Summary

The complainant claimed under a home policy for storm damage to a fence and concrete block wall. AFCA found the collapsed wall section was not covered, but the insurer's consultants wrongly demolished standing sections and the insurer must contribute 75% of reconstruction cost plus reimburse rubble removal costs with interest.

The complainant must prove the loss falls within the policy; the storm was not shown to be the dominant cause of the collapse, but the insurer's agents caused unnecessary additional damage to undamaged sections which the insurer must indemnify.

Issues

Subjects and remedies

pay compensationpay interest

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 837380 Financial firm Allianz Australia Insurance Limited Determination | Case number: 837380 Page 1 of 7 Case number: 837380 20 June 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On or around 30 July 2021, a claim was lodged for damage to a timber fence and concrete block wall during a storm on 28 July 2020. The insurer has accepted the claim. However, it has limited its liability to the storm damaged timber fence and says the damaged concrete wall (wall) is not due to the storm. Rather, the partial collapse of the wall was because of inherent structural defects, faulty design, gradual deterioration and wear and tear. These are expressly excluded from cover. The complainant says the partial collapse of the wall was due to the storm and that further damage to the remaining sections of the wall was caused by the insurer’s appointed representatives during make safe works. 1.2 Issues and key findings Has the complainant established a valid claim for storm damage to the wall? No. The complainant has not shown, on the balance or probabilities, that the section of the wall that collapsed in July 2021 was because of the storm or any other insured event specified in the policy. Accordingly, the insurer is not required to accept liability for the collapsed section of the wall under the claim. Is the insurer liable for the additional damage caused to the wall? Yes. The insurer is liable for the damage to the remaining sections of the wall that did not collapse but were demolished by the insurer’s appointed consultants ‘DL’ . The information does not show sections of the wall were unsafe or required complete demolition. The complainant has been left in a position that he would otherwise not have been in but for DL’s actions. I determine it is fair in the circumstances that the insurer cover the complainant for the cost to reinstate the demolished sections of the wall. Why is the outcome fair? The complainant has not shown the partial collapse of the wall was because of the storm, and so it is fair to allow the insurer to decline indemnity for this damage. However, it is also fair to require the insurer to indemnify the complainant for the damage its appointed representatives caused to the remaining sections of the wall. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is not required to cover the collapsed section of the wall. However, it is liable for the additional damage to the wall caused by its consultants during make safe works, in line with this determination. Determination | Case number: 837380 Page 2 of 7 2 Reasons for determination The insurer, in rejecting the preliminary assessment provided by AFCA, says the case manager did not refer to every piece of evidence it provided in support of its position. I do not accept this. There is no requirement for every single piece of evidence to be specifically referred to in a preliminary assessment or determination provided by AFCA. 2.1 Has the complainant shown the wall was storm damaged? No. The available information does not establish, on balance, that the damaged section of the wall subject of the claim is because of the storm or any of the listed insured events. The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Storm ’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The complainant bears the onus to establish the loss claimed is covered It is established insurance law that an insured bears the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is commonly called a prima facie claim. Only once this has been established, will the onus shift to the insurer to establish, on balance, that it is not responsible to cover the claimant for the loss in line with a provision or exclusion present in the terms of the policy. There is no dispute that the concrete wall and a timber fence at the insured property sustained damaged during a storm on or about 28 July 2021. The insurer has accepted and indemnified the complainant for the damaged timber fence. However, the insurer says the complainant has not shown the partial collapse of the wall is because of the storm event or linked to any of the inured events specified in the policy. Rather, it says the damage to the wall is because of circumstances excluded under the policy. No information to support the storm event caused the damage to the wall The complainant has lodged the claim on the basis the storm event caused a partial collapse of the wall. I note the complainant has not provided any independent and/or qualified information in support of his claim that the wall was damaged by the storm. In considering the proximate or effective cause of loss or damage, it is necessary to consider the facts of the situation alongside the terms of the relevant policy. It is a well-established principle of insurance law that the proximate cause of the loss is not the first, or the last, or the sole cause of the loss but the effective or dominant or effective of the loss. I have not been provided with any information relating to the storm