Home / Suncorp Group / Determination 838938
Determination 838938
Claim denied for water damage under accidental damage cover; AFCA found damage covered and ordered payment of quoted repair costs.
Summary
The complainant claimed under a home and contents policy for water damage after a storm water blockage, and the insurer denied the claim as excluded. AFCA found the damage was caused by an accidental escape of liquid, not excluded rising damp, and ordered the insurer to pay $22,669.20.
The damage was accidental escape of liquid following the November 2019 water ingress rather than excluded rising damp, and the insurer's failure to complete its engineering inspection before the sale weighed against it.
Issues
- Claim denial primary · upheld
“The insurer declined the claim on the basis that the damage is excluded under the policy. AFCA found the damage not excluded and in favour of the complainant.”
- Inadequate claim investigation secondary · upheld
“The insurer acknowledged that it would obtain an engineer but this did not occur, and the property is no longer accessible.”
Subjects and remedies
home or building damagethird party authoritypay claim
Text of the determination
Determination
Case number 838938
Financial firm AAI Limited
Determination | Case number: 838938 Page 2 of 10
Case number: 838938 30 September 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer)
the policy includes a provision for accidental damage.
The complainant lodged a claim with the insurer on 8 August 2020 due to water damage.
Unfortunately, the property was sold prior to the insurer being able to arrange an inspection
by an engineer. The insurer declined the claim on the basis that the damage is excluded
under the policy. This matter was the subject for recommendation in favour of the
complainant. The insurer rejects this, and the matter has been referred for determination.
1.2 Issues and key findings
Was the insurer entitled to deny the claim?
On the information provided to me, on balance, I am satisfied as follows:
the complainant held accidental damage cover subject to the terms of the policy
there was a pipe at the property which was blocked causing an escape of water
there had been an entry of water into the property as a result of the blocked pipe in
November 2019
the cause of the dampness in the property was likely as a result of the blocked pipe
the damage was cause as escape of liquid that occurred accidentally
the insurer intended to appoint an engineer to undertake a further inspection
the insurer knew that the property was for sale
the property was sold, and the engineer was unable to obtain access to the property
the dampness in the property is likely as a result of the blocked pipe and I am not satisfied
that it is excluded under the terms and conditions of the policy
the complainant had obtained a quotation for repairs
the complainant has established that the damage is covered under the policy.
This determination is in favour of the complainant.
Why is the outcome fair?
The insurer however was given the opportunity to assess the property. The insurer knew that
the property was for sale. The insurer acknowledged that it would obtain an engineer but
unfortunately this did not occur, and the property is no longer accessible. Whilst the insurer
says this was only to assist in the decision and that they previously denied the claim, the
process was too slow for this to take place. In the circumstances the decision has been made
on the information available and it would be unfair to deny the complainant’s claim.
1.3 Determination
This determination is in favour of the complainant.
The insurer is to settle the claim by paying the complainant $22,669.20.
Determination | Case number: 838938 Page 3 of 10
Determination | Case number: 838938 Page 4 of 10
2 Reasons for determination
The complainant held a home and contents policy with the insurer. The complainant
discovered water damage to the premises and lodged a claim with the insurer on 8 August
2020, reporting that a potential blockage in a storm water drain was causing damage. The
complainant also advised the insurer that during heavy rains in November 2019 the tenant
had noticed rain water was not draining away and it had entered the home causing only
minimal damage.
The insurer investigated the claim and denied on the basis that the damage was excluded
under the terms and conditions of the policy.
2.1 Was the insurer entitled to deny the claim?
Reports
The complainant obtained the assistance of a plumber (MB) who attended the property on 21
August 2020. His invoice indicates that he attended the property due to storm water blockage,
undertook general excavation to access piping, jet blasted blocked storm water lining, used
CCTV camera to inspect, and reinstated bitumen at rear of property. Then back filled the
excavation and relayed pavers. Subsequently MB provided a report dated 7/9/2020 stating:
“ Called to the above property due to a blocked surcharging stormwater line
towards the rear of the property.
-On investigation we discovered the exit point of this stormwater line in the rear
lane point had been blocked off & covered over with bitumen, not allowing water
to flow outwards of this proper ty.”
MB also provided photographs of the blockage.
A further report was provided by engineers (WW). WW carried out a CCTV inspection and
dye test to pipework. He found water guttering entering the laneway via an eatherrn ware [sic]
pipe that had been sealed over by bitumen. The bitumen was removed, and a short piece of
steel pipe installed to cater for the car traffic in the laneway. The bitumen was then replaced.
The complainant also arranged for an inspection by a builder inspection organisation (JB) JB
provided a report dated 3 August 2020.
