Text of the determination
Determination
Case number 840547
Financial firm Youi Pty Ltd
Determination | Case number: 840547 Page 1 of 18
Case number: 840547 10 May 2022
1 Determination overview
1.1 Complaint
The complainants hold a home insurance policy with the financial firm (insurer). In June 2020,
they lodged a claim for storm damage.
The insurer accepted the claim and arranged for repairs to be completed. The complainants
are dissatisfied with the quality of repairs and want the roof replaced.
The insurer offered a cash settlement for the outstanding repairs and rectification works. The
complainants are dissatisfied with the offer. The complainants are also seeking electricity
costs due to loss of the solar rebate and repairs to the front entrance cladding.
1.2 Issues and key findings
Is the insurer required to replace the roof?
The panel is not satisfied the complainants have established the roof must be replaced or re-
battened. The information provided establishes while some of the battens had split this can
be rectified by bracing. Further the available information establishes the failure to discuss the
decision not to remove and replace the battens once repairs commenced does not affect the
outcome.
Is the insurer’s offer for rectification repairs fair ?
The information provided establishes the amount offered by the insurer is fair considering the
issues identified by the insurer’s engineers save that an uplift of 30% is fair in all the
circumstances.
Are the complainants entitled to compensation?
Considering the policy terms and the AFCA approach to consequential loss a fair outcome is
for the insurer to pay 50% of the complainants’ claimed loss for electricity costs and the lost
solar rebate.
An award of non-financial loss compensation is also warranted because there has been an
unusual degree or extent of physical inconvenience and time taken to resolve the complaint
which would have interfered with the complainants’ expectation of enjoyment or p eace of
mind.
Why is the outcome fair?
The insurer is entitled to rely on its policy terms and expert opinion. As the preponderance of
expert opinion does not establish on the balance of probabilities the roof must be re-battened
or replaced it would not be fair to require the insurer to pay the amount sought by the
complainants.
Determination | Case number: 840547 Page 2 of 18
1.3 Determination
This determination is mostly in favour of the insurer.
Should the complainants accept this determination then within seven days of notification of
acceptance the insurer is to pay to the complainants:
$10,403.25 for rectification repairs;
interest pursuant to section 57 of the Insurance Contracts Act on $10,403.25 from the date
of the first rectification offer (6 August 2021) until settlement;
$4,000 for non-financial loss; and
50% of the complainants’ claimed loss for electricity costs and the lost solar rebate from
April 2021 until the date of this determination.
Should the complainants accept this determination then within seven days of acceptance the
complainants are to provide details and supporting material to the insurer in relation to the
claim for the lost solar rebate and electricity costs incurred so the claim can be assessed.
If not done so already the insurer is to forthwith provide a contractor to inspect and assess the
claimed damage to the front entry cladding. If the policy responds to the claimed damage,
either because of the subject claim or a later event, the insurer is to repair the damage (if
any), or cash settle the claim pursuant to the policy terms and conditions together with a 15%
uplift on the amount cash settled.
Otherwise, the insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 840547 Page 3 of 18
2 Reasons for determination
2.1 Is the insurer required to replace the roof?
Background
It is not in dispute the complainants’ property was damaged by hail in April 2020.
The complainants lodged a claim in June 2020. The insurer arranged for two builders to
assess the loss. Builder A assessed repairs at $92,273.01. Builder OS’s total contract price
was $67,242.02. This was increased in March 2021 by $4,653.
In July 2020, OS was authorised to complete the repairs. The claim file notes show in
September 2020 the complainants considered obtaining their own builder and had some
queries on the repairs. The insurer asked OS to make contact. The scope of works (SOW)
and building contract were signed. The complainants paid the policy excess. In December
2020 it was agreed repairs would commence in March 2021. The new contract sum then
totalled $71,895.02.
In April 2021, the complainants said they had issues regarding OS’s workmanship including
with the roof sheeting, metal roofing battens (instead of wood) and allowing water ingress.
Claim file notes and correspondence between the parties show make safe attempts and
attempts to address the complainants’ concerns (which included splits in the wooden battens)
and discussions about the repairs and rectifications required.
The insurer arranged for its assessor and two engineers to inspect the property and the repair
work undertaken. The general tenor of the reports was the workmanship was defective and
although rectification repairs were required the entire roof did not have to be replaced or re-
battened.
