Summary

A commercial landlord claimed storm damage to shops and loss of rent after the tenant left. AFCA found the cladding and PC sheeting damage was due to wear, tear and deterioration, and that loss of rent was largely caused by the complainant's delayed maintenance, so the insurer's limited offer was fair.

Damage excluded under the policy's wear and tear and gradual deterioration exclusion, and loss of rent not payable for the period caused by the complainant's delay in maintenance works.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 847088 Financial firm Allianz Australia Insurance Limited Determination | Case number: 847088 Page 2 of 8 Case number: 847088 21 October 2022 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy (policy) with the financial firm (insurer). A claim was lodged for storm damage to the insured property (commercial shops) said to have occurred on 20 July 2020. The insurer has partially accepted the claimed based on what it has assessed to be loss or damage covered under the policy. The complainant disputes the insurer’s assessment of the external damage in the area of the roof. The complainant is also seeking cover for loss of rent relating to Shop 3 from 1 September 2020 to 31 October 2021, which he says is due to the storm damage and the insurer’s delays. 1.2 Issues and key findings Is the insurer’s assessment of the damage to the insured building fair? Yes. The available information shows the damage to the fibro cladding roof walls and polycarbonate sheeting (PC sheeting) is due to wear, tear, gradual deterioration and incorrect installation. Such loss or damage is excluded under the policy. Is the insurer’s settlement offer for loss of rent fair? Yes. The insurer’s decision to limit loss of rent cover to the period 2 February 2021 to 22 February 2021, whilst it completed repairs to the property, is fair in all the circumstances. Why is the outcome fair? The outcome is fair because the information shows the damage to the cladding and PC sheeting is due to factors excluded from cover under the policy. Further, it would not be fair to require the insurer to cover the claimed loss of rent where the delays associated with completing all needed repairs were mostly due to the complainant. 1.3 Determination This determination is in favour of the insurer. The insurer’s assessment of its liability for the damage to the insured building as well as loss of rent for shop 3 is fair and consistent with the policy provisions. Determination | Case number: 847088 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer’s assessment of the damage fair ? Yes. The insurer’s assessment of and decision to decline cover for the cladding and PC sheeting is consistent with the policy exclusions. The policy covers the insured building against accidental loss or damage The policy covers the insured property for accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The policy covers loss of rent which is also subject to the conditions, limitations and exclusions specified in the PDS. The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The complainant has established a valid claim There is no dispute the insured property, including Shop 3 and Shop 5, suffered water ingress damage on 20 July 2020 because of a storm event. The insurer does not dispute a valid claim exists for damage to the insured building and for loss of rent. However, it is seeking to limit its liability to only internal damage to the shops and loss of rent (LOR) for shop 3 ($1,242.78). The complainant is seeking cover for damaged cladding to the roof walls and PC sheeting. The insurer has assessed this as being maintenance related damage and is excluded under the policy. The complainant is also seeking cover for loss of rent for the period 1 September 2020 to 31 October 2021 ($19,523.28). I note the insurer says the policy is a defined events contract of insurance. However, my reading of the ‘Material Damage’ benefit is that it provides accidental loss or damage at the insured address within the period of insurance. Relevant policy wording has been provided in section 3 below. Therefore, I accept the complainant has established, on balance, a valid claim for all the damage claimed, including the cladding and PC sheeting. The onus rests with the insurer to show, on balance, it is entitled to limit its liability under the claim in line with the policy or otherwise. The information from appointed consultants does not assist the complainant The insurer appointed loss adjusters ‘CR’ to report on the damage to the insured property. CR appointed building consultants ‘N’ to investigate the cause and extent of the damage. N confirmed internal water ingress damage to shops 3 and 5, which is not in dispute between the parties and has been accepted under the claim. N arranged for roofing specialists ‘VR’ to assess the roof area. In its report dated 9 August 2020, VR says the condition of the cladding and PC sheeting was fair. However, it notes that the screws securing the PC sheeting were old, rusted and could be allowing water ingress. This is maintenance related. VR also then says the cladding was showing signs of Determination | Case number: 847088 Page 4 of 8 deterioration and the main cause for the water ingress is a broken section of the cladding i.e. a hole approximately 1.5m x 0.9m wide. VR notes other maintenance related issues and water ingress locations. This includes various cracked and damaged cladding sections and failure of the insulation around the antenna. The insurer also refers to CR’s report dated 5 August 2020. This confirms