event in question. This includes but is not limited to any information which could assist in determining the significance of this event in terms of the amount of rainfall and wind speeds. This information in necessary Determination | Case number: 837380 Page 3 of 7 to consider as to whether the weather event was of such significance that, on balance, it was capable of being the dominant cause for the partial collapse of an established concrete wall. Consultants refer to a combination of factors responsible for the damage DL attended the insured property on 6 August 2021 to investigate the cause and extent of damage to the insured property. DL found the damaged timber fence showed signs of storm damage but presented with significant rotting of the rails and posts. DL says the construction of the concrete wall is outdated and not to the current standards. DL refers to historical photos and says these photos show the wall presented with pre-existing damage (before the storm event). DL assessed the sections of the wall remained standing and says they showed signs of mortar deterioration and the materials had reached the end of their serviceable life. DL proceeded to demolish several sections of the wall on the basis they were considered unsafe. The complainant disagree s with DL’s findings and says the consultants entered onto his property and processed to cause additional damage to the sections of the wall without his permission. The complainant says he had to physically interject to stop DL from demolishing the last remaining standing section of the wall. The insurer appointed building and engineering consultants ‘CB’, wh o sent out a building consultant (not an engineer), to investigate the cause of the damage to the concrete wall. CB advises:  in its opinion, the concrete block wall has deteriorated and collapsed because of structural issues and refers to the National Construction Code 2019  in its opinion the concrete wall has collapsed because of an absence of a reinforced concrete footing  the deterioration of the concrete wall has been occurring for a considerable amount of time and not a result of a single storm event. The insurer has provided additional comments from both DL and CB dated 29 March 2022. They do not provide any new information. Instead, they reiterate their original findings and further reinforce their opinion the wall passed its serviceable life before the storm event occurred. The complainant has provided a scope of work and repair quotes for the damaged concrete wall. However, this information does not assist in establishing the cause for the damage to the wall. The complainant has also provided a letter from eng ineering consultant ‘AD’ dated 15 September 2022. AD says:  a qualified structural engineer should have been appointed to assess the structural integrity of the remaining parts of the concrete wall  there were several alternatives to the complete demolition of the remaining parts of the wall  it is unreasonable to make a broad assessment of the structural integrity of the storm damaged section of the wall based on an inspection of sections of the wall that had been damaged by the insurer’s representative s. The insurer is entitled to decline cover for the collapsed section of the wall I am satisfied it is fair in the circumstances to accept the insurer is entitled to decline cover for the partially collapsed section of the wall. This is because I am not satisfied it has been Determination | Case number: 837380 Page 4 of 7 shown that the storm event on its own was so significant that it would have caused the damage to the wall independent of the issues noted by the consultants. I am not satisfied the available information establishes the storm or any other listed insured event was the dominant and therefore proximate cause of the damage. Accordingly, I determine the insurer is entitled to decline cover for the partially collapsed section of the wall. 2.2 Is the insurer liable for additional damage to the wall? Yes. The insurer is liable for the additional damage caused by DL to the remaining undamaged and standing sections of the wall. Insurer’s representative caused further damage during make safe works There is no dispute DL attended the insured property and pushed over sections of the concrete wall until it was stopped by the complainant. This complainant managed to stop DL whilst it was attempting to push over the last section of the wall that had remained standing after the storm. DL says, it found these sections of the wall to be unsafe and therefore it pushed them over as make safe works. DL says there was evidence of structural issues with these sections of the wall including pre-existing cracking. The complainant refu tes DL’s assertion that the remaining sections of the wall were unsafe. DL has not provided persuasive information in support of its position that the standing sections of the wall were unsafe or presented with cracking damage. I have reviewed the photos it has provided and in my opinion they do not show the claimed structural issues or significant cracking. I do not wish to question DL ’s m otive and accept, on balance, DL was of the opinion the remaining sections of the wall were unsafe and needed to be pushed over. However, it is reasonable to expect, as a professional consultant, DL should have documented and retained reasonable information in support of its position, which it has not in this instance. Information from consultants does not show the remaining wall was unsafe In addition to the above, I have carefully considered the other expert information made available for consideration. I am not satisfied this establishes, on balance, it was reasonable to