Determination 849432

Impact damage claim to retaining wall and fence denied by insurer

FirmIAG
Decided2022-07-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$75,514
Non-financial loss—
Amount claimed$519,621
SourceAFCA PDF

Summary

The complainants claimed impact damage to their retaining wall and fence caused by a neighbour's excavator after the insurer denied the claim. AFCA found the excavator most likely caused the damage and ordered cash settlement based on the insurer's builder quote plus a contingency uplift and a debris contribution, but rejected the complainants' larger quote, non-financial loss and professional costs.

Impact damage cover applies to vehicles including excavators, and the insurer must cash settle on the reasonable EC quote, with a 20% contingency uplift and $5,000 debris contribution, while accidental damage and wear-and-tear exclusions did not defeat the impact claim.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterrelated party investmentpay claimpay compensationpay interest

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 849432 Financial firm Insurance Australia Limited Determination | Case number: 849432 Page 1 of 9 Case number: 849432 16 June 2022 1 Determination overview 1.1 Complaint The complainants held a home and contents policy with the financial firm and on 14 May 2019 lodged a claim for impact damage to a fence/retaining wall caused by an excavator during construction works on their neighbour’s property . Based on a detailed report from IPRA including review of reports from earlier claims the insurer denied the claim. The insurer later offered $80,000 to settle the claim. The complainants dispute the denial and say the insurer ’ s builder caused further damage. The complainants seek $461,797.50 plus GST for repairs, $58,823 plus GST for removal of debris and compensation of $5,400 for non-financial loss and $5,000 in professional costs. 1.2 Issues and key findings Is the insurer liable for the damage to the retaining wall? Yes. The damage to the retaining wall/fence was most likely due to the impact from the excavator. Is the insurer liable to cash settle the claim? The insurer is to cash settle the claim based on the insurers quote from EC ($59,595.21 (including GST) plus a 20% uplift of $11,919.04 to cover contingencies including interest. The insurer should contribute $5,000 to the cost of the removal of debris. Are the complainants entitled to compensation for non-financial loss? No. The insurer is not liable to pay compensation for non-financial loss. It was entitled to assess the matter. The delays and inconvenience suffered by the complainants is likely associated with the dispute with the neighbours rather that the insurer’s claims handling. Is the insurer liable to contribute to the complainants’ professional costs? No. The panel is not satisfied the professional costs were necessarily incurred. Why is the outcome fair? This determination has been made in consideration of all information provided in this matter. It would not be fair to require the insurer to settle the matter in accordance with the EM quote, as that quote does not appear actionable and is beyond scope. 1.3 Determination This determination is substantially in favour of the complainants. Within 14 days of the complainants ’ acceptance of this determination the insurer is to pay the complainants $59,595.21 for the impact damage, a 20% uplift of $11,919.40 for contingencies and $5,000 for the removal of debris. The insurer is not liable to pay compensation for non-financial loss or professional costs. Determination | Case number: 849432 Page 2 of 9 2 Reasons for determination 2.1 Is the insurer liable for the excavator damage? Yes. The damage to the retaining wall/fence was most likely due to the impact from the excavator. The insurer is to cash settle the claim based on the insurers quote from EC ($59,595.21 (including GST)), plus a 20% uplift of $11,919.04 to cover contingencies including interest. The insurer should contribute $5,000 to the cost of the removal of debris. Complainant has onus to establish claim falls within terms of policy It is established insurance law that an insured has the initial onus rests with an insured to establish on the balance of probabilities (that is more likely than not) that the loss claimed falls within the terms of the policy. This is commonly called a prima facie claim. The complainants’ home and contents insurance policy provides cover for a series of defined events including impact damage. Optional cover for accidental damage was not taken out when the policy renewed on 8 March 2019. The policy but was upgraded to include Accidental Damage on 21 May 2019 after the claimed damage occurred. The complainants made a claim for damage to their fence/retaining wall on 14 May 2019 , due to excavations to their neighbour’s property during construction. The excavator was alleged to have struck the complainant’s fence/wall, along with digging out soil around the foundation of the wall. ‘Impact damage’ cover includes loss or damage caused by impact from some listed sources, including vehicles. The panel accepts an excavator would fall under the definition of ‘vehicle’ for the purpose of establishing impact damage. Complainants have established that most likely there was impact damage In a phone call with the complainants’ representative, the insurer defined the different aspects of the building:  The wall was defined as the retaining wall, built on the complainants’ property out of similar bricks that were used to build the original home.  