storm water damage claim partly declined (floor) and dental chairs claim stalled; BI claim

FirmAIG Australia Limited
Decided2022-06-28
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$13,798
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A dental practice claimed storm water damage to its floor, ceiling, cupboards and four dental chairs, plus business interruption loss. AFCA found the floor damage covered, ordered cash settlement of the floor, ceiling and cupboard claims with a 15% uplift, and a contribution of up to $5,000 to the expert report costs, but no non-financial loss and no BI payment yet.

Under the policy and the utmost good faith duty in section 13 of the Insurance Contracts Act 1984, the expert evidence of SN was preferred over FG as to the cause of the floor damage, and the insurer is primarily responsible for only part of the claim.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disasterthird party authoritypay claimpay compensationprovide documentsreassess claim

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 838158 Financial firm AIG Australia Limited Determination | Case number: 838158 Page 1 of 10 Case number: 838158 22 June 2022 1 Determination overview 1.1 Complaint The complainant holds a business insurance pack policy with the financial firm (the insurer). The complainant lodged a claim for water damage to the insured dental practice due to a storm event that occurred on 9 February 2020. The insurer agreed to cover the cost to repair the damaged ceiling and cupboards. However, it declined to cover the damage to the floor on the basis it was not storm related. The insurer also says the complainant’s failure to co-operate with its investigation into the claimed damage to four dental chairs means it is unable to progress that aspect of the claim. The complainant disagrees with the insurer. It wants the insurer to cover the claims relating to the floor and the chairs and pay for business interruption (BI). It also seeks non-financial loss compensation for st ress and inconvenience due to the insurer’s claim handling delays. 1.2 Issues and key findings Is the insurer required to cover more of the claim? Yes. The panel prefers the view of the complainant’s engineer, SN, who says the floor damage was due to the storm. The insurer is to take the steps set out in section 1.3 below to cash settle the floor damage claim. It is also to cash settle the damage to the ceiling/cupboard based on the quote from its builder, AB. A 15% uplift is to apply to both payments. Has the complainant reasonably co- operated with the insurer’s investigations? No. T he complainant’s insistence that the dental chairs be inspected after 9pm is not reasonable, as the insurer has said it will consider a claim for resultant BI. The complainant is to allow assessment of the dental chairs in business hours, subject to reasonable prior notice. Has the complainant proven an entitlement to payment of BI? Not yet. The insurer is yet to receive enough information to enable assessment of any BI loss. The insurer is not required to do anything more until the complainant provides adequate proof of covered BI loss. Is the complainant entitled to any additional payments? Yes. The insurer is to contribute up to $5,000 towards the complainant’s cos ts incurred in obtaining SN’s report . However, the panel is not satisfied that the insurer is primarily responsible for the delay experienced. Non-financial loss compensation is not payable. Why is the outcome fair? It is fair that the parties comply with the policy’s terms. The complainant has shown the floor damage is covered but is yet to prove a BI loss. It is also fair to expect the complainant to reasonably co-operate with the insurer. SN assisted in establishing the floor damage is covered. Therefore, it is fair that the insurer contributes to SN’s costs. It would be unfair to Determination | Case number: 838158 Page 2 of 10 require non-financial loss compensation to be paid as the insurer is not primarily responsible for the delay. 1.3 Determination This determination is partially in favour of the complainant. Upon the complainant providing written notice it accepts this determination (the notice), the following steps are to be taken:  within 14 days of receiving the notice, the insurer is to appoint an independent engineer not previously involved in the claim, to promptly prepare a scope of works (SOW) based on SN’s description of the covered floor damage.  within seven days of receipt of the SOW, the insurer is request two independent builders, to provide current and actionable quotes based on the SOW  the insurer is to pay the complainant the higher of the two quotes plus a 15% uplift for repair contingencies and transfer of risk.  within 21 days of receiving the notice, the insurer is to pay the complainant $13,797.70, being the amount of AB’s quote plus 15% . The insurer is permitted to deduct the policy excess if it has not already been paid  within 21 days of receiving the notice, the insurer is to provide the complainant with a range of at least five options between 9am and 5pm, Monday to Friday (the range) when its expert is available to inspect the dental chairs  within seven days of receiving the range, the complainant is to notify the insurer of which of the options in the range it prefers. The complainant is then to permit inspection of the dental chairs on the time and date it has selected  within 21 days of receiving supporting invoices or receipts from the complainant, the insurer is to reimburse the complainant the cost of SN’s report, subject to a maximum amount of $5,000  the insurer is to assess the dental chairs claim and any submitted BI claim in accordance with the terms and conditions of the policy. The complainant is to reasonably co-operate with the insurer’s investigations concerning those claims. Determination | Case number: 838158 Page 3 of 10 2 Reasons for determination The complainant is represented in this complaint by its lawyer, EG. Unless otherwise stated, a reference in this determination to ‘the complainant’ includes both the complainant and EG. 2.1 Is the insurer required to cover more of the claim? Yes. The panel prefers the view of the complainant’s engineer, SN, who says the floor damage was due to the storm. The insurer is to take the steps set out in section 1.3 above to cash settle the floor damage claim. It is also to cash settle the damage to the ceiling/cupboard based on the quote from its builder, AB. A 15% uplift is to apply to both payments. Complainant has established a prima facie claim under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not) that it suffered a loss caused by an insured event covered by the policy. This is known as a prima facie claim. