Home / QBE / Determination 848679

Determination 848679

Storm damage claim handling, repairs, additional water ingress damage and contents

FirmQBE
Decided2022-09-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$5,400
Amount claimed—
SourceAFCA PDF

Summary

A storm damaged the complainants' home and QBE accepted the roof claim, but the roof repairs left an unappealing appearance and later water ingress and contents damage occurred. AFCA ordered further appearance rectification, contents settlement and increased non-financial loss compensation to $5,400, while rejecting some cracking and internal damage claims.

The insurer must ensure repairs comply with bylaws and match materials as required by the policy, and it is fair to return the insured to pre-loss condition, while damage from failed make-safes and water ingress during the insurer's carriage is covered.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disasterpay compensationpay non financial lossrepair or rectify

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 848679 Financial firm QBE Insurance (Australia) Limited Case number: 848679 11 August 2022 Determination | Case number: 848679 Page 2 of 12 1 Determination overview 1.1 Complaint The complainants ’ home was impacted by a large storm event on 19 April 2020, with strong wind gusts and hail causing damage to the roof. The insurer accepted the claim for damage to the roof and agreed to cover the additional cost of increasing the pitch to meet building regulations. Soon after repairs commenced in September 2021, the complainants raised concerns with the appearance of the house which, in the process of increasing pitch, had taken on an unconventional and unappealing appearance. The complainants also reported walls shifting and gaps between bricks and fibro, damage to contents caused by the insurer’s trades, damage to vehicles from constructions materials left on-site, and quality of repairs. The complainants say the insurer’s handling of the claim has been inadequate and caused avoidable delays. More recently, the complainants reported cracking and movement damage. The complainants say this is a result of water ingress while the property was in the insurer’s control, and of increased wind loads from the higher roof. The complainants say the home cannot be sold in its current condition, and the insurer is responsible for this. They say the insurer is liable for the building which is effectively a total loss and should be rebuilt, its offer for damaged contents is insufficient, and it should increase an offer for compensation. The insurer has offered to render the top half of the home to achieve a uniform appearance. It says cracking and movement is a result of environmental conditions over time and is excluded from cover. It says its settlement for damaged contents and non-financial loss are reasonable, and it has met the claim in full. 1.2 Issues and key findings Should the insure replace the roof? The insurer should ensure the roof complies with relevant standards and take necessary remedial action if it does not. Otherwise, it is not required to replace the roof. It must render the home to create a uniform appearance in line with architectural designs or pay the complainants this cost plus an allowance of 20% for contingencies. Is the insurer liable for additional damage? Yes. The available information establishes the building suffered additional damage after the loss, primarily because of failed make-safes. The insurer is liable for:  gaps between external wall lining and brickwork caused by moisture from leaks  minor external lining cracks the front, rear and left of the building caused by water ingress from leaks. The insurer is not liable for:  minor external cracking to the right side of the building caused by water pooling beneath air conditioner outlets  cracking damage to the slab caused by defective construction methods Determination | Case number: 848679 Page 3 of 12  pre-existing internal damage  rectification of internal painting which is adequate  deteriorated sealant and walkway movement caused by long term exposure to elements. Should the insurer increase its offer for damaged contents? The insurer has declined to assess the claim for certain contents. It has not offered to arrange restoration, nor responded to the complainants’ assertion that t hey have already established a loss. Given this, it should increase its offer for damaged contents. As the insurer has not assessed the value of the claim nor provided quotes, settlement should be based on the complainants’ quotes. Should the insurer increase its offer for compensation? Yes. The claim has caused significant disruption and stress. The insurer should increase its offer from $4,000 to $5,400. Why is the outcome fair? It is fair that the insurer ensures its repairs comply with relevant bylaws and match materials as this is required by the policy. It would not be fair for the insurer to decline damage caused by ground movement when it has not established this is the cause, or to decline to cover a claim for contents it has neglected to assess. As the insurer’s handling of the claim has been poor and caused avoidable stress, it is fair the insurer compensates the complainants for this experience. 