Home / Allianz Australia / Determination 837380
Determination 837380
Storm damage claim partly declined for concrete wall; insurer's consultants demolished standing sections of wall
Summary
The complainant claimed under a home policy for storm damage to a fence and concrete block wall. AFCA found the collapsed wall section was not covered, but the insurer's consultants wrongly demolished standing sections and the insurer must contribute 75% of reconstruction cost plus reimburse rubble removal costs with interest.
The complainant must prove the loss falls within the policy; the storm was not shown to be the dominant cause of the collapse, but the insurer's agents caused unnecessary additional damage to undamaged sections which the insurer must indemnify.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to decline cover for the partially collapsed section of the wall.”
- Inadequate claim investigation secondary · not upheld
“Insurer's consultants' reliance on historical photos and structural findings was not accepted as showing the standing sections were unsafe.”
- Repairs or contractors secondary · upheld
“The insurer is liable for the damage to the remaining sections of the wall that did not collapse but were demolished by the insurer's appointed consultants.”
Subjects and remedies
pay compensationpay interest
Text of the determination
Determination
Case number 837380
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 837380 Page 1 of 7
Case number: 837380 20 June 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) with the
financial firm (insurer). On or around 30 July 2021, a claim was lodged for damage to a timber
fence and concrete block wall during a storm on 28 July 2020.
The insurer has accepted the claim. However, it has limited its liability to the storm damaged
timber fence and says the damaged concrete wall (wall) is not due to the storm. Rather, the
partial collapse of the wall was because of inherent structural defects, faulty design, gradual
deterioration and wear and tear. These are expressly excluded from cover.
The complainant says the partial collapse of the wall was due to the storm and that further
damage to the remaining sections of the wall was caused by the insurer’s appointed
representatives during make safe works.
1.2 Issues and key findings
Has the complainant established a valid claim for storm damage to the wall?
No. The complainant has not shown, on the balance or probabilities, that the section of the
wall that collapsed in July 2021 was because of the storm or any other insured event
specified in the policy. Accordingly, the insurer is not required to accept liability for the
collapsed section of the wall under the claim.
Is the insurer liable for the additional damage caused to the wall?
Yes. The insurer is liable for the damage to the remaining sections of the wall that did not
collapse but were demolished by the insurer’s appointed consultants ‘DL’ . The information
does not show sections of the wall were unsafe or required complete demolition.
The complainant has been left in a position that he would otherwise not have been in but for
DL’s actions. I determine it is fair in the circumstances that the insurer cover the complainant
for the cost to reinstate the demolished sections of the wall.
Why is the outcome fair?
The complainant has not shown the partial collapse of the wall was because of the storm, and
so it is fair to allow the insurer to decline indemnity for this damage. However, it is also fair to
require the insurer to indemnify the complainant for the damage its appointed representatives
caused to the remaining sections of the wall.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is not required to cover the collapsed section of the wall. However, it is liable for
the additional damage to the wall caused by its consultants during make safe works, in line
with this determination.
Determination | Case number: 837380 Page 2 of 7
2 Reasons for determination
The insurer, in rejecting the preliminary assessment provided by AFCA, says the case
manager did not refer to every piece of evidence it provided in support of its position. I do not
accept this. There is no requirement for every single piece of evidence to be specifically
referred to in a preliminary assessment or determination provided by AFCA.
2.1 Has the complainant shown the wall was storm damaged?
No. The available information does not establish, on balance, that the damaged section of the
wall subject of the claim is because of the storm or any of the listed insured events.
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Storm ’. Cover under these benefits is subject to the
conditions, limitations and exclusions specified in the product disclosure statement (PDS).
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
The complainant bears the onus to establish the loss claimed is covered
It is established insurance law that an insured bears the initial onus to prove on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy. This is commonly called a prima facie claim.
Only once this has been established, will the onus shift to the insurer to establish, on balance,
that it is not responsible to cover the claimant for the loss in line with a provision or exclusion
present in the terms of the policy.
There is no dispute that the concrete wall and a timber fence at the insured property
sustained damaged during a storm on or about 28 July 2021. The insurer has accepted and
indemnified the complainant for the damaged timber fence.
However, the insurer says the complainant has not shown the partial collapse of the wall is
because of the storm event or linked to any of the inured events specified in the policy.
Rather, it says the damage to the wall is because of circumstances excluded under the policy.
No information to support the storm event caused the damage to the wall
The complainant has lodged the claim on the basis the storm event caused a partial collapse
of the wall. I note the complainant has not provided any independent and/or qualified
information in support of his claim that the wall was damaged by the storm.