A cash settlement offer to pay for repair rectifications was made (final offer $9,202.87) which
was rejected by the complainants. They are seeking $145,000 comprising a cash settlement
as per their builder’s quote, reimbursement of missed solar rebate, electricity costs and
additional repairs to the front entrance cladding (about which they say they note recent water
damage).
Parties’ material and submissions considere d
The complainants made several submissions. They rely on a local builder (BB) who says the
damage is substantial and work required includes re-battening with standard hardwood
battens and re-roofing.
They also say the Anticon blanket is to be installed as per manufacturer ’ s specifications and
they require work to fascia and gutters that were damaged or poorly installed.
They contend the SOW authorised the removal and replacement of roofing battens to
facilitate the roof replacement, but the battens were never removed or replaced.
They also say the policy provides cover on a new for old basis and as timber battens are still
available, these should have been replaced at the commencement of the works.
To comply with the SOW the complainants contend new hardwood timber roofing battens are
to be reinstated resulting in a new roof. They refer to and provide photographs of other
Determination | Case number: 840547 Page 4 of 18
defects/non-compliant issues/breaches of the building contract (including roofing sheets and
flashing overhang and tie down upgrade).
They challenge the amount offered saying the payout figure should include damage caused
by OS which is now substantial. They also say the offer does not address the main issue
which is the battens were not removed and replaced as per the signed SOW.
The complainants also contend the insurer did not act in good faith as they were not afforded
an opportunity to choose a repairer other than OS and the insurer did not ensure good quality
work. They say OS’s quote was below the true cost of repairs and the workmanship reflects
this.
The complainants also refer to other issues leaving their home in a “total state of disrepair”.
They say the roof repairs were totally mismanaged due to very limited supervision (the SOW
provided for 6 hours) and there was lack of communication about concerns unless instigated
by the complainants.
The insurer agrees rectifications are required due to poor workmanship. Relying on its
engineers’ reports it does not agree the roof or battens require replacement. It says there is
not a widespread issue with the integrity of the timber as the split roof battens can be braced.
It obtained a quote to ensure all bracing noted in its experts’ reports were included in the
offer. It says the repairs can be rectified and that its offer has b een based on the engineer’s
scope of works and includes solar reinstallation. Additionally, it has allowed a 15% margin for
unforeseen items.
The insurer also says the complainants would not allow the builder on site to complete
rectifications. The complainants dispute this characterisation of events.
The insurer reviewed the quote from BB which it says does not a breakdown of costs. The
insurer says the difference in the quotes by A and OS was that A quoted to replace the timber
battens with metal battens.
The insurer says it is unaware of any other damage and can arrange to have another
engineer attend to report and quote to confirm if any additional items are required.
Expert evidence does not establish re -battening and re-roofing is required
The complainants are required to show, on the balance of probabilities, they suffered a loss
caused by a risk insured against under the policy. This is known as establishing a prima facie
or valid claim.
The complainant must establish on the balance of probabilities the claimed damage was
caused either by the storm or by OS’s poor workmanship.
The relevant policy terms are set out in supporting section 3.2 of this determination.
It is not in dispute hail damaged the roof. The insurer also does not dispute the roof is badly
repaired. The dispute is about the amount payable to rectify the poor repairs.
Both parties rely on expert opinion which is summarised in supporting section 3.3 of this
determination. A summary of relevant invoices is also included in section 3.3 of this
determination.
The complainants rely on a report from their builder (BB) who describes the work he says is
required to reroof and repair the home. He says the roof must be re-battened with standard
hardware battens and re-roofed in colour bo nd. He notes “severe splitting of existing battens”
Determination | Case number: 840547 Page 5 of 18
and that the house is about 24 years old. He says he cannot reuse the battens a third or
fourth time after so many re-roofing episodes. He quotes necessary repairs at $139,920
(including materials, labour , builder’s margin, and GST).
The insurer arranged for two civil engineers to inspect the roof and repairs and provide
reports.
The first civil engineer (PG) inspected the roof cavity on 14 June 2021. He says he was able
to see about 80% of the roof battens. PG acknowledged some battens were split but did not
believe there was a sufficient quantity of damage to warrant a re-roofing of the house. He
says the amount of splitting is minimal and remedial works could be undertaken from within
the ceiling cavity. His photographs and commentary describe the repair methods. PG
provided a site sketch showing where the repairs were required. His sketch shows 14 battens
require bracing.
