Determination 838702

Dispute over insurer's settlement offer for storm-damaged rear fence requiring compliant non-combustible materials

FirmSuncorp Group
Decided2022-02-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,313
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainants disputed the insurer's offer to repair only the damaged panel of their bushfire-zone rear fence rather than replacing all lattice infills with non-combustible material. AFCA found the insurer's offer fair, with a repair option or a cash settlement of $4,312.81, plus $1,000 for non-financial loss.

Under the 2014 PDS, the insurer must pay to make damaged parts comply with current building regulations but is not required to upgrade undamaged parts of the building.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionpay compensationpay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 838702 Financial firm AAI Limited Determination | Case number: 838702 Page 1 of 6 Case number: 838702 21 February 2022 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). They lodged a claim for damage to their rear fence from a fallen tree branch. The insurer accepted the claim. However, there is a dispute regarding the insurer’s proposed settlement of the claim. The damaged fence has a Colorbond frame with wooden lattice inserts slotted within. The complainants say this was compliant at the time it was constructed. However, the lattice inserts are not compliant with current legislation as they are within a designated flame zone. They say the fence must now be built, or repaired, in non-combustible material. The insurer agreed to repair the damaged sections of the rear fence using non-combustible materials to comply with council bushfire requirements. It says it is not required to replace all sections of the fence to comply with council requirements. The complainants are unhappy with the insurer’s offer. They want the insurer to cover the cost to replace all eight panels of the wooden lattice inserts to the fence panels to ensure the fence is compliant. 1.2 Issues and key findings Is the insurer’s offer of settlement fair ? The insurer’s offer of settlement is fair. It is not required to replace the wooden lattice inserts in all the fence panels and is entitled to limit its liability based on the quote from its builder RC. 1.3 Determination This determination is in favour of the insurer. The insurer’s offer to resolve the claim is fair. The complainants are entitled to choose from the following two options:  the insurer to authorise RC to undertake repairs to the damaged section of fence using non-combustible materials, in line with RC’s quotation (which only included one panel), which will be covered under the lifetime guarantee on repairs, or  the insurer to provide a cash settlement based on RC’s quotation, plus an uplift of 10 per cent to reflect the transfer of risk and loss of repair guarantee (total settlement of $4,312.81). The insurer ’s offer of compensation of $1,000 is also fair. Determination | Case number: 838702 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s offer of settlement fair ? The insurer’s offer of settlement is fair. It is not required to replace the wooden lattice inserts in all the fence panels and is entitled to limit its liability based on the quote from its builder RC. Complainants have established a valid claim for the damage The policy covers several insured events, including impact. There is no dispute the complainants have established a valid claim for damage to the rear fence. There is also no dispute the property is within a bushfire zone that requires repairs to be compliant with certain legislation. This requires the materials for the fence to be made from non-combustible materials. This dispute concerns the insurer’s settlement of the claim. The insurer refers to the secti on of the product disclosure statement (PDS) for ‘Other repair/rebuilding costs’. This includes repairing the damaged parts of the building to comply with current home building regulations. It says this does not include undamaged parts. Relevant sections of the PDS are included in section 3.2 of this determination. Complainants are unhappy with the insurer’s settlement offer The complainants say:  the insurer accepted only two fence panels, however, the policy, in conjunction with NSW legislation, requires the insurer to replace all the wooden lattice with non-combustible material to make the continuous fence compliant  t he insurer’s builder made statements inconsistent with the policy and legislation, including stating it did not need to meet legislative requirements and replace the panels with non- combustible materials as the fence was not part of the building, which is incorrect  they had to personally provide the evidence from council before the insurer agreed to use non-combustible materials  the lattice infill is the non-compliant building component and should be replaced along the rear fence to make it compliant, given the property is in a designated flame zone  the current PDS for 2020 includes a section for repairing the property to comply with current building laws  the quote from RC only covers one panel, not the two panels that the insurer initially accepted  they do not want to replace the whole fence, only the lattice infills across the whole fence to make them compliant, as well as the damaged sections of the Colorbond frame. PDS limits the insurer’s liability to damaged sections of