Determination 838702
Dispute over insurer's settlement offer for storm-damaged rear fence requiring compliant non-combustible materials
Summary
The complainants disputed the insurer's offer to repair only the damaged panel of their bushfire-zone rear fence rather than replacing all lattice infills with non-combustible material. AFCA found the insurer's offer fair, with a repair option or a cash settlement of $4,312.81, plus $1,000 for non-financial loss.
Under the 2014 PDS, the insurer must pay to make damaged parts comply with current building regulations but is not required to upgrade undamaged parts of the building.
Issues
- Claim amount dispute primary · not upheld
“The insurer's offer of settlement is fair. It is not required to replace the wooden lattice inserts in all the fence panels and is entitled to limit its liability based on the quote from its builder RC.”
- Poor communication secondary · upheld
“The insurer acknowledges it incorrectly referred to the 2020 PDS and apologised for this error.”
- Repairs or contractors secondary · not upheld
“RC's quote for $3,920.73 for the damaged section of the fence is fair and reasonable; complainants' concerns about the insurer's builder statements were considered.”
Subjects and remedies
home or building damagemotor vehicle collisionpay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 838702
Financial firm AAI Limited
Determination | Case number: 838702 Page 1 of 6
Case number: 838702 21 February 2022
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
They lodged a claim for damage to their rear fence from a fallen tree branch.
The insurer accepted the claim. However, there is a dispute regarding the insurer’s proposed
settlement of the claim.
The damaged fence has a Colorbond frame with wooden lattice inserts slotted within. The
complainants say this was compliant at the time it was constructed. However, the lattice
inserts are not compliant with current legislation as they are within a designated flame zone.
They say the fence must now be built, or repaired, in non-combustible material.
The insurer agreed to repair the damaged sections of the rear fence using non-combustible
materials to comply with council bushfire requirements. It says it is not required to replace all
sections of the fence to comply with council requirements.
The complainants are unhappy with the insurer’s offer. They want the insurer to cover the
cost to replace all eight panels of the wooden lattice inserts to the fence panels to ensure the
fence is compliant.
1.2 Issues and key findings
Is the insurer’s offer of settlement fair ?
The insurer’s offer of settlement is fair. It is not required to replace the wooden lattice inserts
in all the fence panels and is entitled to limit its liability based on the quote from its builder
RC.
1.3 Determination
This determination is in favour of the insurer.
The insurer’s offer to resolve the claim is fair. The complainants are entitled to choose from
the following two options:
the insurer to authorise RC to undertake repairs to the damaged section of fence using
non-combustible materials, in line with RC’s quotation (which only included one panel),
which will be covered under the lifetime guarantee on repairs, or
the insurer to provide a cash settlement based on RC’s quotation, plus an uplift of 10 per
cent to reflect the transfer of risk and loss of repair guarantee (total settlement of
$4,312.81).
The insurer ’s offer of compensation of $1,000 is also fair.
Determination | Case number: 838702 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer’s offer of settlement fair ?
The insurer’s offer of settlement is fair. It is not required to replace the wooden lattice inserts
in all the fence panels and is entitled to limit its liability based on the quote from its builder
RC.
Complainants have established a valid claim for the damage
The policy covers several insured events, including impact. There is no dispute the
complainants have established a valid claim for damage to the rear fence. There is also no
dispute the property is within a bushfire zone that requires repairs to be compliant with certain
legislation. This requires the materials for the fence to be made from non-combustible
materials. This dispute concerns the insurer’s settlement of the claim.
The insurer refers to the secti on of the product disclosure statement (PDS) for ‘Other
repair/rebuilding costs’. This includes repairing the damaged parts of the building to comply
with current home building regulations. It says this does not include undamaged parts.
Relevant sections of the PDS are included in section 3.2 of this determination.
Complainants are unhappy with the insurer’s settlement offer
The complainants say:
the insurer accepted only two fence panels, however, the policy, in conjunction with NSW
legislation, requires the insurer to replace all the wooden lattice with non-combustible
material to make the continuous fence compliant
t he insurer’s builder made statements inconsistent with the policy and legislation, including
stating it did not need to meet legislative requirements and replace the panels with non-
combustible materials as the fence was not part of the building, which is incorrect
they had to personally provide the evidence from council before the insurer agreed to use
non-combustible materials
the lattice infill is the non-compliant building component and should be replaced along the
rear fence to make it compliant, given the property is in a designated flame zone
the current PDS for 2020 includes a section for repairing the property to comply with
current building laws
the quote from RC only covers one panel, not the two panels that the insurer initially
accepted
they do not want to replace the whole fence, only the lattice infills across the whole fence
to make them compliant, as well as the damaged sections of the Colorbond frame.