A second civil engineer (JH) inspected the roof on 14 and 15 July 2021. He considered there
was no widespread issue with the integrity of the timber. He provided a scope of works to
rectify repairs.
OS quoted on JH’s scope of works and to brace the battens as per PG’s requirements. The
insurer included a 15% uplift and offered the complainants $9,202.87 for repair rectifications.
The panel has carefully considered all the available material including the three expert reports
and photographs provided by the parties.
The panel does not find BB’s report sufficiently persuasive but prefers the reports from the
insurer’s two civil engineers. Like PG, BB was able to inspect about 80% of the ceiling space.
BB describes “severely split battens” identified in certain areas but unlike PG does not
photograph the battens or identify where the battens are. Relevantly, BB does not comment
on the bracing mechanism recommended by PG.
Both the insurer’s engineers say the splitting is minimal and not widespread. The engineers
have the relevant expertise to comment. Their opinions are supported by comprehensive
reports and photographs.
The complainants do not recognise PG as a credible or independent expert. They point out
PG wrongly identified the house construction as brick veneer. The panel notes this but does
not consider this derogates from PG’s opinion about the battens.
Having considered the available information, the panel is not satisfied the complainants have
established on the balance of probabilities there is damage/severity of damage which
warrants a re-roofing or re-battening of the house.
Failure to discuss the variation of the works does not affect the outcome
The complainants say the offer is not enough because the battens were not removed and
replaced as per the signed SOW.
The insurer agrees the SOW noted the removal and replacement of the timber battens but
says a SOW can change during repairs and items can be added or removed once the repairs
begin. It says batten replacement was not required when the repairs began. It apologised as
the negative variation was not discussed with the complainants but says its engineers
confirmed the battens did not require replacement.
The complainants challenge this was a variation as a variation is signed and consented to by
both parties, and this did not occur.
Determination | Case number: 840547 Page 6 of 18
The panel accepts the SOW included the removal and replacement of roof battens to facilitate
roof replacement. The panel also accepts the building contract between the complainants and
OS provided the parties may agree to vary the works by omitting work which must be put in
writing and signed by the parties. The panel notes this was not done and that good industry
practice means it should have been done.
If OS breached the contract by failing to comply with this condition the complainants still must
establish the breach of contract lead to loss. The panel has carefully considered the expert
evidence and reached a conclusion about the expert opinion as set out above. Having
considered the available material and for the reasons stated the panel accepts on the balance
of probabilities the removal and replacement of roof battens was not required to facilitate the
roof replacement.
The complainants refer to OS’s initial reports and photographs and say the entire process
was mismanaged from the beginning as OS wrongly identified the type of roof battens. In
circumstances where once the works commenced, the removal and replacement of roof
battens was not required to facilitate the roof replacement the panel does not accept this
incorrect identification made a material difference to the outcome.
The panel accepts the SOW can change during repairs and items can be added or removed
once the repairs begin. The panel is satisfied the insurer was entitled to remove items from
the SOW where the works were not warranted. The panel notes the insurer apologised as the
negative variation was not discussed with the complainants. The panel considers good
industry practice would be for the negative variation to be discussed. However, the remedy is
not for the roof to be re-battened or the roof to be replaced. In the circumstances the remedy
lies in compensation for non-financial loss which will be discussed further in this
determination.
The complainants wanted AFCA to investigate the contract breach. AFCA is a complaint
resolution service offered as a free alternative to the courts. AFCA is not a regulator of the
financial services industry, nor can we investigate whether there was a contract breach.
Relying on policy terms and expert opinion, AFCA’s jurisdiction is lim ited to consideration of
individual complaints and claims regarding loss or damage caused by an event to which an
insurance policy responds.
2.2 Is the insurers offer for rectification repairs fair?
Insurer to pay the complainants $10,403.25 plus interest for rectification repairs
The policy terms are clear and unambiguous. The insurer is entitled to settle a building claim
by undertaking repairs or paying the complainants the reasonable cost of repairs.
The insurer must act fairly. It asked JH to create the rectification scope of works and based its
offer on JH’s report.
