Claim 2 (clay pipes/subfloor) declined as ground movement and maintenance exclusions; Claim 1 cash settlement amount disputed
Text of the determination
Determination
Case number 845158
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 845158 Page 1 of 9
Case number: 845158 8 July 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the
insurer). He lodged a claim in May 2020 for damage caused by an escape of liquid event
(Previous Claim). The insurer assessed the damage, which was noted to be soft and bubbling
plasterboard in the hallway near the main bathroom. The claim was then withdrawn as the
repair costs were below the policy excess, and the cause was maintenance-related.
In October 2021, the complainant noticed further water damage, which is being dealt with
under two separate claims: Claim 1 for damage following an escape of liquid event from a
leak in the upstairs bathroom; and Claim 2 for cracked clay pipes and subfloor damage under
the downstairs (main) bathroom.
The insurer has accepted only some of the resultant damage under Claim 1, and has
declined Claim 2. The complainant disputes those decisions. He believes the downstairs
damage (Claim 2) is related to the leak from upstairs (Claim 1).
The complainant has now repaired all the damage. He is claiming partial costs of $23,946.15.
In addition, the complainant believes the assessor provided misleading information to the
insurer, and that the insurer has engaged in other improper conduct.
1.2 Issues and key findings
Is the insurer entitled to decline Claim 2?
The available evidence does not establish the damage to the clay pipes and subfloor was
caused by the escape of liquid event notified under Claim 1. Instead, on balance, the
proximate cause of that damage was ground movement over time, which is what cracked the
clay pipes in the first place and then allowed water to escape. Ground movement is a policy
exclusion. Other damage in the subfloor area is, on balance, from longer term deterioration
and unrepaired maintenance issues identified under the Previous Claim. That means the
insurer is entitled to decline Claim 2.
What is a fair cash settlement for Claim 1?
There is no dispute there was an escape of liquid event from a leak in the upstairs bathroom.
That means the insurer is liable for the resultant internal water damage, which it has offered
to cash settle. It is also liable for exploratory costs in locating the leak.
However, t he insurer’s repair estimates do not include exploratory costs; nor have they been
shown to be based on quotes actionable by the complainant as a retail customer. The cash
settlement for Claim 1 should be $6,706.35 (as explained further in section 2.2 below).
Why is the outcome fair?
The outcome is fair because the available evidence does not establish the additional damage
and costs being claimed fall within the scope of cover under the policy.
Determination | Case number: 845158 Page 2 of 9
The policy provides cover for damage from an escape of liquid event, but does not extend to
covering the cost of repairing the source of the leak. Nor does it cover damage resulting from
specifically excluded causes such as ground movement, maintenance issues, gradual
deterioration or matters of which the complainant is aware but has failed to rectify.
While the complainant has expressed concern about the handling of the claim by the insurer
and its representatives, the available evidence does not establish inappropriate or
unreasonable behaviour overall, and so it would not be fair to require a compensation
payment in the circumstances.
1.3 Determination
The determination is substantially in favour of the insurer. It is required to cash settle the
complainant $6,706.35, together with statutory interest on that amount, calculated from 26
November 2021 to the date of settlement.
It is not required to take any other action.
Determination | Case number: 845158 Page 3 of 9
2 Reasons for determination
Damage being considered under separate claims
On 12 October 2021, the complainant reported damage as follows:
Failed membrane and waterproofing barriers discovered under house. Water has
been escaping from broken fixed pipes from two (2) bathrooms without knowledge
until recently when upstairs bathroom flooded the ceiling and walls below in
downstairs bathroom. Found water has affected support timbers under house and
gyprock walls downstairs have bubbled with ongoing slow leak water damage.
Affected by escaping water some of sub-floor brick piers have sunk 5-40mm
It was during the course of investigations into that reported damage that the complainant says
he was advised he would be required to lodge a second separate claim.
Accordingly, the matters were separated and dealt with as follows:
Advised to put in two claims by Assessor from MK*.
