Text of the determination
Determination
Case number 838419
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 838419 Page 1 of 13
Case number: 838419 25 July 2022
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
They lodged a claim for damage to their property following a hail storm on or about 31
October 2020.
The insurer accepted the claim and agreed to cash settle the complainants for damage to the
roof of the house and garage, but not for internal damage to the ceilings. The insurer says
internal damage was either not caused by the storm or is excluded under the policy terms.
The complainants do not agree with the insurer and seek to be cash settled for both internal
and external damage.
1.2 Issues and key findings
Is the insurer entitled to limit its liability under the claim?
No. The evidence shows both internal and external damage to the property was caused by
the storm. On that basis, the insurer should cash settle the complainants $118,441.10 plus a
contingency allowance of 10% to account for an increase in the cost of materials and for
inflation. This amounts to $130,285.21.
Are the complainants entitled to compensation for non-financial loss?
Yes. The complainants are entitled to $3,000 for non-financial loss.
Why is the outcome fair?
The evidence shows the internal and external damage was caused by the storm on 31
October 2020. The insurer has not proven that any exclusion applies. On that basis, it is fair
that the insurer pays the complainants $118,441.10, based on the scope of works (SOW) of
its expert, P, plus a 10% contingency allowance. It was reasonable for the insurer to have
accepted the claim on 1 3 September 2021 (3 weeks after the date of RI’s report). On that
basis, it is fair that the insurer pays interest in accordance with section 57 of the Insurance
Contracts Act 1984 (the Act) from that date. The complainants are also entitled to $3,000 for
non-financial loss because of inconvenience caused.
1.3 Determination
This determination is in favour of the complainants.
Within 14 days of receiving notice the complainant accepts this determination, the insurer
should pay the complainants $130,285.21 in settlement of the claim and $3,000 for non-
financial loss.
The insurer is also to pay interest on this amount, pursuant to section 57 of the Act. Interest is
payable from 13 September 2021 until the date of payment.
Determination | Case number: 838419 Page 2 of 13
2 Reasons for determination
2.1 Is the insurer entitled to limit its liability under the claim?
No. The evidence shows both internal and external damage to the property was caused by
the storm. On that basis, the insurer should cash settle the complainants $118,441.10 plus a
contingency allowance of 10% to account for an increase in the cost of materials and for
inflation. This amount is $130,285.21.
Complainants must establish a valid claim
The complainants carry the initial onus to show on the balance of probabilities that they have
suffered a loss caused by a risk insured under the policy. This is known as a valid claim.
The complainants’ policy provides cover for loss and damage for certain defined events.
Relevant extracts of the policy’s product disclosure statement (PDS) is set out in section 3.3
of this determination.
Subject to its conditions and exclusions, the policy provides cover for loss or damage caused
by the insured events listed in the PDS, one of which is storm.
There is no dispute that the roof of the house and the garage were damaged in a storm on 31
October 2020. The insurer disputes that the internal damage to the ceiling was caused by the
storm. The insurer has focused its arguments in this respect to internal damage not being
caused by hail. However, the definition of storm includes damage caused by hail, wind or
rain.
The internal damage to the building is storm related
After lodgement of the claim, the insurer appointed assessors MK to attend the property,
assess the damage and provide a relevant scope of works (SOW).
MK provided a SOW dated 22 December 2020. This SOW included repairs to the damage on
the exterior of the property, but no repairs to the internal ceilings of the property. For details of
MK’s SOW, see section 3.2 of this determination.
The complainants criticised the SOW prepared by MK and asked the insurer to appoint a
suitably qualified expert to comment on the cause of damage to the ceilings and prepare a
comprehensive SOW. The insurer appointed P (builder) and RI (roofing expert) to provide
reports.
P’s report dated 12 August 2021 says:
the property was subject to a storm event on 31 October 2020. On that basis, P
recommended that the claim be approved.
The storm event caused damage to the main roof (external), bedrooms, kitchen, living
area, ensuite, media room and garage.
P identified storm related damage to almost every room of the house.
certain roof screws were identified as missing in the roof cavity, but P did not associate this
with the cause of the damage claimed, due to minimal water entry having occurred through
this location.
no maintenance issues were found at the property which directly related to the claimed
resultant damages.
Determination | Case number: 838419 Page 3 of 13
With respect to internal damage the report said:
We have identified movement/storm created damage to almost every ceiling in
the house. All ceilings were showing some sagging. Screw heads, some rooms
on external walls had signs of water ingress (bathroom and ensuite).
