Home / Allianz Australia / Determination 842774

Determination 842774

Cash settlement amount for fire-damaged home and non-financial loss for claim handling delays

FirmAllianz Australia
Decided2022-06-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$75,935
Non-financial loss$2,500
Amount claimed$540,000
SourceAFCA PDF

Summary

The complainants' home was damaged by fire after a gas bottle explosion and the insurer cash settled the claim, which the complainants disputed as insufficient. AFCA found the settlement should be increased to the $535,000 sum insured and confirmed $2,500 non-financial loss compensation for handling delays.

A cash settlement must be fair, reasonable and sufficient to place the complainants in their pre-loss position, allowing for scope gaps, professional fees and contingencies such as cost increases.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 842774 Financial firm Allianz Australia Insurance Limited Determination | Case number: 842774 Page 1 of 6 Case number: 842774 6 June 2022 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer) and on 16 January 2021, lodged a claim after their home was damaged in a fire following a gas bottle explosion. The insurer accepted the claim and has paid the complainants $459,064.87 plus $2,500 non- financial loss to cash settle the claim. The complainants disagree with the cash settlement and seek a settlement of $540,000 being the sum insured plus $5,000 for non-financial loss. 1.2 Issues and key findings Is the insurer’s offer the settle the claim reasonable? No. The insurer should increase the settlement to $535,000 to take into account the items missing from the scope of works (SOW), contingencies and likely professional costs. Is the complainant entitled to non-financial loss compensation? Yes. The panel accepts the level of service provided to the complaint under the claim was not at the level expected from a professional organisation. The panel is s atisfied the insurer’s apology and a payment of $2,500 in non-financial loss compensation is fair in all the circumstances. Why is the outcome fair? The insurer’s proposed settlement does not adequately account for the SOW or the contingencies including the rapidly increasing costs of repairs or likely professional costs including architect and engineering costs. It is also fair and reasonable that the insurer also pays the complainants $2,500 for non- financial loss compensation for delays in handling the claim. 1.3 Determination This determination is significantly in favour the complainant. The insurer is to increase its cash settlement of the claim to $535,000. As the insurer has already paid $459,064.87, then within 14 days of the complainant’s acceptance of this determination, the insurer must pay the complainants the balance of $75,935.13. Interest is payable pursuant to section 57 of the Insurance Contacts Act 1984 (Cth) on the $75,935.13 from 2 February 2022 until date of payment of the determination. As the insurer has paid the complainants $2,500 it has met its liability to pay compensation for non-financial loss. Determination | Case number: 842774 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s offer the settle the claim reasonable ? No. The insurer should increase the settlement offer to $535,000 to take into account the items missing from the scope of works (SOW), contingencies and likely professional costs . Policy provides an insurer with a discretion whether to cash settle a claim. The complainants policy is a home and contents policy covering the home for a sum insured of $535,000 and contents for $105,000. The policy includes additional benefits for temporary accommodation, removal of debris and rebuilding and professional fees. There is no dispute the complainants have a valid claim for damage sustained to the home and contents following a fire on 16 January 2021. The insurer has already paid the complainant the sum insured for the contents of $105,000 and the maximum allowance for temporary accommodation being 10% of the sum insured. The product disclosure statement (PDS) states the insurer can, at its discretion, choose to repair the building or pay the reasonable cost to repair the property. The insurer had offered to repair the property or pay a cash settlement to repair the property. The complainants expressed a preference to be cash settled. The insurer has now paid of $461,564.87 in settlement of the claim based on a quote from ABS of $399,186.84 with a 15% uplift to $459,064.87 plus $2,500 in recognition of any stress this matter has caused. Although the complainants rejected the offer the insurer paid the settlement of $461,564.87 to the complainants on 1 February 2022. The complainants initially sought $558,400 to settle the claim. They have since indicated they would accept the sum insured of $535,00 plus $5,000 for the inconvenience to finalise the claim. Dispute as to scope of works The panel acknowledges the insures initial offer to complete the repairs. We note that offer was made when the insurer considered only the façade of the house was heritage listed. The insurer obtained a scope of works (SOW) from an engineer SWP dated 11 February 2021. The complainants raised concern with the insurers loss adjuster CC that the SOW did not include various items. It is unclear which of those items the insurer now agrees should be included in the SOW. The insurer obtained quotes from ABS and SGB. According to CC these quotes were based on the SOW from SWP additional items raised by the complainants. It is unclear just what additional items were included in the quotes. The quote from ABS simply states it is based on the SOW. It is not itemised but notably excludes any allowance for replacing the dining room ceiling, restoration works, testing for environmental hazards or any unforeseen damage. It also fails to account for the professional costs of $15,000 as contained in SWP’s scope of works. The insurer provided a separate quote from SGB for $410,018.40. This quote is said to be based on the SOW plus review of the additional items claimed by the complainants. Again, this quote is not itemised, but it does acknowledge possible variations. Determination | Case number: 842774 Page 3 of 6 Dispute as to items included in quotes The insurers claim notes suggest that the insurer and CC first became aware the entire home was heritage listed on 23 July 2021. This is after the quotes obtained from ABS and SGB. Development authority had to be obtained from the local council covering internal and external repairs. This not only resulted in delays in commencing the repairs, but no doubt caused frustration to both the insurer and complainants. It was following these additional delays that the complainants sought to cash settle the claim. The complainants say the following items have not been included in the quote from ABS:  replacing the dining room ceiling plasterboard;  reproduction and replacement of existing decorative ceiling and cornice to match existing in living room and