JB found damp in the hallway of the main building he also noted evidence of wood rot he
further noted that this storm water drain was not connected and stated:
“T he roof plumbing is not adequately connected to stormwater drainage on the
site. This disconnection negatively impacts the functional capacity of the roof
plumbing.
Where roof plumbing doesn’t drain adequately, the area at the base perimeter can
become excessively damp, potentially created an environment that is susceptible
to rust and corrosion of surrounding building elements, as well as attracting
termites and other pests.
Determination | Case number: 838938 Page 5 of 10
It is highly recommended that a plumber be appointed to further inspect the area
and to install adequate drainage equipment where necessar y.”
The insurer arranged for an inspection and a leak detection report by (RC). RC provided an
assessment dated 12 August 2020.
RC concluded:
“ The ensured advised in recent weeks water has been observed to flood the
courtyard area and leak down the hallway area.
We were requested to attend and carry out testing to determine whether any
damaged pipe work may be responsible or contributing to the observed
damages.
Upon arrival the ensured advised a plumber had attended prior to our attendance.
The ensured advised the plumber carried out CCTV work finding tree roots
blocking the storm water line, advising the tree roots are within close proximity to
the gully in the back year.
The plumber had attempted to sewer jet the storm water line but the jetter has
become stuck possibly in tree roots All nitrogen pressure tests to hot and cold
water lines PASSED with no evidence of burst or leaking pipe work.
We carried out CCTV inspection to the storm water lines on the northern side of
the property. We found the terracotta and PVC storm water line to be in poor
condition with a cracked terracotta pipe, a dislodged PVC pipe and a blockage.
We attempted to carry out CCTV inspection to the storm water lines in the court
yard. We were not able to push the camera down the line due to the plumbers
jetter restricting the camera head. Flood testing to storm water line FAILED.
We identified a crack, a blockage and dislodged storm water line. We used the
locator device identifying the location and depth of the damaged and blocked pipe
work. The dislodged and blocked section of pipe work in our opinion relates to the
flooding of the hallway and observed damaged wall.
The cracked storm water line we marked out relates to no damages.
We carried out testing to the main bathroom area to determined what has
caused the discolouring to the floor grout.
We made observations of the water affected areas where we found
elevated moisture readings. We observed the bath area to be in
average condition (see attached pic).
Determination | Case number: 838938 Page 6 of 10
All nitrogen pressure tests to hot and cold water lines passed with no evidence of
burst or leaking pipe work. All flood testing to all drainage fixtures within
bathroom passed with no evidence of a water leak.
All testing within the main bathroom passed.
We believe the discoloured floor grout relates to rising damp. ”
RC carried out a further assessment on 10 August 2020. He confirmed that all damage was
long-term and from rising damp mainly which he noted was picked up in the building report
the client had done recently to sell the property. The rotten timber, high number patch repairs
to the render walls and efflorescence on the floor slate confirms the rising damp issue. He
stated further that the damages are not from a single event and rising damp has caused
everything you can see not the overflow of the storm pipe back in November 2019.
The insurer also provided their assessor’s report dated 18 August 2020 which:
“That the moist ure damage to these areas is long term/aged (gradual
deterioration) and not related to a one-off event or the advised flooding of water
than [sic] ran through this area at least on one occasion.
Previously patching to wall areas was noted indicating moisture issues with rising
damp. ”
Subsequently on 4 September 2020 the assessor recommend payment for the plumbing work
carried out by NB and also for the digging up of the pipe.
The complainant’s pre -purchase report shows that there was rising damp previous to the
escape of liquid.
The complainant took steps to rectify this issue by installing extensive subfloor ventilation
system that cored through a sandstone wall. It has not been disputed, by the insurer, that this
was sufficient enough to fix the rising damp.
Determination | Case number: 838938 Page 7 of 10
Product Disclosure Statement (PDS)
The insurer has referred to the PDS as follows:
Quote for Repairs
The complainant obtained a quote from a repairer JS.
