Home / Terri Scheer Insurance Pty Ltd / Determination 838352

Determination 838352

Building claim settlement limited to sum insured; alleged failure to advise underinsurance

FirmTerri Scheer Insurance Pty Ltd
Decided2022-05-02
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$131,355
SourceAFCA PDF

Summary

The complainant's landlord building was destroyed by fire and the insurer paid the $185,400 sum insured plus inflation adjustment and 52 weeks loss of rent. He sought a further $131,355, alleging the insurer should have warned him the property was underinsured; AFCA found the insurer correctly settled the claim and was not required to advise on sum insured.

The policy clearly limits building payments to the sum insured on the schedule, and the insured bears responsibility for adequately insuring the property.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionno remedy

Related

All Terri Scheer Insurance Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 838352 Financial firm Terri Scheer Insurance Pty Ltd Determination | Case number: 838352 Page 1 of 7 Case number: 838352 2 May 2022 1 Determination overview 1.1 Complaint The complainant held a landlord residential building insurance policy (policy) with the financial firm (insurer). On 5 July 2021 he lodged a claim after the property was damaged by fire. After forensic investigation and assessment, the insurer accepted the claim. On 25 August 2021 the insurer paid to the complainant the sum insured ($185,400) plus an inflation adjustment ($3,245) (total $188,645). It also paid the complainant $16,900 for 52 weeks loss of rent. The complainant is dissatisfied with this settlement because the estimated rebuild cost is significantly more. He says even though he contacted the insurer to reduce his premiums (by amending the sum insured) on three occasions, the insurer has acted negligently in failing to adequately inform or warn him that the property was grossly under-insured. He seeks an additional payment of $131,355 to resolve the complaint. 1.2 Issues and key findings Has the insurer settled the claim correctly? Yes. The insurer has settled the claim correctly and in accordance with its policy obligations. Should the insurer have told the complainant the property was underinsured? No. The onus is on the complainant, not the insurer, to ensure the property is adequately insured. Why is the outcome fair? The outcome is fair because the insurer is entitled to rely on its policy terms. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint save to pay legal fees for the discharge of mortgage if the fees are incurred. Determination | Case number: 838352 Page 2 of 7 2 Reasons for determination 2.1 Has the insurer settled the claim correctly? Sum insured, inflation adjustment and loss of rent paid in accordance with policy terms It is not in dispute there was a fire in July 2021 which destroyed the building. The dispute is about the settlement of the fire claim. The insurer says it is only obliged to settle the complainant for the amount noted in the policy schedule. The insurer contends as it has dispatched the relevant policy documents to the complainant it is entitled to rely on the policy terms and conditions. The insurer has provided material to confirm the complainant was sent the policy documents. The complainant does not dispute receiving the relevant policy document. The panel accepts the insurer is entitled to rely on the policy terms. The product disclosure statement (PDS) wording in relation to the limits of amounts payable is set out in supporting section 3.2 of this determination. The panel has reviewed the policy terms. The panel accepts the policy terms are clear and unambiguous. If the insurer agrees to pay a claim for loss to the building the maximum amount it will pay is the building sum insured shown on the policy schedule. The policy was renewed in November 2020. The house was destroyed by fire in July 2021. At the time of the fire the renewal documents show the relevant sum insured for the property was $185,400. The inflation adjustment brought the sum insured to $188,645. The policy clearly and unambiguously sets up the benefits payable within the sum insured providing the building sum insured is not exhausted. The building sum insured was exhausted when the insurer paid the complainant $188,645 in August 2021. Based on the available information the panel is satisfied the insurer is not required to pay anything more. Additionally, the policy provides cover for loss of rent as follows: We cover Loss of rent if your property becomes untenantable for a minimum period of 7 days due to damage to your building caused by an insured event listed in 'Section 1: Building' (except for 'Tenant damage') and we have accepted your claim under 'Section 1: Building'. Cover will commence from the date the property became untenantable until whichever of the following occurs first:  The property becomes tenantable; or Determination | Case number: 838352 Page 3 of 7  The property is re-let; or  The limit for this insured event is reached. Cover under this insured event will only apply if your property is insured as a permanent tenancy and this is shown on your policy schedule. Limit: 52 weeks loss of rent. The complainant was also paid 52 weeks loss of rent. The panel is satisfied the limits payable under the sum insured and loss of rent benefit have been applied and settled correctly. 2.2 Should the insurer have told the complainant the property was underinsured? Parties’ material and submissions considered The complainant’s policy commenced in 2015 with a sum insured of $250,000. It is not in dispute the complainant contacted the insurer on three separate occasions to amend the sum insured. At the time of the fire the relevant sum insured was $185,400 (adjusted for inflation the sum insured was $188,645). The available material shows the complainant amended the sums insured to reduce the premiums he was paying. He says:  he was totally unaware the house was grossly under-insured  he had no knowledge of re-building costs in the event of a total loss event such as fire  the insurer should have had systems in place to alert him he was significantly underinsured  the insurer is a recognised expert in building insurance and failed to alert him and guide him as to the correct sum insured The complainant also says he had another property insured with a different insurer, and this insurer would not allow the sum insured range to go below a certain amount to pre vent underinsurance in the event of a total loss. The insurer says it can only settle the complainant for the amount noted as the sum insured on the schedule and it is up to the complainant to ensure the property is adequately insured. It contends an insured is required to review the policy documents to ensure the policy is appropriate to his needs. The insurer also submits that in accordance with relevant regulation it is only allowed to operate