Home / IAG / Determination 843236

Determination 843236

Claim declined for cracking damage allegedly caused by leaking sewer pipe; insurer relied on settling and landslide/subsidence exclusions

FirmIAG
Decided2022-09-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$13,060
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under his home insurance for cracking damage he attributed to a leaking sewer pipe, and the insurer declined it under settling and subsidence exclusions. AFCA found the leak was the proximate cause, the exclusions did not apply, and ordered the claim accepted, underpinning costs, non-financial loss, expert and legal costs paid.

The proximate cause of the damage was the escape of liquid from a fixed pipe, and the settlement and landslide/subsidence exclusions do not apply to a continuing, gradual event.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay compensationpay interestpay non financial lossreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 843236 Financial firm Insurance Australia Limited Determination | Case number: 843236 Page 1 of 10 Case number: 843236 16 September 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer) and lodged a claim after noticing cracking damage to his property. The complainant says a leaking pipe caused damage at the property. The insurer declined the claim because it says the damage is due to settlement from natural causes. It says the damage is excluded under the policy. The complainant disagrees with the insurer’s assessment. The complainant wants the insurer to repair all damage caused by the leaking sewer pipe, reimburse him for the repairs/ underpinning of the footings, reimburse him the cost of his engineer’s report, pay his costs for dealing with the claim, and compensation for pain and suffering. 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. I am not satisfied the insurer has established the application of a relevant exclusion or condition. I am satisfied the proximate cause of the damage was the leaking pipe. It is fair in all the circumstances for the insurer to accept the claim. Is the complainant entitled to compensation? Yes. The insurer’s offer of non -financial loss compensation of $1,500 is fair. Should the insurer contribute to the complainant’s professional costs? I also consider it fair in all the circumstances for the insurer to pay the complainant for his expert reports and legal fees. 1.3 Determination This determination is in favour of the complainant. The insurer is to:  accept the claim under the terms and conditions of the policy  pay the complainant $10,025 for the underpinning works (subject to the complainant clarifying this is the total amount paid for these works). Interest is payable on any amount in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from the date of the invoice to the date of payment of the claim  pay the complainant $1,500 for non-financial loss compensation  pay the complainant $1,650 and $385 for his expert reports  pay the complainant $1,500 for his legal fees. Determination | Case number: 843236 Page 2 of 10 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? No. I am not satisfied the insurer has established the application of a relevant exclusion or condition. I am satisfied the proximate cause of the damage was the leaking pipe. It is fair in all the circumstances for the insurer to accept the claim. Policy covers accidental damage, subject to exclusions The policy covers accidental damage to the property. Accidental loss or damage is defined in the product disclosure statement (PDS) as: damage to, loss or destruction of the buildings that make up your home, or your contents and valuable items, when it is caused by an unintentional act, or an unforeseen and uncontrollable incident. Incident is defined as: a single occurrence or a series of occurrences, including an accident or series of accidents, arising out of one event. It also covers several incidents in certain situations, including landslide or subsidence as follows: Landslide or subsidence We will cover your buildings or contents for loss or damage as a result of a landslide or subsidence. We will only do this if the loss or damage occurs within 72 hours of: • an earthquake or explosion • a storm or flood, including rainwater or wind, or • liquid escaping from a fixed pipe, or an object attached to a pipe, fixed gutter, fixed tank or a drain. The policy also covers escape of liquid as follows: Water or liquid damage We will cover your buildings or contents for loss or damage caused by water or liquid. We will also cover the cost of finding where the water or liquid escaped from, including the cost of repairing any damage that occurs while looking for the cause. We will not cover your buildings or contents for loss or damage caused by: • landslide or subsidence, unless: –– we agree to cover the incident as described under ‘Landslide or subsidence’. The PDS also includes exclusions for accidental damage for: We will not cover any loss or damage as a result of, or caused by: Determination | Case number: 843236 Page 3 of 10 • settling, shrinkage or any movement