Text of the determination
Determination
Case number 841028
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 841028 Page 1 of 6
Case number: 841028 9 December 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy (policy) with the financial firm
(insurer). On 2 March 2021, a claim was lodged for water ingress damage to the insured
building due to a leak in the hot water system located on the roof.
The insurer initially declined the claim. However, after the complaint was brought to AFCA,
the insurer reversed its decision and accepted the claim on 4 February 2022.
The complainant disputes insurer’s proposed settlement and is seeking a cash settlement for
the co st of repairs in line with a quote from consultants ‘CB’ dated 28 November 2022, in the
amount $57,587.50.
1.2 Issues and key findings
Is the insurer’s required to increase its level of indemnity under the claim?
Yes. The insurer is to increase its settlement offer in line with the scope of works (SOW)
prepared by CB. However, it is fair that the insurer be allowed to cost these works through an
actionable quotes from its preferred consultants, as set out in section 2.1 of this
determination.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer is to pay the complainant $1,500 in non-financial loss in line with the AFCA
Rules, given the complainant’s poor experience over the life of the claim and the stress this
caused.
Why is the outcome fair?
The outcome is fair because the SOW sourced by the complainant best reflects the damage
to the insured building. However, it is fair in all the circumstances that the insurer be allowed
to assess its liability under the claim based on what it would cost the insurer to complete the
repairs. Finally, given the complainant’s poor experience, it is fair that the insurer be required
to pay compensation.
1.3 Determination
This determination is significantly in favour of the complainant.
The insurer is to obtain two actionable quotes for repairs based on the scope of works
prepared by CB. The insurer is to cash settle the complainant based on the higher of these
two quotes. The settlement is to be increased by a further 15% to allow for contingencies and
the transfer of risk to the complainant in having to arrange the repairs.
The insurer is to pay the complainant $1,500 in non-financial loss (NFL) compensation in line
with the AFCA Rules. The insurer is to also reimburse the complainant $550 towards the cost
incurred in sourcing the scope of works and quote from consultants CB.
Determination | Case number: 841028 Page 2 of 6
2 Reasons for determination
The available information shows that at the time this complaint was brought to AFCA, the
insurer was maintaining its decision to decline the complainant’s claim. However, the insurer
has since reversed this decision and the claim has been accepted under the policy.
The remaining issues in dispute relate to how the claim is to be settled by the insurer and
whether it is fair that the insurer pay the complainant non-financial loss compensation. Given
the above, consideration under this determination has been limited to the remaining issues in
dispute between the parties.
2.1 Is the insurer to increase its indemnity under the claim?
Yes. The insurer is to increase its settlement offer in line with the scope of works prepared by
CB.
The complainant bears the onus to establish a prima facie claim
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Water and oil leaks ’. Cover under these benefits is subject to
the conditions, limitations and exclusions specified in the product disclosure statement (PDS).
It is established law that the complainant has the onus to establish, on the balance of
probabilities (that is, more likely than not) that the loss falls within the terms of the policy. Only
if a prima facie claim is shown to exist, will the onus shift to the insurer to show, on balance, it
is entitled to decline the claim in line with the policy provisions.
No dispute the complainant has established a prima facie claim
The complainant lodged a claim for water damage to the insured building on 2 March 2021.
The insurer arranged for consultants ‘J’ to assess the cause and extent of the damage. J
confirmed the presence of water damage and provided a SOW and quote for repairs in the
amount of $4,381.22, dated 16 March 2021. The insurer accepted and offered to settle the
claim in line with J’s quote.
The complainant disputed the scope of J’s assessment and said it did not include all the
resultant damage from the event. The insurer subsequently declined the claim saying the
damage was not consistent with a single event and referred to a previous claim under the
policy, which the complainant did not accept. On 4 February 2022, after the matter had been
referred to AFCA, the insurer reversed its decision and accepted a valid claim did exist for
water damage.
From this point onwards, the parties have been unable to come to an agreement on the
method of repairs as well as on a settlement amount for the damage under the claim.