1.3 Determination This determination is substantially in favour of the complainants. It should settle the claim in line with section 2 of this determination. Determination | Case number: 848679 Page 4 of 12 2 Reasons for determination 2.1 Should the insurer replace the roof? The insurer should ensure the roof complies with relevant standards and take necessary remedial action if it does not. Otherwise, it is not required to replace the roof. It must render the home to create a uniform appearance in line with architectural designs or pay the complainants this cost plus an allowance of 20% for contingencies. Insurer has offered to render the upper portion of the home The insurer agr eed to replace the complainants’ roof, and to pay the cost of increasing the pitch to ensure compliance with current building regulations. These repairs are complete, and the insurer says it has met its obligations under the policy. The complainants say the appearance of the home is unsatisfactory and has impacted the resale value of the home. In support, the complainants have supplied a valuation which says the home cannot be sold in its current condition. It is unclear from this report, which reports on ongoing cracking and movement damage, what part the unusual appearance of the home plays in the reduction of its value. The panel has reviewed the images of the home in its pre-loss condition, and after repairs are complete. The panel agrees the home looks somewhat unconventional and unappealing. In recognition of the complainants ’ concerns, the insurer has offered to render the upper portion of the home to create a uniform appearance. Complainants’ engineer says home exposed to additional wind loads The complainants’ engineer ( MM) says the height of the complainants’ home has been increased by an estimated 1200mm. Referencing Australian standards in relation to wind loads on housing, MM classifies the site as C1, although does not expand on the definition or context of this. MM says the increased height would result in an approximate 19 kN bracing load in east/west and north/south directions. MM does not comment on the potential for this increased exposure to wind loads to cause damage, however, recommends a building certifier should confirm the new roof design accounts for this. The insurer says it understood the co mplainants’ engineer would ensure the roof design accounted for wind loads. Regardless, it says the complainants have not provided any evidence the plans are not compliant. Repairs must comply with relevant bylaws and match materials The policy outlines how the insurer will settle a building claim. Where the insurer decides to repair a building, the policy requires that it will:  try to match any material used to repair a building with the original materials or nearest equivalent available to the original materials  ensure repairs to a building comply with government and local authority bylaws. Determination | Case number: 848679 Page 5 of 12 Insurer must ensure repairs comply with relevant bylaws The insurer agreed to carry out repairs to the building. While it was not obliged under the policy to increase the pitch, it elected to do so and is responsible for this work. It is not for the complainants to ensure the insurer’s works m eet with government or local authority bylaws, such as the Australian Standards. The insurer should engage an appropriately qualified professional to review its design plans and ensure compliance with relevant standards, including AS 4055:2021 Wind loads on housing. In the event the plans are not compliant, the insurer must take the necessary action to achieve compliance. Insurer must rectify appearance of the home The insurer has only partially used nearest equivalent materials. It has not continued brick columns to the roof height. The panel agrees this has negatively impacted the appearance of the home. The complainants signed documents agreeing to the proposed repair methods. However, the architectural diagrams presented to the complainants do not accurately convey the finished condition. The diagrams present a clear delineation between the existing home and section of increased pitch, with horizontal lines suggesting the use of a horizontal timber cladding or timber. Instead, a series of large panels creates a cheap appearance, leaving upper floor windows looking undersized. The finished appearance is far from attractive. The panel does not consider it is fair to require the insurer to rebuild the roof anew. The complainants sighted the designs and the insurer, at least in terms of height and shape, largely adhered to the design. However, given the intent of the policy is to return an insured to a pre-loss condition, it is fair that the insurer improve the appearance. The insurer has proposed to render the upper portion of the home or pay the complainants the cost of this work (initially estimated to cost between $30,000 and $40,000). The panel considers this is a reasonable solution, yet in the absence of a design or architectural drawings, it is difficult to envision whether the result will remedy the unusual appearance. The insurer should therefore engage an appropriately qualified party to prepare at least three alternative design plans (including the render option). The complainants may choose to allow the insurer to carry out works based on her preferred design or accept cash settlement based on the quote to render, plus a 20% allowance for contingencies. 2.2 Is the insurer liable for additional damage? Yes. The available information establishes the building suffered additional damage after the loss, primarily because of failed make-safes. The insurer is liable for:  gaps between external wall lining and brickwork caused by moisture from leaks  minor external lining cracks the front, rear and left of the building caused by water ingress from leaks. The insurer is not liable for:  minor external cracking to the right side of the building caused by water pooling beneath air conditioner outlets  cracking damage to the slab caused by defective construction methods  pre-existing internal damage  rectification of internal painting which is adequate Determination | Case number: 848679 Page 6 of 12  deteriorated sealant and walkway movement caused by long term exposure to elements. Gap between external wall lining and brickwork The insurer’s engineer ( NJ) says that gaps between external wall lining and brickwork are present around the perimeter of the