the roof area over the shops needs maintenance. All the cladding requires replacement as well as the deteriorated PC sheeting. CR notes there was no evidence of impact damage to the cladding or PC Sheeting, with temporary make safe works completed to cover the large hole. The insurer also refers to the complainant’s plumbing consultant ‘M’s report dated 9 October 2020. M says the metal sections of the roof had deteriorated over time requiring replacement. M found the cladding had split in several sections with some sheets having fallen off. M says the cladding product used is not the right material for this application due to the high expansion of the building. M noted five different sections of the cladding that required replacement as they were either cracked or had broken away. M noted the PC sheeting as being brittle due to age with cracks and require replacement. N confirms the cause of internal damage was due to water ingress through the roof cavity and the large opening to the cladding wall. N says it did not see any evidence of storm impact damage to the cladding. N concludes that the cladding is in poor condition due to years of exposure to the elements. The PC roof sheets had deteriorated with corroded fixings, which is the result of long term exposure to the elements. The complainant has provided a quote from plumbing and roofing maintenance consultant ‘P’ dated 13 February 2020. This pre- dates the storm event. P’s quote provides different options and costings for repairs to the roof and guttering. It does not provide detailed comment on the condition of the roof materials or cause for damage, other than to confirm existence of rusted sections. I note option 1 of the quote does recommend full replacement of roof sheets. The insurer is not required to cover the cladding and PC sheets I have carefully considered these reports. I am satisfied this evidence establishes, on the balance of probabilities, that the cladding and PC sheets were in an aged and deteriorated condition before the storm. I note N ’s opinion that the damage would not have occurred but for the deteriorated condition of the sheeting. I acknowledge the complainant’s view that there is no objective information from the consultants to show it is not storm damage and that the water ingress did not exist before the storm. However, I do not agree. All the consultants are reasonably consistent in their findings regarding the condition of the cladding and PC sheets. This being that the cladding and PC sheets were in a deteriorated condition before the storm. This is consistent with gradual deterioration over time due to wear, tear, and a lack of maintenance. I note the complainant’s belief that the big hole found in a section of the cladding is impact damage caused by debris in the storm. However, there is no persuasive information to support this as being the case. Rather, the available information and photos show several areas of the cladding presented with long term cracking damage and deterioration. I accept, on balance, it is reasonable to accept this particular section was also subject to the same level of deterioration and cracking before the partial loss of the sheet leaving the hole. In line with the available information, and considering what is fair in all the circumstances, I accept the insurer has shown the damage to the cladding and PC sheeting is because of Determination | Case number: 847088 Page 5 of 8 wear and tear, gradual deterioration and a lack of maintenance. Such damage is clearly excluded from cover under the policy. Therefore, the insurer is entitled to decline cover for the cladding and PC sheets under the claim. 2.2 Is the insurer’s loss of rent offer under the claim fair? The insurer has covered some of the claimed loss of rent The insurer has accepted LOR from 2 February 2021 to 22 February 2021. This being the period during which the insurer completed the internal repairs accepted under the claim. The insurer says the claimed LOR from 1 September 2020 to 2 February 2021 is not covered. This is because this period relates the complainant’s delay in arranging the required maintenance works, which were necessary before the claim related repairs could be done. The insurer has considered the complainant’s reasons for the delay in completing the said maintenance works. However, the insurer maintains any delays relating to the claimed lack of materials would have been minimal and not months. Also, that the resultant damage would not have required the tenant to vacate and/or prevent the tenant from continuing business activities. There is no dispute the tenant, given the delays in completing the necessary repairs and continued water ingress issues, requested to be released from the lease. The complainant agreed to this and the tenant was released from the lease as of 10 March 2021. The complainant was able to enter a new lease arrangement for shop 3 from 27 July 2021, subject to a three month rent free period ending 31 October 2021. The complainant seeks cover for LOR from 1 September 2020 to 31 October 2021, on the basis the tenant’s exit from the lease and subsequent time to find a new te nant. He says this arises from the storm damage and the insurer’s management of the claim. Complainant delayed maintenance works I am satisfied as early as August 2020/September 2020, the complainant was informed of his obligation to complete the required maintenance works before the insurer could complete the authorised internal repairs. The available information shows the maintenance works did not commence until January 2021 and were