Determination 842201

Claim denial for pontoon-jetty damage (insured event vs wear and tear)

FirmSuncorp Group
Decided2022-10-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home and contents policy for a destroyed pontoon-jetty, which the insurer denied as wear and tear. AFCA found the proximate cause was impact and directed the insurer to accept the claim and either reinstate or cash settle, with cash settlement based on a scope of works, quotation and a 20% contingency.

The pontoon-jetty is a covered building under the PDS, and on balance the proximate cause of its destruction was impact rather than wear, tear and gradual deterioration.

Issues

Subjects and remedies

pay claimreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 842201 Financial firm AAI Limited Determination | Case number: 842201 Page 2 of 8 Case number: 842201 7 October 2022 1 Determination overview 1.1 Complaint The complainants lodged a claim under their home and contents insurance policy held with the financial firm (insurer) for the replacement costs of a pontoon-jetty at their home in Gxx Bay, New South Wales. The pontoon-jetty was found destroyed and in pieces on 30 October 2020. The complainants say that the pontoon-jetty was structurally sound and operating as normal some three to 5 days prior to 30 October 2020. The insurer denied the claim on the basis there was no evidence that an insured event, such as an impact or a storm, destroyed the pontoon-jetty. The insurer also says that damage to the pontoon-jetty came about because of wear, tear and gradual deterioration, which the policy expressly excludes from cover. The complainants disagree, and maintain that an insured event (an impact, to be precise) destroyed the pontoon-jetty. Therefore, the complainants say, the insurer should accept the claim in full. 1.2 Issues and key findings Is the insurer liable for the replacement costs of the pontoon-jetty? Yes. The insurer should meet the replacement / reinstatement costs of the pontoon-jetty. Why is the outcome fair? The outcome is fair because the complainants have established that the destruction of the pontoon-jetty was caused by an insured event, and not merely by wear, tear and gradual deterioration. 1.3 Determination This determination is in favour of the complainants. The insurer should resolve the claim as set out in section 2, below. Determination | Case number: 842201 Page 2 of 8 2 Reasons for determination Pontoon and jetty are a ‘ building ’ under the terms and conditions of the policy Page 14 of the Product Disclosure Statement (‘ PDS ’) clearly states that the following structures are included under the definition of ‘buildings’ which are covered by the policy: - … boat jetties, pontoons, mooring poles and their attachments and accessories which are located within the boundaries of the insured address or where part of their structure begins or terminates on the insured address; Clearly, the pontoon-jetty is a building that is potentially covered under the terms and conditions of the policy . I therefore reject SHB’s conclusion in their report dated 4 November 2020 that:- the damage is „not a claim ‟ as pontoons and jetties are not covered under the policy schedule . SHB is a Builder engaged by the insurer. Further, and relevantly, at page 23 of the PDS under the sub- heading ‘Impact’, the following appears:- We cover loss or damage to the building caused by impact at the insured address from:- …. watercraft, aircraft, motor vehicles or trailers. Finally, unde r the heading ‘What we do not cover – general exclusions’, the PDS also details the types of loss and damage which are not covered under the policy. At page 40 of the PDS the following is included in this category:- Wear, tear and gradual deterioration …. wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration. The proximate cause of damage was impact The pontoon-jetty is a ‘ building ’ as defined by the PDS. Damage to it may be covered under the terms and conditions of the policy in certain circumstances. For instance if, as the complainants say, the pontoon-jetty was destroyed by impact, such damage and loss should be covered under the policy. However if, as the insurer says, wear, tear and general deterioration caused the pontoon-jetty to break apart, such damage and loss will not be covered under the policy. Therefore, a relevant issue is identifying the proximate cause of the damage to the pontoon- jetty. The proximate cause of a loss need not be the sole cause, but it must be the effective, dominant or operative cause of the loss. SED (Engineering Services engaged by the insurer) provided four reports and ultimately concluded that the proximate cause of the loss of the pontoon-jetty was wear, tear and gradual deterioration. SED says such wear, tear and gradual deterioration involved (amongst other things) damage to a base of a floating pontoon. This, in turn, caused the pontoon to sink and thereby cause corrosion to sections of the pontoon and jetty. Determination | Case number: 