the complaint and claims process which I have reviewed. I have also considered the requirements outlined in the General Insurance Code of Practice (GICOP). I note that:  The insurer responded within the required timeframes;  The insurer sent multiple trades to assess all concerns raised by the complainant;  The insurer has correctly assessed its liability; and  The insurer conducted additional works outside of its obligations to reduce the impact of the water ingress on the complainant (being the installation of the additional downpipe). Determination | Case number: 850734 Page 7 of 16 On that basis, I am satisfied there was no delay. 2.4 Why is the outcome fair? The outcome is fair because the insurer has assessed the claim in accordance with the terms and conditions of the policy and conducted all repairs resulting from the insured event to an acceptable standard. The insurer is not liable for the additional damage alleged by the complainant. In addition, the insurer responded to the claim and arranged for damage to be repaired in a timely manner. Determination | Case number: 850734 Page 8 of 16 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 850734 Page 9 of 16 3.2 Relevant PDS The policy provides cover for impact damage Page 21 Impact Damage What’s covered? Buildings and/or contents Loss or damage caused by impact from: […] Falling trees or parts of trees […] Page 60 Buildings claims If we agree to cover your claim for loss of or damage to your buildings, we will pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. At our discretion, we may: • enter into a contract with a builder to repair or rebuild your home, or • pay you the cost of repairing or rebuilding your home in cash or cash equivalent. This is the cost of repairing or rebuilding, less any discounts that would be available to us if we were to repair or rebuild. When it is not possible to use original materials during the repair or rebuilding process the nearest available equivalent to the original materials will be used. […] Exclusions (page 53) Things we won’t cover Determination | Case number: 850734 Page 10 of 16 We want to be clear about what you’re covered and not covered for. In addition to any other exclusions listed for an event or cover section – here’s a list of things we won’t cover under any section of the policy. Always excluded Loss, damage, injury or legal liability as a result or, caused by or arising from: Wear and tear Including depreciation, gradual deterioration, wear and tear or lack of maintenance. Inherent defects Including faulty design or materials, structural defects or poor workmanship Accidental damage (page 73) Accidental damage means damage caused by sudden, unforeseen and unintended events. Determination | Case number: 850734 Page 11 of 16 3.3 Submissions of parties Record Key points Insurer IDR Re sponse 22 January 2022  Accepted liability for claim relating to storm event on about 9 February 2020 when a tree fell on property.  Appointed CC, A JG and SB to attend and provide assessment of storm related damage.  Claim accept ance for water damaged bedroom ceiling, 20 broken roof tiles, right hand section of front gutter and front eaves.  Following repairs, complainant has lodged complaint re: > Quality of repairs > Gutter overflowing > Timer hand rails to front stairs and porch is loose > Front concrete steps and concrete p atio are damaged > Replacement roof tiles are a different colour and whole roof should be replaced  Does not accept repairs have not been completed to an acceptable standard (based on report of SB).  Additional damage reported is pre - existing and not caused by an insured event – gradual deterioration and wear and tear.  Roof tiles were nearest possible colour match available.  Sets out policy terms – exclusions and how claim is settled  Re timber hand rail – no evidence to suggest rail damaged as a result of insur ed event. Timber hand rail is loose with extensive wood rot and corrosion of fixing bolts – excluded because maintenance issue  Re concrete steps and patio – hand rail fixing bolts expanded due to corrosion and have caused concrete to crack. NO evidence to show concrete has cracked because of insured event. Some cracks have been paint ed over – excluded on basis was pre - existing  Re overflowing gutter – right had section of gutter was damaged and relaced following claimed event. SB believes overflow to be unre lated to insured event and as a result of original section of gutter because it is not correct size  Re ceiling – SB could not find any defects with replaced bedroom ceiling  Re timber in gabled roof – timber affected by wood rot and deterioration and not as a result of insured event  Re mismatched roof tiles – 20 tiles were brok en and required replacement. Cannot provide a direct match and tiles were previously painted different colours. SB have offered to paint new tiles however this offer was declined. Determination | Case number: 850734 Page 12 of 16 Record Key points Com plainant Letter to AFCA 16 March 2022  Says considering photos he has sent, it is obvious that when the tree fell it damaged the gutter, railings, stairs and concrete path  Have lived in the house for 19 years and never had any problems until the tree fell on the house. After the repairs were completed by the insurer’s builder, he has had severe problems wit h rain on the balcony and water entering the hall and into the garage and walls of the house  SES attended and wrot e a report which he attached referring to the faulty downpipes and gutters. He says this is the insurer’s fault Determination | Case number: 850734 Page 13 of 16 Record Key points Insurer Letter to AFCA 28 March 2022  Insurer accepted liability caused by tree impact and appointed CC and SB to attend and assess extent of loss and arrange for repairs  24 December 2021, complainant lodged complaint about repairs The Complainant reported that the gutters are overflowing when it rains, the timber hand rail to front stairs and porch is loose, the front concrete steps and concrete patio are damaged and the replacement r oof tiles are a different colour to the surrounding undamaged tiles and therefore the whole roof should be replaced.  SB attended property and advised additional damage not caused by tree impact. On that basis, claim declined. IDR issues.  After IDR, complai nant cont acted insurer to say water is now leaking into property which has caused additional damage. Insurer arranged a further assessment by CRD.  