Summary

The complainant's home suffered hail damage to garage roof trusses, which the insurer declined as gradual deterioration. AFCA found the hailstorm was the proximate cause, ordered the insurer to arrange repairs, pay $1,000 non-financial loss and reimburse $1,800 for the engineer's report.

Proximate cause of the roof truss damage was the storm, and the insurer failed to prove the gradual deterioration exclusion applied.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterpay compensationpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 849386 Financial firm Insurance Australia Limited Determination | Case number: 849386 Page 1 of 7 Case number: 849386 3 June 2022 1 Determination overview 1.1 Complaint The complainant and his wife, K, hold home and contents insurance with the financial firm (the insurer). On 23 October 2021, the complainant lodged a claim on the policy after a severe hail storm earlier that day caused damage to the insured property. The insurer accepted the claim for damage to the garage ceiling, eaves, flyscreens and ventilation whirlybirds. However, it declined to cover the roof framing damage, initially on the basis the framing did not meet applicable standards and codes. The insurer later agreed that was incorrect but said the damage was not storm related. The complainant disputes the insurer’s decision. He wants the insurer to repair of all of the damage claimed, pay non-financial loss compensation for stress and inconvenience it has caused and to reimburse the professional costs he incurred during the claim process. 1.2 Issues and key findings Is the insurer required to cover more of the claim? Yes. The available information shows that the proximate cause of the damage claimed was the storm event. The insurer is required to cover the claim, including the roof truss damage. Is the complainant entitled to any additional payments? Yes. The insurer has caused the complainant undue stress and inconvenience. It is to pay him $1,000 in non-financial loss compensation. Further, the complainant’s engineer, KU, particularly assisted in establishing the extent of the covered claim. The insurer is to reimburse the complainant the $1,800 he paid for KU’s report. Why is the outcome fair? The outcome is fair because the available information shows that the proximate cause of the claimed damage was the storm event. Accordingly, it is fair that the insurer covers the claim in full. It is also fair that the insurer pays non-financial loss compensation and contribute to the complainant’s professional costs given how the claim has been managed. 1.3 Determination This determination is in favour of the complainant. Following receipt of notice that the complainant accepts this determination (notice), the insurer is to:  within 7 days of receiving the notice, provide the complainant with details of two builders on its panel who are in a position to promptly attend to the repairs KU has said are required (the works)  w ithin 7 days of receiving the complainant’s written indication of which of the two builders he prefers, engage that builder to as soon as is reasonably possible compete the works  within 21 days of receiving the notice, pay the complainant $1,000 in non-financial loss compensation and $1,800 for costs. Determination | Case number: 849386 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer required to cover more of the claim? Yes. The available information shows that the proximate cause of the damage claimed was the storm event. The insurer is required to cover the claim, including the roof truss damage. Complainant has established a valid claim under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not) that he suffered a loss caused by an insured event covered by the policy. This is known as a valid claim. The complainant holds a home and contents policy. Subject to its conditions and exclusions, the policy provides cover for loss or damage caused by the insured events listed in the product disclosure statement, which include ‘Storm’ . It is not in dispute that the complainant’s home was damaged on 23 October 2021, as a result of a severe hailstorm involving golf ball sized hailstones. The insurer accepted the complainant’s claim and has agreed to partially cover the damage. In the circumstances, I am satisfied that the complainant has established a valid claim. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proof in establishing that an exclusion applies. The standard of proof is the balance of probabilities. The proximate cause of the damage must be determined The primary issue in dispute between the parties is whether the hailstorm was the proximate cause of the damage to the roof trusses above the garage. Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. The insurer submits that the true cause of the roof truss damage is gradual deterioration, rather than a single storm event. It relies on the following general exclusion set out in policy: What we don’t cover Loss, damage, injury or death arising from: • rust, corrosion, gradual deterioration, depreciation, wear or tear … Experts disagree on the cause of the roof truss damage Following notification of the claim, the insurer appointed R, builders, to undertake a claim assessment and to prepare a scope of works (SOW). R inspected the property on 26 October 2021 and reported that the damage to the garage, eaves and whirlybirds was consistent with the claim event. R noted that an engineering report had attributed failure of a girder truss partially to the storm. The same report suggested the roof trusses were undersized. R estimated repair costs including girder truss replacement at $9,756.76 inclusive of GST. Determination | Case number: 849386 Page 3 of 7 The engineering report that R referred to is a