Partial decline of storm/flood damage claim for rear pool area; further assessment ordered and non-financial loss awarded
Text of the determination
Determination
Case number 847020
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 847020 Page 1 of 8
Case number: 847020 30 September 2022
1 Determination overview
1.1 Complaint
The complainant holds a building and contents insurance policy with the financial firm
(insurer). In March 2021, he lodged a claim for damage at the insured property following a
major storm and associated flooding event.
Based on its engineer ’s report, the insurer partially declined cover (for damage at the rear of
the property, including to the retaining wall). The complainant says the insurer’s engineer’s
report was incomplete and inaccurate. The complainant has declined the insurer ’s offer to
arrange for another assessment of the cause of the damage by an independent engineer.
The complainant wants the insurer to pay for the disputed damage (pool area) and cover fees
incurred in obtaining expert reports. He is extremely unhappy about the handling of the claim,
and alleges multiple breaches of the relevant industry code of practice by the insurer.
1.2 Issues and key findings
Is the insurer required to settle the claim for the disputed damage?
In the particular circumstances, a further assessment of the property by a suitably qualified
expert(s) is reasonable and appropriate to provide more certainty about the cause and extent
of the disputed damage. While there was a severe storm/flooding event, and damage was
found, neither the insurer ’s nor the complainant’s submissions or expert evidence is
compelling as to the proximate cause or scope of all the issues identified. A final decision as
to the extent of the claim-related damage should be deferred until that further assessment
and necessary scope of work is concluded.
The insurer is also required to pay $2,000 as non-financial loss in recognition of its handling
of the claim and the impact of that on the complainant.
Why is the outcome fair?
The insurer ’s offer to arrange an independent reassessment of the damage and the
associated scope of work is fair in the circumstances, as it provides the opportunity for a
definitive conclusion as to the proximate cause and extent of the disputed damage.
1.3 Determination
This determination is substantially in favour of the insurer. As set out in section 2.1 below, the
insurer is required to arrange for a re-assessment of the disputed (pool area) damage and a
scope of work for any found to be claim-related and not otherwise excluded. The complainant
is to allow access to the property for that work. The insurer must then make a decision on
cover for the disputed damage, and settle the claim, as appropriate, based on the evidence
arising from the re-assessment report. The insurer is also required to pay the sum of $2,000
non-financial loss compensation.
Determination | Case number: 847020 Page 2 of 8
2 Reasons for determination
Since the complainant first lodged the complaint the subject of this determination, a new claim
has been made to deal separately with the damaged retaining wall.
The complaint and this determination now only concern the insurer’s decision to decline the
remainder of the disputed damage, and its subsequent offer of a re-assessment and scoping
of that damage.
Any commentary in this determination about the retaining wall and stairs is only for context
and reference purposes in relation to the remaining disputed damage.
2.1 Is insurer required to settle the claim for disputed damage?
Complainant’s policy covers specified events, subject to conditions/exclusions
The complainant holds a home and contents ‘accidental damage’ insurance policy for his
property, which backs onto a river. The complainant’s policy covers specified events
(including ‘storm, tempest, rainwater, flood, wind…’).
However, cover is subject to exclusions, and the policy also states that some loss or damage
is only covered under certain conditions. That includes ‘accidental’ loss or damage from
‘erosion, subsidence, landslide or earth movement’, but only if it is directly as a result of one
o f the listed specified events (including ‘storm’) and it occurs no more than 72 hours after the
insured event. Any other erosion, subsidence, landslide or earth movement is not covered.
The policy specifically excludes cover for any loss or damage resulting from or caused by:
inherent defects, structural defects, faulty workmanship, faulty design. However,
we will pay for resultant loss or damage that is caused directly by an insured
event if you did not know about (or could not reasonably have known about) the
defect, faulty design or faulty workmanship at the time of the loss. Under no
circumstances will we repair the inherent defect, structural defect, faulty
workmanship or faulty design that caused the loss, nor any loss that is caused by
the inherent defect, structural defect, faulty workmanship or faulty design that is
not caused directly by an insured event.
The policy also excludes cover for ‘any gradual process’.
There is no dispute a major storm event occurred in NSW in March 2021, following which
external damage was discovered at the compla inant’s property (to both the front and rear).
The insurer has accepted damage at the front of the property due to the storm event.
However, the dispute arose from the insurer declining cover for the rear of the property, which
included damage to:
retaining wall and stairs
pool paving
pool plumbing
pool fence.
The complainant says the retaining wall suffered movement damage during the March 2021
event, however, it completely collapsed in another event in March 2022. As noted above, he
Determination | Case number: 847020 Page 3 of 8
is no longer claiming damage to the retaining wall and stairs under the 2021 claim, the
subject of this complaint.