Sets out what policy covers and exclusions The Complainant is disputing the following: 1. The insruer’s decision not to provide cover for damage to the porch railing and driveway on the basis that the areas were not damaged by the claimed storm and further that the cause of the damage is specifically excluded from cover; 2. The decision to replace the dama ged roof tiles with the closest possible match rather than replacing the entire roof; and 3. Insurer’s decision not to provide cover for the cost to rectify the defects to his gutters and to cover the resultant damage caused by the overflow.  Re porch rai ling – SB and CRD could see no evidence of impact damage from the tree event. Rather, hand rail is showing signs of deterioration due to lack of maintenance. Cracks in the handrail have been painted over  Damage to conc rete under railing also as a result of lack of maintenance and not impact related.  Damage to conc rete driveway has been occurring over time (CRD report) and not as a result of impact from falling tree.  Notes that porch rail and driveway were not raised at the time of lodgement of claim but ove r 12 months after claimed loss  Re roof tiles – 20 tiles had been replaced. Evidence shows tiles had previously been painted and tiles were painted to match as best as possible. Insurer has offered to paint roof tiles but complainant has declined.  Re overf lowing gutter – complainant believes water overflowing Determination | Case number: 850734 Page 14 of 16 Record Key points Insurer letter to AFCA 4 May 2022  Complainant lodged initial claim on 13 February 2020 for leaking roof from 9 February 2020.  SB attende d and took photos at that point (18/ 19 February 2020)  Complainant then called on 19 February 2020 to say tree had fallen ont o roof and caus ed additional damage – second set of photos taken 21 February 2020.  Provided an image which shows location of downpipe, power connection and where overflow is occurring. CRD said overflow of gutter is occurring not because of any defect in the gutter, but because of the power connection. Neither CRD or SB have identified problems with quality of repair. Inadequate drainage existed before inured event. 3.4 Reports Record Key points Insurer’s builder (SB) Report 2 September 2021  Attended site following complaint about water leaks.  Inspected and put a level which showed gutter was falling towards downpipe.  Complainant says downpipe overflows where it meets the gutter, but we did not repair this area  Complainant believes timber handrail and balustrading should have been r eplaced.  Complainant is not happy with the colour of the roof tiles which can be seen by standing far away  Could not inspect the bedroom as someone was asleep  Would need to see the gutters overflowing when it was raining to determine cause Determination | Case number: 850734 Page 15 of 16 Record Key points Insurer’s builder ( SB ) Report 11 October 2021  Roof tiles are not the same colour – complainant would like all roof tiles replaced so they match  Gutter on left hand side of hous e was not r eplaced by us, only right hand side gutter. The downpipe connecting the gutter is not the correct size and overflows. The complainant wants this fixed. There is a lot of wood rot and deterioration of the pointing around the gutter which is not as a result of the storm The front balcony handrail is all loose but does show signs of wood rot and wear and tear. The bolts are also rusted and has caused the concrete to crack, as the rusted bolts expand the concrete cracks around the edges. Some of the cracks have been painted over which sho ws there were some previous cracks. The insured is of the opinion that the tree had damaged all the balcony handrail and it’s not due to any maintenance. It is my opinion that the handrail is more maintenance issues than impact and if fixed the whole lot would have to be replaced due to the condition of the handrail.  The ceiling in the bedroom is level  Report includes photos of roof tiles which are not all paint ed and are a similar shade; also includes photos of gutter that was not replaced by them with d amage to timber that has been painted previously Insurer’s loss adjuster (CC) Report 13 October 2021  Have reviewed report of SB  Timber hand rail to front stairs and porch is loose  No allowance was made to repair the handrail as there was no evidence to suggest that it sustained any damage as a res ult of the claimed tree impact event. The timber hand rail is loose with extensive wood rot evident and corrosion of the metal fixing bolts.  Front concrete steps and concrete patio are damaged  [SB] have reporte d that the hand rail fixing bolts have expanded due to corrosion and these have caused the concrete to crack. There is no evidence to suggest that any part of the concrete has cracked as a result of the claimed tree impact event and, some of the cracks hav e been painted over, clearly indicating that the Determination | Case number: 850734 Page 16 of 16 Record Key points cracks were pre - existing.  Timber at gable end of roof was not replaced  [SB] have confirmed that the timber is affected by wood rot and deterioration and was not affected by any tree impact or storm. Insur er’s builder (SB) Report 14 October 2021  Went out to address gutter guard not running all the way to the end of the roof and fan switch has been replaced.  Inspected the ceiling and this is in accordance wit h Australian Standards  Different colour roof tiles – could not get same colour. Only way to fix this would be to spray whole roof on one side.  Downpipe and timberwork – when it was raining lightly the water was dripping out of the top of the downpipe. This was not part of the original scope of works and t he socket in the gutter is not connected and the wrong size  Handrail – handrail is very loose around the stairs. Complainant says this is from when a tree fell on it and made it loose. The timber is so deteriorated that no repair can be carried out to strengthen it, the entire item would need to be replaced. Insurer’s builder (CRD) 21 March 2022  Front gutter is not performing as intended. Recommend a new gutter and downpipes at each end of the gutter are required which would prevent water backflowing into eaves and wall cavity. Window has no cavity flashings  Timber handrail to front stairs and porc h is loose due to corroded fixings of the handrail which is a maintenance issue  Cracking in concret e shows long term weathering and not from recent events  Sl ight variation in colour of roof tiles but closest match has been achieved  Front gutter is not up to current codes becaus e it is over 13 metres long and an additional downpipe is required. The owner has installed an emergency downpipe which is of smaller d iameter discharging directly onto the concrete below. The point of power connection is hindering backflow to the original downpipe