hallway (SOW contains a specific statement around the difficulty of restoring these);  rendering/skim coating the hallway, which will be required if cornice is removed;  ceiling joist rectifications to dining room, living room and hallway (required if removing ceiling);  new floorboards, given age of current floorboards (discussed at length in paragraph 1.8.5)  sanding and polishing floorboards in Bedroom 2 to match the remaining floors;  new skirting to Bedroom 1 and hallway (due to new flooring);  kitchen roof framework (the Architectural Drawings “Reinstatement of Fire Damaged Dwelling” reference upgrading to Australian Standards. This will be a requirement considering the high probability that the joists have been affected by the fire);  reframing kitchen, laundry and WC walls – there is no reference to this in the documents, but given that the state of these walls cannot be properly assessed due to lining covering, it is highly likely they will be damaged and warped from fire and water damage and need to be reframed and sarked before re-lining;  new insulation to the external perimeter of the kitchen, laundry and WC (required in accordance with the National Construction Code (NCC);  replacement of picture rails (required if removing render and replastering)  new electrical wiring throughout, which is highly likely in the case of a fire and  strip screed from kitchen, laundry and WC and supply new (kitchen screed is missing from the SOW and ABS Quotation but is obviously required). The complainants provided an itemised quote from TSG for $534,845.85 dated 26 August 2021. The quote includes an allowance for replacing/repairing damaged turf in the backyard of the property. The complainant says this was included for two reasons:  new footings are required to be excavated; and  the property has rear-lane access. As most of the damage is to the rear of the property, the backyard will be the main thoroughfare for any builders/workers/deliveries. The quote also includes a $10,000 allowance for supply of kitchen appliances. The panel accepts these items are considered contents and should not be included in the quote. The panel also notes that as part of the building cost validation report provided by CC it acknowledges TSG was not given the opportunity to correct the scope of works. Cash settlement to be sufficient to place complainants in pre-loss position The panel accepts that where a claim is to be cash settled the settlement must be fair, reasonable and sufficient to place the complainants in the position that existed prior to the loss. The insurer in offering to cash settle the claim based on ABS quote says that ABS have confirmed to CC they can complete the repairs for the quoted amount. The panel notes the Determination | Case number: 842774 Page 4 of 6 building validation report from CC for cash settlement purposes suggests that most of the additional items identified by the complainants can be included in the scope provided by ABS with a variation of $5,000 -$10,000. Although ABS might say it would honour the quote, the panel does not consider the quote sufficient to allow the complainant to complete the necessary repairs. As indicated earlier the quote from ABS was obtained in March 2021. Since then there has been a well documented significant increase in building costs associated with supply of building materials and labour issues due to various factors including Covid -19. A cash settlement requires the complainants to engage their own contractors/ architects/engineers to complete repairs. They lose the lifetime guarantee on the repairs. A cash settlement should also consider contingencies such as unforeseen damage not included in the ABS quote and price rises as referred to above. In the panels view a fair cash settlement is reached by starting with the ABS quote of $399,186.84, allowing $15,000 for permits, levies and professional services (as per SOW) and $20,000 for the additional SOW items identified by the complainants ($434,186.44). It is fair to the allow 25% for contingencies given the impact on building supplies and labour due to covid, the heritage DA requirements and transfer of risk. This brings you to a settlement figure of $542,000. Insurer to cash settle for sum insured. The sum insured for the home is $535,000. Given the above, the panel is satisfied it is fair that the insurer cash settle the claim for the sum insured. The insurer has already paid the complainants $459,064.87 plus $2,500 for non-financial loss. This was paid by the insurer on 2 February 2022. It is fair in the circumstances that the insurer pays the complainants the balance of $75,935.13 plus interest pursuant to section 57 of the Act on the balance of the cash settlement from 2 February 2022 to date of payment of the claim. 2.2 Is the insurer required to pay non-financial compensation? AFCA can award compensation for non-financial loss. AFCA can award up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The complainants have expressed dissatisfaction for the way the insurer has handled the claims. The complainant says:  the insurer has not adequately addressed the issues raised and has been dismissive in its responses; and  the insurer has unreasonably delayed the claim. Insurer’s offer of non -financial loss compensation is reasonable The insurer accepts that the service was below standard. The insurer offered to pay the complainants $2,500 in non-financial loss compensation given the level of service provided and associated delays experienced. Determination | Case number: 842774 Page 5 of 6 The panel acknowledges that the complainant’s concerns and dissatisfaction with the fact they had to chase up and dispute several decisions made by the insurer since the claim was lodged in January 2021. The insurer does not dispute this. The panel accepts t he insurer’s poor management of the claim would have caused the complainants an unusual degree of inconvenience, stress, anxiety and interference with their expectation of enjoyment or peace of mind. While many of the issues have been out of the insurers control, the poor claims handling has led to finalisation of the claim being unreasonably delayed. The panel consider the insurer’s offer of $ 2,500 is fair and reasonable in the circumstances. As this has been paid to the complainants the insurer has no further liability. 2.3 Why is the outcome fair? This outcome is fair because both parties have had the opportunity to provide information to support their position. Accordingly, all the available material has been considered and the outcome is in line with AFCA’s approach to these types of matters and what is fair under the circumstances to both parties. Based on the available information, it is fair the claim be settled for the sum insured plus the allowance for non-financial loss compensation for delays in handling the claim. Determination | Case number: 842774 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in general insurance We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.