The insurer says the rectification works were not completed as its contractors were denied
access to site and a cash settlement was offered in lieu of the repairs.
The complainants’ emails sent in October 2021 to OS indicated a willingness to give OS a
chance to rectify. OS did not follow up the invitation. However, other claim file notes and
submissions indicate a willingness to consider a cash settlement.
Determination | Case number: 840547 Page 7 of 18
In any event, even if it was accepted the complainants did not reject the insurer’s offer to
rectify the repairs, the panel considers the relationship between the parties has probably
broken down to such an extent that a cash settlement is fair in the circumstances.
The complainants challenge JH’s report. They say the entire ceiling space was not inspected
and only references work to be undertaken but does not quantify the materials, failed to
include the ensuite/main bedroom which has split battens and did not address the Anticon
blanket issues. They are concerned for the work on the roof may cause more battens to split
with further attempts to screw roof sheets.
The panel notes the entire ceiling space was not inspected by either BB or PG. Both
inspected up to 80% of the space. The panel considers these inspections were sufficient to
form an opinion.
The complainants made several submissions about OS’s costs of repairs and the costs of
rectification. The panel is not assisted by BB’s q uotation because it is not itemised. The panel
has considered the photographs provided by the complainants but in the absence of
independent expert evidence about the cost of rectification repairs, the panel accepts JH has
identified the rectification repa irs required. The panel has reviewed OS’s quote which
addresses the rectification repairs set out by JH.
The insurer addressed the issue regarding the cost of the new solar system. It provided
information showing the submitted costs were to install the solar system only. The actual
system could be collected by the complainants from the electrician.
As for the Anticon blanket the insurer agrees it has not been installed as per specifications
but submits the scope of works upon which the settlement was based included the cost for
this item.
The complainants say there are many more instances where this failure of installation of the
blanket occurred, and to fully verify the integrity of the installation the roof sheets must be
removed. The panel considers this contention is not supported by the available expert
evidence. JH agrees the blanket was not installed as per the manufacturer’s specifications.
The SOW allowed to remove and reinstate the roof sheeting in locations where the blanket
has not been installed properly and has been allowed for by OS.
Having considered the available information, the panel is satisfied the amount offered by the
insurer is fair in the circumstances taking into account the issues identified by JH and PG.
The panel notes the insurer has allowed a 15% uplift. The material relied on by the insurer is
now several months old. Further, the panel accepts Covid19 has resulted in increased costs
for materials and labour. Taking all matters into account the panel is satisfied an uplift of 30%
is fair in this complaint.
Should the complainants accept this determination then within seven days of notification of
acceptance the insurer is to pay to the complainants $10,403.25 for rectification repairs.
The panel is also satisfied it is fair that interest pursuant to section 57 of the Insurance
Contracts Act is paid on $10,403.25 from the date of the first rectification offer (6 August
2021) until settlement.
Repairs to front entrance cladding to be assessed forthwith
When the complainants came to AFCA they said they recently became aware of water
damage to the front entrance cladding. The insurer says it was unaware of any other damage
Determination | Case number: 840547 Page 8 of 18
at the property but is happy to have a service provider attend to report and quote to confirm
the repairs are required.
In his letter 12 December 2021 BB says:
My inspection to re-quote on 10 December 2021, has raised further damage
issues not evident three months prior when I was first asked to quote. Damage
due to weather/water intrusion to the front entry cladding, same wall as gable
above now shows signs of more water damage.
There is insufficient material for the panel to decide on this issue. If not done so already the
insurer is to forthwith provide a contractor to inspect and assess the claimed damage to the
front entry cladding. If the policy responds to the claimed damage, the insurer is to repair the
damage (if any), or cash settle the claim pursuant per the policy terms and conditions. The
insurer is to allow a 15% margin on its cash settlement (if any).
2.3 Are the complainants entitled to compensation?
Fair the parties share lost solar rebate and electricity costs
The complainants say solar panels were installed to reduce electricity costs and they would
forgo the solar rebate for six weeks while the roof was replaced. However, as the roof
replacement took a significant amount of time they are now seeking financial reimbursement
for the lost solar rebate and electricity costs incurred since April 2021 as they are now paying
for electricity. The complainants provided electricity bills for consideration.