Insurer’s management of the claim has complicated the settlement process
I have considered all the information from the parties and the history or the claim, I note the
following:
After lodgement of the claim on 2 March 2021, the insurer appointed J to assess the cause
and extent of the damage claimed
Having received J’s report dated 16 March 2021, the insurer informed the complainant the
claim had been accepted and offered a cash settlement in the amount of $3,881.22
(applying the $500 excess) on 22 March 2021
Determination | Case number: 841028 Page 3 of 6
The complainant declined the offer on the basis J ’s SOW did not include all the resultant
water damage . The insurer proceeded to appoint consultants ‘R’ to inspect the insured
property and provide a quote for mould remediation
R provided its report and quote for mould remediation in the amount of $10,257.32. The
complainant requested information from the insurer as to extent of repairs and time it
would take to complete the repairs by J and R, which the insurer was unable to confirm
The insurer told the complainant to obtain his own quote, which he arranged through
consultants ‘M’, in the amount of $29,818.80 including mould remediation works
On or about 18 August 2021, the insurer sent a decline letter to the complainant advising
the damage was not due to a single insured event and because of a failure to complete
repairs under a previous claim which was cash settled in 2019
The complainant disputed the insurer’s decision and says it never provided him with an
explanation as to why M’s SOW and quote were not acceptable. The complainant
registered a complaint with AFCA on 3 November 2021
The insurer has then appointed consultants ‘C’ on or about 23 November 2021 with
instructions to assess the damage and provide a SOW and quote, this is despite it
maintaining it decision to decline the claim
The complainant refused C access questioning the basis for this given the insurer was
maintaining the decision to decline the claim. On 4 February 2022, insurer reversed its
decision and confirmed a valid (prima facie) claim under the policy
The complainant agreed to C having access and requested C to attend as soon as
possible to provide a quote. However, the insurer refused on the basis that the mould
remediation works must first be completed before C could attend
The complainant requested that all the works, mould remediation and building repairs, be
completed as one event, given the complainant’s age and impact on his health. The
insurer maintained its position and in August 2022 offered to cash settle the complainant
for the mould remediation works based on M’s quote
Subsequently, with the assistance of AFCA, the parties agreed for the complainant to
obtain a SOW and quote for the works (mould remediation and building repairs) for the
insurer’s consideration. The complainant obtained a quote from CB in the amount of
$57,587.75 dated 28 November 2022 at a cost of $550.00
The insurer has refused to accept the quote saying it is excessive and reverted to its
position that the mould remediation works must be completed first, before it will arrange a
builder to attend to determine the repair SOW.
Given the information above, I am of the view the insurer’s management of the claim and
several instances of shifting positions has significantly contributed to the difficulty in bringing
this claim to conclusion. The shi fting in positions relates to the insurer’s acceptance, then
decline and subsequent acceptance of the claim. Also, it’s changing position on the method of
settlement has confused the process and resulted in a lack of trust between the parties.
This is because the insurer first sought to cash settle the claim for an amount that did not
include all resultant damage. It then told the complainant to obtain his own quote which was
dismissed without reasonable explanation. The insurer then took the position that mould
remediation works must first be completed before the building repairs could be assessed.
However, the available information shows the insurer had previously appointed C to provide a
SOW and quote regardless of mould remediation works having been completed or not. Later,
the insurer again said it was prepared to consider a quote from the complainant for the
building repairs but then refused to accept the quote and again returned to the position that
the building repairs cannot be scoped until mould remediation works are completed.
Determination | Case number: 841028 Page 4 of 6
I acknowledge it is not the insurer alone that has contributed to the delays and complexity in
bring this claim to conclusion. I accept the complainant has also shown a lack of flexibility and
strongly maintained the position that all the works (mould remediation and building repairs)
need to be cash settled at the same time. Further, that he did not allow C access to the
insured building. However, I also accept the loss in trust in the insurer’s process and the fact
C was appointed at a time the claim was declined can reasonably be accepted to be
contributing factors for the complainant’s actions.
Insurer is to increase the level of indemnity offered under the claim
I am satisfied the insured building was water damaged and that this has then led to the noted
mould infestation. I am also satisfied it is reasonable to accept the extent of damage and
associated cost of repairs will have increased due to the delay in bring the claim to
conclusion.
