Home / Suncorp Group / Determination 848817

Determination 848817

Storm damage claim to parapet wall and chimney declined as wear and tear / gradual deterioration

FirmSuncorp Group
Decided2023-02-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home parapet wall collapsed and chimney was damaged after heavy rain, and the insurer declined the storm claim as wear and tear and gradual deterioration. AFCA found the proximate cause was wear and tear, upheld the denial, but ordered $1,000 non-financial loss compensation for delay in handling.

The proximate cause of the building damage was wear and tear and gradual deterioration, which is excluded under the policy, rather than the storm or heavy rainfall.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 848817 Financial firm AAI Limited Determination | Case number: 848817 Page 1 of 8 Case number: 848817 14 February 2023 1 Determination overview 1.1 Complaint The complainant has been ably assisted by his brother throughout this matter. For the sake of convenience, I shall refer to both the complainant and his brother as ‘the complainant’. The complainant holds an events-based home and contents insurance policy with the financial firm (insurer). On 29 January 2021 he lodged a claim for storm damage to part of a parapet wall and chimney at his home in Middle Park, in inner suburban Melbourne. The insurer assessed and declined the claim. The insurer says the damage to the building was not caused by a storm, rather it was caused by gradual deterioration and wear and tear. The complainant disagrees. He says the damage to the chimney and parapet wall was a direct result of a storm or heavy rainfall event. The complainant seeks to have the claim accepted and for the insurer to provide coverage under the policy for the storm damage. The complainant has experienced a significant degree of stress during the time taken to resolve this complaint, as well as an unusual degree of inconvenience and interference with his expectation of enjoyment and peace of mind. He therefore seeks non-financial loss compensation as well. 1.2 Issues and key findings Should the insurer accept the claim? No. The insurer can deny the claim for damage to the building as this is excluded under the terms and conditions of the policy. Should the insurer pay non-financial loss compensation? Yes. The insurer should pay $1,000 in non-financial loss compensation to the complainant. Why is the outcome fair? The events the complainant has described are unfortunate and I understand he has suffered hardship due to reasons beyond his control. But the outcome regarding the substantive claim is fair. This is because the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant regarding the claim. The award of non-financial loss compensation is fair because the complainant has experienced a significant degree of interference with his expectation of enjoyment and peace of mind during the time taken to resolve this matter. 1.3 Determination This determination is substantially in favour of the insurer. The insurer does not need to take any further action in relation to the substantive part of the claim. Determination | Case number: 848817 Page 2 of 8 However, within 14 days of receipt of notice that the complainant accepts this determination, the insurer must pay to the complainant the sum of $1,000. Determination | Case number: 848817 Page 3 of 8 2 Reasons for determination 2.1 Should the insurer accept the claim? Complainant’s home is a period dwelling The complainant has lived in his single storey home since about 1976. The home was constructed over 100 years ago and is subject to heritage overlay. On about 29 January 2021, after a period of heavy rain, the top portion of the parapet wall on the western side of the building collapsed into the neighbouring property owned by P. The masonry chimney also suffered was what later described as ‘distress’. I note that a parapet is a ‘dwarf’ wall or heavy railing built around the edge of a roof (in this case). Parapet walls are designed to conceal rooftop equipment, reduce wind loads on the roof and to prevent the spread of fires. I also note that rainfall data from the two nearest weather stations to the complain ant’s home (Melbourne Olympic Park station and Melbourne Botanical Gardens station) show that about 44mm of rain fell during the 24-hour period between 9am on 29 January 2021 and 9am on 30 January 2021 in Middle Park when the wall collapsed. The complainant immediately lodged a claim for storm damage with the insurer. The insurer inspected and assessed the property and declined the claim. Complainant has onus to establish a valid claim It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event or incident covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. The policy c overs loss or damage caused by an insured event, being the incid ents listed in the policy disclosure statement (PDS) and the Certificate of Insurance . These events include ‘ storm ’ (see page 30 of the PDS). ‘Storm’ is defined on page 10 of the PDS as: - …. a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. The PDS also says an incident or event which is covered under the policy is:- …. a single event, accident or occurrence which you did not intend or expect to happen (see page 8 of the PDS). Thus, to establish a valid claim, the complainant must show the claimed damage is a result of a single incident, or at least a series of related incidents, such as several periods of heavy rain which fell as part of a single weather ‘event’. On the face of it, the parapet wall collapsed during a single storm or heavy rain