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy provides cover for accidental loss or damage to the insured property that occurs during the period of insurance. The insurer has accepted the complainant’s claim that on 9 February 2020 a severe stor m led to the insured dental practice sustaining water damage. In the circumstances, the panel is satisfied that the complainant has established a prima facie claim. Insurer says only limited amount of damage is covered The complainant says that the storm event caused water damage to:  the ceiling in the sterilisation room  vinyl flooring in the treatment rooms  cupboards  four dental chairs. The insurer has agreed to cover damage to high wall mounted cabinets and water staining to the ceilings in the sterilization room. On 14 September 2021, the insurer obtained a quote from AB to repair those items. The quote totalled $11,998.70. The insurer has offered to pay the complainant that amount plus a 15% uplift to allow for contingencies. Following claim lodgement, the insurer appointed A, loss adjusters. A reported that:  it could not locate any bubbling or lifting of the vinyl flooring  separation around the joins could potentially be an installation issue  vinyl flooring is meant to be waterproof  there was no visible damage consistent with the storm event  an expert engineering opinion should be obtained. The insurer engaged FG, engineers. In relation to the vinyl flooring, FG said:  vinyl flooring is manufactured of polymer materials, a key characteristic of which is its excellent moisture resistance  it did not observe damage to the vinyl floors consistent with prolonged moisture exposure  it did not observe any bubbling or delamination to indicate moisture had seeped under the vinyl floor Determination | Case number: 838158 Page 4 of 10  there was cracking and deterioration to the vinyl floor seaming throughout all five treatment rooms  if the water had caused the seaming damage, that damage would be isolated to the water affected rooms. As the damage is consistent in all the rooms, the damage to the seaming is unrelated to the storm event. Relying on FG’s report, the insurer says that the claim for damage to the floor is not related to the claim event and therefore not covered. Complainant says the damage caused by the storm is more extensive On 3 March 2020, the complainant received an SOW and quote from PP, an entity that represents itself as a dental practice fit out specialist. According to PP, extensive repair work was required to a large part of the dental practice. PP costed the works it said were required at $108,670 plus GST. The panel is not satisfied that PP’s quote is confined to items covered by the policy. It is also now more than two years old so is of questionable reliability. On 27 January 2022, the complainant’s expert engineer, SN, inspected the premises. In its resulting report dated 7 February 2022, SN says:  treatment rooms 1,2,3 and 4 were all flooded areas as per contemporaneous videos and photos taken at the time of the storm event  while some vinyl floors can be waterproof, this vinyl floor is medical grade. The joins (seams) are designed to withstand chemicals, mould and bacteria. They have not been designed to overlap so as to be waterproof  'all areas where water pooled, Rooms 1,2, 3 and 4 as well as the sterilization room has damages to the vinyl joints'  joinery has clearly swelled at the base (or the MDF carcass). To be properly tested and examined one or more of the joinery cupboards need to be taken apart and inspected. The carcass should be replaced and if the joinery is not damaged then it can be reinstalled  the vinyl flooring needs to be replaced where damaged and matched to existing if possible  i t agrees with the insurer’s proposed repairs to the overhead cupboards. In an email dated 16 February 2022, SN provided responses to questions posed by the insurer. The email included the statements: The cupboard are damages as I inspected swelling. Since there is black mould in the flooring on balance there would be damage and most likely mould in the carcass. To inspect the carcass you need to disassemble it and once disassembled, which is the expenses part of the process, each carcass should be replaced and the costs to replace them is less than the labour of disassembly of the entire cupboard. I inspected the flooring and I have over 30 years experience in types of vinyl flooring. In my opinion the vinyl flooring at the premises is medical grade and not water proof and in particular as stated the joins have not been designed for water pooling. Complainant’s expert evidence is more persuasive Having reviewed the available reports, the panel prefers the expert opinion of SN. This is because: Determination | Case number: 838158 Page 5 of 10  it is apparent that of the experts involved, SN has the most experience in vinyl flooring  SN provides a logical explanation of the cause of the seaming damage. FG’s report does not explain the cause of the damage, other than asserting it is not water related  t he insurer has not provided any expert evidence to refute SN’s opinion. It does not appear that FG was invited to comment on it. The insurer says that as a prudent engineer SN should ‘ be