In considering the proximate or effective cause of loss or damage, it is necessary to consider
the facts of the situation alongside the terms of the relevant policy. It is a well-established
principle of insurance law that the proximate cause of the loss is not the first, or the last, or
the sole cause of the loss but the effective or dominant or effective of the loss.
I have not been provided with any information relating to the storm event in question. This
includes but is not limited to any information which could assist in determining the significance
of this event in terms of the amount of rainfall and wind speeds. This information in necessary
Determination | Case number: 837380 Page 3 of 7
to consider as to whether the weather event was of such significance that, on balance, it was
capable of being the dominant cause for the partial collapse of an established concrete wall.
Consultants refer to a combination of factors responsible for the damage
DL attended the insured property on 6 August 2021 to investigate the cause and extent of
damage to the insured property. DL found the damaged timber fence showed signs of storm
damage but presented with significant rotting of the rails and posts.
DL says the construction of the concrete wall is outdated and not to the current standards. DL
refers to historical photos and says these photos show the wall presented with pre-existing
damage (before the storm event).
DL assessed the sections of the wall remained standing and says they showed signs of
mortar deterioration and the materials had reached the end of their serviceable life. DL
proceeded to demolish several sections of the wall on the basis they were considered unsafe.
The complainant disagree s with DL’s findings and says the consultants entered onto his
property and processed to cause additional damage to the sections of the wall without his
permission. The complainant says he had to physically interject to stop DL from demolishing
the last remaining standing section of the wall.
The insurer appointed building and engineering consultants ‘CB’, wh o sent out a building
consultant (not an engineer), to investigate the cause of the damage to the concrete wall. CB
advises:
in its opinion, the concrete block wall has deteriorated and collapsed because of structural
issues and refers to the National Construction Code 2019
in its opinion the concrete wall has collapsed because of an absence of a reinforced
concrete footing
the deterioration of the concrete wall has been occurring for a considerable amount of time
and not a result of a single storm event.
The insurer has provided additional comments from both DL and CB dated 29 March 2022.
They do not provide any new information. Instead, they reiterate their original findings and
further reinforce their opinion the wall passed its serviceable life before the storm event
occurred.
The complainant has provided a scope of work and repair quotes for the damaged concrete
wall. However, this information does not assist in establishing the cause for the damage to
the wall. The complainant has also provided a letter from eng ineering consultant ‘AD’ dated
15 September 2022. AD says:
a qualified structural engineer should have been appointed to assess the structural
integrity of the remaining parts of the concrete wall
there were several alternatives to the complete demolition of the remaining parts of the
wall
it is unreasonable to make a broad assessment of the structural integrity of the storm
damaged section of the wall based on an inspection of sections of the wall that had been
damaged by the insurer’s representative s.
The insurer is entitled to decline cover for the collapsed section of the wall
I am satisfied it is fair in the circumstances to accept the insurer is entitled to decline cover for
the partially collapsed section of the wall. This is because I am not satisfied it has been
Determination | Case number: 837380 Page 4 of 7
shown that the storm event on its own was so significant that it would have caused the
damage to the wall independent of the issues noted by the consultants.
I am not satisfied the available information establishes the storm or any other listed insured
event was the dominant and therefore proximate cause of the damage. Accordingly, I
determine the insurer is entitled to decline cover for the partially collapsed section of the wall.
2.2 Is the insurer liable for additional damage to the wall?
Yes. The insurer is liable for the additional damage caused by DL to the remaining
undamaged and standing sections of the wall.
Insurer’s representative caused further damage during make safe works
There is no dispute DL attended the insured property and pushed over sections of the
concrete wall until it was stopped by the complainant. This complainant managed to stop DL
whilst it was attempting to push over the last section of the wall that had remained standing
after the storm.
DL says, it found these sections of the wall to be unsafe and therefore it pushed them over as
make safe works. DL says there was evidence of structural issues with these sections of the
wall including pre-existing cracking. The complainant refu tes DL’s assertion that the
remaining sections of the wall were unsafe.
DL has not provided persuasive information in support of its position that the standing
sections of the wall were unsafe or presented with cracking damage. I have reviewed the
photos it has provided and in my opinion they do not show the claimed structural issues or
significant cracking.
I do not wish to question DL ’s m otive and accept, on balance, DL was of the opinion the
remaining sections of the wall were unsafe and needed to be pushed over. However, it is
reasonable to expect, as a professional consultant, DL should have documented and retained
reasonable information in support of its position, which it has not in this instance.