[Claim 1]…relates to the upstairs bathroom liquid escape. Burst pipe caused
flooding to downstairs ceiling and walls.
[Claim 2] relates to downstairs bathroom, discovered broken pipes have been free
spilling under house caused some brick piers to sink 5mm-40mm + Wood rot to
some timber supports. Discovered mould present on timbers. Unsure of full extent
of damage being checked during strip out.
2.1 Is insurer entitled to decline Claim 2 (clay pipes/subfloor)?
Onus on the complainant to establish a valid claim
The complainant carries the initial onus to establish, on balance, any claimed loss or damage
arose from an insured event and is covered under the terms and conditions of the policy. This
is known as establishing a valid or prima facie claim.
Once this is established, the onus shifts to the insurer to show, on the balance of
probabilities, the loss claimed falls within a policy exclusion or that it is otherwise entitled to
decline the claim.
Policy covers listed insured events, subject to exclusions
The policy covers loss or damage caused by certain listed events, including loss or damage
from an escape of liquid. That is:
loss or damage caused by the accidental escape of liquid from any fixed pipe,
fixed tank, waterbed, fish tank, or fixed item used to hold liquid…
The Product Disclosure Statement (PDS) goes on to make it clear, however, that cover for an
escape of liquid does not include:
Determination | Case number: 845158 Page 4 of 9
escape of liquid which is evident and which you fail to rectify
loss, damage or repairs to the item from which the liquid escaped, and if the liquid
escaped from a shower recess, shower base or wet room, the associated cost of re-
tiling or waterproofing the walls or floor of the shower recess, shower base or wet
room.
The policy also specifically excludes cover for damage which is caused by (amongst other
things):
wear, tear and gradual deterioration
earth or soil movement and settling (unless it is the direct result of an insured event)
lack of maintenance.
Need to establish the proximate cause of the damage
The complainant needs to show the proximate cause of the damage being claimed was, on
balance, an escape of liquid event which is not otherwise excluded.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have
to be the first, the last or the sole cause.
If there are several causes, each needs to be examined for qualities of reality, predominance
and efficiency to identify the proximate cause. For example, if one cause would have caused
the loss in any case, and the other one would not have done so without the first, then the first
is the proximate cause.
Reports indicate impact of water and ground movement over time
On 15 October 2021, the insurer ’s appointed builder MK undertook an assessment of the
damage.
In their 22 October 2021 report, MK noted two cracked drainage pipes in the subfloor from
which water had escaped, and found those pipes had been damaged due to ground
movement. Based on their assessment, MK recommended declining Claim 2 as the damaged
clay pipe work was not caused by the escape of liquid event from the upstairs bathroom.
MK also noted the fi ndings of the complainant’s plumber (AT), who reported on 22 September
2021, having been engaged to address both the issues with the broken clay pipes/subfloor
(Claim 2) and the leak from the upstairs bathroom (Claim 1).
In his report, AT notes:
found brick piers to have sunk over time. From 5mm to 40mm drop
pipe work (drainage) from downstairs bathroom have cracked and broken, most likely due
to movement in the ground
base of the [sewerage] stack has large mass tree roots entering the pipe causing restricted
flow to 20% and cause leaks
stormwater not currently operating and is blocked or no longer intact and rainwater may be
contributing to the undermining of the piers.
AT undertook various tests including a hydrostatic testing of the pipe work. This test
concluded, with regard to the upstairs bathroom:
signs of leaking where drainage stack work meets water proofing. This means the
connections where waterproofing is rolled into PCV drainage is not a complete
Determination | Case number: 845158 Page 5 of 9
seal. And causing leaks into downstairs bathroom. This issue would have been
amplified by the fact that the drainage was only operating at 20% due to blockage.
And regarding the downstairs bathroom, having identified failed membrane and waterproofing
barriers, AT said:
All other testing abandoned due to membrane and pipe work being broken and
leaking badly.