the fence The complainants referred to a PDS from 2020. However, the insurer says the correct PDS version is from 2014 because the loss occurred in August 2020, prior to the 2020 PDS coming into effect. The complainants disagree and say the insurer refers to the 2020 PDS in its Internal Dispute Resolution letter. They say the 2020 PDS is effectively the same as the 2014 PDS, but better informs the policy with more detail on the definitions. The insurer acknowledges it incorrectly referred to the 2020 PDS and apologised for this error. Determination | Case number: 838702 Page 3 of 6 I am satisfied the correct PDS to consider against the claim is the 2014 PDS. I am also satisfied the PDS entitles the insurer to limit its liability to the damaged sections of the fence only. It is not required to replace all the lattice infills across the whole fence. This is because I consider each separate panel is a different part of the fence. It would be unfair to require the insurer to replace undamaged parts of the fence when the policy specifically excludes this loss. Insurer’s offer is fair in the circumstances RC’s report dated 23 November 2021 states:  it confirmed there was a damaged panel to the rear boundary fence and shared boundary end post  it could not find any impact damage to the second panel metal frame or timber lattice, so it only allowed for replacement of one panel and realignment of the second fence post  it quoted to replace the panel with Colorbond metal lattice that complies with legislation as non-combustible  it can warrant repairs. RC provided a quote for $3,920.73 for the damaged section of the fence. It also provided a quote for replacement of the entire rear fence for $29,807.29. The insurer says it is not required to upgrade the entire fence, only the damaged parts. The complainants say RC’s quote only incl udes one panel, when the insurer had previously accepted two panels. They say this was included to cover issues with alignment between the two panels after impact. However, the most recent inspection from RC shows, on balance, only one panel is damaged. If the complainants allow RC to conduct repairs, this will be covered by the lifetime guarantee on repairs. If there is any issue with alignment of the two panels, this should be considered by RC in repairing the fence. I do not consider the insurer is required to replace the two panels in the circumstances. In the absence of any alternative quote, I consider RC’s quote for $3,920.73 is fair and reasonable. The insurer’s cash settlement offer to include a 10 per cent increase is fair. This is because the complainants will no longer be able to obtain the lifetime guarantee on repairs. I also consider it fair for the complainants to be given the choice as to whether to allow RC to conduct repairs or accept a cash settlement. Compensation offered is fair Under our Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with a complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim. The complainants raise several concerns with the claims process. The insurer acknowledged the complainants’ frustration and offered $ 1,000. Determination | Case number: 838702 Page 4 of 6 I appreciate the complainants’ concerns with the insurer’s builders and having to provide relevant information from council to ensure the offer made was fair and in line with council requirements. I accept this would have been frustrating. Given ou r conservative approach to compensation, I consider the insurer’s offer of $1,000 is fair in the circumstances. Determination | Case number: 838702 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant sections of the PDS: Other repair/rebuilding costs We cover We do not cover When we are rebuilding or repairing damaged parts of the building, we will pay the reasonable and necessary costs: • of any temporary work required to make the damaged or destroyed building and insured address safe; • for the services of professionals, such as architects or surveyors, to repair or rebuild at the insured address; • to make the damaged parts of the building comply with the current home building regulations and laws. .. . The cost of: • removing tree stumps and roots still in the ground; • removing or lopping fallen trees or fallen branches that have not damaged the buildi ng; • upgrading undamaged parts of the building to comply with the current home building regulations and laws; • making the building comply with home building regulations and laws that existed but were not complied with when the building was originally bui lt or altered. … How we settle building claims If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will: • repair damage to the building; Determination | Case number: 838702 Page 6 of 6 • rebuild the building; • pay you what it would cost us to repair or rebuild the building; • pay you the building sum insured shown on your certificate of insurance; Note: This does not apply if you have selected the Complete Replacement Cover® option. • give you a voucher, store credit or stored value card for the amount it would cost us to repair or rebuild an item. If we rebuild (or pay you what it would cost us to rebuild), we will do so on a `new for old’ basis. If we repair (or pay you what it would cost us to repair), we will at our option do so on a `new for old’ basis or repair to a similar condition to what the building was in before the loss or damage occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.