report dated 4 November 2021 by CT, building consultants and engineers. The report’s author is a builder, not an engineer . CT’s report says:  the damage to the timber girder roof truss above the garage is partially attributed to the storm – the weight of concrete roof tiles and the hailstones built up on the roof caused the truss webs to tear the nail plates out of the truss’ top cord leading to the truss failing  the damage to the girder truss should be treated as resultant damage from the storm  the roof trusses are suffering nail plate back out. The back out is a gradual and ongoing process and not a result of the storm  the construction of the roof trusses does not comply with the applicable 1992 Australian standard and is defective building work. There are references in the submitted material to a second report from CT, dated 8 December 2021, responding to comments the complainant made about CT’s first report. A copy of CT’s second report has not been provided. However, it appears that CT maintained the views it originally expressed. The complainant did not agree with CT’s assessment so engaged an engineer, KU, to provide a responding report. KU inspected the property on 21 December 2021 and reported:  the timber truss roof framing was adequately constructed to support a tiled roof  the structure supporting the valley gutter had collapsed due to the additional weight of hailstones collected on the roof  the additional, excessive weight caused the nail plates to be pulled out  only nail plates in the area under the valley gutter have failed, the remaining areas of the roof structure showed no signs of structural stress and appeared to be structurally sound. KU listed 14 remedial work steps it recommended be carried out. The insurer then engaged IE, engineers. IE inspected the property on 15 February 2022, and reported:  there was evidence of long term nail plate backout, a common occurrence in houses with roof trusses. It is due to drying out of the timber, not a single storm event  the roof trusses were not defectively designed or constructed  the nail plates that failed were smaller than IE typically observed with some only ever having had three nails into the timber and one very close to the end of the framing member  a truncated truss along the girder truss had a web member with a significant bow and the horizontal section had a significant sag. They would not have been loaded by the hail build up but were partially loaded by roof solar panels. The panels lowered the truss’ capacity  there have been latent defects in all the trusses since they were fabricated and they have been slowly deflecting and the nail plates have been backing out  the roof’s pitch is such that capacity of the trusses would not be exceeded by hail build up. The complainant obtained a further report from KU, dated 9 March 2022, commenting on the insurer’s expert reports. KU’s second report says:  the building licence number given for the author of the CT report does not exist  the section of the 1992 Australian Standard CT relies on does not apply  the damage to the nail plate dislodgement and the girder truss failure is consistent with additional load applied by hailstone build up  if nail plate backout caused the problem, the girder truss would have failed prior to the storm  while IE has correctly calculated that the roof trusses have a safety factor of 2.53 (more than double design capacity), it has incorrectly referenced the 2010 Australian Standard given the property was built in 1998. Determination | Case number: 849386 Page 4 of 7 The complainant ’s expert is more persuasive There is no dispute that:  there was a severe hailstorm on 23 October 2021  the insured property sustained damage as a result, which the insurer has agreed to cover  there was hail build up in the gutter valley  the roof trusses under the gutter valley are damaged. Relying on its expert reports, the insurer says the roof truss damage is not a result of a single storm event. It says the damage has occurred over a long period and is due to the permanent weight of the solar panels, long term timber drying and nail plate backout. The insurer has denied the claim based on the policy’s gradual deterioration general exclusion. However, I find KU’s reports more persuasive, including for the following reasons:  the roof truss damage is directly under the area where there was a large build up of hail  the rest of the roof structure is undamaged and structurally sound  if long term timber drying and nail plate backout were causative, it is reasonable to expect evidence of these issues throughout the roof structure  the complainant says he was in the ro of space two weeks before the hailstorm and ’there was definitely no damage to the trusses or nail plates’  CT’s report refers to the incorrect section of the relevant Australian Standard and there are unresolved issues concerning the expertise of the repor t’s author  IE in part relies on an Australian Standard that was introduced after the property was built  While IE says the failed nail plates were smaller than typically observed, some only had three nails into the timber and one was close to the end of the member, it nevertheless confirms that the truss structure exceeded design load capacity  IE says the weight of the solar panels would reduce the load capacity, but it does not say the reduction meant there was insufficient load capacity. In the circumstances, I am satisfied that the proximate cause of the damage to the roof trusses was the hailstorm on 23 October 2021. The insurer has the onus of proving the damage to the roof trusses is excluded. It has not met that onus. Insurer is required to repair the claimed damage The insurer has the right under the policy to choose to settle a claim by