building, and do not correlate with areas of identified building movement. Given this, NJ considers the cause is timber framing shrinkage and swelling caused by moisture within the frame from the reported roof leak. NJ recommends these gaps are sealed with a flexible sealant. Between the initial event in April 2019, and the roof being replaced, there were numerous instances of water ingress. These events lead to damaged electrics and required make safe works. The insurer’s make safe works included applying temporary roof waterproofing which had significantly deteriorated by 7 May 2021, and tarps which were damaged and not replaced in a timely manner. MM could not attribute a root cause to the other separation between brick and external wall linings, although considered a gap between brickwork and a front wall may be a result of differential moment. MM reached its conclusions without carrying out a floor level survey, a tool relied upon by NJ to accurately gauge areas affected by differential movement. Given this, the panel finds the view of NJ more persuasive regarding these gaps. Gaps between lining and brickwork were not reported as part of the initial claim or identified in any reports. A report from engineer PT, dated 1 November 2021, notes the home is in good condition with no signs of movement. The damage therefore appears recent. Given this, the panel is satisfied the water ingress leading to this shrinkage and swelling, and subsequent gaps, occurred while the insurer had carriage of the claim and because of failed make safes. The insurer is therefore liable for this damage. Minor external lining cracks MM notes the property was not maintained when unoccupied and when repairs were being carried out. MM considers this had the potential to allow for differential movement between walls that were not suitable braced or tied. MM notes there are no large trees (known to create soil moisture variations and differential movement) in the vicinity of the property, ruling out this common external factor. NJ says minor lining cracks, including to the external lining above the entry door and to a cornice to the front, upper level bedroom, are consistent with differential building movement. The timing of these cracks cannot be confirmed. NJ considered there were two possible influences to footing system movement. The first was ponding water adjacent to footings to the right side of the building from air- conditioner condensers, consistent with elevated floor level identified via a floor level survey. NJ observed brick efflorescence, indicative of rising damp through capillary action which occurs over a long period of time and is attributable to poor site drainage and lack of waterproofing. NJ considered the second influence to footing movement was water ingress to the rear perimeter wall of the building, noting this correlates with elevated floor levels to the rest of the building. Determination | Case number: 848679 Page 7 of 12 NJ notes differential movement will often stabilise once soil moisture conditions equalise, and this can take several months. On review, it is apparent that NJ considers air conditioners responsible for lining cracks to the right side of the building, and efflorescence indicates this is a long-term issue. Conversely, NJ considers minor external lining cracks to other walls is a result of differential movement from water ingress. As noted, the property was subjected to water ingress over an 18-month period. Earlier indications of water ingress were observed in the form of staining to ceilings, however, this damage was found to have existed since the home was purchased and had not worsened. Given this, the panel considers water ingress since the claimed storm damage is the cause of these minor cracks. The insurer is therefore liable for this damage. Regarding ponding adjacent to footings from air conditioners, the complainants say the air conditioners were installed by the insurer as part of roof replacements. The complainants describe raising this as a concern with the insurer yet receiving no response, and question why the insurer would install these items in a manner likely to cause damage. The insurer has not responded to this assertion. However, the presence of effluence indicates the damage is long term damage, potentially caused by pooling from the previous air conditioners which were replaced. Given this, the panel does not consider the insurer is liable for external lining cracks on the right side of the building. Cracking damage to slab NJ lists cracking damage and differential slab movement to the ground level because of movement and moister related damage. It is unclear whether NJ considers movement or moisture the predominate cause, however, the two are interrelated, with moisture imbalances contributed to variations in soil moisture content which leads to cracking. NJ says the infill slab is unlikely to have been constructed with internal stiffening boards, in accordance with Australian Standards. NJ says this movement and cracking is unlikely to have occurred if the slab was constructed in line with standards. In determining whether the insurer is liable for slab cracking and movement, it is necessary to consider what is the proximate cause of this damage. The proximate cause of the loss is a question of fact to be determined based on the surrounding circumstances. Where there are several causes operating, each must be examined for the qualities of predominance and efficacy in relation to the resultant damage. If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. NJ says this damage would not have occurred if the slab was constructed with internal stiffening boards, in line with standards. So, if not for the slab construction, water ingress and variations in soil moisture content would not have caused the damage and is therefore not the proximate cause. Given