…
Based on our site inspection and information obtained P can confirm that the
claimed resultant damage has been caused by the hail storm event from the 31 st
October 2020 passed over the suburb of [G] causing widespread and severe
damage.
The RI report dated 23 August 2021 says:
he inspected the roof cavity where several small holes were found where the roof screws
appear to be missing and around the TV and Foxtel dish wiring penetrations. These areas
have allowed some very minor water entry however no visible water stains.
the damage was consistent with building movement and possible air pressure occurring
inside the large open ceiling cavity during the storm event.
ceiling damage to the home appears consistent with air pressure within the ceiling cavity
during the storm event which has caused some movement to the plasterboard lining.
the overall condition of the roof is excellent.
After receiving these reports, the insurer asked MK to prepare a report on the basis of his
inspections. The MK report dated 13 October 2021 says:
damage to the internal plasterboard ceilings linings is because of settlement damage. MK
informed the insured that this damage is as a result of defects in the original application of
the plasterboard joint works and building settlement over time.
The insurer invited P to review his opinion after MK’s report was received. P maintained his
earlier opinion in a report dated 22 February 2022. Importantly, P criticised MK’s report
because it did not comment at all on the internal water damage identified by P and RI in their
earlier reports.
The extracts above are limited to discussion of the internal damage at the property. For more
detailed extracts of these reports, refer to 3.2 of this determination below.
In considering the evidence as a whole, I find that the internal damage was caused by the
storm that occurred on 31 October 2020. MK did not inspect the roof cavity. The reports of RI
and P are consistent with each other’s findings. Both reports are thorough and provide
reasoning to support their assertions. The report of MK does not. The reports of P and RI
indicate:
> the internal damage was likely caused by the storm event,
> there is water ingress into the ceiling cavity, especially to the rooms on the exterior of
the property;
> there is no evidence of a lack of maintenance to the property that would cause damage
to the ceiling or that there were any pre-existing issues.
Determination | Case number: 838419 Page 4 of 13
On that basis, the insurer is liable for damage to the ceilings at the property, unless an
exclusion applies.
The insurer has not established an exclusion applies
Once a valid claim is established, the burden then falls to the insurer to show on balance that
an exclusion applies to deny the claim. The insurer in this instance says the loss and damage
claimed was caused by a combination of wear and tear and lack of maintenance.
I do not accept this. The only report that mentions a lack of maintenance is MK’s report dated
13 October 2021. There are no images to support a lack of maintenance. I note MK did not
inspect the roof cavity. In contrast, the reports of P and RI both note that the roof is in
excellent condition and the property, whilst having a number of belongings in it, has been well
maintained.
On that basis, the insurer is liable for both internal and external damage to the property.
The insurer is required to increase cash settlement amount
The insurer’s expert, P, prepared a SOW to repair the internal and external damage. The
quote is dated 12 August 2021 with a total amount of $118,441.10.
The complainant also provided a quote from DR. Given the length of time since the
complainant obtained the quote, the insurer contacted DR to request a revised quote. This is
dated 16 December 2021 with the cost of repairs being $60,936.70. In my view, this quote
must be disregarded because the quote was prepared based on MK’s SOW dated 22
December 2020, which only included external repairs.
The complainants are satisfied that P’s SOW and quote includes all relevant items. I n ote that
the quote includes a 20% margin, which should adequately compensate the complainant for
the transfer of risk. However, P’s quote was prepared almost 12 months ago. I note that the
cost of building materials has increased as has inflation. On that basis, a further 10%
contingency allowance should be applied, bringing the total to $130,285.21.
The insurer is also required to pay interest on the amount of $130,285.21 in accordance with
section 57 of the Act. Interest is payable from 13 September 2021 (being the reasonable date
that the insurer should have accepted the claim) until the date of payment.
2.2 Are the complainants entitled to compensation for non-
financial loss?
Yes. The complainants are entitled to $3,000 for non-financial loss.
Insurer to pay compensation for non-financial loss
Under the AFCA Rules, AFCA may award compensation (capped at $5,400) for non-financial
loss where complainants have suffered an unusual amount of physical inconvenience or time
taken to resolve the situation or inter ference with the complainant’s expectation of enjoyment
or peace of mind.
AFCA takes a conservative approach when considering any award of compensation.
