Text of the determination
Determination
Case number 842201
Financial firm AAI Limited
Determination | Case number: 842201 Page 2 of 8
Case number: 842201 7 October 2022
1 Determination overview
1.1 Complaint
The complainants lodged a claim under their home and contents insurance policy held with
the financial firm (insurer) for the replacement costs of a pontoon-jetty at their home in Gxx
Bay, New South Wales.
The pontoon-jetty was found destroyed and in pieces on 30 October 2020. The complainants
say that the pontoon-jetty was structurally sound and operating as normal some three to 5
days prior to 30 October 2020.
The insurer denied the claim on the basis there was no evidence that an insured event, such
as an impact or a storm, destroyed the pontoon-jetty. The insurer also says that damage to
the pontoon-jetty came about because of wear, tear and gradual deterioration, which the
policy expressly excludes from cover.
The complainants disagree, and maintain that an insured event (an impact, to be precise)
destroyed the pontoon-jetty. Therefore, the complainants say, the insurer should accept the
claim in full.
1.2 Issues and key findings
Is the insurer liable for the replacement costs of the pontoon-jetty?
Yes. The insurer should meet the replacement / reinstatement costs of the pontoon-jetty.
Why is the outcome fair?
The outcome is fair because the complainants have established that the destruction of the
pontoon-jetty was caused by an insured event, and not merely by wear, tear and gradual
deterioration.
1.3 Determination
This determination is in favour of the complainants.
The insurer should resolve the claim as set out in section 2, below.
Determination | Case number: 842201 Page 2 of 8
2 Reasons for determination
Pontoon and jetty are a ‘ building ’ under the terms and conditions of the policy
Page 14 of the Product Disclosure Statement (‘ PDS ’) clearly states that the following
structures are included under the definition of ‘buildings’ which are covered by the policy: -
… boat jetties, pontoons, mooring poles and their attachments and accessories which
are located within the boundaries of the insured address or where part of their
structure begins or terminates on the insured address;
Clearly, the pontoon-jetty is a building that is potentially covered under the terms and
conditions of the policy . I therefore reject SHB’s conclusion in their report dated 4 November
2020 that:-
the damage is „not a claim ‟ as pontoons and jetties are not covered under the policy
schedule .
SHB is a Builder engaged by the insurer.
Further, and relevantly, at page 23 of the PDS under the sub- heading ‘Impact’, the following
appears:-
We cover loss or damage to the building caused by impact at the insured address
from:-
…. watercraft, aircraft, motor vehicles or trailers.
Finally, unde r the heading ‘What we do not cover – general exclusions’, the PDS also details
the types of loss and damage which are not covered under the policy. At page 40 of the PDS
the following is included in this category:-
Wear, tear and gradual deterioration
…. wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of
light, atmospheric or climatic conditions or gradual deterioration.
The proximate cause of damage was impact
The pontoon-jetty is a ‘ building ’ as defined by the PDS. Damage to it may be covered under
the terms and conditions of the policy in certain circumstances.
For instance if, as the complainants say, the pontoon-jetty was destroyed by impact, such
damage and loss should be covered under the policy. However if, as the insurer says, wear,
tear and general deterioration caused the pontoon-jetty to break apart, such damage and loss
will not be covered under the policy.
Therefore, a relevant issue is identifying the proximate cause of the damage to the pontoon-
jetty. The proximate cause of a loss need not be the sole cause, but it must be the effective,
dominant or operative cause of the loss.
SED (Engineering Services engaged by the insurer) provided four reports and ultimately
concluded that the proximate cause of the loss of the pontoon-jetty was wear, tear and
gradual deterioration. SED says such wear, tear and gradual deterioration involved (amongst
other things) damage to a base of a floating pontoon. This, in turn, caused the pontoon to
sink and thereby cause corrosion to sections of the pontoon and jetty.
Determination | Case number: 842201 Page 3 of 8
Whilst the photographs supplied by both parties show evidence of corrosion and some
wear and tear to parts of the structure, I am not persuaded that wear, tear and gradual
deterioration was the proximate cause of the destruction of the pontoon-jetty.
