Home / IAG / Determination 837089
Determination 837089
Storm damage claim - electrical wiring replacement and alternative accommodation not paid
Summary
The complainants claimed an additional $12,233.24 for electrical wiring replacement and temporary accommodation after a storm, beyond a $107,076.32 settlement for internal repairs. AFCA decided in favour of the insurer, finding the settlement contingency sufficient to cover kitchen electrical damage and awarding no further payment or non-financial loss.
The proximate cause of the additional electrical damage was not established beyond the kitchen area, and the existing contingency payment adequately covers that damage.
Issues
- Claim amount dispute primary · not upheld
“I accept the contingency is more than sufficient to address this given IP's quote. The insurer is not required to make any further payments.”
- Inadequate claim investigation secondary · not upheld
“Complainants' expert quotes do not explain cause of damage; storm damage confined to kitchen area per IP and BA findings.”
- Instructions not followed secondary · not upheld
“I do not accept it is an agreement from the insurer to meet these quotes; reliance on phone calls did not cause loss.”
- Poor communication secondary · not upheld
“Insurer handled the claim reasonably overall; delays in call recordings due to IT issue; not misleading.”
- Repairs or contractors secondary · not upheld
“No evidence make safe repairs by OS caused any damage to the electrical wiring.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 837089
Financial firm Insurance Australia Limited
Determination | Case number: 837089 Page 1 of 6
Case number: 837089 2 August 2022
1 Determination overview
1.1 Complaint
The complainants lodged a claim with the financial firm (insurer) for damage sustained to their
property following a storm event. The insurer settled the complainants for $107,076.32 for the
internal repairs of the property.
The complainants seek an additional $12,233.24 for:
the replacement of the electrical wiring throughout the property, and
temporary accommodation whilst they vacate the property to enable the wiring
reinstatement.
The insurer disputes the complainants’ quotes and says it has factored in electrical repairs in
its previous settlement totalling $987.00.
1.2 Issues and key findings
Is the insurer required to increase its settlement?
No. I accept some of the electrical wiring confined to the kitchen area has been damaged by
the storm and was not reflected in the scope of works. However , the insurer’s $9,325.93
contingency payment factored in the settlement should be more than sufficient to capture
these additional repair costs.
Is the insurer liable for non-financial loss compensation?
No. I consider the insurer ’s waiving of the $1,000 policy excess to be fair compensation for
the complainants’ claims experience.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action.
Determination | Case number: 837089 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer required to increase its settlement?
The property has been subject to storm damage
There is no dispute the complainant s’ property has suffered damage as a result of storm. The
insurer settled the complainants based on these quotes because its builder was unable to
warrant the repairs:
$71,498.79 for the internal building repairs
$27,462.60 for the roof repairs.
The parties dispute the damage to the electrical wiring of the property. The complainants say
there has been electrical damage either as a result of the storm event or faulty workmanship
by the insurer’s repairer following the make safe repairs. The complainants are seeking
$12,233.24 for the electrical wiring repairs and alternative accommodation. The complainants
say they need to vacate the property to enable the repairs to proceed.
Insurer’s settlement does not factor in possible electrical damage
I note the insurer’s builder (OS) and engineer (BA) has confined the storm related damage to
the dining room and lounge room ceilings.
In BA’s scope of works, he recommends the removal of some of the internal ceiling and wall
lining to the kitchen, dining and lounge areas. Relevantly, BA recommends a licenced
electrician to advise on the upgrade or the replacement of the affected kitchen electrical
services.
In the complainants ’ builder costed quote (GB), on which the claim was settled, I note the
reinstatement works is limited to the plastering of the kitchen and lounge rooms walls and
ceilings. This is consistent with BA’s findings. I accept the storm damage is confined to this
portion of the property.
GB also allowed $987 for the electrician to disconnect and reconnect the lights and power
points. Of importance, the quote does not factor in any potential electrical works as
recommended by BA.
Complainants’ expert reports do not explain cause of damage
The insurer’s liability depends on the proximate cause of the damage. The proximate cause is
the real, dominant, or effective cause. It is not necessarily the cause that most immediately
preceded the damage.
The complainants provided two quotes regarding the electrical works from (JD) totalling
$6,998.42 and (CE) totalling $7,137.90.
Both JD and CE’s quotes do not outline the cause of the damage (if any) to the electrical
wiring. Further, both JD and CE’s quotes include the replacement of the electrical wiring,
power fittings, lights and switches throughout the entire property rather than to those areas
affected by the storm.
Neither JD nor CE explains the why these works are necessary to repair the claim related
damage.
Determination | Case number: 837089 Page 3 of 6
No evidence makes safe repairs by OS caused any damage
The complainants suggest the initial make safe repairs carried out by the insurer has caused
damage to the electrical wiring at the property. Further, the complainants say their son was
electrocuted as a result of the poor make safe.
I note OS says it isolated a power point. It has provided photographs of the make safe. OS
concludes there is no possibility for anyone to be electrocuted as the plate is all plastic and
there is no metal component to make it conductive.
Neither JD nor CE suggests this make safe repairs have either caused or contributed to the
need of the electrical wiring replacement.
In the absence of any other information, I am not satisfied the complainants have established
the make safe repairs have caused the claimed loss.
Storm caused damage to the electrical wiring to some areas but not all
The insurer attempted to organise an onsite assessment for the electrical wiring through OS
to establish causation. Further it says the complainants have not allowed access to OS.