842201 Page 3 of 8 Whilst the photographs supplied by both parties show evidence of corrosion and some wear and tear to parts of the structure, I am not persuaded that wear, tear and gradual deterioration was the proximate cause of the destruction of the pontoon-jetty. On balance, I find that the pontoon-jetty was likely destroyed and broken apart by a significant force. Further, in all the circumstances, I am of the opinion that an impact from a watercraft is the m ost likely explanation for such force. I have examined all m aterial exchanged by the parties in this matter. In my opinion, the following factors are most pertinent and persuasive in a determination of the proximate cause of the loss of the pontoon-jetty:-  The pontoon-jetty was structurally sound and operational shortly before 29 October 2020  On 30 October 2020 WC (Licences Builders) first discovered that the pontoon-jetty structure had been broken apart and reported its destruction to the complainants. WC concluded in its report dated 2 November 2020 that a substantial force (probably a side-on impact) was responsible for the destruction of the pontoon- jetty. The photographs taken by WC on about 30 October 2020 show evidence of a substantial force having impacted the structure including, but not limited to, a sheared bolt on the side of a pontoon structure, and a sheared timber beam which had framed the pontoon  The sheared bolt on the side of a pontoon and broken timber frame appear to be clear evidence of an impact of substantial force. SED did not place a great deal of significance on the damaged timber frame. Yet, a distinct break in part of the timber frame is depicted in photographs 2 and 3 of WC’s report. It appears that a section of the damaged timber ‘snapped’. It is reasonable to assume that this section of timber, which had not been degraded or rotted by water, was subject to a significant lateral force – that is, a 200mm x 50mm timber beam does not just break apart or snap in the absence of significant forces  SED also dismisses the sheared bolt in terms of evidence of impact because there is no damage to the surrounding concrete supporting the bolt, in the form of concrete breakout or concrete pry out failure. Whilst this may be true in theory, SED offers no alternate persuasive explanation for the fact that the bolt has, indeed, been sheared level with the concrete surface in which it is imbedded. One is entitled to ask what sort of force might shear such a bolt, even in the absence of damage to the concrete surrounding the bolt  Likewise, SED placed little significance on damage to the corner of one of the floatation pontoons as shown in photographs 3 and 4 of the SW report dated 19 August 2021. SW (Consulting Structural & Civil Engineers engaged by the complainants) concluded that such damage is consistent with damage caused by impact, yet SED offered no persuasive alternate explanation regarding the cause of that damage. Indeed, SED appeared to dismiss this damage as impact-related because there was no dam age observed to the concrete immediately adjacent to the part of the pontoon that was damaged Determination | Case number: 842201 Page 4 of 8  Whilst SED acknowledges that the floating pontoon landing sections had been dislodged from their position around two concrete piers, SED is unable to give an explanation as to how the sections became dislodged  Whilst SED says there was no evidence of recent impact to concrete piers, photographs 1 and 2 in the SHB report dated 4 November 2020 show obvious cracks in concrete piers consistent with impact. SED does not comment on the cracks, instead stating that the overall condition of the concrete piers was unable to be assessed properly. Further, SED does not comment on a crack in a concrete pier which is depicted in photograph 12 of its report dated 5 January 2 021. This failure to adequately assess and address the cracks in the concrete piers undermines SED’s conclusions  There is no persuasive evidence to suggest wear and tear and gradual deterioration caused a portion of the structure to be submerged for a prolonged period, thereby weakening the structure. The claim should be resolved in this way Within 7 days of the date of receiving notice that the complainants accept this determination, the insurer m ust accept the claim and elect to either replace / reinstate the pontoon-jetty or offer a cash settlement to the complainants. In the insurer elects to replace / reinstate the pontoon-jetty, subject to the complainants providing reasonable access to their property, the insurer m ust commence and complete the necessary works as soon as is reasonably practicable without delay. Thus, time is of the essence regarding the resolution of this matter. The quotations provided are now about six months old. Therefore, I determine that, if the insurer elects to offer a cash settlement to the complainants, and the complainants agree to be cash settled:-  Within a further period of 21 days of the date of receiving notice that the complainants