The fence was defined as the structure on top of the retaining wall, made up of breeze blocks, as well as a timber structure on top of the breeze blocks. The insurer noted breeze blocks are made from a cement like material that has large holes through it, which are designed to allow wind to move through a wall, thus reducing the wind load on the wall. Photos of the wall included in the insurer ’ s report from IPRA show that someone, presumably the neighbours, had placed boards over the sections of the breeze blocks fence, thus increasing the wind load on the wall. The complainants say they had an SMS from the neighbour advising when the excavator hit the fence/wall, however this was not provided to the insurer. The complainants say the fence/wall had been damaged by the excavations in three ways:  By striking the fence/wall.  Removing the soil from next to the wall, hence weakening the retaining wall.  Removing the soil from around the foundation of the wall, also weakening the retaining wall. Determination | Case number: 849432 Page 3 of 9 The insurer submitted it was unclear what part of the excavator (i.e. bucket or tracks) hit the wall, and that it was also unclear what part of the fence/wall they hit. A photograph taken of the excavator from insider the home shows part of the breeze block fence missing, but also shows the timber cladding, on the neighbour’s side, still erect. Importantly, the photo supplied by the complainants (also included on page 37 of the insurer’s building consultant’s (IP RA report) shows the leaning and broken fence, with the bucket of the excavator close by. On the balance of probabilities, the panel accepts that the excavator bucket struck the wall, and that it dug next to the wall and around the foundations. The panel accepts the complainants have established a prima facie claim. Onus on insurer to establish exclusion applies The panel agrees with the insurer that damage caused by digging out of soil from next to the wall, and around the foundations, is not covered as there was no cover for accidental damage. The insurer says the fence had deteriorated and was at imminent risk of collapse prior to any excavation work performed by the neighbour, making its collapse inevitable. The policy excludes cover for loss or damage arising from gradual deterioration, wear or tear. The policy also excludes cover for:  structural failure of an item  compensation for distress, inconvenience or other non-financial loss, except if covered under liability cover  loss or damage arising from faulty design or workmanship  loss or damage from you not maintaining the site in good repair and condition. After the insurer ’s contractor (T) removed the fence, the complainants advised that their neighbours continued to demolish the remaining section of the fence, as well as removing most of the brick wall. The insurer relied on a report from a building consultant IPRA which considered the proximate cause of damage was age related and typical ‘wear or tear’ . IPRA reviewed previous reports and photographs that showed that there was bracing of the retaining wall prior to the alleged incident on 14 May 2019. IPRA suggested that some horizontal strutting was present and then removed and then later replaced. IPRA says that the retaining wall and fence was delipidated and was required to be removed and therefore the incident (if indeed it did occur) did not result in any damage. Panel accepts impact was most likely the proximate cause of the damage The complainants refer to the dilapidation report that was prepared prior to the works commencing at their neighbour’s property. They say the report includes images of the southern side of the property, which confirm that at the time of inspection, the brick retaining wall, concrete block fence and wooden screen were in good order. The panel agrees that the wall looks to be in adequate working order, although the structure looks aged. It also notes the ‘propping’ seen in the top portion of the photo. This w as discussed in the complainant’s engineer’s report. The complainants say the wooden screen was installed by the neighbours without their consent. They say they installed props to ensure the wall stayed vertical and did not collapse (from the unbalanced load). The panel agrees that at the time of the dilapidation report, the concrete block fence was vertical. Determination | Case number: 849432 Page 4 of 9 The dilapidation report does not say the structure was in poor condition, or that it was likely to collapse due to poor maintenance. The complainants noted these issues would have been material given the plans for the development of the neighbours’ property included works on that site directly up to the wall. The insurer ’ s consulting engineer ICE reported in June 2019 that most likely the observed damage was due to impact by a large backhoe while excavating the new retaining wall footings. ICE noted that the damaged fence had not contributed to the existing observed cracking in the walls as it appears that the fence was leaning away from the building walls. The panel notes the insurers assessor ‘T’ also reported on 4 June 2019 that the damage to the wall /fence was caused by impact. The complainants also provided an engineering report from (SR). SR considered, from the historic reference photographs, that the dilapidation report, the construction phase photographs and email correspondence proved that the existing retaining wall and fence had been stable for many years. SR considered the damage could only have occurred due a significant additional force being exerted to the rear of the wall at the specific point along the wall at which the collapse has occurred. The only explanation is that the rear of the wall was struck by the excavator being operated as part of construction work. The panel share the insurer’s concerns in relation to whether the retaining wall is required but accepts the proximate cause of the damage to the retaining wall and fence is impact damage caused by the excavator. The panel is satisfied that, while the fence and wall were aged, they were still in good working order and a lack of maintenance or wear and tear, were not the cause of the damage. 