demolish undamaged sections of the wall in the circumstances. I accept the wall’s construction may not have been met current standards. However, this in itself does not mean it was unsafe or required demolition. The wall had remained standing without any issue for many years. I am not satisfi ed the insurer’s information establishes the standing sections of the wall were subject to inherent defects or faulty design, structural defects or poor workmanship. I note the insurer’s reference to and reliance on historical photos of the wall, with CB noting corroded steel reinforcements and cracking to concrete blocks within the last section of the wall that remains standing. On reviewing the photos, I am not satisfied they do show a pre- existing lean in the wall. With respect to the single piece of corroded steel and a crack to a few concrete blocks, the complainant has explained that this was the location of an iron gate which had been removed some time ago. I accept this explanation to be plausible and explains the presence of the single corroded steel piece and crack. Determination | Case number: 837380 Page 5 of 7 I acknowledge the insurer’s appointed consultants’ reference to deteriorated paintwork to the wall. However, deteriorated paint cannot reasonably be accepted to be the cause for a concrete structure to be deemed unsafe. It is entirely reasonable to accept the wall was subject to a degree of wear and tear. However, the available information does not show the wear and tear was to such an extent that the only reasonable option was to demolish the remaining sections. The insurer says the material used in the construction of the wall had reached the end of their serviceable lifetime. However, it has not provided any persuasive information in support of this statement. There is no information identifying the specific materials used or information from the manufacturers of the expected lifetime or serviceability of the building materials. I accept the complainant’s position that he did not give DL permission to demolish the standing sections of the wall. I also accept he has confirmation by AD that there were other options available other than to simply demolish these sections of the wall. It is fair in the circumstances that the insurer covers the damaged wall Having considered all the information, I determine the insurer has not shown that the undamaged sections of the wall that remained standing were unsafe or required total demolition. In demolishing these sections of the wall, the insurer has left the complainant in a position that he must now rebuild those sections. There is nothing to say these sections of the wall would not have remained in place without issue for several more years to come. Further, there is some information, although limited, that there were possibly other options available in considering what could have been done with these sections of the wall. Given DL’s actions, the complainant has now been deprived of such opportunity and left with the financial burden of having to replace the entirety of the wall. Considering what is fair in the circumstances and having regard to the fact it is reasonable to accept the wall was subject to a certain degree of wear, tear and deterioration, the insurer should contribute 75% of the cost to reconstruct the wall. This excludes the collapsed section of the wall that followed the storm event. The 25% discount also addresses the fact the complainant would have at least incurred a repair cost with the other sections of the wall which, on balance, is reasonable argue would likely be substantively less than the replacement cost. The insurer has the option to choose whether it wishes to arrange and undertake these works or if it would prefer to cash settle the complainant for these works. If the insurer wishes to cash settle the complainant for the cost of the works, this is to be based on a fresh and actionable repair quote, within 14 days of the complainant’s acceptance of this determination. The insurer is to cash settle the complaint based on this quote and increase the settlement by a further 20% to account for contingencies and the transfer of risk to the complainant in arranging the works. Subject to being provided with proof of payment, the insurer is to reimburse the complainant $5,280.00 for the expenses he incurred in arranging removal of rubble and debris from the insured property. The insurer is to pay interest on this reimbursement payment in line with section 57 of the Insurance Contracts Act 1984. Interest is to be calculated from the date the invoices were paid by the complainant until the insurer issues payment. Determination | Case number: 837380 Page 6 of 7 In the interest of completeness, I note the insurer’s reference to being prejudiced by the complainant removing the debris of the collapsed section of the wall, depriving it of the opportunity to inspect it. However, the complainant says, and which has not been denied or countered by the insurer, that it was the insurer’s appointed consultants ‘CR’ that gave him the okay to arrange for the rubble to removed, which he did. Therefore, I am not satisfied the insurer has shown it has been prejudiced by the com plainant’s actions. Why is the outcome fair? The complainant has not shown the partial collapse of the wall was because of the storm, and so it is fair to allow the insurer to decline indemnity for this damage. However, it is also fair to require the insurer to indemnify the complainant for the damage its appointed representatives caused to the remaining sections of the wall during make safe works. Determination | Case number: 837380 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.