The insurer says the solar system was not put back on the roof at the complainants ’ request,
as confirmed in the claim notes. It says OS’s quote is to reinstate the system to the roof.
The insurer also says the electricity costs are a consequential loss and are excluded by the
policy.
Under the AFCA Rules, AFCA can award up to $5,400 compensation for indirect financial
loss.
Many insurance policies exclude cover for indirect loss. If this is the case, AFCA will not
award this type of compensation for loss caused by the event giving rise to the claim.
However, if the complainants suffered an additional loss because the insurer mishandled the
claim, we may require the insurer to compensate for the additional loss.
The policy wording is clear. The policy excludes loss of use or any other financial loss arising
from or consequential to an insured event. The panel considers the electricity costs claimed
by the complainants are consequential loss or indirect financial loss.
It is not in dispute the repairs were unsatisfactory and require rectification. In the
circumstances, the panel considers it was not unreasonable for the complainants to request
compensation for losses incurred fr om the insurer’s failure to reinstate the solar system.
However, the panel recognises the insurer unsuccessfully tried to cash settle the rectification
repairs from 6 August 2021 and the amount of this determination is not significantly more than
the amount finally offered.
Determination | Case number: 840547 Page 9 of 18
In these circumstances, considering the policy terms and our approach to consequential loss
the panel is satisfied a fair outcome is for the insurer to pay 50% of the complainants’ claimed
loss from April 2021 until the date of this determination.
Should the complainant accept this determination then within seven days of acceptance the
complainants are to provide details and supporting material to the insurer in relation to the
claim for the lost solar rebate and electricity costs incurred so the claim can be assessed.
Fair the insurer pays the complainants $4,000 non-financial loss compensation
AFCA will award compensation (capped at $5,400) if there has been an unusual degree or
extent of physical inconvenience, time taken to resolve a complaint or interference with the
complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and anxiety. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The panel has considered the available information including the correspondence between
the parties and the claim file notes. The complainants say they engaged with numerous
caseworkers and their concerns were not addressed.
The panel notes the insurer’s attempts to rectify repairs and attempts to cash settle the claim.
However, it is not disputed repairs did not commence until several months after OS was
contracted, OS’s workmanship was deficient and at least two attempts were made to
undertake rectification.
The complainants refer to a court case and say the insurer failed to act in good faith. The
panel notes the repairer referred to in the court case had three complaints from other
insureds regarding the quality of workmanship. The available material does not establish the
insurer had other complaints about OS’s work at the relevant time or that there was adverse
intent by the insurer or OS.
The panel does not accept the insurer in this complaint failed to act in good faith, but the
panel accepts the claim was not managed well by the insurer. The panel considers the
insurer ’s claims management resulted in an unusual degree of time taken to resolve the claim
and physical inconvenience. These factors would have interfered with complainants’
expectation of enjoyment and peace of mind. Taking all matters into account the panel is
satisfied it is fair the insurer pays to the complainants $4,000 compensation.
2.4 Why is the outcome fair?
The insurer is entitled to rely on its policy terms and expert opinion. As the preponderance of
expert opinion does not establish on the balance of probabilities the roof must be re-battened
or replaced it would not be fair to require the insurer to pay the amount sought by the
complainants.
Determination | Case number: 840547 Page 10 of 18
3 Supporting information
3.1 AFCA approach
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination. The panel
comprises the ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience in the insurance industry.
The panel has decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry practice and
previous relevant determinations of AFCA or predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective parties.
Each party has had the opportunity of addressing any issues raised. All the provided
information has been reviewed and considered. The parties have raised numerous issues in
their submissions to AFCA. However, commentary in this determination is restricted to those
issues considered relevant to the outcome.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
AFCA’s role
AFCA is a complaint resolution service offered as a free alternative to the courts. We are not
a regulator of the financial services industry. We can consider individual complaints regarding
loss or damage caused by an insurer’s actions.
The purpose of AFCA is not to punish or impose a fine on an insurer. We do not have the
power to review a general practice unless the practice breaches a specific duty or obligation,
or it is not consistent with industry practice. Organisations such as the Australian Securities
and Investments Commission (ASIC) and the Australian Competition and Consumer
Commission (ACCC) have a role in consumer protection and the regulation of the financial
services industry.
Determination | Case number: 840547 Page 11 of 18
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainants.