I acknowledge the insurer’s position that it would have been better for the mould remediation
works to have been completed first, before arranging the SOW for building repairs. However,
I am satisfied it was nevertheless possible to arrange a reasonably detailed assessment to
determine the extent of damage and associated repairs. I accept the complainant’s position
that the insurer was provided with reasonable time and opportunity to complete such
assessment.
Further, that the insurer, despite being requested for information/clarity, has failed to provide
any persuasive information as to why it refused the SOW put forward by M and subsequently
CB ’s SOW . The available information shows, given the time lapsed and the insurer’s rigid
expectations during the quoting process, M has lost interest in the job, which required the
complainant to source a new quote from CB.
I note CB’s proposed SOW allows for more works than those put forward by M. However, I
am satisfied the extent of damage will have continued to worsen as well as the impact and
spreading of mould over the 16 months that past between the dates the two quotes were
prepared. I note the insurer also acknowledges that it was possible there could be more
damage given M’s SOW was based on a non-invasive assessment. The insurer says that
post mould remediation, it was possible that further damage becomes apparent.
I accept CB’s quote appear s excessive in terms of the cost of the repairs. I am of the opinion,
it is fair that the insurer be allowed to assess its liability under the claim based on what it
would cost the insurer to complete the repairs. Therefore, I am satisfied it is fair in all the
circumstances (and in the interest of bring the matter to conclusion), that the claim be settled
in the manner set out below:
the insurer is to settle the complainant for damage to the insured building based on the
SOW identified by CB, this being the latest assessment of the damage and based on an
invasive assessment of the areas of damage
the insurer, within 14 days of receiving notice of t he complainant’s acceptance of this
determination, is to arrange for two of its preferred consultants to provide actionable
quotes based on CB’s SOW . In the interest of clarity, this does not mean two additional
assessments of the property, rather, that these two consultants provide their costings
based on the SOW presented by CB
within 7 days of receiving these quotes, the insurer is to cash settle the complainant based
on the higher of the two quotes. The insurer is entitled to reduce this payment by any
amount it may have already paid the complainant towards mould remediation and costs
relating to the damaged carpet, as the policy only covers the insured building (not
contents)
Determination | Case number: 841028 Page 5 of 6
the insurer is to increase the final settlement amount by a further 15% to allow for
contingencies and the transfer of risk in arranging the repairs to the complainant
the insurer is entitled to apply the $500 policy excess to the claim.
2.2 Is the complainant entitled to NFL compensation?
Insurer is to pay the complainant $1,500 in NFL compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
In this instance and considering AFCA’s approach to compensation, I accept the insurer’s
overall management of the claim has been poor and significantly contributed to the delay in
finalising the claim. I accept this will have caused the complainant to experience an
unreasonable level of stress, anxiety and physical inconvenience.
In saying that, as discussed above, I also accept it is not the conduct of the insurer alone that
has contributed to the delays experienced under the claim. I accept the complainant has also
acted with a lack of flexibility towards to possible actions that may have assisted in moving
the claim forward at times. I don’t feel these can be completed ignored, however, I accept this
relates to and arises from the complainant’s loss of trust in the insurer’s management of and
poor experience under the claim.
Therefore, the for the reasons previously discussed in this determination and in line with the
AFCA Rules, the insurer is to pay the complainant $1,500 in NFL compensation within 14
days of receiving notice of the complainant’s acceptance of this determination.
2.3 Why is the outcome fair?
The outcome is fair because the SOW sourced by the complainant best reflects the damage
to the insured building. However, it is fair in all the circumstances that the insurer be allowed
to assess its liability under the claim based on what it would cost the insurer to complete the
repairs. Finally, given the complainant’s poor experience, it is fair that the insurer be required
to pay compensation.
Determination | Case number: 841028 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred
to the Complainant’s feelings or humiliation has been suffered by the
Complainant; or
b) for other complaints – an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the
Complainant’s expectation of enjoyment or peace of mind has occurred.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.