2.2 Is the insurer entitled to cash settle the claim? The insurer is to cash settle the claim based on the insurers quote from EC ($59,595.21 (including GST)), plus a 20% uplift of $11,919.04 to cover contingencies including interest. The insurer should contribute $5,000 to the cost of the removal of debris. Complainants’ quote is outside the scope of works The complainants submitted a quote for $572,683.55 (including GST) by EM. This quote relied on engineering drawings by HT. The insurer said the engineering drawings were undated and were created before the wall was allegedly hit. The quote includes $58,823 plus GST for removal of debris. The insurer’s technical assessor made enquiries (as evidenced in his file notes 25 October 2019), which the showed that the engineering drawings were drawn up well before the claimed event, and that EM are no longer registered as a builder, nor registered for GST. The EM quote and SOW includes damage that had been denied under a previous claim, and for which a previous AFCA determination was made ( in the insurer’s favour ). The EM quote also includes extensive works to the house, the pool house, the garden and rear balcony. There is no persuasive evidence this is related to the impact damage. IPRA stated in its report that the complainant’s pla ns for the new wall were over engineered. IPRA considered the quote and SOW for suggested repairs by EM , ‘is by no means an actuate representation of resultant damage for the alleged impact event that an insurer may consider if they were to accept partial or total l iability for the claim being made’. Determination | Case number: 849432 Page 5 of 9 IPRA considered the quote has been compiled some time prior to the event being claimed and is more of an estimation including damage sustained over a long period of time to the home in general. It is the panel’ s opinion that the complainants have also not provided adequate information to establish why the EM quote should be adopted. Insurer liable to cash settle complainants claim The insurer provided a settlement offer of $80,000 on 12 October 2020 based on costs to reinstate the fence/wall and to also address the alleged privacy breaches stated at the time. The offer was rejected. The insurer obtained a quote from its builder (EC) in August 2020 to rebuild the wall and fence. The amount of this quote was $59,595.21 (including GST). The insurer also obtained a quote from T at $43,938.60, which it did not refer to as it was for a lesser amount. The panel agrees with the insurer that the EC quote of $59,595.21 (including GST) for the replacement of the wall and fence should be adopted. The panel considers this to be a fair and reasonable quote. The panel accepts there has been a significant increase in building costs since the quote was provided. The panel considers it fair in the circumstances to allow a 20% uplift of $11,919.04 to cover contingencies including interest. The policy also includes costs to demolish and remove debris. The IPRA SOW, upon which the EC quotes are based, does not account for removal of debris. IPRA advised there was no photographic evidence of debris after the event. The complainants claimed $58,823 plus GST for removal of debris. The panel notes that most of the fence/wall has already been removed, either during initial impact by the excavator, or subsequently by the neighbours and the complainants. There is some evidence of debris being left although it is relatively minor. The panel considers it fair, in order to finalise the complaint that the insurer contribute $5.000 to the removal of debris. 2.3 Are the complainants entitled to compensation for non- financial loss? No. The insurer is not liable to pay compensation for non-financial loss. It was entitled to assess the matter. The delays and inconvenience suffered by the complainants is likely associated with the dispute with the ne ighbours rather that the insurer’s claims handling. AFCA can award compensation for non-financial loss AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience an d delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Determination | Case number: 849432 Page 6 of 9 Complainants not entitled to compensation for non-financial loss The complainants advise of delays and stress experienced during the insurer’s processing of the complaint, as noted in their submissions. The complainants seek compensation for non- financial result because of the following alleged breaches of the General Insurance Code of Practice: Breach of Insurance Code of Practice S75 (or its predecessor clause) – Employment of a Building Consultant who was not qualified to comment on cause of damage – only reinstatement Breach of Insurance Code of Practice S76 (or its predecessor clause) – Failure to confirm acceptance of Liability within 10 Business Days once the Insurer had received reports from both the their Contractor and Engineer confirming damage was due to impact Breach of Insurance Code of Practice S162 (c) (or its predecessor clause) - Failure to provide Tandem Initial Report confirming the cause of damage as when all service provider reports requested from Insurer While the panel considers the relevant industry codes it does not determine whether there has been a breach of the code. AFCA will report the alleged breach to the Code Committee who has the authority to regulate the code. The complainants had previously advised of the impact of the insurer’s claims processing on them in respect of the