event. The complainant has therefore satisfied this first requirement and has established a valid claim. Determination | Case number: 848817 Page 4 of 8 Insurer says damage is due to wear and tear After arranging inspections and assessments of the complainant’s property , the insurer denied the claim on the basis that the damage was caused by long term ‘wear and tear’ and gradual deterioration. The PDS sets out various exclusions on pages 76 to 83. These exclusions include the following, upon which the insurer relies in order to deny the claim. General exclusions- You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves:- Wear, tear, mould, gradual deterioration and other conditions wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to:- • tiles and their adhesive or grouting break ing down; • weathering of roof tiles or roof ridge capping; • gradual weathering and breakdown of bricks, mortar or concrete. The insurer relied upon various reports and other related evidence to come to its conclusion. For example, PB (builders) inspected the complainant’s property. PB then arranged for IL (engineers) to inspect the complainant’s home on 2 February 2021 and then again on 8 February 2021 after make-safe works had been completed. IL’s report written pursuant to these inspections is dated 26 February 2021. The report contains the following observations:-  a review of Google street view images of the property, which were taken between November 2007 and December 2018, showed the mortar of the parapet wall was degraded  due to the age of the dwelling, its close proximity to Port Phillip Bay and, hence the salt air, the brickwork has naturally degraded leading to a weakening of the bonding between the mortar and bricks  the prolonged period of heavy rainfall that occurred on 29 January 2021 has led to the saturation of the outer skin of brickwork, which has exacerbated the weakening of the bond between the mortar and brickwork  there was no evidence of any brick ties in the upper approximately 700mm of the wall. It is acknowledged that the dwelling was constructed prior to modern design codes coming into effect, however, good building practice dictates that brick ties be used for the full height of the wall to provide horizontal restraint to the wall. Failure to do so has created a 'free end' which, over time, has applied additional stress to the mortar courses of the wall. This is confirmed by the wall having failed along the line where brick ties were first evident in the wall. In relation to the chimney IL observed, amongst other things:-  the chimney distress is not related to a one off single definable event or foundation movement from abnormal moisture conditions in the founding soils  the chimney distress is related to the long-term degradation of the brickwork Determination | Case number: 848817 Page 5 of 8  due to the parapet wall collapsing, the lateral restraint for the chimney in line with the roof framing has been compromised  although the chimney is not at risk of immediate collapse, the insured must have the chimne y rectified within the next three months . Failure to do so will lead to the eventual collapse of the chimney, with the collapse of the chimney having the potential to significantly damage the insured ’s dwelling…. and result in the loss of life. In sum, IL concluded:-  …. the partial collapse of the western boundary wall of the dwelling is attributed to a combination of inadequate construction, long term degradation of the brickwork mortar and a period of prolonged heavy rainfall  by virtue of the inadequate construction and long-term degradation of the wall, the upper section of the wall would have eventually collapsed either from a sudden strong wind gust or the saturation of the wall from the prolonged period of rain. However, the rain is a secondary contributing factor - the inadequate construction and long-term degradation of the wall are the primary causes of the wall failure  the primary cause (90%) of the wall collapse was the inadequate construction (lack of brick ties) and the long term natural degradation of the wall  the secondary cause (10%) of the wall collapse was the prolonged period of heavy rainfall  the primary cause of the chimney damage (distress) was long term degradation of the brickwork  there was no evidence that the failure of the parapet wall or the chimney distress was related to foundation movement. IL also reported that P advised them the parapet wall had a pre-existing lean prior to the storm event and he (that is, P) had been concerned about the state of the wall for a significant period of time. IL says this further information confirmed that the lack of brick ties and the inadequate construction of the wall was a significant contributing factor in the collapse of the wall. The insurer ’s own assessor, LV, also completed an inspection of the complainant’s property on 29 March 2021. The report written pursuant to that inspection is logical and comprehensive and includes helpful photographs. I also note LV’s report is broadly consistent with the conclusions set out in the IL report. What was the proximate cause of the damage? Damage can have more than one cause. In this case, wear and tear, gradual deterioration, a lack of internal support of the parapet wall and the heavy rainfall event are all contributing factors to the building damage. In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. Determination | Case number: 848817 Page 6 of 8 The complainant, by way of email dated 29 March 2022, says that the storm, together with the 44mm of rain, …. ‘was the catalyst for the collapse’ with