completed in February 2021. I accept the available information shows water ingress and associated moisture continued to be present within shop 3 over this period. On balance, I accept this meant the tenant was unable to trade for many months and did not pay rent to the complainant. I note the lease agreement allowed for an initial two month rent free period up to 1 September 2020. The lease also includes a clause where the tenant was not required to pay rent if the landlord (complainant) failed to arrange necessary repairs to the property. I have considered the complainant ’s reasons for the delay in commencing the maintenance works. I accept there may have been some associated delays in sourcing materials. However, I am not satisfied he has shown this should reasonably have been for close to five months. As this LOR was due to the delays in arranging the maintenance works, and not due to the accepted insurance repairs, the insurer is not liable for LOR for the period 1 September 2020 to February 2021. Determination | Case number: 847088 Page 6 of 8 I acknowledge the complainant’s opinion that he should be covered for lo ss of rent arising from the tenant’s release from the lease, time to advertise and re -let shop 3. Also, for the agreed three month rent free period under the new lease agreement, all of which the complainant believes relates to the storm damage. I am not satisfied it would be fair in all the circumstances to require the insurer to cover the claimed LOR up to 31 October 2021. This is because, as discussed above, I believe the complainant failed to arrange the maintenance works within a reasonable period of time. I am of the opinion this resulted in the ongoing water ingress and the tenant’s request to be released from the lease. I am not satisfied the complainant has shown it would be fair in all the circumstances to hold the insurer liable for the tenant’s request to be released from the lease. Given this, I am not satisfied it would be fair to require the insurer to cover LOR for the period following the tenant’s release from the lease (March 2021) . Insurer’s settlement offer for LOR is fair and in line with the policy provisions I note the insurer, in an effort to resolve the complainant’s concerns regarding the LOR , has made several offers on a commercial basis, such as:  a cash settlement of $4,079.64 to cover the Restoration Period for $1,597.86 plus the Storm Repair Period for $1,242.78 plus an additional 3-week period for quoting of the maintenance works for $1,239.00  a further goodwill offer was presented in the sum of $5,178.25 (being 50% of $10,356.50 for 1 September 2020 to 22 February 2021)  after the IDR review process, a further goodwill offer was presented in the sum $12,256.50. The complainant rejected the first and third offer whilst no response was provided to the insurer regarding offer two. The insurer has confirmed these offers have since been formally withdrawn. I am satisfied the insurer’s decision to limit its liability under the claim for LOR to the period 2 February 2021 to 22 February 2021, is consistent with the policy. Therefore, I determine the insurer is not obliged to increase it settlement offer of $1,242.78 towards LOR under the claim. 2.3 Why is the outcome fair? The outcome is fair because the information shows the damage to the cladding and PC sheeting is due to factors excluded from cover under the policy. Further, it would not be fair to require the insurer to cover the claimed loss of rent where the delays associated with completing the maintenance works rests with the complainant. This is also the cause for the tenant seeking release from the lease. Determination | Case number: 847088 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions Material Damage Section The cover Except as otherwise specified, We will pay up to the applicable Sum Insured or sublimit specified herein, subject to a maximum total amount per claim up to the Limit of Indemnity, in accordance with the Basis of Settlement for Property Insured that is accidentally Damaged at the Situation during the Period of Insurance. ... Specific exclusions applicable to this Section Determination | Case number: 847088 Page 8 of 8 3. We will not cover You for Damage caused by: a. wear and tear, gradual deterioration, fading, developing flaws, scratching, marring, normal upkeep or any gradual cause; ... ... Part B Consequential Loss of Profits The cover Where Part B is shown as insured on the Schedule, We will pay You, in accordance with the Part B Basis of Settlement, for Consequential Loss resulting from interruption of or interference with the Business that is caused by a Defined Event that occurs during the Period of Insurance. ... Additional benefits applicable to Part B of this Section ... 2. Loss of rent loss of rent receivable and loss of amounts due for services rendered and/or recoverable expenses. We will pay the amount by which rent and amounts for services rendered and/or recoverable expenses received or receivable during the Indemnity Period falls short of the amount that it may be reasonably estimated would have been received during that period had the Defined Event not occurred, including the additional expenditure necessarily and reasonably incurred for the sole purpose of avoiding or diminishing the loss of rent and loss of amounts for services rendered and/or recoverable expenses, less any sum saved during that period in respect of the charges or expenses payable out of rent that cease or are reduced in consequence of the Defined Event.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.