PDS limits the insurer’s liability to damaged sections of the fence
The complainants referred to a PDS from 2020. However, the insurer says the correct PDS
version is from 2014 because the loss occurred in August 2020, prior to the 2020 PDS
coming into effect. The complainants disagree and say the insurer refers to the 2020 PDS in
its Internal Dispute Resolution letter. They say the 2020 PDS is effectively the same as the
2014 PDS, but better informs the policy with more detail on the definitions.
The insurer acknowledges it incorrectly referred to the 2020 PDS and apologised for this
error.
Determination | Case number: 838702 Page 3 of 6
I am satisfied the correct PDS to consider against the claim is the 2014 PDS. I am also
satisfied the PDS entitles the insurer to limit its liability to the damaged sections of the fence
only. It is not required to replace all the lattice infills across the whole fence. This is because I
consider each separate panel is a different part of the fence. It would be unfair to require the
insurer to replace undamaged parts of the fence when the policy specifically excludes this
loss.
Insurer’s offer is fair in the circumstances
RC’s report dated 23 November 2021 states:
it confirmed there was a damaged panel to the rear boundary fence and shared boundary
end post
it could not find any impact damage to the second panel metal frame or timber lattice, so it
only allowed for replacement of one panel and realignment of the second fence post
it quoted to replace the panel with Colorbond metal lattice that complies with legislation as
non-combustible
it can warrant repairs.
RC provided a quote for $3,920.73 for the damaged section of the fence. It also provided a
quote for replacement of the entire rear fence for $29,807.29.
The insurer says it is not required to upgrade the entire fence, only the damaged parts.
The complainants say RC’s quote only incl udes one panel, when the insurer had previously
accepted two panels. They say this was included to cover issues with alignment between the
two panels after impact.
However, the most recent inspection from RC shows, on balance, only one panel is
damaged. If the complainants allow RC to conduct repairs, this will be covered by the lifetime
guarantee on repairs. If there is any issue with alignment of the two panels, this should be
considered by RC in repairing the fence. I do not consider the insurer is required to replace
the two panels in the circumstances.
In the absence of any alternative quote, I consider RC’s quote for $3,920.73 is fair and
reasonable. The insurer’s cash settlement offer to include a 10 per cent increase is fair. This
is because the complainants will no longer be able to obtain the lifetime guarantee on repairs.
I also consider it fair for the complainants to be given the choice as to whether to allow RC to
conduct repairs or accept a cash settlement.
Compensation offered is fair
Under our Rules, AFCA may award compensation for non-financial loss where there has
been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim.
The complainants raise several concerns with the claims process. The insurer acknowledged
the complainants’ frustration and offered $ 1,000.
Determination | Case number: 838702 Page 4 of 6
I appreciate the complainants’ concerns with the insurer’s builders and having to provide
relevant information from council to ensure the offer made was fair and in line with council
requirements. I accept this would have been frustrating.
Given ou r conservative approach to compensation, I consider the insurer’s offer of $1,000 is
fair in the circumstances.
Determination | Case number: 838702 Page 5 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant sections of the PDS:
Other repair/rebuilding costs
We cover We do not cover
When we are rebuilding or
repairing damaged parts of
the building, we will pay the
reasonable and necessary
costs:
• of any temporary work
required to make the
damaged or destroyed
building and insured address
safe;
• for the services of
professionals, such as
architects or surveyors, to
repair or rebuild at the
insured address;
• to make the damaged parts
of the building comply with
the current home building
regulations and laws.
.. .
The cost of:
• removing tree stumps and
roots still in the ground;
• removing or lopping fallen
trees or fallen branches that
have not damaged the
buildi ng;
• upgrading undamaged
parts of the building to
comply with the current
home building regulations
and laws;
• making the building
comply with home building
regulations and laws that
existed but were not
complied with when the
building was originally bui lt
or altered.
…
How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building, we will decide
if we will:
• repair damage to the building;
Determination | Case number: 838702 Page 6 of 6
• rebuild the building;
• pay you what it would cost us to repair or rebuild the building;
• pay you the building sum insured shown on your certificate of insurance; Note:
This does not apply if you have selected the Complete Replacement Cover®
option.
• give you a voucher, store credit or stored value card for the amount it would cost
us to repair or rebuild an item.
If we rebuild (or pay you what it would cost us to rebuild), we will do so on a `new
for old’ basis.
If we repair (or pay you what it would cost us to repair), we will at our option do so
on a `new for old’ basis or repair to a similar condition to what the building was in
before the loss or damage occurred.