the heavy rainfall saturating and further weakening the mortar to the point where the additional weight gave way to gravity. Whilst this is a reasonable analysis of the circumstances surrounding the collapse, unfortunately a catalyst is not necessarily the proximate cause of damage in legal terms. The insurer says that the proximate cause of the building damage was wear and tear and gradual deterioration and, in the case of the parapet wall, inadequate (or absent) internal structural support. The insurer says that wear and tear and gradual deterioration are causal factors that are expressly excluded for coverage under the terms and conditions of the policy. Thus, the insurer says, it is entitled to deny the claim for damage to the parapet wall and the chimney. I agree. I am of the opinion the insurer is entitled to deny the claim for building damage. In essence, I find that the proximate cause of the damage was not the storm or heavy rainfall event during 29 January 2021 and 30 January 2021. Rather, it was wear and tear which had acted over many years to gradually degrade the structural integrity of the wall and the chimney. In coming to this conclusion, I have considered all the evidence and information which has been provided by the complainant and the insurer. Moreover, I found the following evidence to be especially persuasive:-  The IL report is comprehensive and logical and is supported by helpful, illustrative photographs of the damage  The conclusions set out in the IL report are not opposed or contradicted by other expert opinions  IL further explained the technical bases for its conclusions in its email to the insurer’s assessor dated 19 March 2021  The top portion of the wall lacked adequate internal structural reinforcement  The advice of P about the pre-existing state of the wall. I also note, in particular, the following observations set out in the LV report following his inspection of the complainant’s home on 29 March 2021. An engineer from IL accompa nied LV to that inspection.  If the upper portion of the wall had a pre-existing lean as reported by the neighbour (could not be confirmed by the investigations completed by this office), then the further weakening of the degraded mortar through being saturated from the rainfall has led to the mortar not being able to resist the rotation of the brickwork above. Consequently, the wall has failed and collapsed into the neighbouring property  The strongest wind gust recorded at the St Kilda Harbour weather stati on …. was 45km/h in a northly direction on 29 January 2021. This is well below the design wind speed and further confirms that the proximate cause of the parapet collapse was the degraded mortar and lack of brick ties  Assessor left the property and neighbours came out. Neighbours (said) they have been advising customer (complainant) of the issue for some time. Neighbour advised that he had measured it to be out 55mm at one stage. He didn’t have any images or hadn't reported it to the council prior, as he had been giving the customer (complainant) an opportunity to repair. Neighbour had put a ladder over his gas metre at the side as he had been very concerned that the wall would collapse. Neighbour Determination | Case number: 848817 Page 7 of 8 advised that he had been asking customer (complainant) to have someone come out to do repairs. Customer (complainant) advised neighbour that a builder had attended, and it was all fine. The apparent information provided by the neighbour has not been rebutted by the complainant. 2.2 Should the insurer pay non-financial loss compensation? An award of non-financial loss is warranted Under the AFCA rules, non-financial loss compensation (capped at $5,400) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs, or a claim is made. Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the part of the insurer. I accept the complainant in this matter has suffered an unusual degree of interference with his expectation of enjoyment and peace of mind. The complainant says the insurer has not carefully considered the severity of the storm and has merely based its denial on policy terms and conditions. On review of the available information, it appears the complainant did, often, follow up the insurer seeking updates. I note the com plainant expressed dissatisfaction about the insurer’s handling of the claim during the claims process as he was going through personal issues. I accept the delay and service issues would have been a source of inconvenience and anxiety for the complainant. Whilst the insurer’s investigation evolved and led to its decision to decline the claim, I do consider it could have been prioritised, especially considering the complainant made the insurer aware it was causing him distress. Understandably, the complainant now feels aggrieved. Given these considerations, the insurer should pay to the complainant the sum of $1,000 in non-financial loss compensation. 2.3 Why is the outcome fair? I sympathise with the complainant who has suffered loss and damage in circumstances that were beyond his control. Nevertheless, the outcome is fair in all the circumstances because:-  Although the complainant has established a valid claim for storm damage on the face of it, the proximate cause of the loss and damage is wear and tear and gradual deterioration  The insurer is therefore entitled to rely upon the policy exclusions for wear or tear and gradual deterioration to deny the claim  The award of non-financial loss in this matter is fair and reasonable. Determination | Case number: 848817 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.