the proximate cause of cracking and movement to the slab is not an insured event, the insurer is not liable for this damage. Determination | Case number: 848679 Page 8 of 12 Internal damage and adequacy of painting NJ refers to shower lining separation from the wall. NJ also describes gaps between the external wall lining and brickwork yet notes there is evidence of prior patching attempts at these locations. Internal cracking is also addressed in the FE report of 16 February 2022. FE says the reported cracks in the bathroom look old and noted no other visual movement indicators in the home. Restorer FE also addressed the complainants’ concerns that mould had been painted over, and the painting would suffer as a result, potentially flaking in future. FE said paint would not hold onto a surface affected by mould, dirt or similar, and the paint looked in good condition with no visible mould evidence. MM noted an internal brick wall adjacent the stairwell was deteriorating due to bricks being moist, and that spalling of bricks generally takes years. MM considered this a result of a weather proofing problem. The submissions do not include any evidence to contest these views. The panel therefore accepts that internal cracking damage is limited, and on balance is not a result of an insured event or any subsequent water ingress. The panel also notes that in the event painting fails at some future point the policy offers a repair guarantee. The panel accepts that spalling and effluence are symptoms of a longer-term issues and there is no evidence tying this damage to the claimed storm or subsequent water ingress. The insurer is not liable for this damage. Deteriorated sealant and movement to the front walkway NJ notes columns and the deck are supported by the same footing, so this is unlikely to be the cause of vertical differential movement. Rather, NJ considered seasonal swelling of timber elements of the floor frame is the most likely cause. This swelling is not a result of leaks, but of exposure to elements of external timber. Given this the panel does not consider the insurer is liable for this damage. How should the insurer settle the claim for additional damage? The insurer is to arrange for sealing of any gaps caused by shrinkage and swelling of timber framing. Alternatively, it may obtain an actionable quote for this work upon which to base settlement and cash settle the complainants for this amount, plus 20% to account for contingencies. Any dispute over whether the quote upon which the insurer bases settlement is fair and reasonable, may be heard by AFCA. The complainants say repairs are ongoing, and include repairs to a patio roof and back room identified by FN. The insurer’s notice of response indicated a new assessor would report on outstanding repairs, including damage to the patio and back room. The insurer has since advised the works cannot be warranted and will be cash settled. The submissions do not include a copy of any quote for patio and back room works. AFCA is therefore unable to determine whether the cash settlement offer is fair and reasonable. If the complainants accept this determination, the panel considers the insurer should present its cash settlement offer within 14 days of acceptance. Should a dispute arise over the offer, the complainants may bring the issue to AFCA for consideration Determination | Case number: 848679 Page 9 of 12 The insurer should ensure outstanding repairs are carried out urgently. Alternatively, the complainants may request cash settlement from the insurer for outstanding, approved repairs. If the complainants’ preference is for cash settlement, the insurer should pay an additional 20% on any outstanding repairs. 2.3 Should the insurer increase its offer for damaged contents? The insurer has declined to assess the claim for certain contents. It has not offered to arrange restoration, nor responded to the complainants’ assertion that they have already established a loss. Given this, the insurer should increase its offer for damaged contents. As the insurer has not assessed the value of the claim nor provided quotes, settlement should be based on the complai nants’ quotes. Contents were damaged while in the custody of the insurer The complainants say various content items were damaged by contractors acting for the insurer and other items were damaged by exposure to moisture. In a submission dated 24 December 2021, the insurer advised that an assessor would address this concern. A subsequent report from loss adjuster SW dated 3 February 2022, lists contents damaged by builders and estimates a replacement cost of $24,000. It estimates contents damaged by removalists at $4,242.00 and says the complainants should claim this from the removalist directly. The insurer offered $10,000 on a without prejudice basis to resolve this issue. The offer was rejected by the complainants who supplied quotes for replacement amounting to $32,854.58. Insurer says complainants have not established items damaged beyond repair The insurer says, via a submission dated 26 April 2022, it is unwilling to meet the complainants’ request to pay $32,854.58. It relies on an email from its builder (CC) dated 23 March 2022, which says there is insufficient evidence the items were damaged beyond repair, and that some items can be restored. CC proposed to arrange this restoration. The insurer’s offer does not include the cost of items which CC says could be repaired or restored. The complainant, in an email dated 27 April 2022, questions why the insurer proposed repair and rectification six months after the damage was reported. The insurer has not provided a further submission on the matter. Insurer should increase its settlement offer for contents The insurer has had ample opportunity to carry out repairs since it advised it would address concerns with contents on 24 December 