able to validate through the manufacturer his recommendation that this product cannot withstand pooling water ’ . The panel disagrees. SN is appropriately qualified to provide an expert opinion. The insurer’s submissions are not persuasive on why his opinion should not be accepted. The insurer also says that the limited photos available do not indicate the presence of mould or bubbling or delamination to indicate moisture had seeped under the vinyl flooring. It says that FG did not observe any such damage. SN inspected the property on 27 January 2022, while FG’s inspection took place in June 2021. However, the insurer has not explained why SN’s visual observations should not be accepted. The panel is satisfied that the items SN says were water damaged are to be covered under the policy. Insurer is to cash settle the complainant The panel is satisfied that given the deterioration of the relationship between the parties and as it seems to be an acceptable course for both of them, the claims for the cupboards, ceiling and items SN says were water damaged should be cash settled. When an insurer cash settles a claim, it transfers to the insured the risk that the cost of repairs may unexpectedly increase and/or that additional works not quoted are requ ired. Accordingly, it is important that the quotes the insurer relies on in calculating its offer are reasonably recent and actionable by a retail customer. Further, a reasonable uplift should be applied to allow for transfer of risk and contingencies. The panel considers an appropriate uplift in the circumstances of this case is 15%. Accordingly, if the complainant accepts this determination, the following steps are to be taken:  the insurer is to pay the complainant $13,797.70, being the amount of AB’s quo te plus 15%. The insurer is permitted to deduct the policy excess if it has not already been paid  the insurer is to appoint an independent engineer not previously involved in the claim, to promptly prepare a scope of works (SOW) based on SN’s description o f the covered floor damage.  within seven days of receipt of the SOW, the insurer is request two independent builders to provide current and actionable quotes based on the SOW  the insurer is to pay the complainant the higher of the two quotes plus a 15% upl ift for repair contingencies and transfer of risk. 2.2 Has complainant reasonably co-operated? No. The complainant’s insistence that the dental chairs be inspected after 9pm is not reasonable, as the insurer has said it will consider a claim for resultant BI. The complainant is to allow assessment of the dental chairs in business hours, subject to reasonable prior notice. Determination | Case number: 838158 Page 6 of 10 Complainant says four dental chairs were water damaged The complainant says that as a result of water ingress from the storm, four out of five dental chairs in the practice sustained damage. The complainant says that following the claim incident, the four affected chairs have ‘experienced continuous and sporadic faults…the faults include stall of functions for minutes to complete failure for hours which leads to cancelled or delayed procedures ’ The complainant has provided information and a quote from TR, a dental equipment service provider. TR has suggested that the issues with the four dental chairs will become progressively worse as corrosion sets in, meaning full replacement is required. TR has quoted the cost to replace the four chairs at $285,699.07. Insurer says complainant has failed to reasonably co-operate The insurer appointed an independent dental equipment repairer, D, to assist it in assessing the claim relating to the dental chairs. It says it needs a detailed diagnostics report to understand the extent of the damage and how much of it is due to the claim event. It is apparent that attempts by D to inspect the dental chairs during business hours have been unsuccessful. While the parties disagree on why those attempts were unsuccessful, it is clear that the complainant subsequently specified that the inspection may only occur after 9pm. The complainant says this is necessary to avoid disrupting the operation of its dental practice. The insurer says that the complainant’s refusal to permit D to inspect the dental chairs during business hours is unreasonable, because the complainant permitted SN access to the premises during business hours. Further, the insurer says it has sought to address the complainant’s concerns by agreeing to consider a claim for BI loss that may arise for the estimated two hours required to assess the chairs. The insurer informed the complainant it would need to substantiate any BI claimed with evidence that appointments booked during the inspection time were cancelled and not rescheduled, and on the basis that the chairs are found to be damaged by the storm. Complainant has not reasonably co-operated with the insurer General policy condition eight set out on page nine of the PDS includes a requirement that an insured provides to the insurer ‘all reasonable assistance in investigating, defending or settling [a] claim, including attending court to give ev idence.’ However, it is strongly arguable that when read in the context of general condition eight as a whole, that requirement only applies to liability claims and subrogated (recovery) claims. Nevertheless, section 13 of the Insurance Contracts Act 1984 (Cth), provides that a provision is implied in each contract of insurance requiring each party to the contract to act towards the other party with the utmost good faith, in respect of any matter arising under or in relation to the contract. The panel is satisfied that the duty of utmost good faith obliges the complainant to provide reasonable assistance to the insurer to enable it to assess the claim. Further, the panel is satisfied that the complainant’s insistence that the d ental chairs be inspected after 9pm is not reasonable, as the insurer has said it will consider a claim for resultant BI. Determination | Case number: 838158 Page 7 of 10 If the complainant accepts this determination, the insurer is to provide the complainant with a range of at least five options between 9am and 5pm, Monday to Friday (the range) when D is available to inspect the dental chairs. Within seven days of receiving the range, the complainant is to notify the insurer of which of the options it prefers. The complainant is then to permit inspection of the dental chairs on the time and date it has selected. When the insurer receives D’s report, it is to promptly assess the dental chairs claim in accordance with the policy’s terms and conditions. The complainant is to reasonably co - operate with the in surer’s investigations. 