I note the insurer’s consultant (IP) says the water damage to the cables have been limited to
the kitchen area, specifically the stovetop and splash back area. This is con sistent with BA’s
findings and recommendations.
IP provided a photograph which clearly shows water pouring out from behind the tiles during
the storm event.
Further, IP says the damage is localised to this kitchen area and is not widespread
throughout the home. Also, water exposure to the cables of this area will not affect cables in
other areas.
IP estimated the reinstatement of the cables in this area to be $1,070 plus GST.
In its email dated 1 September 2021, OS says the complainants are not allowing the
electrician access to the property to carry out an electrical report as they are unsatisfied with
the claims delays and are dealing with the insurer directly.
Electrical damage factored in the building contingency settlement
I note the insurer has based the cash settlement on GB’s quote which was supplied by the
complainants. Further, the insurer has factored a contingency element for any unforeseeable
damage equating to $9,325.93 in addition to the quoted damage.
I further note GBs’ comments that the complainants have not commenced any repairs. The
complainants confirmed this to the Authority during this complaint.
Based on the exchanged evidence, I accept the electrical cable damage is limited to the
kitchen area as IP concludes. This is consisted with the storm related damage outlined by
OS, BS and GB. I do not accept the complainants’ quote s are reasonable as the scope of
works is more extensive than this.
Whilst the insurer’s settlement did not specifically allow for this, I note it did include a
contingency. Contingency payments factor in any unforeseeable or missed damage such as
the electrical wiring in this instance. I accept the contingency is more than sufficient to
address this given IP’s quote .
Determination | Case number: 837089 Page 4 of 6
The complainants are claiming $3,639.18 for alternative accommodation whilst the electrical
works are being carried out. Given the electrical repairs are limited to the kitchen area and is
minimal in nature, I am not satisfied this would render the property unliveable.
The complainants have not relied on the insurer’s phone calls to their detriment
The complainants say the insurer accepted to pay for the electrical wiring repairs and advised
it will cash settle them.
I do not accept that.
The insurer provided three call recordings between the insurer’s re presentative (S) and the
male complainant (K). In call recording 1, K expressed his concerns regarding the insurer’s
previous make safe repairs, namely the power point in the kitchen.
S agreed for K to carry out the make safe repairs and send in the invoice (timestamp 13:50
minutes). I have carefully listened to the conversation. I accept it clearly only referred to the
invoice of the temporary repairs to be carried out by the complainants.
Subsequently the complainants provided the insurer with the quotes for the replacement of
the electrical wiring throughout the property.
In call recording 3, S acknowledges receipt of the quotes and explained to K that he referred
the quotes to a specialist team. S then says ‘should not be an issue there’ (timestamp 00:23).
I accept the complainants’ arguments this does indicate the quotes are generally accepted.
However, I do not accept it is an agreement from the insurer to meet these quotes or
reimburse the complainants regardless if they are necessary to repair the claim related
damage.
Even if I accept there has been a miscommunication, I am not satisfied this reliance has
caused the complainants any loss.
The complainants have neither carried out the repairs nor incurred any costs as a result. I am
not satisfied the complainants have substantiated a loss as a result of these interactions.
2.2 Is the insurer liable for non-financial loss compensation?
AFCA can award compensation for non-financial loss
AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an
unusual degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. W e do not award
compensation because the complainant has suffered some inconvenience and delays. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The complainants are dissatisfied with the way the insurer has handled the claim. Amongst
other things the complainants say:
the insurer allowed them to live in an unsafe house which was storm damaged
the insurer’s employees do not provide their full names
the insurer has been misleading in its dealing with the complainants
Determination | Case number: 837089 Page 5 of 6
the insurer has not paid for the water damaged carpet.
The insurer handled the claim reasonably overall
I have carefully considered the exchanged evidence and am satisfied the insurer has handled
the claim reasonably overall.
Having reviewed the claims notes, I note:
in early days following the storm event, the insurer placed the complainants in temporary
accommodation until make safe repairs were completed
the in surer was proactive in addressing the complainants’ concerns throughout the life of
the claim
the insurer explained to the complainants on numerous occasions that they only hold cover
for the building and hence the carpets, which is considered contents, are not covered.
The insurer accommodated the complainants’ circumstances where possible. The insurer has
offered to engage a new electrician to address the complainants’ concerns or for the
complainants to undertake their own make safe repairs.
Whilst the complainants raised concerns regarding the safety of the property because of the
make safe repairs to the power point in the kitchen, they have not substantiated this
assertion.
I consider it is the insurer’s internal process to protect the identity o f its employees by not
disclosing their last name . There is no evidence this has impacted the complainants’ claim. I
acknowledge there were delays in retrieving the phone recordings between S and K.
However, the insurer has explained this is due to an IT issue.
I also note the claim’s experience has been impacted by the Covid 19 challenges such as
restricted movement and resource availability. I accept this aspect is outside the insurer’s
control.
I do not accept the insurer has been misleading or deceptive in its dealing with the
complainants. This is evident by S’s comments about OS’s practice for the make safe.
However, this has been clarified in the supplied report.
In recognition of any service issues, the insurer has waived the $1,000 policy excess and
apologised for any inconvenience. I accept this is a fair compensation for the complainants’
claims experience.
2.3 Why is the outcome fair?
On balance, I accept the storm caused damage to the electrical wiring in the kitchen area.
However, I consider the insurer’s contingency payment for the settlement is more than
adequate to address this. Therefore, the insurer is not required to make any further
payments.
Determination | Case number: 837089 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.