Engineer reported the damage had been occurring over a period of many years
On 7 May 2021, the insurer’s engineer SE attended the property and reported the following:
insured property has moderate to high reactive soil (clay)
minor settlement of rear pool paving
long term rotting/deterioration to the timber sections of the retaining wall
lack of support to the staircase exposed edge
lack of drainage behind the timber retaining wall.
SE obtained two aerial images from Google Street View (before and after the event) and
reported the retaining wall showed no obvious signs of distortion. SE reported deterioration of
the timber retaining wall was due to inadequate timber treatment to the timber sleeper
sections and long-term exposure to the environment that has occurred over a period of years.
SE reported the settlement of pool pavers and the rear western concrete slab stairway
pathway is consistent with consolidation and long-term loss of the fill material from
underneath those structures. Although unable to estimate a percentage contribution from
each factor, SE attributed the settlement of the fill material to the following:
poor compaction of the fill material
saturation of the fill material over an extended period of time
runoff overflow from the adjoining areas
lack of drainage to divert surface water away from the pool area.
SE concluded the settlement of the pool pavers and the concrete slab stairway pathway was
not due to the March 2021 storm event, but had instead been occurring over a period of
years.
On that basis the insurer declined the pool area component of the claim. The insurer refers to
the following policy exclusions:
damage due to inherent defects, structural defects, faulty workmanship, faulty design
any gradual process
wear, tear, rust, corrosion, depreciation or gradual deterioration
settling, shrinkage or expansion in buildings, foundations, walls or pavements
erosion, subsidence, landslide or earth movement occurring more than 72 hours after
an insured event.
After t he complainant disputed the insurer’s decision , and during the course of this complaint,
the insurer offered to arrange for an independent engineer to thoroughly re-assess the
damage to determine whether it should be covered. The complainant declined that offer.
Complainant says insurer’s expert findings are incorrect and incomplete
The complainant says S E’s report is inadequate. He says SE did not undertake any soil
testing to confirm the property is founded on clay soil, and that SE has made assumptions in
its report rather than providing findings based on its own observations.
The complainant points out he notified the insurer its report and its decision were incorrect (at
the initial stages of the claim), in order to prompt the insurer to undertake a further
assessment. He says his requests were ignored.
Determination | Case number: 847020 Page 4 of 8
The complainant and his neighbouring lot owners engaged an engineer (TC) to undertake an
assessment. TC confirmed the riverbank property has been founded on sand, which is not
subject to any movement. The complainant submits that this finding alone proves SE’s report
was based on assumptions and is factually incorrect.
I note, however, that TC did state more testing would be needed to confirm the presence or
otherwise of clay under the stone (pebble) layer. As well, the complainant has acknowledged
that consideration of the paved pool area was not within the direct purview of instructions to
that engineer, who only had limited relevant information.
The complainant also engaged a builder (BB) to report on the cause of damage. BB reported
in the following general terms only, with no detailed explanation:
pavers have been washed away consistent with intense rain
it may be long-term but cannot be assessed due to the absence of pre-event photos
paving ‘by observation’ was constructed as per the building code
cracks to the pool plumbing most likely caused by the pressure of heavy rain
flood undermined the foundation resulting in damage to the retaining wall.
The complainant’s view is as follows:
in issuing its decision, the insurer knew that SE ’s report was incomplete and its findings
were inaccurate
majority of the reasons outlined by SE attributing the damage to settlement are caused by
rainwater runoff
the policy covers subsidence due to soil erosion if it occurs during the first 72 hours of the
rainwater event
he believes another assessment would not provide any useful information, because of the
time which has elapsed since the insured event
policy exclusions of defect and design would not apply because the complainant was
unaware of those issues: the policy covers damage if it is due to an insured event and if a
reasonable person is unaware of the defect and design issues
at no point has the insurer acknowledged it erred in its assessment or decision
if the exclusion cannot be applied as the report is inconclusive, then the policy should be
allowed to respond in full.
Section 54 of Insurance Contracts Act 1984 (Cth) (the Act) does not apply/assist
The complainant has also raised section 54 of the Act as a relevant consideration in this
complaint. He believes that prevents the insurer from declining the claim.
The point of section 54 is to strike a fair balance between the interests of the insurer and
insured with respect to a contractual term designed to protect the insurer from an increase in
the risk during the period of insurance cover.
The section provides that an insurer may not refuse to pay a claim because of some act or
omission of the insured that occurred after the contract of insurance was entered into – as
long as the insured can show that the act or omission could not reasonably be regarded as
being capable of causing or contributing to any part of the loss that gave rise to the claim.
It is not clear how the complainant believes this section should apply to the facts in this
matter. I am not satisfied it is a relevant consideration, nor that it assists the complainant.