Engineer does not find damage linked to upstairs leak
The insurer then arranged for engineer AJE to comment on the cause of the broken clay
pipes and subsequent damage.
AJE attended the property on 10 February 2022 and noted that the leaking clay pipes and
timber floor joists had been replaced prior to his attendance. So AJE’s report takes account,
as well, of photographs (taken prior to repairs) which he said showed the natural ground
around the vicinity of the pipework was severely inundated, indicating ongoing water
migration from the plumbing pipework (escape of liquid).
The engineer reported evidence of long term water damage to the bottom wall plates in the
bathroom around the wall of the shower, significant corrosion and loss of material to the
formwork below the slab at the location of the shower consistent with ongoing water damage,
signs of damage to the timber floor joists below the shower. That was as well as water
staining to the ceiling joists above the bathroom corresponding to the upstairs bathroom.
He provided a clear diagram identifying separate areas of damage/leaking affecting the
ground floor bathroom: one from the wall behind the shower/shower spindle, one from the
clay pipes under the floor, one into the ceiling from the bathroom above.
With regard to the signs of water damage to the timber floor framework, AJE pointed out that
the evidence of efflorescence and corrosion to the formwork was indicative of failed
waterproofing membrane in the shower, which (together with a slow leak from the spindle
behind the waterproofing membrane) had allowed water to escape into the wall cavity.
AJE noted that terracotta clay pipes are susceptible to stress fractures and breakages caused
by ground movement, and that slight movement or settling in the ground around the pipe can
disturb couplings and create water leaks and allow water to escape. AJE concluded that in
this case the cause of the movement was related to general ground reactivity causing slight
movement in the pipework, which had in turn caused the breakage and subsequent leak from
the clay pipes.
On balance, ‘ escape of liquid ’ was not the proximate cause of the damage
Having reviewed all the available evidence, I am not satisfied an escape of liquid from the
upstairs bathroom was the proximate cause of the damage to the clay pipes and underfloor
areas of the house.
The water which had been permeating for an extended period from the downstairs shower
wall had done so as a result of the maintenance-related issues with the shower spindle (of
which the complainant was made aware under the Previous Claim), combined with the
gradual deterioration of the failed waterproofing membrane. That means damage from that
source is excluded.
Determination | Case number: 845158 Page 6 of 9
As well, while water escaping from the broken clay pipes may have contributed to movement
in the piers, the available evidence shows it is more likely than not long term water ingress
into the subfloor (from the compromised downstairs shower) and general ground reactivity
which caused ground movement over time. In other words, the movement caused the clay
pipes to crack, which in turn caused more water to escape from the clay pipes – so the
proximate cause was the progressive ground movement. That is a policy exclusion.
To be clear, I have considered all the complainant’s submissions and detailed responses to
the insurer’s experts’ reports. He has not, however, provided compelling expert evidence to
refute the other evidence.
That means the insurer is entitled to decline Claim 2.
2.2 What is a fair cash settlement for Claim 1?
Previous Claim indicates an escape of liquid event was causing damage
Prior to lodgement of Claim 1, MK had attended the property on 15 May 2020 when the
complainant reported the plasterboard wall lining near the main (downstairs) bathroom was
soft and bubbling. This was considered under the Previous Claim.
During this assessment MK noted that the resultant damage was from a breach of the
tapware caused by deteriorated silicone. He assessed the resultant damage would cost
approximately $990 to repair.
MK said the complainant acknowledged and accepted that the repairs in the bathroom were
maintenance issues and therefore his responsibility. The complainant is reported to have also
acknowledged that MK’s assessment of the repair costs was below the policy excess, and so
the claim was withdrawn.
The evidence does not show the complainant then attended to comprehensive repair of (or
any further investigation into) the maintenance issues identified.
Insurer assessed and initially declined Claim 1
When investigating the new claims, MK noted the water damage to the living room
plasterboard wall (adjacent to the downstairs bathroom) was identical to the damage it had
identified under the Previous Claim as having been a leak from the shower spindles due to
deterioration and lack of maintenance.