2021. Given the already lengthy delays the panel is not satisfied it is fair or reasonable for the insurer to now have the opportunity to carry out assessments, repairs and rectification when it has previously neglected to do so. CC says a dining room table could have been repaired but is no longer on site. The complainants say the table remained on site yet exposed to weather, and has since been replaced at the complainants’ expense. The insurer should reimburse the cost of the table based on the complainants’ quote. CC says curtains and rods and a willow brand bin have been replaced. The complainants disputes this. There are no further submissions on the matter, such as copies of invoices from Determination | Case number: 848679 Page 10 of 12 CC proving the items were replaced or confirmation of attendance to install. The insurer should reimburse these costs based on the com plainants’ quotes. CC proposes to steam clean a sofa bed and replace damaged glass in an outdoor table. The complainants say the bed and table were disposed of by CC. This is not disputed. The insurer should reimburse the complainants the cost of these items, based on their quotes. CC proposes to attempt to restore a TV Unit, leather reclining lounge, rug and shelving unit. There is no guarantee restoration will be successful. To avoid the potential for an ongoing dispute, and given the insurer neglected to attempt restoration earlier, the panel considers the insurer should replace these items. Replacement shou ld be based on the complainants’ quotes. CC says it will arrange settlement of a damaged pot plant and a speaker if the complainants can provide photographs of the items. The complainants say photographs were supplied to the CC site manager when the damage occurred. CC may seek to locate photographs from its site manager, and then provide settlement based on current market value. If it cannot locate the photographs, settlement shou ld be based on the complainants’ quotes. CC also says it is unaware of a damaged shelf unit. The complainants say photographs were supplied to its site manager when the damage occurred. The insurer has not taken the opportunity to further investigate this item. It should settle the complainants based on their quote. CC says the complainants cosmetically damaged a washing machine when attempting to remove paint splash marks. It says it cannot reimburse the complainants for damage they have caused. Given the extensive delays the panel considers it is reasonable the complainants sought to rectify an item which was functional and inside the property. The complainants question why CC failed to immediately rectify the damage. The panel considers ongoing delays prompted the complainants to attempt to repair the item, yet it remains the item was damaged as a result of their actions. In these circumstances, the panel considers the insurer should pay a contribution of 50% to the cost of replacing the washing machine. Settlement shou ld be based on the complainants’ quote. 2.4 Are the complainants entitled to compensation? Yes. The claim has caused significant disruption and stress. The insurer should increase its offer from $4,000 to $5,400. AFCA may award compensation in certain circumstances Under our Rules, we can award up to $5,400 compensation for non-financial loss. We may award compensation if a complainant has suffered an unusual degree of physical inconvenience, time taken to resolve the situation or interference with his or her expectation of enjoyment or peace of mind due to the insurer’s handling of the claim. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. Insurer should increase its offer for compensation The panel recognises the insurer has sought to act with integrity in its management of the claim. While outside the scope of this determination, the evi dence suggests the complainants’ roof may have been defective and the insurer could have cash settled the value of the original Determination | Case number: 848679 Page 11 of 12 claim. Instead, it elected to stand by an earlier commitment, perhaps made in error, to replace the roof. That being said, the issues described above stem from the insurer ’ s handling of the claim. It is clear the complainants’ contents were damaged by the insurer’s agents. The insurer’s representative’s failed make-safes have allowed water into the property, requiring the complainants to spend lengthy periods in temporary accommodation. The complainants describe the disruption this has caused to their family and the challenges presented to them in running and expanding their business. The disruption has been significant and has undoubtedly caused stress. The insurer has offered to $4,000 in compensation for this non-financial loss. The panel considers, in these circumstances, the offer is insufficient. It should increase its offer to $5,400. 2.5 Why is the outcome fair? The insurer cannot confirm its repairs to the roof comply with relevant standards. In partially matching materials, the insurer’s repairs have not achieved a uniform appearance. Given the insurer took responsibility for repairs, it would not be fair for it to leave the home in this condition. Expert evidence does not support the insurer’s view that all movement and cra cking damage is a result of general movement, a cause which is excluded. Given the complainants have established a prima facie claim for damage from the insured event and from subsequent water ingress, it is fair the insurer is liable for this damage. The insurer was offered an opport unity to assess the complainants’ claim for damaged contents. It declined this opportunity. In these circumstances, it would not be fair for the insurer to decline cover on grounds the complainants have not established items were damaged. Determination | Case number: 848679 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.