On balance, I find that the pontoon-jetty was likely destroyed and broken apart by a
significant force. Further, in all the circumstances, I am of the opinion that an impact from
a watercraft is the m ost likely explanation for such force.
I have examined all m aterial exchanged by the parties in this matter. In my opinion, the
following factors are most pertinent and persuasive in a determination of the proximate
cause of the loss of the pontoon-jetty:-
The pontoon-jetty was structurally sound and operational shortly before 29
October 2020
On 30 October 2020 WC (Licences Builders) first discovered that the pontoon-jetty
structure had been broken apart and reported its destruction to the complainants.
WC concluded in its report dated 2 November 2020 that a substantial force
(probably a side-on impact) was responsible for the destruction of the pontoon-
jetty. The photographs taken by WC on about 30 October 2020 show evidence of
a substantial force having impacted the structure including, but not limited to, a
sheared bolt on the side of a pontoon structure, and a sheared timber beam which
had framed the pontoon
The sheared bolt on the side of a pontoon and broken timber frame appear to be clear
evidence of an impact of substantial force. SED did not place a great deal of
significance on the damaged timber frame. Yet, a distinct break in part of the timber
frame is depicted in photographs 2 and 3 of WC’s report. It appears that a section of
the damaged timber ‘snapped’. It is reasonable to assume that this section of timber,
which had not been degraded or rotted by water, was subject to a significant lateral
force – that is, a 200mm x 50mm timber beam does not just break apart or snap in the
absence of significant forces
SED also dismisses the sheared bolt in terms of evidence of impact because there is
no damage to the surrounding concrete supporting the bolt, in the form of concrete
breakout or concrete pry out failure. Whilst this may be true in theory, SED offers no
alternate persuasive explanation for the fact that the bolt has, indeed, been sheared
level with the concrete surface in which it is imbedded. One is entitled to ask what sort
of force might shear such a bolt, even in the absence of damage to the concrete
surrounding the bolt
Likewise, SED placed little significance on damage to the corner of one of the
floatation pontoons as shown in photographs 3 and 4 of the SW report dated 19
August 2021. SW (Consulting Structural & Civil Engineers engaged by the
complainants) concluded that such damage is consistent with damage caused by
impact, yet SED offered no persuasive alternate explanation regarding the cause
of that damage. Indeed, SED appeared to dismiss this damage as impact-related
because there was no dam age observed to the concrete immediately adjacent to
the part of the pontoon that was damaged
Determination | Case number: 842201 Page 4 of 8
Whilst SED acknowledges that the floating pontoon landing sections had been
dislodged from their position around two concrete piers, SED is unable to give an
explanation as to how the sections became dislodged
Whilst SED says there was no evidence of recent impact to concrete piers,
photographs 1 and 2 in the SHB report dated 4 November 2020 show obvious
cracks in concrete piers consistent with impact. SED does not comment on the
cracks, instead stating that the overall condition of the concrete piers was unable
to be assessed properly. Further, SED does not comment on a crack in a concrete
pier which is depicted in photograph 12 of its report dated 5 January 2 021. This
failure to adequately assess and address the cracks in the concrete piers
undermines SED’s conclusions
There is no persuasive evidence to suggest wear and tear and gradual
deterioration caused a portion of the structure to be submerged for a prolonged
period, thereby weakening the structure.
The claim should be resolved in this way
Within 7 days of the date of receiving notice that the complainants accept this
determination, the insurer m ust accept the claim and elect to either replace / reinstate the
pontoon-jetty or offer a cash settlement to the complainants.
In the insurer elects to replace / reinstate the pontoon-jetty, subject to the complainants
providing reasonable access to their property, the insurer m ust commence and complete
the necessary works as soon as is reasonably practicable without delay. Thus, time is of
the essence regarding the resolution of this matter.
The quotations provided are now about six months old. Therefore, I determine that, if the
insurer elects to offer a cash settlement to the complainants, and the complainants agree
to be cash settled:-
Within a further period of 21 days of the date of receiving notice that the
complainants agree to be cash settled, and subject to the complainants providing
reasonable access to their property, the insurer must engage a suitably qualified
and licenced engineer or builder to draw up a scope of works (SOW) regarding the
replacem ent of the pontoon-jetty
Then, within a further 14 day period of the date of receipt of the SOW, the insurer
is to obtain at least one actionable quotation based upon the SOW, either by way
of a tender process or otherwise
Then, within a further 7 day period of the date of receipt of the actionable
quotation, the insurer is to pay to the complainants a sum equal to the total value
of the quotation, plus a 20% contingency on top of this to factor in the risk of the
works passing to the com plainants.