of earth … • landslide or subsidence, unless: –– we agree to cover the incident as described under ‘Landslide or subsidence’. Complainant has established a valid claim The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid (or prima facie ) claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. There is no dispute there is damage to the property. The insurer appointed a builder (UB) to attend the property. UB’s report dated 31 July 2020 refers to the following damage to the property: *Large crack to the tiled and concrete floor between the kitchen and dining room. *Multiple areas of cracking to the walls, ceiling and cornice in the kitchen area. *Multiple areas of cracking to the tiled walls, plaster walls, cornice and ceiling in the adjoining bathroom to the kitchen. *Movement and cracking to the external brickwork to the bathroom. (Previous repairs have been carried out) Given the broad coverage under accidental damage, I accept the complainant has established a valid claim. This is because the damage was, on balance due to an unforeseen and uncontrollable incident. The onus therefore shifts to the insurer to show it is entitled to decline the claim. Reports show there was a leak at the property In addition to the accidental damage there is no dispute that there was an escape of water or liquid from a pipe. The insurer provided a leak investigation report from a plumber (PP) dated 8 September 2020. PP states:  CCTV camera inspection through the head vent in the sewer confirmed a break and tree root intrusion on the toilet branch  tree roots visibly growing from the branch drain into the main drain would suggest a break exists within the toilet drain and it would be allowing water ingress to the soil with any use of the toilet  a down pipe in the neighbouring property empties into a small rain water tank  it could not see if an overflow existed off the tank or connects to a storm water system but if not, then waters would still flow into the complainant’ s property through winter when the tank is full  any water flows into this area are trapped by ground fall and can only soak into the ground.  it also noted a basement vent opening on the affected side has been dug up around its exterior by the complainant, which may allow any possible water inflows from next door to soak down adjacent the foundation. Based on this report, I accept there was an escape of water or liquid event. Determination | Case number: 843236 Page 4 of 10 Complainant says the damage is caused by the leak When deciding whether the policy responds, I need to identify what the proximate cause of the damage was. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. The complainant lodged the claim on 29 July 2020. He says the damage is due to a leaking sewer pipe and excess water flowing from the neighbour’s carport roof. The complainant says the damage is localised and considering the age of the property (70 to 115 years), then with continual settling/subsidence as the insurer suggests the building would have collapsed by now. The complainant provided a report from a structural restoration specialist (SR) dated 11 December 2020. He had engaged SR to undertake underpinning works at the property. SR states:  dry soil shrinks when it loses volume and conversely it expands or heaves when water is induced  when too much water is in the soil it does not continue to expand or heave, it collapses  the soil is not able to bear the weight of the structure, and it is possible this has occurred in this situation  it located the leaking earthenware pipe and also exposed a lead waste pipe from the toilet pan to the earthenware drain  this lead waste pipe is badly corroded and has been leaking for some considerable time as the soil around the lead pipe is black from the sewer waste and the soil has a very strong sewer smell  the soil is dry at the surface, however at approximately 600mm from the surface the soil is quite moist and mouldable, and continues for the depth of approximately 3m  it carried out underpinning work within 500m of this site within the last eight months and the soil was very dry clay  from its 35 years ’ experience in underpinning work, it has no doubt the leaking earthenware sewer pipe and the lead waste at the base of the toilet are the cause of this wetting up of the soil  there is also some evidence of salt damp/efflorescence on this eastern wall, particularly the east external wall along with the eastern wall of the cellar  it is possible this is being caused by the damp/wet soil around the leaking toilet waste and sewer drain adjacent to where the salts are visible. The complainant also provided a report from an engineer (AS) dated 3 August 2021. AS states subsidence undertaken by the corner footing is attributed to the leaking pipework within and under the existing dwellings footprint, where damage has likely been exacerbated by the prolonged nature of the leaking. AS states:  it utilised relevant bore log information, rainfall data and site inspection observations to opine an unnatural source of moisture has caused the subsidence issues seen on the eastern side of the