Insurer declined disputed subsidence and water leak damage claim as caused by excluded ground movement
Text of the determination
Determination
Case number 846021
Financial firm AAI Limited
Determination | Case number: 846021 Page 2 of 10
Case number: 846021 11 October 2022
1 Determination overview
1.1 Complaint
The complainants held a home and contents insurance policy with the financial firm (insurer).
They lodged claims on 11 October 2017 and 11 June 2020 for cracking damage to the
property. The later claim was made when they discovered water leaks from their plumbing.
The insurer accepted part of the claimed damage but has declined the rest saying it is due to
ground movement and subsidence unrelated to the water leak. The insurer assessed its
liability as $4,408.77.
The complainants disagree and say the water leak has caused substantial damage, and the
property now needs underpinning of its foundations. Further, the complainants seek
reimbursement of the professional fees they incurred while pursuing their claim.
1.2 Issues and key findings
Can the insurer decline the disputed repair work?
Yes. The evidence does not show the complainants are entitled to claim the disputed
damage.
Are the complainants entitled to professional fees?
Yes. However, the complainants are only entitled to the plumber’s fees incurred as this
assisted with locating claimable damage. Their engineer’s report did not assist, and
accordingly, the report fee is not awarded.
1.3 Determination
This determination is substantially in favour of the insurer.
If accepted by the complainants, the insurer is entitled to settle the claim for its assessed
liability as set out in section 2.1. The insurer must also settle the complainants’ plumbing
inspection fees in line with section 2.2 below.
Determination | Case number: 846021 Page 3 of 10
2 Reasons for determination
2.1 Can the insurer decline the disputed repair work?
Policy covers insured events, subject to conditions and exclusions
The policy covering the insured property is an insured event policy. This means the policy will
cover the cost of repairing the property up to the policy limits where the cause of the damage
is one of the listed events in the policy.
Relevant to this dispute, water leaking from a tank or fixed pipe falls within the escape of
liquid insured event.
There is no dispute there was an escape of liquid event. The insurer has accepted some of
the damage to the property was contributed to by this event.
The issue is whether this event caused the disputed damage to the property. The insurer
says this was caused by general ground movement unrelated to the leaking plumbing.
In order to determine whether the policy responds to cover the disputed damage, it is
necessary to determine the proximate cause of the loss.
Where there are multiple potential causes of the loss, we consider each to determine its
qualities of predominance and effectiveness as the cause of the damage. Courts have said
the proximate cause is the real, dominant, or effective cause of the loss. It is not necessarily
the cause that most immediately preceded the damage.
On balance, proximate cause of the disputed damage is excluded
The panel is satisfied the insurer is entitled to decline the disputed damage. This is because,
on balance, the disputed damage falls within the policy exclusion for ground movement.
Details of the relevant exclusion are included in section 3 of this determination.
There are several reasons the panel accepts the ground movement is the dominant cause of
the loss or damage. It is noted the property is 30 years old, meaning there has been sufficient
time for damage to happen over the life of the property.
This includes ground movement which is something that occurs naturally to buildings as they
age. The details on how this occurs is described by the insurer’s engineer (JH) and the
complainant’s engineer (CE) in their reports when discussing the cause of the movement.
CE’s evidence is particularly compelling as it explains the mechanism by which the patio slab
ratchets away from the building slab as seasonal movement creates a space between them,
which fills with debris over time.
None of the engineers have accepted the proximate cause of the disputed damage was any
leak.
Considering the evidence of pipes embedded in the concrete slab, the cracks occurring to the
tops of the pipes or the pipes failing due to shearing, the panel is satisfied the pipes were
likely damaged because of the movement and are not the cause of it. The panel is also
satisfied the location of the damage to the pipes and the seal at the tank would mean water
leaks would be a rare occurrence, likely only during times of heavy use.
Determination | Case number: 846021 Page 4 of 10
Complainants’ rebuttal has not advanced their position
The panel is not persuaded by the complainants’ position the water leaks have washed out
the soil which has led to th e undermining of the property foundations. The insurer’s position is
more supported by the evidence.
The complainants’ plumber (OP) has supplied his view the water leak has caused the
foundation movement. The complainants’ builder (SB) also confirmed a si milar view in his
repair quote. However, neither gives sufficient details for their reasoning, nor do they appear
to be sufficiently qualified to provide comment on foundation movement as the engineers do.
