Water damage claims; insurer failed to detect maintenance cause; cash settlement amount disputed
Text of the determination
Determination
Case number 841701
Financial firm AAI Limited
Determination | Case number: 841701 Page 1 of 6
Case number: 841701 25 August 2022
1 Determination overview
1.1 Complaint
The complainant lodged three water damage claims with his home insurer in November 2015,
April 2019 and February 2020. The insurer paid for damage caused by storm and also
requested the complainant carry out maintenance works at the complainant’s own cost.
After the third claim the insurer discovered a previously undisclosed cracked roof tile and a
vertical wall crack. The complainant says the insurer should have detected the true cause of
the problem in 2015 and should pay for all the resultant damage including wasted
maintenance work. The insurer has offered $35,383 but the complainant wants an additional
$11,000.
1.2 Issues and key findings
Is the insurer liable for damage resulting from a failure by the insurer to detect a
maintenance issue when carrying out previous storm repairs?
An insurer may become liable in damages for breaches of duty by its contractors when
inspecting and repairing an insured’s property, but in the circumstances of this case the
complainant has not proven its entitlement to the amounts claimed.
What amount is payable by the insurer?
The insurer has offered to pay $35,383 which is fair in the circumstances subject to a 15%
uplift due to contingencies, rising building costs and the transference of risk.
Why is the outcome fair?
The insurer is making a payment not pursuant to the scope of cover under the policy, but as
compensation to the complainant for the specific circumstances of the case and the amount
offered is reasonable.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 21 days of this Determination being accepted, the insurer is to cash settle the
complainant in the sum of $40,690
Determination | Case number: 841701 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer liable for damage resulting from a failure by
the insurer to detect a maintenance issue when carrying
out previous storm repairs?
An insurer may become liable in damages for breaches of duty by its contractors when
inspecting and repairing an insured’s property , but in the circumstances of this case the
complainant has not proven its entitlement to the amounts claimed.
Complainant has lodged 3 water damage claims since 2015
First claim
The complainant lodged a claim in November 2015 for damage after a storm which is an
insured event under the policy. The insurer’s building contractor PI inspected an d the insurer
accepted the claim.
There was water staining to the plasterboard ceiling, cornice and wall linings in the living
area, open plan area and front external area. PI said the roof was in good condition. PI found
a large amount of water entered through the downpipe, overwhelming the gutters and valley
causing water to track back into the ceiling and walls of these areas.
As of 14 December 2015, the repairs were complete. The complainant says that in 2015 the
insurer (or one of its contractors) advised it had a faulty waterproof membrane on the upper
verandah and the complainant spent $4,000 replacing the sandstone tiles to put down a new
membrane. I have not seen a record of that request but it seems likely to have been made as
the work was carried out.
Second claim
The complainant lodged a second claim for water damage to his living room in April 2019.
The insurer accepted internal damage was caused by a recent storm. However, the insurer’s
repairer HR noticed several issues on the roof, allowing the water to enter. HR advised in its
report:
the mortar on the ridge over the affected living room was severely deteriorated and
allowing water entry
to fix damage on roof, ridges were required to be re-bedded and re-pointed over the
affected area to ensure weep holes are installed on any top ridge.
The complainant was asked to complete the maintenance work, and this was done as of 6
November 2019. The complainant says it has used its own contractors and spent over
$10,000 on repairs and maintenance requested by the insurer but this did not stop the leaks.
Ceiling cracks
The complainants contacted the insurer on 19 November 2019 after noticing cracks in the
ceilings. However, as the cracks were likely from settlement and not located in the same area
as the above repairs, the insurer did not agree to indemnify.
Determination | Case number: 841701 Page 3 of 6
Third claim
The complainant lodged a third claim on 20 February 2020 for water damage. Builder, KB,
was appointed by the insurer and it concluded:
there was a possible issue with the valley and gutter design to the roof area above the
kitchen leak
current damage has occurred in the same area where another panel builder conducted
repairs to the lower level kitchen area
the crack along the ceiling join is in the same area of repairs completed by another panel
builder
the cause of the water ingress to the lower kitchen area is due to the way the valley and
gutters are built, not an insured event.