Sum insured and replacement value
Your buildings and contents are covered on a new-for-old basis. This means
where we replace a damaged item we give you a brand new item which may be
the current replacement model if the same one is no longer available. Also see
the “What if you need to claim?” section for how we handle your claim.
Storm
What is covered?
Loss or damage to the insured property caused by storm, lightning, wind, hail,
snow and storm water overflow from roof gutters and their downpipes or from the
area immediately around the premises. This includes where the storm causes
mechanical, electrical, or electronic (including computer software) breakdown or
failure.
Where you have increased your sum insured on this policy within 72 hours of a
storm occurring, cover will be limited to the sum insured that was effective 72
hours prior to the event.
What is not covered?
Any loss, damage or legal liability caused by:
storm during the first 72 hours of your policy commencing, unless:
o you had another policy that expired before the start of your policy
with is and there was no break or change in the level or type of
cover; or
o you moved into the premises or signed a purchase or lease
agreement for the premises on the same day your policy with us
started.
storm surge, actions of the sea or ties or other oceanic activity.
rising damp or seepage of water from the ground.
rain, wind, hail or snow entering the building through open windows, doors
or openings made for alterations, renovations, or repairs; or
Determination | Case number: 840547 Page 12 of 18
rain, wind, hail, or snow entering the building unless through an opening
that was:
o created by the storm; or
o not created by the storm and that you could not have been
reasonably aware of even though the building is in good condition.
the cost of removing or pruning fallen trees or branches or other objects
that have not damaged the insured property.
Home cover exclusions
Home cover exclusions apply all sections of your policy and describe
circumstances where your policy will not provide cover for any loss, damage or
liability arising directly or indirectly from any cause noted below.
We will not pay for:
…..
4. loss of use or any other financial loss arising from or consequential to an
insured event.
…
If you claim under your policy, we have the choice to settle your claim in
many ways
We will never pay more than the sum insured shown on your policy schedule, or
any applicable policy limits as noted in the PDS, plus the extra amounts shown
under the Extra Cover section.
1. We can settle your buildings claim by:
o paying for the reasonable cost of repair or rebuilding the damaged part of
your buildings;
o paying you the rea sonable cost of repair or rebuilding the damaged part of
your buildings.
o rebuilding the building to its size and quality before the claim;
o any combination of the above.
……..
Determination | Case number: 840547 Page 13 of 18
Quality guarantee
If we choose and authorise repairs with a repairer, we will guarantee the quality of
those repairs for as long as you are the owner of the insured property.
Choice of repairer
If your claim is accepted and your item can be repaired, at our option, we will
arrange repairs with a repairer who is acceptable to us.
Wherever possible, we will offer you a choice of repairer from our network of
recommended repairers.
You may choose another repairer, however we may not authorise repairs.
If we do not authorise repairs we will pay you the fair and reasonable cost of
repairs as determined by us, considering a number of factors, including
comparison quotes from an alternate repairer we choose and our Quality
Guarantee will not apply.
You must choose a repairer that is appropriately licensed and authorised by law
to conduct the required repairs.
3.3 Extracts from material relied on by the parties
Date Action
Extracts from Confirmation
of Scope of Works
22 October 20 20
Main roof: remove and replace metal roofing colour
bond 423/m2
Remove and replace roof battens to facilitate roof
replacement 423/m2
Remove and replace Anticon blanket 423/ m2
…..
Remove and replace the entire 20 solar panel system
……
Supervision 6/hr
……
Home Warranty Insurance
27 October 2020 (Complainant) aut horises OS to
proceed with the insurance repairs at the above
address, as per the above scope. These repairs will be
paid directly to OS by (insurer) upon completion of
works.
Building contract between
OS (signed 13 July 2020)
and complainant s
(signed 13 November 2020)
Total contract price (inc GST) $67,242.02
….
7.3 The parties may agree to vary the Works by adding
or omitting work from the Works.
7.4 Before commencing any work comprising a
Determination | Case number: 840547 Page 14 of 18
variation, the Contractor must ensure that the details of
the variation are pu t in writing in a variation document,
signed by both parties.