arranging repairs or paying to the insured the reasonable cost of repairs. However, that right is qualified by the requirement that the insurer act reasonably in its choice. In late October 2021, R provided an itemised SOW which it costed including girder truss replacement at $9,756.76 inclusive of GST. However, R said it was not willing to warrant repairs given the view the roof truss damage was not storm related. Accordingly, by reference to R’s SOW the insurer has offered the complainant a cash settlement amount of $9,099.99. No allowance has been made for the cost to repair the roof trusses but a 20% uplift has been added to allow for the transfer of risk and for contingencies. The insurer has noted that if the roof truss repairs are included the total amount with a 20% uplift would be $13,561.89. Even with a 20% cash settlement uplift, I am concerned that R’s costing inclusive of the roof truss repairs is insufficient. R prepared its SOW more than six months ago and material and labour costs will have increased in the meantime. Further, the SOW does not include the remedial work KU has recommended. I am satisfied KU’s recommendations are reasonable in circumstance s where KU’s reports are the most persuasive expert evidence available. Determination | Case number: 849386 Page 5 of 7 The complainant has provided an SOW and quote dated 26 February 2022 from TK, builder. TK has provided a general outline of the works required and has estimated a total cost of $35,200 inclusive of GST. There is no breakdown of how that amount has been calculated. I acknowledge that TK’s SOW is more recent than R’s and encompasses more steps to address the roof truss damage. However, without a comprehensive itemisation and breakdown, I am unable to assess its reasonableness The complainant has a number of medical conditions and K is terminally ill. They have expressed a firm preference for the insurer to repair their house. They are concerned that the stress of having to themselves organise repairs following a cash settlement could further compromise their health. They are also anxious to have their claim resolved as soon as possible given K’s condition. However, for the reasons outlined in section 2.2 of this determination, the complainant and K have to a degree lost trust in the insurer. In all the circumstances, I am satisfied that it is fair and reasonable to require the insurer to as soon as possible undertake the repairs KU has recommended. For the purpose of prompt progression and finalisation of the claim, following receipt of notice that the complainant accepts this determination (notice), the insurer is to:  within 7 days of receiving the notice, provide the complainant with details of two builders on its panel who are in a position to promptly attend to the repairs KU has said are required (the works)  within 7 days of receiving the complainant’s written indication of which of the two builders he prefers, engage that builder to as soon as is reasonably possible compete the works. The insurer is entitled to collect the $500 policy excess if it has not already done so. 2.2 Is the complainant entitled to any additional payments? Yes. The insurer has caused the complainant undue stress and inconvenience. It is to pay him $1,000 in non-financial loss compensation. Further, the complainant’s engineer, KU, particularly assisted in establishing the extent of the covered claim. The insurer is to reimburse the complainant the $1,800 he paid for KU’s report. AFCA may award non-financial loss compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has caused stress and inconvenience The complainant says that due to their health conditions, he and K are vulnerable persons. He says the insurer has unreasonably delayed progression of the claim and his complaint. According to the complainant, the errors the insurer and its experts have made has led him to lose trust in the insurer and its trades moving forward. The complainant submits that all of these issues have caused K and him unreasonable stress and inconvenience. The insurer has apologised for CT’s incorrect interpretation of the 1992 Australian Standard. The insurer also says that while overall the claim has progressed in a timely fashion, it Determination | Case number: 849386 Page 6 of 7 unreasonably delayed registering the complainant’s IDR complaint for a period of 20 days and failed to return a call in the time it said it would do so. The insurer has offered the complainant $1,000 in non-financial loss compensation. Having reviewed all the available information, I am satisfied that the insurer has unreasonably caused the complainant a degree of avoidable stress and inconvenience. However, I also consider the insurer’s offer of $1,000 for non -financial compensation to be appropriate. It is fair that the insurer pays the complainant $1,000 in non-financial loss compensation. Insurer is to contribute to the complainant’s costs The AFCA rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. KU charged the complainant $1,800 for its expert commentary. I have found KU’s reports persuasive in establishing the proximate cause of the roof truss damage was the hailstorm on 23 October 2021. In the circumstances, it is fair that the insurer reimburses to the complainant the $1,800 in fees KU charged him. 2.3 Why is the outcome fair? The outcome is fair because the available information shows that the proximate cause of the claimed damage was the storm event. Accordingly, it is fair that the insurer covers the claim in full. It is also fair that the insurer pays non-financial loss compensation and contribute to the complainant’s professional costs given how the claim has been managed. Determination | Case number: 849386 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.