Determination | Case number: 842201 Page 5 of 8
2.1 Why is the outcome fair?
The available information shows the proximate cause of the loss of the pontoon-jetty was an
impact. Therefore, it is fair and reasonable that the insurer resolves this matter according to
section 2, above.
Such a resolution also accords with the ter ms and conditions of the policy and the insurer’s
obligations to the complainants regarding this claim.
Determination | Case number: 842201 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant background and brief overview of evidence
On 30 October 2020 WC [Licenced Builders] discovered the pontoon-jetty in pieces. WC
examined the wreckage, took photographs, recovered the pieces of the pontoon-jetty and
then moved them to a more secure position on a nearby ramp/slipway on shore. WC then
notified the complainants about the loss.
The photographs taken by WC appear in its report dated 2 November 2020. Relevantly, the
photographs include images of a sheared metal bolt on the edge (side) of a concrete pontoon
and one of the sheared (200mm x 50mm) timber beams which framed the pontoon portion of
the structure.
WC concluded the damage was caused by a „significant impact to the side of the pontoon‟
and that ‘ the pontoon structure…. are deemed unrepairable and require replacement‟.
As mentioned, the complainants say that they noticed the pontoon was intact, undamaged
and functioning normally about three to 5 days prior to 30 October 2020.
Determination | Case number: 842201 Page 7 of 8
Subsequently, the complainants arranged for SW [Consulting Structural & Civil Engineers] to
inspect the remains of the pontoon-jetty. SW did so on 4 August 2021 and provided a report
(including photographs) dated 19 August 2021. SW concluded:-
The damage shown in the corner of the now northern section of the pontoon is located
immediately below the “running board” and has quite likely been caused by impact from
a vessel or similar water bound object ( see photographs 3 and 4 of SW’s report dated
19 August 2021 .)
Meanwhile, the insurer also arranged for the remains of the pontoon-jetty to be inspected by
SHB [Builder] who attended the complainant’s property on 4 November 2020. SHB made
several conclusions:-
the damage is „not a claim ‟ as pontoons and jetties are not covered under the policy
schedule
at time of inspection, the pontoon had been damaged by wind or impact.
The insurer also arranged for SED [Engineering Services] to inspect the remains of the
pontoon-jetty on 18 December 2020. SED’s first report (including photographs) is dated 5
January 2021. SED also provided three supplementary reports, dated 6 April 2021 (including,
amongst other things, an informative photograph depicting the pontoon-jetty prior to being
damaged), 14 September 2021 and 24 January 2022.
Ultimately, SED concluded:-
At the time of inspection there was no obvious evidence of vessel related impact
damage to:
o the two pontoon piers
o the northern and southern sides of the upper fixed jetty platform
o the northern and southern sides of the lower moving jetty structure
o the two rectangular PVC pontoon floats with concrete deck.
The current observed distress to the pontoon jetty appears to be consistent with
long term cracking damage to the base of the floating pontoon, causing the
pontoon to sink and cause corrosion to the ends of the steel sections of the lower
moving jetty section
Based on the available evidence, there was no evidence to suggest that the
pontoon / jetty had been impacted. We are of the opinion that the observed long-
term damage to the pontoon / jetty was not caused by a recent storm event in
October 2020.
I also note, in particular, at paragraph 6.5 of its report dated 5 January 2021, SED stated:-
It is not clear how the floating pontoon landing sections had been dislodged from their
position around the two concrete piers. There were no signs or evidence that they had
been dislodged by impact action.
A further ‘Assessment’ by JR on behalf of the insurer dated 20 April 2021 mainly contains a
review of expert reports and therefore adds little value to this analysis.
Finally, I note there is broad agreement between the parties that the pontoon-jetty is
irreparable and will therefore have to be replaced.