dwelling  the borehole closest to the toilet (BH1) contains moisture within its initial horizon where as BH2 situated only 5.7m south of BH1, is dry and crumbly, indicating an external source of moisture is affecting BH1  reduction in the volume of soil due to newly created voids will initiate subsidence in areas of saturation as historical loading will remain constant throughout this process, compressing newly created voids  this subsidence can almost be instantaneous or can take years or decades to occur Determination | Case number: 843236 Page 5 of 10  the soils displayed on site have a higher permeability than regular clays  water seepage has occurred over a prolonged period and therefore it is reasonable to assume this process of soil mechanics has been occurring for an extended period  the existing strip footing when constructed would not have accounted for the excess stresses introduced at the corner locations, nor the continuity of footing beams considered  due to the high stresses at these locations and small span of the wall, the footing has potential to act as a cantilever as the volumetric profile of the soil below this area is reduced  the subsidence would be visibly largest at these locations as seen on site during inspection. The complainant provided a further email from AS dated 21 January 2022, which states:  Following our comprehensive investigation and review of documentation, it is [AS’s] opinion that the damage to the property is caused by the escape of fluids from the broken sewer pipe which in turn caused the building to settle, consequently resulting in cracking in the walls.  We do not believe the damage to the property is caused by landslide or soil subsidence. A further response from AS dated 31 March 2022 states:  silty soils are affected by acidic effluent in and around its influence  the chemical reaction would have commenced within 72 hours of any effluent escaping from the broken sewer pipe, and that escape would be continuous every time the toilet was flushed  it does not believe nearby trees have contributed to any shrinkage or heave of the area affected  it does not believe seasonal and environmental influences have contributed to any of the soil reaction to either heave or shrinkage. The complainant wants the insurer to accept the claim and pay to repair the damage from the leaking sewer pipe. Insurer says the damage is excluded The insurer says the damage did not happen within 72 hours of liquid escaping from a fixed pipe. It says the cause of damage is settlement due to natural causes and the policy excludes this cause of damage. The insurer says the leak has been occurring over a prolonged period. It says the pipe will leak every time wastage is passed through the sewer pipe, meaning any deterioration of the soil found to be due to the leak has not occurred because of a one-off event as defined by the policy. It says the incident in this instance is every time the toilet is flushed, it causes a leakage to occur. It says the leakage has not caused the resultant subsidence to occur within 72 hours. The insurer appointed an engineer (IE) to attend the property. I E’s report dated 25 September 2020 states:  the pattern of cracking is consistent with differential movement between the original house and cellar, where the kitchen and wet areas are settling away from the cellar, and previous repairs indicate that this is an historical issue within the house Determination | Case number: 843236 Page 6 of 10  this settlement has been caused by shrinkage of reactive clay foundation due to reducing soil moisture content as a result of seasonal and environmental factors, including the moisture demands of nearby trees  the cellar is founded significantly deeper in the foundation than the rest of the house and as a result, the recent drying settlement of the soil has caused the kitchen and bathroom areas to settle away from the cellar, resulting in the recent cracking, including in the kitchen and dining room floor  in its opinion, the evidence does not indicate that the pipe leak or reported moisture from the neighbour has contributed to the damage in the area, as it would expect a leaking pipe would cause the foundation to swell and the building to heave, rather than settle. IE’s conclusion on the cause of damage is as follows: 1. The cracking and movement in the house have been caused by ongoing settlement of the house away from the cellar area. 2. This settlement has been caused by gradual shrinkage of reactive clay foundation due to reducing soil moisture content as a result of seasonal and environmental factors, including the moisture demands of nearby trees, which have dominated the environment over the recent period due to the below average rainfall. 