The insured event occurred on 31 October 2020. Following this, the insurer sent out an
assessor and a SOW was prepared by MK on 22 December 2020. However, the insurer did
not engage an expert to comment on the cause of damage to the ceilings and inspect the
Determination | Case number: 838419 Page 5 of 13
internal roof cavity until August 2021, some eight months later. The complainants repeatedly
criticised the conduct of MK during this time and the insurer largely ignored these concerns.
In addition, despite having two reports from its own experts by early September 2021 that
were supportive of the complainants’ assertions, the insurer:
continued to deny liability for damage to the ceilings at the property, and
commissioned a further report from MK, who had been subject to criticism by the
complainants.
I accept these actions would have caused considerable stress to the complainants who have
still not had their property fixed after over 18 months since the event.
Given this, it is fair in all the circumstances for the insurer to pay $3,000 in non-financial loss.
2.3 Why is the outcome fair?
The evidence shows that internal and external damage was caused by the storm on 31
October 2020. The insurer has not proven that any exclusion applies. On that basis, it is fair
that the insurer pays the complainants $118,441.10, based on the scope of works (SOW) of
its expert, P, plus a 10% contingency allowance. It was reasonable for the insurer to have
accepted the claim on 13 September 2021 (3 weeks after the date of RI’s report). On that
basis, it is fair that the insurer pays interest in accordance with section 57 of the Insurance
Contracts Act 1984 from that date. The complainants are also entitled to $3,000 for non-
financial loss because of inconvenience caused.
Determination | Case number: 838419 Page 6 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 838419 Page 7 of 13
3.2 Expert reports
Record Key points
Financial firm’s expert (MK)
Scope of works
22 December 2020
Supply and install edge protection scaffold to workplace health
and safety requirements
Remove Colorbond roof linings main dwelling
Supply and install Colorbond roof linings including all cappings
and flashings main dwelling
Remove and replace 3 roof mount ed ventilation units
Remove and replace roof penet ration Dektite seals
Test and report on roof mounted solar panels
Remove and reinstate/replac e roof mounted solar panels
Remove and reinstate roof mounted television antenna
Remove and reinstate roof - mount ed satellite dish
Remove edge protection at completion of repairs
Remove and replace roof ventilation unit shed
Remove all associated damaged material from site
Financial firm’s expert (MK)
Report
8 April 2021
Complainant has request cash settlement for solar panels.
Complainant has provided a quote for $7,500 to complet e the
repairs
Consider quote fair and reasonable
Also $500 for garden shed which should be set off against
excess payable
Financial firm’s expert (MK)
Report
21 May 2021
Recommended settlement of insured for damaged solar panels,
as repairs for these items could not be warranted due to issues
relating to the original configuration of the system, and shading
of the panels from nearby vegetation
$7,500 has been paid to complainant, but complainant is now
requesting insurer complet e repairs. Works cannot be
warranted.
If required, builders can complete the removal and
reinstatement of the panels, and replacement of six damaged
panels, with no warranty held on these works.
Financial firm’s expert (P)
Report
13 August 2021
Recommended claim be approved
Quote of $118, 441. 10 for approved works
> Quote for $75,157.05 for external damage
> Quote for $43,284.05 for internal damage
Inspected the property whic h has a lot of stuff everywhere. The
internal condition of the home P considers to unfort unat ely be in
a poor state, because of various belongings all over the house
Sighted some maintenance/ common building m ovement/
cracking to one ceiling and cornice in the hallway
Inspected roof cavity because the complainant was concerned
she could see sunlight through different parts of the roof cavity.
There are some roof screws missing here and there.
Determination | Case number: 838419 Page 8 of 13
Record Key points
We have identified movement/storm created
damage to almost every ceiling in the house. All
ceilings were showing some sagging. Screw
heads, some rooms on external walls had signs
of water ingress (bathroom and ensuite).
Inspection of the house, garden shed and free - standing garage
revealed clear indentation damage consistent with large hail
Check BOM website and found a hail storm event from the 31 st
October 2020 passed over the suburb of Greenbank causing
wides pread and severe damage
On inspection of the insured’s property we have found no
maintenance issues directly related to the claimed resultant
damages
On inspection of the insured’s property we have found the
following damages that are a direct result of the claimed event:
> Main house roof
> Master Bedroom
> Bedroom 2,3,4’
> Kitchen/ living
> Ensuite
> Media Room
> Garage
Based on our site inspection and information
obtained P can confirm that the claimed
resultant damage has been caused hail storm
event from the 31 st October 2020 passed over
the suburb of [G] causing widespread and
severe damage
Full list with details in report and attached SOW
Financial firm’s expert (RI)
Roofing Report
23 August 2021
…the owner of the home explained that they had
noticed small movement cracks and ceiling
damage after the storm event.