on a general advice model. It says its consultants could not provide financial advice on how much the property should be insured for. They could only let the complainant know how much the premiums would be when the complainant decreased the sums insured. Whilst the insurer acknowledges other insurers may operate on a different model, the insurer said it can only provide commentary on the processes specific to it. It says the policy terms are clear and ambiguous. The sum insured is the maximum amount payable. Determination | Case number: 838352 Page 4 of 7 Onus to adequately insure the property rests with the insured The panel has carefully considered the complainant’s arguments but does no t agree with them. The panel accepts at the time the policy was renewed before the fire, the responsibility of adequately insuring the property rested with the insured. The panel is satisfied the insurer was not required to alert and guide the complainant as to the correct sum insured. The panel accepts the insurer can only provide general advice in relation to how the premiums change when sums insured are amended. The panel considers the complainant was aware of the effects of a lower sum insured by another insurer and this should have alerted him to the possibility this property was not adequately insured. Even if the panel were to accept the complainant was unaware the house was under-insured and had no knowledge of re-building costs in the event of a total loss event the panel considers the complainant had adequate opportunity to address the issue. This is because at any time during the period of insurance, the complainant could have arranged an assessment of the property to ascertain an approximate rebuild cost, but this was not done. Insurer is not required to pay anything further Based on the available information and for the reasons stated, the panel is satisfied the insurer has settled the claim correctly and is not required to take any further action in relation to the claim or the complaint save for one matter which has not been addressed by either party. Additional benefit of c) legal costs may be payable In addition to the inflation adjustment, the policy provides an additional benefit in addition to the sum insured. c) Legal costs If we agree to pay a total loss claim under this Section 1 for loss of or damage to your building, we will pay the reasonable legal costs incurred in discharging any mortgage over your building. The available material indicates there was a mortgage over the building. It is not known whether the complainant has incurred costs yet in discharging any mortgage of the building. Should these costs eventuate, the insurer is also required to pay the reasonable legal costs incurred in discharging any mortgage over the building. 2.3 Why is the outcome fair? The policy terms are clear and ambiguous. The maximum amount the insurer will pay is the building sum insured on the policy schedule. The relevant policy schedule’s sum insured was $185,400 (adjusted for inflation the sum insured was $188,645). The insurer is entitled to rely on the policy terms. In these circumstances it would not be fair for the insurer to be required pay more than required by the policy terms. Determination | Case number: 838352 Page 5 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion app lies if it seeks to deny or limit its liability for the loss. This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in the insurance industry. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. AFCA’s role AFCA is a complaint resolution service offered as a free alternative to the courts. We are not a regulator of the financial services industry. We can consider individual complaints regarding loss or damage caused by an insurer’s actions. The purpose of AFCA is not to punish or impose a fine on an insurer. We do not have the power to review a general practice unless the practice breaches a specific duty or obligation, or it is not consistent with industry practice. Organisations such as the Australian Securities and Investments Commission (ASIC) and the Australian Competition and Consumer Commission (ACCC) have a role in consumer protection and the regulation of the financial services industry. Determination | Case number: 838352 Page 6 of 7 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Benefits within your sum insured The following additional benefits are payable provided that your building sum insured is not exhausted. For any additional benefits to be payable you must suffer or incur the relevant loss or damage to your building during the period of insurance. Benefit a) Fees If we agree to pay a claim under this Section 1 for loss or damage to your building, we will pay the reasonable fees which we have approved and which are incurred directly in relation to repair or replacement of your building. b) Removal of debris If your building is damaged and we agree to pay a claim under this Section 1, then we will pay the reasonable and necessary costs of demolition and removal of debris from the site to the nearest authorised facility. If the damage for which we agree to pay a claim is caused by a fallen tree, which as a result becomes debris, we will also pay to remove the tree from the site. We will pay to remove a standing tree or branch that formed part of the tree that caused the insured damage only if:  We agree that the remaining tree or branch is unsafe;  The remaining tree or branch only became unsafe as a direct result of the insured event covered under this policy causing damage to the tree; and  All necessary approvals have been obtained and removal of the tree or branch would not result in a breach of any laws, by-laws, regulations or contractual obligations.  We will pay to remove a stump that formed part of the tree that caused the insured damage only if: o Not removing the stump would interfere with repairing or replacing the damaged part of the building required to settle your claim. c) Extra costs of re-instatement If your building is damaged and we agree to pay a claim under this Section 1, we will pay the extra costs necessary to meet the requirements of any statutory Determination | Case number: 838352 Page 7 of 7 authority in connection with rebuilding or repairing the building at the site. If only part of your building is damaged, we will pay only the extra costs you incur in repairing that part. We do not pay any extra costs which resulted from any notice which a statutory authority served on you before your building suffered loss or damage. Basis on which claims are paid Limit of amount payable The maximum amount we will pay under this ‘Section 1: Building’, during any one period of insurance (excluding any amounts paid for ‘Benefits in addition to your sum insured' see page 22 for details) is the building sum insured shown on the policy schedule. 3.3 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails.  Correspondence between the parties.