Determination | Case number: 847020 Page 5 of 8
Insurer to undertake another assessment
While there was damage identified to the pool area after the storm/flooding events (plumbing,
paving and fence), there are questions about the age/timing and proximate cause of that
damage, and the evidence indicates the likelihood that there were other longer-term factors
involved (as seen, for example, in cracking of certain tiles). I do not consider the currently
available expert evidence or submissions from either party to be sufficiently compelling or
conclusive for a final claim decision to be made about cover for the disputed damage at this
stage. I note, for example:
BB’s report lacks detail and justification/explanation for its statements
while TC says the property was founded on sandy soils, it has not undertaken any
site-specific testing. Rather, its testing was generic, relating to a group of lot owners
TC does not specifically address or provide a conclusion as to the cause of the
disputed damage to the complainant’s own property
even if the complainant’s property was founded on sand, there is not sufficient
information to confirm the damage around the pool was ‘ accidental ’ and from the
specific storm event, rather than being longer-term
at the same time, SE’s findings appear quite broad and generic , and the insurer has
acknowledged the complainant’s concerns about the adequacy of its expert reports.
In the particular circumstances, it is fair and reasonable that there be a further assessment by
an appropriately qualified expert to establish the proximate cause of the disputed damage
and provide a scope of work for repairs for any damage found to be claim-related and not
otherwise excluded.
Within 14 days of the complainant accepting this determination:
the insurer is required to provide the complainant with the details of two appropriately
qualified and experienced independent engineers who have not previously been involved
in this claim
within a further 14 days, the complainant is to choose one of the engineers to conduct the
re-assessment and advise the insurer of his choice
the insurer is required to promptly engage the chosen engineer and arrange for the
necessary assessment, report and scope as soon as possible; immediately provide a copy
of the report and scope to the complainant; issue a claims decision within 21 days of
receiving the report and then promptly settle the claim to the extent damage (if any) is
found to be claim-related.
I acknowledge there may be issues impacting timing of the assessment and report (for
example, with the chosen engineer’s availability), however the parties are to work together
co-operatively to facilitate finalisation of this as soon as reasonably practicable.
To be clear, however, if the complainant does not accept this determination and a further
assessment is not carried out, then the insurer is not liable for the disputed damage. That is
because I am not satisfied the currently available evidence is sufficient to establish it all falls
within the scope of cover.
Complainant not entitled to reimbursement of professional fees
The complainant is also claiming for professional costs incurred (around $15,000) for the
assessments/reports he is relying on (from BB and TC, which includes advice from
geotechnical adviser JK).
Determination | Case number: 847020 Page 6 of 8
I do not consider the insurer should be required to pay for these costs, because the latter
reports discuss the riverbank and its stabilisation more generally, rather than the
complainant’s property and the claimed damage specifically (and, I understand, were not
personally commissioned by the complainant for his sole use) ; and BB’s report does not, in
any case, include a detailed explanation of the cause of the damage, or address the possible
excluded factors.
The complainant’s reports have not assisted in establishing his position nor resolving the
claim at this stage.
Insurer is required to increase compensation for non-financial loss
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of:
physical inconvenience
time taken to resolve a situation, or
interference with the complainant’s expectations of enjoyment or peace of mind.
When assessing whether to award compensation AFCA expects complainants to:
be moderately robust
bear the normal degree of inconvenience to be reasonably expected when a problem
occurs, and
taken reasonable steps to minimise the inconvenience suffered.
The complainant has raised several issues regarding the insurer’s handling of the claim and
what he says were the insurer’s inadequate responses. He says the insurer’s claims
management was sub-standard (including breaching the relevant industry code of practice on
multiple occasions, and referring to an incorrect PDS in initial investigations) and also that
there were extensive delays in it reaching a claims decision.
The question is whether the delays were caused by the insurer’s actions , and the extent to
which this (and its overall handling of the matter, including the adequacy of its expert reports)
caused the complainant an unusual and significant degree of upset and inconvenience.
The claim was lodged in April 2021. It was in February 2022 that the insurer offered a re-
assessment of the damage and scope of works, after the expert evidence available up to that
point, and the parties’ respective responses, had not produced a conclusive outcome.
The lengthy overall delays (as well as other issues with response times and communication
from the insurer in the meantime) have caused significant upset and inconvenience to the
complainant, as well as creating a loss of confidence.
The insurer has offered $1,500 as non-financial loss in recognition of any inconvenience
caused to the complainant. It has acknowledged and, it says, addressed the complainant’s
concerns about breaches of the industry code of practice.
In the circumstances, I consider it appropriate that compensation for non-financial loss be
increased to $2,000.
2.2 Why is the outcome fair?
The insurer’s offer to arrange for an independent re -assessment of the damage by an
appropriately qualified expert is fair in the circumstances, as it will allow the opportunity to
more accurately identify the cause, and scope of claim-related repairs (if any).
Determination | Case number: 847020 Page 7 of 8
I appreciate this will involve further time and effort by the parties, but it should also provide
more certainty and a reasonable and fair conclusion of the claim and complaint.
Determination | Case number: 847020 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.