We were further advised that the owners had
accessed the ceiling cavity and found some
small holes in the roof sheets and areas where
'daylight' was clearly visible.
Determination | Case number: 838419 Page 9 of 13
Record Key points
Checked inside of ceiling cavity and found areas of ‘daylight’ –
this is normal and simply a reflection of light from the roof and
around the gutter line
Inspection found several small holes where the roof screws
appear to be missing and around th e TV and Foxtel dish wiring
penetrations. These areas have allowed some very minor water
entry however no visible water stains.
Inspection of house roof showed small indent ations across the
Colourbond roof sheets and flashing including roof ventilators
Solar panels appear visually undamaged however thermal
testing recommended
Small garden shed seen to have large indentations across the
roof panels
Free standing garage was found to have small round
indentations across the Trim - dek roof sheets including flashings
Caus e of damage - Inspection of the house, garden shed and
garage revealed clear indentation damage consistent with large
hail
Ceiling damage appears consistent with air pressure within the
cavity during the storm event which has caused some
move ment to the plasterboard lining.
Minor water entry to the ceiling is a result of loos e fasteners and
aging sealant around the TV and Foxtel dish wiring
penetrations. Minimal water entry has occurred through the
loose/ missing screw fasteners and penetratio ns.
Indent ation damage to all roof areas consistent with large hail
from a storm event on 31 October 2020
Ceiling damage to the home appears consistent with air
pressure within the ceiling cavity during the storm event which
has caused some movement to the plasterboard lining
The overall condition of the hous e roof is excellent with all
roofing materials in good condition prior to the storm event
Financial firm’s expert (MK)
Report
13 October 2021
Inspection of Colorbond roof lining identified hail impact damage
to approximately half of the roof linings. This will require removal
and replacement with edge protection scaffold required during
repairs
Inspected roof mounted solar panels, no evident damage noted,
solar panel specialists appointed to assess
Roof mounted ventilation units which have been damaged by
hail impact, will require removal and replacement
Roof mounted satellite dish and Tv antenna will require removal
and reinstatement during repairs
Colorbond garden shed installed to the property has sustained
damage by hail impact and will require removal and
replacement
Inspection of children’s cubby house did not identify any evident
hail damage to Colorbond roof or wall linings. Found one large
Determination | Case number: 838419 Page 10 of 13
Record Key points
roof mounted ventilation unit had sustained hail damage to a
large Colorbond shed and will require removal and replacement.
Minor hail impact damage was identified to four Colorbond roof
lining sheets of the shed, which will require removal and
replacement.
Settlement damage was identified to plasterboard ceiling linings
to all areas. Informed the insured this damage is the result of
defects in original application of plasterboard joint works and
building settlement over time. Complai nant accepts and
acknowledges this damage is not the result of an insurable
event and will be excluded from the claim
On testing of solar panel system , other builder reported that 6
of the panels were not working; also issues with original
configuration of the panels and shading. Recommend
complainant be settled $7,500 for this damage.
Complainant’s quote (DR)
16 December 2021
Quote of $60,936.70 for main roof, 10 year warranty on works
Insurer’s internal report
15 February 2022
Claimed event is hail impact to external surfaces with no storm
created openings confirmed by specialist roofing reports
Hail impact damage consistent with the stated claimable event
across all external surfac es which is reported by P and M
Damages to the internal are not related to the on - off event and
as confirmed by P screws are missing throughout the roof which
was also confirmed by concern raised by the insured about this
directly affecting the property and the insured’s failure to keep
the property water tight
Intern al damages are not result of a one off insurable event
more to result of maintenance issues and failing to keep
property watertight
P have outlined in their report that these are direct result of
building movements/ air pressures so should not be included in
part of the claim
Insurer’s internal building
consultant report
22 February 2022
In reviewing claim found 2 conflicting SOW and quotations
Found impact damage from hail consistent with the insured
event
P have entered the roof cavity and assessed damage to internal
of property
In my professional opinion given we have
confirmation that internal damage is not related
to the hail event by MK we should not be
including this in the SOW / repairs. In my
professional opinion damages to the internal are
not related to this one off event and as
confirmed by PIB screws are missing throughout
Determination | Case number: 838419 Page 11 of 13
Record Key points
the roof which also was confirmed by concern
raised by the insured about this directly effecting
the property and the insured's failure to keep the
property water tight.