The panel also notes the subsidence claimed extends well away from the detected leaks,
including the full length of the western edge of the property. The panel does not see any
evidence explaining why the water has undermined some parts of the property but not others.
The panel also finds JH’s evidence m ore compelling that the water would travel away from
the property.
The exact nature of the water leaks, how much water was released, and when conditions
occurred to release water from the pipes or the tanks is not known. Theoretical evidence is
provided, but little in the way of corroborating evidence other than the presence of
subsidence.
There is no information showing when the tank seal failed, or even if the seal was in place to
begin with. The complainants say water would escape in a pressurised fashion when the
tanks were full, and the property experienced heavy rain periods where this could occur.
However, there is little evidence confirming this event or linking it to the extent of the damage
claimed. Importantly, none of the engineers support this theory as the cause of damage.
Alternatively, the engineers have concluded there is another mechanism which does explain
the subsidence. This is the settlement of the fill material over time and different effects on the
different foundations.
The complainants have the onus to show its more likely than not that the insured event, being
water escaping from the tank, is the dominant cause of the disputed damage. The available
information does not establish this. Instead, the insurer’s position is support ed by the views of
several of the more qualified experts. Accordingly, and on balance, this view is the most
supported by evidence.
Finally, the complainants have explained the experts said different things on site versus what
they wrote in the reports. Unfortunately, this does not assist the complainants as they still
hold the onus to show evidence in support of their position. Reporting what was said on site is
not sufficient to overturn the views expressed in the written reports.
When considering all the available information, the panel is satisfied the insurer is entitled to
decline the disputed damage. There is insufficient evidence linking the claimed subsidence
and resulting damage to the water leaks. It is fair the insurer declines the claim in those
circumstances.
Insurer may settle the claim with appropriate contingencies
Given the recommendations for underpinning the property, it is more expedient to resolve the
claim with a cash settlement to the complainants for the repairs the insurer has accepted.
The insurer has supplied a liability quote of $4,408.77 which is dated 11 April 2022. The
insurer is to provide an uplift on this value when it settles the claim.
Determination | Case number: 846021 Page 5 of 10
This is because the quote supplied is a liability quote only and is not necessarily a true
reflection of the costs the complainants will incur. Also, given the recent volatility of the cost of
building materials and accessing trades, the complainants must be compensated for the
transfer of risk involved with this settlement method. Finally, the insurer must also provide
additional compensation for the loss of any repair guarantee the policy would otherwise offer,
and the effort involved in organising the work the insurer otherwise would.
Accordingly, the insurer must increase its offer by 20% to account for these factors.
2.2 Are the complainants entitled to professional fees?
Complainants are entitled to plumber’s fees
Under the AFCA Rules, we can require the insurer to reimburse a complainant for costs
incurred in making a complaint. We consider whether the fees incurred were reasonable and
whether they helped resolve the complaint.
The expert fees claimed by the complainants are for their plumber’s investigation and the
engineer’s report. The panel accepts the insurer should reimburse the complainants’ plumber
fees. This is because this information caused the insurer to change its position on some of
the claimed damage.
However, the engineer’s fees are not awarded. CE’s report did not change the outcome of the
claim or the complaint. The insurer had already organised one engineer in 2017, and another
in 2020 along with multiple reviews. Accordingly, it is not reasonable the insurer covers a third
opinion which generally agreed with the findings of the first two.
2.3 Why is the outcome fair?
This is a fair outcome as the complainants have not shown the cause of the damage is due to
an insured event. Given this, it is fair the insurer declines the damage.
Determination | Case number: 846021 Page 6 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 846021 Page 7 of 10
3.2 Relevant insurance policy information
Escape of liquid
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and
sewage systems (not forming part of a shower cubicle wall, floor or base);
fixed tanks;
…
General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement, but we will cover landslide or subsidence that is specifically covered under
the following insured events:
‘Storm’;
‘Flood’;
‘Earthquake and Tsunami’;
‘Explosion’.
Glossary of important words and phrases
Event or incident
means a single event, accident or occurrence which you did not intend or expect to happen.
