Determination 846296
Escape of liquid damage to bathroom vanity; cash settlement amount disputed and claim delayed
Summary
The complainant claimed escape of water damage to a bathroom vanity and disputed the insurer's cash settlement offer, which was increased to $3,000. AFCA found the insurer's quote insufficient, ordered settlement based on an updated quote from the complainant's builder and ordered $1,250 compensation for delay and poor claims handling.
The insurer's quote did not adequately assess repair costs, and it failed to arrange the agreed building consultant inspection, so settlement should be based on the complainant's repairer's updated quote, and unreasonable delay warranted non-financial loss compensation.
Issues
- Claim amount dispute primary · upheld
“The insurer's quote is not sufficient to repair the observed damage... settlement should be based on an updated quote from this repairer.”
- Poor claim handling secondary · upheld
“Poor claims handling delayed the claim and caused an unusual extent of inconvenience for the complainant.”
- Delay secondary · upheld
“The insurer did not proceed as agreed with the building consultant inspection and has not explained why; delays were avoidable.”
Subjects and remedies
pay non financial lossreassess claim
Text of the determination
Determination
Case number 846296
Financial firm Allianz Australia General Insurance Limited
Case number: 846296 26 August 2022
Determination | Case number: 846296 Page 2 of 6
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy underwritten by the financial
firm (insurer).
On 27 March 2021, the complainant lodged a claim for damage to the bathroom at her home.
A water leak from the cold water tap extensively damaged the vanity unit.
The insurer agreed to cover the damage. As the complainant wanted to use her own builder,
the insurer offered a cash settlement. It assessed the damage at $2,035. The complainant
refused the offer, seeking $15,697.02 based on her quote for the damage. The insurer
increased its offer to $3,000 but this was also refused.
The complainant says the insurer should be liable to repair the damage in full.
1.2 Issues and key findings
Is the insurer liable to increase its settlement offer?
Yes. The insurer’s quote is not sufficient to repair the observed damage. The insurer offered
to obtain an independent building consultant’s view and the complainant accepted this. The
insurer did not proceed as agreed and has not explained why. In the absence of this report,
the only viable quote to repair the damage is from the complainant’s repairer. The insurer
should settle the complainant based on an updated quote from this repairer.
Is the insurer required to pay compensation?
Yes. Poor claims handling delayed the claim and caused an unusual extent of inconvenience
for the complainant. The insurer must pay compensation of $1,250.
Why is the outcome fair?
The insurer failed to determine a fair amount to repair the damage, despite ample time and
opportunity. It is therefore fair that the complainant be able to use her nominated repairer to
do the work, based on a new quote. Given the delays involved, the failure to address the
complaint properly and the frustration and distress this caused for the complainant, it is fair
that the insurer should pay compensation.
1.3 Determination
This determination is in favour of the complainant.
The complainant should obtain a new quote from builder ‘CC’ to account for any change in
costs. This quote must be based on the same scope of works CC prepared in 2021. The
insurer may then either authorise the repairs through CC or pay the amount of the updated
quote, with a 10% contingency for the loss of the lifetime guarantee and possible additional
costs. There is no need to pay interest as the new quote will be immediately actionable.
The insurer must also pay the complainant compensation of $1,250.
Determination | Case number: 846296 Page 3 of 6
2 Reasons for determination
2.1 Is the insurer liable to increase its settlement offer?
Yes. The insurer’s quote is not sufficient to repair the observed damage. The insurer offered
to obtain an independent building consultant’s view and the complainant accepted this. The
insurer did not proceed as agreed and has not explained why. In the absence of this report,
the onl y viable quote to repair the damage is from the complainant’s repairer. The insurer
should settle the complainant based on an updated quote from this repairer.
Complainant says insurer has not properly considered the water damage
The complainant discovered damage to the bathroom vanity unit on or about 27 March 2021
and lodged a claim with the insurer.
Water escaped from a leaking cold water tap causing damage to the vanity unit. The
complainant has since attended to the source of the leak.
The insurer prepared a quote to repair the damage. The complainant believes this quote is
inadequate. She obtained two independent quotes which exceed what the insurer has
quoted. She wants authority for her preferred builder (CC) to attend to this work.
Damage caused by escape of liquid affected the vanity unit in the bathroom
The insurer arranged for builder ‘MK’ to inspect the damage to the insured home. MK notes:
the collapsed shelving removed a section of the rear panel of the vanity unit
the chipboard construction of the vanity has no water resistance
mould was identified and remediation arranged
it recommends settlement for $2,035, as the complainant wants to use her own builder.
Photos show extensive rotting of the chipboard under the vanity unit.
The complainant later provided a repair quote from CC for $15,697.02. MK considers this
‘excessive’ saying it quoted to completely renovate the bathroom.
CC’s quote of 16 June 2021 included removing and refitting the shower screen, some fixtures
and the bathtub. It also included new tiles, concrete bedding and other considerations.
The complainant says CC ’s quote is to repair the damage caused by the leak. It is not a
renovation. She says CC confirmed the vanity must be replaced due to the extent of damage.