Information from consultants does not show the remaining wall was unsafe
In addition to the above, I have carefully considered the other expert information made
available for consideration. I am not satisfied this establishes, on balance, it was reasonable
to demolish undamaged sections of the wall in the circumstances.
I accept the wall’s construction may not have been met current standards. However, this in
itself does not mean it was unsafe or required demolition. The wall had remained standing
without any issue for many years. I am not satisfi ed the insurer’s information establishes the
standing sections of the wall were subject to inherent defects or faulty design, structural
defects or poor workmanship.
I note the insurer’s reference to and reliance on historical photos of the wall, with CB noting
corroded steel reinforcements and cracking to concrete blocks within the last section of the
wall that remains standing. On reviewing the photos, I am not satisfied they do show a pre-
existing lean in the wall. With respect to the single piece of corroded steel and a crack to a
few concrete blocks, the complainant has explained that this was the location of an iron gate
which had been removed some time ago. I accept this explanation to be plausible and
explains the presence of the single corroded steel piece and crack.
Determination | Case number: 837380 Page 5 of 7
I acknowledge the insurer’s appointed consultants’ reference to deteriorated paintwork to the
wall. However, deteriorated paint cannot reasonably be accepted to be the cause for a
concrete structure to be deemed unsafe. It is entirely reasonable to accept the wall was
subject to a degree of wear and tear. However, the available information does not show the
wear and tear was to such an extent that the only reasonable option was to demolish the
remaining sections.
The insurer says the material used in the construction of the wall had reached the end of their
serviceable lifetime. However, it has not provided any persuasive information in support of
this statement. There is no information identifying the specific materials used or information
from the manufacturers of the expected lifetime or serviceability of the building materials.
I accept the complainant’s position that he did not give DL permission to demolish the
standing sections of the wall. I also accept he has confirmation by AD that there were other
options available other than to simply demolish these sections of the wall.
It is fair in the circumstances that the insurer covers the damaged wall
Having considered all the information, I determine the insurer has not shown that the
undamaged sections of the wall that remained standing were unsafe or required total
demolition.
In demolishing these sections of the wall, the insurer has left the complainant in a position
that he must now rebuild those sections. There is nothing to say these sections of the wall
would not have remained in place without issue for several more years to come.
Further, there is some information, although limited, that there were possibly other options
available in considering what could have been done with these sections of the wall. Given
DL’s actions, the complainant has now been deprived of such opportunity and left with the
financial burden of having to replace the entirety of the wall.
Considering what is fair in the circumstances and having regard to the fact it is reasonable to
accept the wall was subject to a certain degree of wear, tear and deterioration, the insurer
should contribute 75% of the cost to reconstruct the wall. This excludes the collapsed section
of the wall that followed the storm event.
The 25% discount also addresses the fact the complainant would have at least incurred a
repair cost with the other sections of the wall which, on balance, is reasonable argue would
likely be substantively less than the replacement cost.
The insurer has the option to choose whether it wishes to arrange and undertake these works
or if it would prefer to cash settle the complainant for these works. If the insurer wishes to
cash settle the complainant for the cost of the works, this is to be based on a fresh and
actionable repair quote, within 14 days of the complainant’s acceptance of this determination.
The insurer is to cash settle the complaint based on this quote and increase the settlement by
a further 20% to account for contingencies and the transfer of risk to the complainant in
arranging the works.
Subject to being provided with proof of payment, the insurer is to reimburse the complainant
$5,280.00 for the expenses he incurred in arranging removal of rubble and debris from the
insured property. The insurer is to pay interest on this reimbursement payment in line with
section 57 of the Insurance Contracts Act 1984. Interest is to be calculated from the date the
invoices were paid by the complainant until the insurer issues payment.
Determination | Case number: 837380 Page 6 of 7
In the interest of completeness, I note the insurer’s reference to being prejudiced by the
complainant removing the debris of the collapsed section of the wall, depriving it of the
opportunity to inspect it. However, the complainant says, and which has not been denied or
countered by the insurer, that it was the insurer’s appointed consultants ‘CR’ that gave him
the okay to arrange for the rubble to removed, which he did.
Therefore, I am not satisfied the insurer has shown it has been prejudiced by the
com plainant’s actions.
Why is the outcome fair?
The complainant has not shown the partial collapse of the wall was because of the storm, and
so it is fair to allow the insurer to decline indemnity for this damage. However, it is also fair to
require the insurer to indemnify the complainant for the damage its appointed representatives
caused to the remaining sections of the wall during make safe works.
Determination | Case number: 837380 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.