Policy indemnity was not accepted by the insurer. After undertaking recommended repairs,
the complainant said that the problems continued. The insurer appointed an engineer MS
who in an undated report found no storm damage but only design issues and a lack of
flashing. MS said the roof tiles were generally in good condition.
Communications on these issues between insurer and complainant continued for another
year. The insurer’s claim file notes on this matter exceed 330 pages.
2021 leak detection test reveals source of leak
At the request of the complainant, a leak detection test was carried out by KB on 24 March
2021. It showed water could enter through the balcony floor and walls. A broken tile was
found which allowed the water to enter. Water was also coming through a crack in a vertical
joint in an exterior wall. These problems had not been revealed previously and were not
previously disclosed to the complainant.
The insurer’s own assessment report dated 19 April 2021, states:
As per the LDT (leak detection test), the waterproofing membrane has failed and the
external walls. These are maintenance related items and would have not been
damaged by a one-off event but gradual deterioration over time.
As the customer was not advised of these issues in 2015 and further damage has
occurred in 2020, the claim is to be accepted and a liability quote to be arranged and
settled with the customer. As the LDT identified the maintenance issues, further
claims arising in the same area from the same cause of damage, will need to be
reviewed and assessed. The customer is to be given a reasonable amount of time to
complete the repairs.
Complainant says Insurer has admitted liability
The complainant relies on the assessment report as an admission by the insurer. The
complainant also says the insurer’s own staff who inspected the damage have said “ This is
on us ” .
It is unclear however if these remarks were actually made by the assessor or KB or other
contractor. An assessor or contractor would not usually have authority to admit liability on a
claim. The remarks may amount to evidence that the speaker felt some responsibility in
Determination | Case number: 841701 Page 4 of 6
respect of the damage being referred to, but it remains unclear if that responsibility was
intended to extend to the insurer.
In any case the insurer has agreed to make a payment. Despite the loose language in the
assessment report the insurer has not agreed or admitted that there is a valid claim within the
scope of cover in the policy. The agreement appears to be based on the assessor’s view o f
the specific circumstances, in particular, the ongoing water damage has occurred despite
multiple insurer inspections and the maintenance work undertaken. Furthermore, in my
interpretation of that agreement, it is not unlimited, it is subject to an assessment by the
insurer of the quantum it will pay.
Complainant says insurer should have detected cause of leak back in 2015
The complainant says a leak detection test should have been conducted in 2015. The
complainant says he will have to remove and replace the tiles and waterproofing to the
balcony again due to the insurer’s misdiagnosis.
By an email response dated 19 January 2022 the complainant concedes the items in
dispute are maintenance issues but says “if we had been notified of this issue 5 ye ars
earlier, then we could have had this repaired and not suffered the internal damage that
we now have”.
The complainant in a 24 March 2022 email says:
”Its pretty simple…we did everything to maintain our house over 7 years based on what (the
insurer) advised us to do, yet they failed on 2 separate issues/claims to ever actually
investigate where the leak to the roof and the leak to the upper balcony came from. Now we
face far greater repair costs due to this water damage over many years ” .
The insurer does not agree to this. The insurer says that whatever repairs were carried out by
the complainant were in fact necessary at the time.
Complainant has failed to prove breach of duty by insurer
The burden of proof is on the complainant to prove that the damage now claimed in fact
resulted from the insurer’s alleged failure to properly investigate.
In my view and despite the unclear language of the assessment report, there is no evidence
that the broken tile and vertical wall crack were present and or visible in 2015. Even if they
were present in 2015, there is no evidence, for example from a building expert, to say that the
insurer’s contractors in 2015 should have detected those defects or maintenance issues.