Says PDS excludes damage caused by complainant not
keeping property water tight.
Thinks insurer should only be liable for external damage and not
for any internal damage as these are long term
maintenance/ defects.
Insurer’s expert report (P)
22 February 2022
Internal damage to the ceiling appears to be consistent with
building movement and possible air pressure inside the large
open ceiling cavity during the storm event
Minor water entry to the ceiling is a result of loos e fasteners and
aging sealant around the t v and Foxtel dish wiring penetrations
Minimal wat er entry has occurred through the loose/ missing
screw fasteners and penet rations
The MK report does not make any comment of water damage in
the areas that P have highlighted in its internal resultant damage
scope, where as we can somewhat agree that in sections of the
ceiling linings that could present in a way that supports MK
comments, did they make an assumption that due to one or two
areas which had no no ticeable water was the overall comment
and applied that rule overall
The internal resultant damage is largely due to the building
movement and air pressures in the ceiling during the well - known
Halloween hail storm in 2020.
Majority of the noted water damage to the property in the
ceilings/cornice and some walls from memory were around the
external sections of the house. Where some water damage was
noted towards the middle of the house in some sections.
No maint enance issue was sighted during both atten dances by
our internal assessor and in our external roof report highlighting
any kind of regularly mentioned maintenance related with water
ingress
Opinion bas ed on the wat er damage and movement to the
ceilings that presented on the day in t otal that the damage
sighted during assessment was consistent with the stated event
P construction manager would also like to advise that he had
received similar damage to his personal property during this
event, just to highlight that the damage to his home also
included sagged ceilings that had let go due to air pressure build
up inside the ceiling activity. P has had this occur on 3
properties over the past decade and 2 of those properties were
less than 3 years old.
Determination | Case number: 838419 Page 12 of 13
3.3 Relevant policy wording
Page Wording
3 What is not covered
Policy does not cover any loss or damage that is caused by or
arises from:
Maintenance and building.
d efects in design, structure, materials, workmanship or
construction,
f ailure to keep the property insured watertight, well maintained,
structurally
sound and secure. For example:
> a storm can highlight defects rather than cause them, and
> damage due to lack of maintenance or which happens
gradually is not covered,
failure to undertake building work that a relevant authority
required you to undertake before the loss or damage
occurred, or
obtaining permits or permission to replace structures that were
erected by you illegally or without planning permission.
Wear and tear, and environmental conditions
wear and tear, gradual deterioration, or fading,
rust, corrosion, oxidisation, mould, mildew or atmospheric
conditions,
earth or soil movement (other than earthquake) including
landslide,
subsidence, erosion or heave,
settling, expansion, shrink age or vibration,
actions or movements of the sea or high water (other than storm
surge and tsunami),
hydrostatic pressure, or
tree roots.
17 Insured events
Depending on whether you have Building cover or Contents cover,
we will insured your building/and or contents at the site against
loss or damage caused by the following events if they occur during
your period of insurance
20 Storm
What is covered
Loss or damage caused by storm, including cyclone, hail, wind,
snow or rain
Determination | Case number: 838419 Page 13 of 13
Not covered
Loss or damage caused by:
storm for a period of 48 hours, or
cyclone for a period of 5 days from the dat e the cover was
initially provided by us, unless the policy is replacing another
policy with equivalent storm or cyclone cover and there has
been no gap in cover and no change to the sum insured, or you
have ent ered into a cont ract to purchase the property and the
risk has passed to you as purchaser.
Loss or damage to:
gates, fences or freestanding walls that were not in good
condition prior to damage occurring,
retaining walls, paths, driveways, bridges or landscaping,
fabric awnings, blinds or shade sails, unless professionally
installed and less than 5 years old,
plastic liners or covers for swimming pools or spas,
water in swimming pools or spas, or
external paint or coatings caused by rain.
Loss or damage caused by or resulting from:
gradual deterioration from rain,
rain entering the building due to poor maintenance, or where
openings, doors or windows are not closed,
rain entering the building while construction work, alterations or
additions are being carried out, or
water seeping or running through or down the sides of earth or
earth fill that is up against your building
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.