……
Variation – 01 (OS)
19 March 20 21
Rate increase approved $4,653
Complainants’ builder’s
quote (BB)
Undated
Re - batten with standard hardwood battens, re - roof in
colour bond custom - orb approximately 425 m² ……
$139,920 including materials labour builders’ margin
and GST
Complainants’ builder’s
(BB)
Letter
12 December 2021
14 September 2021, quoted for roof repairs
Property is single storey, rendered 'Blue Board' home,
approximately 425sqm under roof, comprising of
standard gable and semi - gable ends.
10 December 2021, I attended the property to re -
inspect the roof for the purpose of pros pective re -
quotation
A compr ehensive inspection was undertaken of the
ceiling space wit h approximately 80% of it accessible.
Severely split battens were identified in the
kitchen/dining area, ensuite/main bedroom, and
western end (media room) of the roof space.
Damage is clearly vi sible through the manhole.
To remedy this roof sheeting, as quoted, needs to be
removed.
View from ceiling access, 'manhole' the foil backed
fibre glass insulation blanket was draping down into
ceiling space. There are areas not insulated and also
areas that have been patched. To remedy this and
achieve min. 150mm lap as per manufacturer's
recommendations, roof sheeting, as quoted, needs to
be removed
Further damage issues not evident three months prior
when first quoted. Damage due to weat her/ water
intru sion to the front ent ry cladding, same wall as
gable above now shows signs of more water damage.
Hous e about 24 old with a build completion in 1997.
Indications of severe splitting of existing roof battens
after so many re - roofing episodes, does not allow the
re-use of them for third and fourth time. There are
standards to adhere to and a reputation to maintain.
As quoted all hardwood battens to be replaced.
Due to material price rises and further weather
damage to home, quotation 14 Sept ember 2021 will
need to adjust and is not now indicative or current.
Insurer hail claim on site Inspected and photographed roof
Determination | Case number: 840547 Page 15 of 18
roof inspection and quote
(A)
Dents found on sheeting, gutter, flashing
Colour surfmist
Quoted to replace roof including supply and install
metal roof battens 40mm (cyclone rat ed), tiedowns,
steel sheeting, custom flashing, decktites, vents,
reinstate antenna, replace solar panel, install anticon
installation
$92,273.01 including builders margin 19%, GST and
insurance premium
Insurer’s quot e (A)
6 July 20 20
Quote provided after hail claim on site roof inspection
……………….
Metal Roofing - Supply and install metal roof battens
40mm (cyclone 850. 00 l/m $6.00 $5,100.00 rated)
Total including GST and builder’s margin and QBCC
insurance premium $92 , 273.01
Insurer’s builder’s report
(OS)
22 June 20 20
Hailstorm damaged property 19 April 2020
Inspected and photographed house 22 June 20
Single story, rendered brick, corrugated iron roof, built
1992
Damage to 423m2 metal colour bond roof; 90lm rail,
replace 20 solar panels and ant enna and existing
satnav, cladding to be removed to facilitate apron
flashing replacement
Photograph annotat ed “metal roof battens and anticon”
Cleaning and restoration
report (RR)
30 July 2020
Attended site for a make s afe to property as there was
some mould forming on the cornice from a water leak
in the roof, from a vent that goes up through the roof.
Small section of mould has formed in the spare
bedroom cornice which we treated with an
antimicrobial.
Took moisture readings and found that it is all dry, so
no drying is required.
Builder to attend and do some small repairs as there is
some staining, if they remove the wall recommended
we return to site to check the frames for mould.
Small amount of skirting board mo vement in the
bedroom and in the hallway, which will need to be
fixed.
Insurer has temporarily fixed the leak, so no more
water should be leaking inside.
Civil engineer report (JH)
29 July 20 21
Inspected and photographed 14 and 15 July 2021 to
report on adequacy of repairs
Inspected roof surface and roof cavity identified poor
workmanship including splitting to some timber battens
Reported on the defects/issues with the repair works
and specifically notes although there were a couple of
Determination | Case number: 840547 Page 16 of 18
battens that showed evidenc e of splitting from timber
shrinkage around the fixings, this is an issue that can
potentially develop due to the multipl e attempts at
fixings the roof sheets during both the original
construction and remedial works.
Generally, there did not appear to be a widespread
issue with the integrity of the timber however, this
would need be assessed once any further adjustments
to the roof cladding are made (Figure 20)
Figure 20 photographs split to roof batten – annot ation
says does not appear to be a widespread issue
Recommended scope of works to ensure property
compliant wit h current requirements.