Lastly, but importantly, even though an insurer provides a specific guarantee of quality in
respect of its repair work and even though the insurer may recommend or even stipulate
attention to maintenance issues, the insurer does not assume a duty to warrant or guarantee
the overall state of an insured property.
I do not find the insurer liable to reimburse the complainant for the costs of the complainant’s
maintenance work carried out since 2015. There is inadequate evidence to suggest that work
was unnecessary. The insurer has however agreed to make a payment to the complainant in
respect of the damage suffered as at 2021.
2.2 What amount is payable by the insurer?
The insurer has offered to pay $35,383 which is fair in the circumstances subject to a 15%
uplift due to contingencies, rising building costs and the transference of risk.
Determination | Case number: 841701 Page 5 of 6
The insurer offered a cash settlement
My understanding of the insurer’s position is that it is agreeable to pay for the further internal
and other water damage to the home but it does not propose to pay for fixing the sources of
the leak, where those sources are not caused by storm, but are due to a lack of maintenance.
There is no evidence that the broken tile and wall crack were caused by the 2015 storm or
any other storm. It is not disputed that the insurance policy excludes coverage for wear and
tear and gradual deterioration (see 3.2 below).
In August 2021 the insurer offered a cash settlement for the damage in an amount of
$35,383. This figure comprises $16,364.96 for replacement gutterguard, $16,243.59 for
loungeroom and internal areas and $2,774 for repairs to the verandah. These first two
amounts only were agreed by the complainant. The insurer also offered an additional amount
of $1,000 as compensation. The offer was not accepted.
Complainant seeks $15,887 for verandah repairs
The complainant is seeking an amount of $15,887 to undertake repairs to the verandah from
which water was entering the home. The complainant has provided a quote dated 19 August
2021 from his builder. Based on that quote the complainant has identified components
relating to the verandah adding up to $15,887. The quote does not specify the proposed
repairs but the complainant has provided a breakdown. The largest item appears to relate to
replacement of the waterproofing and the tiling on top of the waterproofing. The complainant
has alleged that the previously installed waterproofing was damaged by the ongoing water
leaks, due to those leaks not being detected by the insurer’s contractors. Without supporting
evidence from an expert, I am unable to accept that the waterproofing was damaged in this
way.
The insurer offered $2,774 for repairs to the verandah and provided a scope of work which
does not include installing a new waterproof membrane or replacement tiling. The
complainant has indicated he would accept an additional $11,000 on top of the $2,774.
However, I am unable to identify any basis either at law or as a matter of fairness to justify the
extra amount sought by the complainant.
Insurer to cash settle claim
Accordingly, the insurer should settle the complainant for the damage which it has offered to
cash settle in the sum of $35,383.00. This figure is based on a quote which is now a year old.
I consider it reasonable the insurer pays a 15% contingency on this amount to account for
rising building costs and the transference of risk. This comes to $40,690.
The insurer submits this delay is due to the complainant being unreasonable but there is no
reason in my view that the agreed amounts could not have been paid several months ago. On
balance however the insurer has sought to act fairly, it is paying an amount outside policy
coverage. I do not propose to direct payment of the $1,000 compensation which was
previously offered.
2.3 Why is the outcome fair?
The insurer is making a payment not pursuant to the scope of cover under the policy but as
compensation to the complainant for the specific circumstances of the case and the amount
offered is reasonable.
Determination | Case number: 841701 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant Policy Terms
Policy Exclusions
Wear, tear, mould, gradual deterioration and other conditions
wear, tea r, rus t, fadi ng, rising da mp, mould, mildew, corrosion, rot, a ction of light, a tmospheri c
or clima ti c condi tions or gradual deteri orati on such as, but not limited to :
• tiles and thei r adhesi ve or grouting breaking down;
• wea theri ng of roof tiles or roof ridge capping;
• gra dual weathering and breakdown of bri cks , morta r or concrete.