2.3 Has complainant proven entitlement to BI payment? Not yet. The insurer is yet to receive enough information to enable assessment of any BI loss. The insurer is not required to do anything more until the complainant provides adequate proof of covered BI loss. The complainant claims BI loss The complainant says it has sustained BI loss due to the storm damage and also by COVID- 19. It estimates its resulting losses at around $100,000. No further details have been provided. Policy provides potentially relevant BI cover Section two of the PDS sets out the BI cover available. The indemnity period is six months and the total limit of liability is $650,000. The sub limit applicable to additional cost of working is $50,000. Under coverage section 2.2, cover for BI is available when it has been in consequence of physical damage to the insured property, where the damage is due to a risk insured against. Additional benefit 2.13 provides cover for BI due to closure or evacuation by order of a government authority as a result of: an outbreak of an infectious or contagious human disease occurring within a 20- kilometre radius of the Situation, however there is no cover for highly pathogenic Avian Influenza or any disease declared to be a quarantinable disease under the Quarantine Act 1908 (as amended) Additional benefit 2.16 provides cover for BI ‘caused by or result[ing] from… intervention of any Government Authority resulting from threat of damage to property within a 50-kilometre radius of the Situation, which prevents access to or hinders the use of the Situation ’ . Complainant has not yet proven an entitlement to payment of BI loss The insurer says that it has asked the complainant for information to assist it in assessing the complainant’s claim that it has sustained BI loss due to the storm event and due to COVID- 19. It says that the complainant is yet to provide any evidence substantiating the BI claims. The insurer also says that any COVID-19 related losses do not concern the storm event so should not be assessed as part of it. It has opened a separate claim file for that purpose. The panel accepts the insurer’s position that it is yet to receive enough information to enable an assessment of the extent to which the complainant may be entitled to cover for a BI loss. Determination | Case number: 838158 Page 8 of 10 The insurer is not required to do anything further until the complainant establishes an entitlement to BI and provides an adequate proof of BI loss. 2.4 Is complainant entitled to any additional payments? Yes. The insurer is to contribute up to $5,000 towards the complainant’s costs incurred in obtaining SN’s report. However, the panel is not satisfied that the insurer is primarily responsible for the delay experienced. Non-financial loss compensation is not payable. Insurer is t o contribute to the complainant’s expert costs The AFCA rules enable AFCA to require the insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000 per complaint. When considering whether to require a financial firm to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. The complainant has presumably incurred costs in obtaining SN’s report dated 7 February 2022 and email comments provided on 16 February 2022. SN’s opinion has assisted the complainant in establishing that the floor damage claim is covered. In the circumstances, it is fair that the insurer contributes to the fees SN charged the complainant. Within 21 days of receiving supporting invoices or receipts from the complainant, the insurer is to reimburse the complainant the cost of SN’s report, subject to a maximum amount of $5,000. AFCA may award non-financial loss compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer is not required to pay non-financial loss compensation The complainant’s principal says that the insurer has unreasonably delayed progression of the claim, leading to avoidable stress and inconvenience. However, the panel is not satisfied that the insurer is primarily responsible for the delay experienced. This is because:  while it appears that the complainant notified its insurance broker the day after the storm, the insurer was first notified of the claim on 1 July 2020, approximately five months later  the broker was the agent of the complainant, not the insurer  no explanation has been provided for the delay in notifying the insurer  t he complainant’s refusal to allow the insurer to inspect the dental chairs during business hours has been unreasonable and has led to delay. In the circumstances, the panel is not satisfied that the complainant is entitled to non-financial loss compensation. Determination | Case number: 838158 Page 9 of 10 2.5 Why is the outcome fair? It is fair that the parties comply with the policy’s terms. The complainant has shown the floor damage is covered but is yet to prove a BI loss. It is also fair to expect the complainant to reasonably co-operate with the insurer. SN assisted in establishing the floor damage is covered. Therefore, it is fair that the insurer contributes to SN’s costs. It would be unfair to require non-financial loss compensation to be paid as the insurer is not primarily responsible for the delay. Determination | Case number: 838158 Page 10 of 10 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.