3. The evidence does not indicate that the damage has been caused by any leaking pipe or overflow from the neighbour’s site. IE provided a supplementary report dated 2 December 2020. IE states previous repairs to cracking damage at the property indicates the house has a history of previous movement. It states this is not consistent with reported earthquake damage because it is not widespread throughout the property. It also states the damage to the house is caused by soil drying and is not caused by any leaking pipe or rainfall runoff. IE provided further reports, including a report dated 12 April 2021. IE conducted soil testing and states there is a suspected stream beneath one area of the property that resulted in increased moisture in the sample. It states the sample closest to the damage returned drier suction test results, which shows the soil has dried out and is consistent with its previous findings. Reports show damage, on balance, due to the leaking pipe I am persuade d by SR’s and AS’s reports on the cause of damage. SR excavated the eastern side of the property to undertake underpinning work. SR’s inspection of this area noted the condition of the soil and broken pipe. This highlighted the extent of moisture in the soil and strong sewer smell. I am satisfied based on this information the broken pipe has been leaking for some time, leading to significant moisture in the soil in this vicinity. Given the invasive works carried out by SR, I consider this report persuasive. AS’s report states the floor is sloping towards the eastern side of the dwelling, confirming the concrete slab on the eastern side of the dwelling has subsided differently to the western side. It says this has caused the cracking damage. AS provides persuasive conclusions as to how the leaking pipe has caused this area of the property to settle and ultimately lead to the cracking damage. I accept it is likely the continual escape of water or liquid has resulted in the load bearing capacity of the highly reactive soil leading to the property movement. Determination | Case number: 843236 Page 7 of 10 The conclusions in these reports are plausible, logical and consistent with the available evidence. IE’s conclusions are broader, and I do not consider the reports give sufficient consideration to the complainant’s particular property. There is no dispute there is a leaking pipe in the vicinity of the damage, and I do not consider IE has given sufficient consideration to the leaking pipe causing damage to the eastern side of the property. While IE relies on the absence of heave to support its findings that the leaking pipe would not have caused the damage, I accept the soil at the complainant’s property may react differently with an ongoing water leak. AS provides persuasive conclusions as to how the soil has reacted to the presence of excess moisture. Having reviewed all the information provided, I consider the proximate cause of the damage to the property was the leaking pipe. Fair for the insurer to accept the claim The insurer’s policy consists of the policy schedule and PDS. It is not in dispute the insurer provided the policy documents to the complainant. The insurer is therefore entitled to rely on those terms when assessing any claim made against the policy. As the complainant has satisfied his onus to establish a valid claim, the onus is on the insurer to show the damage is excluded. The insurer relies on the exclusions for settling, shrinkage or any movement of earth. However, the proximate or dominant cause of the damage was the escape of liquid. Such damage falls within cover under the policy as the settling / earth movement was a consequence of the event covered under the terms of the policy. This exclusion therefore does not apply in the circumstances. The insurer also refers to the exclusion for landslide or subsidence. This states damage is excluded unless it agrees to cover it under the landslide or subsidence insured event. This states landslide or subsidence damage will only be covered if the loss or damage occurs within 72 hours of the liquid escaping from a fixed pipe. This exclusion would only apply if the information shows, on balance, the damage is landslide or subsidence. The reports provided interchange the wor ds ‘settlement’ and ‘subsidence’. The two terms are included in separate exclusions and I do not consider the commercial intention of the policy is for the terms to be interchangeable. I consider settlement is more consistent with a gradual process of the property or part of it sinking. This is contrasted with subsidence, which refers to the collapse of a section of the ground. Subsidence is included with the word ‘landslide’, which is defined in the Macquarie Dictionary as ‘the sliding down of a mass of soil, detritus, or rock on a steep slope’. Given the cover for subsidence and landslides includes cover for certain events occurring within 72 hours, I do not consider these events apply to a gradual process or an ongoing event such as this event. AS’s report states the cracking damage inside the residence is due to the ‘subsidence’ of the corresponding ground support from the eastern side of the slab. Determination | Case number: 843236 Page 8 of 10 IE’s report dated 26 August 2021 states the damage at the property is consistent with settlement, not subsidence. It states settlement is the downward vertical movement of a surface, such as the house or soil surface, and this appears consistent with the term ‘subsidence’ used in AS’s