The quote was as follows:
Determination | Case number: 838938 Page 8 of 10
1
Co mpletely gut ex isting bathr oom and dis pos e,
roughin new plumbing/elec tr ics, gyproc k/plaster,
w aterpr oof, tile, paint and make all good, A ll
items to r emain in s a me place
90.00 $7,650.00 $1,500.00 $9,500.00 $18,650.00
2 Re mov e and dispos e appr ox imately 10 m 2 of
slate tiles in hallw ay inc luding scr eed under neath 16.00 $1,360.00 $200.00 $0.00 $1,560.00
3 Prov ision for Ty ler to supply screed to s ame ar ea 10.00 $850.00 $250.00 $0.00 $1,100.00
4 Me mbr ane scr eed w ith tw o c oats 8.00 $680.00 $175.00 $0.00 $855.00
5
Pr ov is ion for appr ox imately 11 m 2 of s late tiles
based on $50 per s quare meter and the cost to
tile
0.00 $0.00 $550.00 $1,500.00 $2,050.00
6 paint w alls of area w her e hallw ay f loor w as
replac ed 6.00 $408.00 $125.00 $0.00 $533.00
7 Time to c ollect mater ials and rubbish 4.00 $340.00 $100.00 $0 . 00 $440.00
Sub T ot al: 134.00 $11,288.00 $2,900.00 $11,000.00
Expected Total: Expected Range:
$25,188.00
$22,669.20 to $27,706.80
All Pric es Inc lude 10% GSTI
Insurer’s further response
The insurer disagreed with the AFCA recommendation and provided a further internal report
by assessor JR as follows:
-Rising damp is caused by a failed or non-existent waterproof course on the
bottom course of brick work usually one course above ground level called DPC
(Damp proof course).
-Whether the ground water is from a one off event caused by a blocked storm
water drain or a long term drainage issue, water capillary up the brickwork should be
stopped by the DPC
- Another issue which in my opinion has been overlooked is the identified timber rot
in the timber joinery which makes the damage long term damage …
-In my opinion the customer would of been well aware of the rising damp issues as
all the damage is long term (sic). The customer was aware of the rising damp
issue identified in the pre purchase building report and previous attempted repairs .
The insurer said that while acknowledging that the damage has been caused by rising damp,
AFCA found the rising damp was caused by escape of liquid and that there is no exclusion
that applies to the claim. The Insurer referred to pages 22 and 23 of the PDS which
explains under the Insured event ‘Escape of liquid’ there is no cover for loss or damage
caused by rising damp.
The Insurer’s vi e w was th at the complainant had not established a loss u n d e r t h e
p o l i c y .
Determination | Case number: 838938 Page 9 of 10
Insurer to pay for damage
It is unfortunate that the insurer was unable to obtain the report from an engineer prior to the
property being sold. The insurer says that the offer was made in the effort to resolve the
complaint but that there is sufficient information to make a decision.
I am only able to make a decision on the information provided which is obviously without any
engineering report.
I am satisfied from the information from MB that the storm water pipe was blocked and that it
certainly had backed up into the property which was reported by the tenants. No claim was
lodged at that time as it appears the water did not enter the property. However, it is
conceivable that the water that had backed up had pooled in the area under the property.
It is also noted that the complainant had obtained a report previously in relation to dampness
at the property. The complainant had installed a ventilation system and says that there was
no further problem following that. The subsequent damage was not discovered until after the
tenants had vacated but the complainant says this was damage that was not apparent prior to
November 2019.
When the attendance of RC and SM occurred at the property they found a section of the pipe
work was dislodged which they stated related to the flooding of the hallway and even
damaged walls.
RC carried out leak detection tests and found that the main bathroom passed.
Both RC and SM believed that the moisture damage to the areas is long term/aged (gradual
deterioration) and not related to a one-off event or the advised flooding water than ran
through the area on at least the occasion of 11 November 2019 when it was tenanted.
Unfortunately, without that the engineer’s report it is necessary to rely heavily upon MB’s
view. As the person who carried out the repairs he provided an opinion as to what was
causing flooding.
Also, no information has been provided to show that the installation of the subfloor ventilation
failed to rectify the previous problem.
The insurer referred to previous patching, however that is consistent with past repairs prior to
the installation of the under-floor ventilation. I also note that JR refers timber rot, however
unfortunately he did not specifically refer to where the rotten timber was.
In the circumstances I accept that the flooding and obvious pooling of water under the
premises was, on balance, the likely cause of the damage. Thus, the blocked storm water
drain would be the proximate cause of the dampness. I note that the policy excludes rising
damp. However, the damage is not caused by rising damp but by the escape of liquids.
However, loss or damage caused by liquid as a result of a gradual process of bursting leaking
or splashing is excluded. Given that the damage occurred following the noted water ingress in
November 2019 I am satisfied that it is more than likely that this resulted in the damage. The
caused was accidental and I am satisfied that it is not excluded under the policy.
It is also noted that the insurer has paid for the exploratory costs and I am of the opinion that
is part of the coverage under the policy as this is considered in an insured event.
The complainant has obtained a quotation from JS with a range of $22,699.20 to $27,706.80.
The insurer is to pay the sum of $22,699.20 les any excess.
Determination | Case number: 838938 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.