agree to be cash settled, and subject to the complainants providing reasonable access to their property, the insurer must engage a suitably qualified and licenced engineer or builder to draw up a scope of works (SOW) regarding the replacem ent of the pontoon-jetty  Then, within a further 14 day period of the date of receipt of the SOW, the insurer is to obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise  Then, within a further 7 day period of the date of receipt of the actionable quotation, the insurer is to pay to the complainants a sum equal to the total value of the quotation, plus a 20% contingency on top of this to factor in the risk of the works passing to the com plainants. Determination | Case number: 842201 Page 5 of 8 2.1 Why is the outcome fair? The available information shows the proximate cause of the loss of the pontoon-jetty was an impact. Therefore, it is fair and reasonable that the insurer resolves this matter according to section 2, above. Such a resolution also accords with the ter ms and conditions of the policy and the insurer’s obligations to the complainants regarding this claim. Determination | Case number: 842201 Page 6 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant background and brief overview of evidence On 30 October 2020 WC [Licenced Builders] discovered the pontoon-jetty in pieces. WC examined the wreckage, took photographs, recovered the pieces of the pontoon-jetty and then moved them to a more secure position on a nearby ramp/slipway on shore. WC then notified the complainants about the loss. The photographs taken by WC appear in its report dated 2 November 2020. Relevantly, the photographs include images of a sheared metal bolt on the edge (side) of a concrete pontoon and one of the sheared (200mm x 50mm) timber beams which framed the pontoon portion of the structure. WC concluded the damage was caused by a „significant impact to the side of the pontoon‟ and that ‘ the pontoon structure…. are deemed unrepairable and require replacement‟. As mentioned, the complainants say that they noticed the pontoon was intact, undamaged and functioning normally about three to 5 days prior to 30 October 2020. Determination | Case number: 842201 Page 7 of 8 Subsequently, the complainants arranged for SW [Consulting Structural & Civil Engineers] to inspect the remains of the pontoon-jetty. SW did so on 4 August 2021 and provided a report (including photographs) dated 19 August 2021. SW concluded:- The damage shown in the corner of the now northern section of the pontoon is located immediately below the “running board” and has quite likely been caused by impact from a vessel or similar water bound object ( see photographs 3 and 4 of SW’s report dated 19 August 2021 .) Meanwhile, the insurer also arranged for the remains of the pontoon-jetty to be inspected by SHB [Builder] who attended the complainant’s property on 4 November 2020. SHB made several conclusions:-  the damage is „not a claim ‟ as pontoons and jetties are not covered under the policy schedule  at time of inspection, the pontoon had been damaged by wind or impact. The insurer also arranged for SED [Engineering Services] to inspect the remains of the pontoon-jetty on 18 December 2020. SED’s first report (including photographs) is dated 5 January 2021. SED also provided three supplementary reports, dated 6 April 2021 (including, amongst other things, an informative photograph depicting the pontoon-jetty prior to being damaged), 14 September 2021 and 24 January 2022. Ultimately, SED concluded:-  At the time of inspection there was no obvious evidence of vessel related impact damage to: o the two pontoon piers o the northern and southern sides of the upper fixed jetty platform o the northern and southern sides of the lower moving jetty structure o the two rectangular PVC pontoon floats with concrete deck.  The current observed distress to the pontoon jetty appears to be consistent with long term cracking damage to the base of the floating pontoon, causing the pontoon to sink and cause corrosion to the ends of the steel sections of the lower moving jetty section  Based on the available evidence, there was no evidence to suggest that the pontoon / jetty had been impacted. We are of the opinion that the observed long- term damage to the pontoon / jetty was not caused by a recent storm event in October 2020. I also note, in particular, at paragraph 6.5 of its report dated 5 January 2021, SED stated:- It is not clear how the floating pontoon landing sections had been dislodged from their position around the two concrete piers. There were no signs or evidence that they had been dislodged by impact action. A further ‘Assessment’ by JR on behalf of the insurer dated 20 April 2021 mainly contains a review of expert reports and therefore adds little value to this analysis. Finally, I note there is broad agreement between the parties that the pontoon-jetty is irreparable and will therefore have to be replaced.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.