alleged privacy beaches by the insurer. As the privacy breach claims have been withdrawn from this complaint, any corresponding non-financial loss because of these breaches will not be considered in this determination. In so far as the complainants allege the insurer ’ s complaints handling has caused an unusual degree of physical inconvenience or time taken to resolve the complaint, the panel accepts it was reasonable for the insurer to take time to consider and review the substantial submissions provided, along with seek expert information and await the relevant reports. The panel notes that the complaint was previously closed at AFCA twice, and this new complaint opened, due to delays by the complainant’s representative in providing the requested information. Those delays were outside of the insurer’s control. The complainants’ representative noted the severe health eff ects on the female complainant and advised she had been admitted to hospital numerous times due to the ongoing stress of the claim process. The panel notes the complainants have been involved in protracted litigation with the neighbours which is likely to have significantly contributed to the stress suffered and delays in this matter. The delays do not appear to be caused by the insurer ’ s conduct. The panel does not consider the insurer ’ s handling of this complaint unreasonable. The file notes indicate the insurer had responded reasonably to the complainants and their representative. In the panels view issues with the claims handling were outside the control of the insurer. Having carefully considered the submissions, the panel considers that the insurer is not liable to pay any compensation for non-financial loss. Determination | Case number: 849432 Page 7 of 9 2.4 Is the insurer liable to contribute to the complainants’ professional costs? No. The panel is not satisfied the professional costs were necessarily incurred. Insurer not liable to pay for claim preparation costs Under the AFCA Rules, we may decide an insurer contributes up to $5,000 to the professional costs incurred by a complainant in the course of a complaint. AFCA provides a free service for complainants and it is not usually necessary for either party to be represented. If a complainant chose to be represented, they will usually have to cover their own fees. When considering whet her an insurer should contribute to a complainant’s costs, we consider the complexity of the complaint and whether the complainant need to incur the costs to understand or establish their claim. The panel notes the insurer ’ s file notes confirm the representative was acting for the complainants from 2 June 2019 shortly after lodgement of the claim. No particular reason for this is apparent. The issues in this complaint are not complex. The complaint did not raise legal issues for which the complainants reasonably needed advice. Any legal issues relate largely to the complainants’ relationship and claims against the neighbours. The expert report obtained from SR confirms the findings of ICE and T. The report was not obtained until May 2021 while ICE’s report is from June 2019. The report from SR was not needed to establish the complainants ’ claim given the insurer had offered to settle the claim in October 2020 based on a quote to replace the wall / fence. In the circumstances the panel does not consider it appropriate to award the complainants compensation towards the professional costs incurred in the course of this complaint. 2.5 Why is the outcome fair? This outcome is fair This determination has been made in consideration of all the submissions, expert reports and other information provided in this matter. It is fair that the insurer cash settle the complainants claim based on the quote to replace the damaged wall/fence. By allowing a 20% contingency above the quoted amount this should fairly cover the anticipated additional costs likely to be incurred. Determination | Case number: 849432 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Supporting information Policy documents Document Relevant section Certificate of insurance (COI) renewal 2019 - 2020 Certificate of Insurance Home@50 Buildings and Contents Renewal … Your contract Determination | Case number: 849432 Page 9 of 9 Valid from 11:59pm, 8 March 2019 to 11:59pm, 8 March 2020 … Options you may add You may be eligible to add thes e options to your policy. Cont act us for an estimate or refer to the PDS for more information. • Accidental Damage Product Disclosure Statement (PDS) 25 January 2018 Page 51 Accidental damage You can choose to add cover for loss or damage to your home and/or contents that is caused accidentally – that is, mishaps around your home that are caus ed unintentionally. However, if you have a Home Plus policy then you are automatically covered for Accidental damage. Page 28 Impact damage If loss or damage is caused by an item shown here. Covered under Buildings Insurance and Contents Insurance …  aircrafts, vehicles or watercrafts . Page 37 Demolishing and removing debris If a listed event causes loss or damage to your home and we agree you need to demolish part or all of your home or remove any debris. Covered under Buildings Insurance costs to demolish and remove debris costs to make your site safe – for example, the costs to install a temporary fence around the damaged area. Conditions we must agree to pay the costs bef ore you make any arrangements. Page 65 General exclusions for all covers and benefits The exclusions set out in this section apply to all covers and benefits under your policy. What we don’t cover Loss, damage, injury or death arising from:  rust, corrosion, gradual deterioration, depreciation, wear or tear

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.