Determination | Case number: 846021 Page 8 of 10
3.3 Expert evidence summary
Record Key points
Insurer ’s e ngineer ( MC )
Structural inspection r eport
20 November 2017
eastern section of the veranda has settled and moved away from
the residence
one section of the veranda rests on fill which consolidates
naturally, while another rests on the water tanks creating a
differential in settlement
no evidence water tanks are leaking, and evidence is not
consistent with localised movement around the sub soil drainage
pipe
veranda slab has been constructed separately to the building slab,
but is supporting p art of the building roof while sharing the building
footings and wat er tanks for its own support
movement of the veranda has led to damage to the roof and
flashing and water damage within the property
cracking of the ceiling lining is due to normal movemen t as the
cracks follow the weak points at sheet joins.
Insurer’s plumber (AB)
Leak det ection r eport
10 November 2017
CCTV inspection report indicates no leaks and underground
plumbing in good condition
first flush diverter has a constant drip
rust and holes visible in the gutters above the veranda.
Insurer ’s e ngineer ( MC )
Supplement ary letter
20 November 2017
some gutter corrosion may res ult in some minor localised
settlement
damage is due to long term settlement and not related to an
insured event.
Complainan t s ’ plumber ( OP )
Report
11 June 2020
sewer pipe sheared off at Y joint 200mm from edge of the slab
sewer pipe would leak each time the bathroom was used
contributing to footing movement
all three stormwater connections to the underground tanks a re
cracked with signs water has undermined the slab
professional opinion is the cracked pipes have caused foundation
movement.
Insurer’s plumber (AB)
Escape of liquid report
19 June 2020
damage to rear blockwork and bedroom two internal wall near the
veranda slab may be related to undermined soil around rear slab
footing
dual assessment recommended.
Insurer’s engineer (JH)
Site inspection report
16 July 2020
undermined section of foundation adjacent to leaking storm water
pipe
removed central section of veranda pavement revealed a sheared
off sewer waste pipe embedded in the concret e
inadequate cover between foundation slab and PVC pipes
observed in both locations
hydraulic level survey shows differential movement between
Determination | Case number: 846021 Page 9 of 10
Record Key points
building foundations and rear veranda subsidence consistent with
fill settlement
extent of foundation movement is significant and causing tensile
stress leading to the cracking damage
available evidence indicates movement occurring over an
extended period of time
settlement has occurr ed first which has led to the cracked pipes
property needs structural stabilisation including underpinning and
relocation of the plumbing services.
Complainants’ engineer (CE)
Site inspection report
8 March 2021
disagrees with JH assessment there is a substantial slope in the
patio slab resulting in the cracking damage
slope is consistent with a properly constructed slab which drains
away from the building
JH approach to recording settlement is giving a false impression
and is relying on a single data p oint instead of comparative data
points
concrete masonry walls of the water tanks form a very stiff and
deep footing for the patio slab
differential settlement occurring between patio slab and slab on fill
gaps under the patio slab consistent with subsidence of the fill
movement of patio slab away from the building consistent with a
slab which was not built as part of the building slab or connected
to it
each season the patio slab ratchets away from the dwelling
movement is minor and can be conceale d with flexible sealant.
Complainants’ builder (SB)
Builders scope of work
19 May 2022
based on MM’s site visit, there is obvious differential settlement
across the western end of the dwelling
leaking from underground tanks has likely compromis ed the stri p
footings due to over wetting, leading to the settlement.
Insurer’s engineer (JH)
Supplement ary report
30 August 2021
CE’s report is mostly in agreement with the causation conclusions
available evidence indicates uneven ground movement has
occurred due to varying bearing capacities of the foundations
damage is not caused by a single event and has happened over
time
Insurer’s engineer (JH)
Supplement ary site inspection
report
15 June 2022
water from the two main leaks likely to move away from the house
based on site topography
movement damage occurring to each and every section of the
dwelling rather than confined around the leak areas
damage is consistent with age of the building and slope is within
building toleranc es
missing water tank seal only contributes when the tank was full
and would only be expected two or three times a year
tank leak would also be an ongoing cause since construction (30
years ago) rather than something recent
cracked pipes could be caused by movement, rather than being
Determination | Case number: 846021 Page 10 of 10
Record Key points
the cause of the movement, and cracks are to the tops of the
pipes meaning leaks would require pipe to be carrying a high
volume of water to leak
leak cannot be fully dismissed as a contributing factor to the
damage in the north western corner bedroom
contri bution of the leak is 10% to the damage in this area
influence of the leak is not substantial given the location and
nature of the leak compared to the location of the cracking
damage elsewhere in the property
subsidence of the patio is in the north easter n corner
patch cracking and paint bedroom two damage, and patch and
disguise brickwork damage at north west corner.
\