The insurer therefore initially declined cover for the Claim 1 damage saying it had been
occurring gradually over a prolonged period, and was ‘in plain sight’ but had remained
unrepaired, which meant exclusions applied (for gradual deterioration, failure to maintain and
keep the property watertight).
However, following an internal review on 26 November 2021, the insurer did accept aspects
of Claim 1: namely, the damage to the ceilings of the downstairs bathroom and bedroom from
the leaking pipe in the upstairs bathroom. It maintained its denial of the living room wall
damage.
I consider it is fair that the insurer accepts the resultant damage under the claim.
Determination | Case number: 845158 Page 7 of 9
Insurer required to cash settle Claim 1
MK quoted the cost of repairs as $3,498 (as at 6 December 2021). A comparison quote
obtained by the insurer from AJ (dated 22 December 2021) was for $2,811.60.
The insurer did not accept the complainant’s own quote for $9,099.15 for the damage from
the upstairs leak (which appears to have been repaired by the complainant in
October/November 2021), since it was felt to be excessive. The complainant also provided a
quote for $5,755.20 for painting of those areas, although I note there is already an allowance
for base and top coats in the initial repair quote. The complainant’s separate quote for
exploratory work to locate the source of both the upstairs and downstairs damage was
$1,017.50.
T he complainant’s evidence of his repair costs is based on quotes, and not paid invoices, so
it is not clear exactly what he has paid for the solely claim-related work (and not including
additional work to allow, for example, for matching different areas not directly damaged by the
leak).
In making a cash settlement, the insurer is required under the policy to ‘pay the reasonable
costs of repair’. The insurer has not made a specific cash settlement offer.
I acknowledge the insurer’s quotes are significantly lower than the complainant’s. However, I
am not satisfied either of the insurer’s quotes is reasonable in the circumstances, although
they both appear to include the living room wall (which would cover off the resultant damage
originally identified under the Previous Claim).
That is because AJ’s quote was stated as not having been based on an actual site
attendance, and so there was the possibility the amount would not accurately reflect the
eve ntual cost. I am also not satisfied MK’s quote allowed for contingencies and the transfer of
risk to the complainant. As well, neither quote is stated as being actionable by the
complainant as a retail customer, and they do not, in any case, include an allowance for
exploratory costs in locating the upstairs leak (which is a policy entitlement).
I am also not satisfied the allowance for painting which is included in the insurer’s quotes
necessarily reflects the standard and quality which might reasonably be expected from a
suitably qualified and specialist tradesperson in that field.
In the particular circumstances, I consider it fair that the insurer cash settle the Claim 1
resultant damage repair costs for $6 ,197.60. That is based on MK’s quote of $3 ,498, but
increased by 20% to take account of the transfer of risk and contingencies; together with a
further allowance of $2,000 for painting.
It is fair the insurer also pays $508.75, which is half of the c omplainant’s exploratory costs.
That amounts to $6,706.35. The insurer is also required to pay statutory interest on that
amount, pursuant to section 57 of the Insurance Contracts Act 1984 ( Cth), calculated from 26
November 2021 until the date payment is made.
2.3 Why is the outcome fair?
The outcome is fair because the complainant has not established all the claimed damage was
the result of an insured event. The insurer has, in any case, shown exclusions apply.
I also acknowledge the complainant’s concerns about the way the claims have be en handled.
He has suggested, for example, the insurer’s assessor was deliberately untruthful and
Determination | Case number: 845158 Page 8 of 9
provided misleading information, and that the insurer did not act in line with its obligations
under the relevant industry Code. I appreciate there appears to have been some confusion at
times between the different claims, however, I am not persuaded on the available evidence
the insurer has acted unreasonably or inappropriately overall. It would not be fair to award
compensation in the circumstances.
Determination | Case number: 845158 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.