report. AS provided a further response, which states the escape of fluids from the broken sewer pipe caused the building to settle, which resulted in the cracking. It states the damage was not caused by landslide or soil subsidence. While AS initially used the word subsidence, based on its subsequent report, I accept its intention was to describe the damage as settlement of the soil due to the escape of liquid event. This is consistent with its description that water seepage has occurred over a prolonged period and the process of soil mechanics has been occurring for an extended period. I consider the damage is more consistent with soil settlement from the leaking pipe over time, as opposed to the collapse of a section of the soil. I consider the exclusion is intended to apply to a single event of escape of liquid. In this case the event has been continual with the settlement happening at a point where the soil has become saturated. There is no indication the complainant was aware this was happening until the damage appeared. The onus is on the insurer to show the exclusion applies. I consider the above exclusion cannot fairly be applied in the circumstances of the complaint. The proximate cause of the damage was the escape of liquid that was unforeseen and unexpected, and it is fair in the circumstances given the intent of the policy that the insurer meets its liability under the claim. The complainant provided a receipt for a progress payment of underpinning works to SR and an invoice from SR for $10,025. The insurer is liable for these costs. The complainant is to clarify the total amount paid for the underpinning works and forward the final invoice to the insurer for payment (if it is different to the above amount). Interest is payable on any amount in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from the date of the invoice to the date of payment of the claim. The insurer is not liable for the costs to repair the leaking pipe. However, the insurer is liable for the cracking damage to the property. The insurer is to arrange an inspection of this damage and settle the complainant for this damage in accordance with the terms and conditions of the policy. 2.2 Is the complainant entitled to compensation? Yes. The insurer’s offer of non -financial loss compensation of $1,500 is fair. AFCA can award compensation in certain circumstances Under our Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with a complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim. Determination | Case number: 843236 Page 9 of 10 Non-financial loss compensation warranted in the circumstances The complainant raises sev eral concerns with the insurer’s handling of the claim. He says it has caused immense frustration and stress, especially due to a medical condition and other difficult personal circumstances. The insurer acknowledges a delay between April 2021 to June 2021 when the insurer was reviewing soil reports. The insurer offered $1,500 in acknowledgement of this delay. It otherwise says it handled the claim well. I consider any claim will bring a level of stress and inconvenience. However, I consider there were some delays on the claim, which caused an unusual amount of time to resolve the situation and caused the complainant stress and inconvenience. Having considered the circumstances of the claim, I consider the insurer’s offer of $1,500 for non -financial loss compensation is fair. 2.3 Should the insurer contribute to the complainant’s professional costs? I also consider it fair in all the circumstances for the insurer to pay the complainant for his expert reports and legal fees. Legal costs and expert costs to be reimbursed The complainant obtained expert reports to support his position. He provided invoices for these costs, including an invoice from AS for $1,650. He provided a further invoice from AS for $385. The complainant obtained legal advice during the claim. He provided an invoice for $1,500 from his lawyer. Under the AFCA Rules, we can require an insurer to contribute to legal costs, other professional costs, or travel costs a complainant incurred in making a complaint. Unless special circumstances apply, we cannot require the insurer to contribute more than $5,000 to these costs. When determining whether an insurer should contribute to the payment of professional costs, AFCA considers the complexity of the dispute, whether the advice was reasonably needed and whether the costs incurred were because the expert advice was genuinely required. Given the insurer’s position on the matter, I consider it was reasonable for the complainant to appoint experts. These reports assisted in the resolution of the complaint. It is therefore fair for the insurer to pay the complainant $1,650 and $385 for AS’s report s. I am also satisfied the complainant obtaining legal advice on his policy coverage was warranted, given the insurer’s position on the claim and the overall complexity of the dispute. It is fair for the insurer to pay $1,500 for the complainant’s legal costs. Determination | Case number: 843236 Page 10 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.