Concluded there were a number o f issues and defects
found with the repair works including the insulation,
apron flashing, barge capping and Dektite above the
bathroom.
Because of this, a scope of works has been outlined in
the above report to amend the various issues as well
as any resu ltant damage from defective works.
Insured has raised some other concerns with the
finished works which have been addressed and will not
require remediation as they are not considered
defects.
Scope of Works:
Remove and re - instate roof sheeting in locatio ns
where anticon blanket has not been installed to
manufacturers’ specifications and install additional
material as required (See Figures 18 and 19 for
examples )
➢ Remove and replace apron flashing and blueboard
cladding to manufacturers’ specifications on gable
sections (Cladding will need to be rendered and re -
painted)
➢ Where roof sheeting overhangs gutter by more than
65mm, cut roof sheet to ensure it is compliant (Figure
8)
➢ Remove and reinstate Dektite above front RH
bathroom with flat flashing to be installed to the ridge
line to prevent water ingress – alternat e solution is to
seal the sheet lap to the ridge line
➢ Remove and replace all barge capping to
manufacturers’ specifications and ensuring the ends
are consistent throughout
➢ Repair and/or re - paint water - stained ceiling in 4
separate rooms
➢ Repair and re - paint foot traffic damage to ceiling
above living room (Figure 15)
➢ Remove all debris and unused materials from site
Determination | Case number: 840547 Page 17 of 18
Civil engineering details re -
roof report (PG)
3 August 20 21
14 June 21 inspected and photographed with
complainant and completed engineering checks and
advis ed on existing hardwood roof battens and their
general condition
Insured had removed a section of ceiling lining and
through the opening he observed roof batt ens to be
split.
Access was gained through the manhole into the roof
cavity and a thorough inspection was undertaken on all
the battens visible - approximately 80% of the roof
battens were observed with the remainder inaccessible
adjacent to the lower areas of the roof.
There were some split battens present but do not
believe there is sufficient quantity of damage to
warrant a re - roofing of the residence. The amount of
splitting is minimal and remedial works could be
undertaken from wit hin the ceiling cavity to offset any
potential loss of structural integrity certain cladding
supports will have lost.
Refer to the following p hotos and commentary where
describes repair methods and annotates photographs
with repair methods including:
Split Length < 200mm Some of the existing splits could
be repaired by simpler installing timber screws
horizontally at 300mm centres which will pot entially
minimise impact (shown in yellow)
Split Length > 200mm Utilise a backing timber (70x35
MGP12) that can be placed under the existing batten.
The existing roof screw can be removed, and longer
ones installed ensuring sufficient embedment (15mm
min) into the new backing timber (shown in blue).
Areas shown in the phot o would require the installation
of the new backing timber. There would be
approximately 10m similar to this requiring repairs.
Areas as such exhibit minor splitting and timber screws
i nstalled horizont ally at 300mm cent res are required. A
suitably sized 8g or similar would be required noting
the existing electrical cabling throughout. There would
be approximately 15m similar to this requiring repair.
Appendix B site sketch noted about 490 lineal metres
of timber battens in the observed areas of the
residence. Of this only 80% was visible and
approximately 25 lineal metres of split timber was
observed.
Either of the suggested repairs in Photo 2 will be
required in certain areas. A best estimate of what is
required is shown in a sketch. Backing Timber 4.
Screws: 10
Areas nominated above may need to be clarified but
the required works is nominated as per the length of
Determination | Case number: 840547 Page 18 of 18
the split to be able to properly be assessed.
Revised negative variatio n
remaining works (OS)
5 August 20 21
Negative variation for rectifications and remaining
works to roof, solar panels, carpentry, painting, roofer,
two hours supervision and GST $7,557
Quotation (OS)
1 October 20 21
Brace 2 battens as per engineer’s recommendation
labour and material total $176 ind GST
Quotation (OS)
21 October 20 21
Brace 12 battens as per engineers’ rec ommendation
labour and material total $269. 50 ind GST
Tax invoice (OS)
12 November 20 21
Quote plus variation ($4,230) less negati ve variation
$61,137.74
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails.
Parties’ expert reports.
Photographs and invoices.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.