This requires extra work as the vanity was built into the bathroom itself.
The complainant later obtained a second quote from ‘PB’ for $22,378.55 on 24 January 2022.
She prefers that CC attends to the work.
MK later detailed discussions with cabin et maker ‘RC’ about the proposed repairs. RC doubts
there was any waterproofing to the wall behind the vanity. It considers any repairs will ‘most
likely not disturb any of the tiles’ as part of the repair process.
Policy covers losses caused by an escape of liquid
It is not in dispute that the complainant has a valid claim for damage caused by the escape of
liquid, and that the insurer is liable for the reasonable repair cost. In settling a claim, the PDS
says the insurer will pay:
Determination | Case number: 846296 Page 4 of 6
to match materials, items or construction with those that existed before the loss
or damage occurred or, where that is not possible, with the nearest similar
materials, items or construction, and
only those costs that directly apply to the part of your property that has suffered
the loss or damage.
The PDS says the insurer may choose to pay:
the reasonable cost of repair, or
the reasonable costs of replacement to new condition with property of the same
size and specification or with items as near to original as is currently possible, or
a cash amount. If we agree to pay cash, we’ll pay the amount it would
reasonably cost to repair or replace the property.
Insurer was meant to arrange for a building consultant to visit the property
The concern in relation to this matter relates to whether the insurer has adequately estimated
the repair cost, so the claim may be settled.
The insurer says the CC and PB quotes are for a full renovation of the bathroom. It says it is
not liable for this. Given CC is the more competitive of the two complainant quotes, I have not
considered the PB quote.
I accept it is not the intent of the policy to cover the costs to renovate the bathroom. CC’s
quote includes items that may not have been affected by the claimed loss. The insurer has
not addressed what should or should not be covered from this quote. I accept some tiles may
require replacement and the bath may be affected as it is adjacent (and possibly fixed) to the
vanity unit. It is not clear why (for example) the shower is included in the quote.
A photo from the complainant shows the base of the vanity is destroyed and will have to be
replaced. This is not included in MK’s scope of works. RC’s concerns about the tiles and lack
of surety about whether they require replacement also raises doubts abo ut MK’s quote.
To address these issues, the insurer offered to arrange for an independent building
consultant to attend the property in April 2022. The consultant was to review the damage and
prepare a scope of works for the consideration of both parties. The insurer offered this on the
basis that both parties agree to be bound by the outcome.
The complainant accepted this offer. However, there is no evidence the insurer retained a
building consultant or arranged the inspection. The insurer has also not responded to
repeated requests about completing this inspection. The complainant says no building
consultant attended her home. She says a plumber came but was unsure of why he was
there. No report has been submitted.
Insurer is to cover the cost of CC’s re pairs based on a new quote
I n the absence of the building consultant’s report and in the interest of resolving the matter, I
consider settlement should be based on CC’s scope of works. It is the most complete quote
provided to address the claimed damage.
The MK quote is not reasonable because it does not address the likelihood that the tiles and
bath will be damaged during the vanity repair process. It also does not address the vanity
Determination | Case number: 846296 Page 5 of 6
floor damage. I am not satisfied MK’s quote is complete or thorough enoug h to repair all the
damage. I also consider I should not speculate on how much this quote should be increased.
Noting the insurer’s responsibility to pay the ‘amount it would reasonably cost to repair or
replace the property’, it is fair the settlement should be based on CC’s quote. Whilst I accept
this quote may include items which are not damaged, this does not mean these items do not
require attention as part of the repairs.
The complainant pointed out the construction of the vanity meant its repair or removal may be
difficult. There is no evidence to contradict this view. I accept CC should be permitted to
finalise a new quote based on current prices. This means the quote should be sufficient to
cover all claim-related damage. Once this is done, the insurer may either:
authorise repairs through CC, or
cash settle the complainant based on the updated quote, including a 10% contingency for
the loss of the lifetime guarantee and possible additional repairs. It will then be up to the
complainant to arrange the repairs with CC directly.
2.2 Is the insurer required to pay compensation?
Yes. Poor claims handling delayed the claim and caused an unusual extent of inconvenience
for the complainant. The insurer must pay compensation of $1,250.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a person’s expectation of enjoyment and/or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. We expect
complainants to be moderately robust, and we will not award compensation for the ordinary
degree of inconvenience involved in making a claim.
Insurer delayed the matter unnecessarily and must pay compensation of $1,250
This matter has been delayed and it is nearly a year and a half since the claim was lodged. I
accept the insurer is principally responsible for these delays.
The insurer failed to respond to queries on time, or at all on some occasions. It did not
address the issues with MK’s quote. Its failure to arrange a new inspection by a building
consultant further delayed the matter and upset the complainant.
These delays were avoidable. I accept this caused the complainant an unusual degree of
stress and unnecessarily delayed the resolution of the claim. This interfered with the
co mplainant’s expectation of enjoyment and peace of mind. It is appropriate that the insurer
pay compensation of $1,250.
Determination | Case number: 846296 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.