Bank failed to obtain builder's insurance before approving construction loan, leading to lost deposit

FirmGreat Southern Bank
Decided2022-05-31
ProductCredit · Home loan
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$19,225
SourceAFCA PDF

Summary

The complainant lost a construction deposit paid to a builder who lacked required insurance and later became insolvent, and alleged the bank should have obtained the insurance before approving the loan. AFCA found the bank's policy only required the insurance before the first drawdown and dismissed the complaint.

The bank's construction lending policy and loan terms required builder's insurance only before the initial progress payment, not at loan approval, and the bank had no advisory or duty regarding the builder.

Issues

Subjects and remedies

scamno remedy

Related

All Great Southern Bank determinations · Find similar determinations

Text of the determination

Determination Case number 836457 Financial firm Great Southern Bank Determination | Case number: 836457 Page 1 of 9 Case number: 836457 31 May 2022 1 Determination overview 1.1 Complaint In October 2019, the complainant and his wife obtained a construction loan of $383,264 (loan 1) with the financial firm (bank) for the construction of a dwelling. The complainant entered a building contract with PH Pty Ltd (builder). The complainant paid a deposit to the builder from his own funds in the sum of $19,225 (deposit) on 10 July 2019. Prior to drawdown of the loan, the complainant discovered that the builder was collecting deposits but not building homes. The complainant then entered another construction contract with a different builder. As a result, the complainant had to enter a new loan with the bank on or about 27 August 2020 (loan 2). Loan 2 consolidated the balance in loan 1 and provided additional funding required under the new construction contract. In March 2020, the complainant was successful in obtaining an order from the Victorian Civil and Administrative Authority (VCAT) against the builder for $27,568 plus costs (judgment sum) . The builder is insolvent, and the complainant has not been successful in recovering the judgement sum. The complainant says the bank is partly responsible for the lost deposit because:  it should have obtained a copy of the builder’s Building Warranty Insurance (builder’s insurance) before it approved loan 1  when he paid the deposit to the builder on 22 July 2019, he did so, relying on the verbal approval he received from the bank for loan 1. I the bank had acted in accordance with its own policy and requested a copy of the builder ’ s insurance at this point, he would have d iscovered that the builder did not have the required builder’s insurance and he would not have paid the deposit. 1.2 Issues and key findings Was the bank obliged to obtain a copy of the builder’s insurance when it approved loan 1? Based on the available information provided to me, the approval of loan 1 was not conditional on the bank obtaining a copy of the builder’s insurance. Why is the outcome fair? The events the complainant has described are unfortunate and I understand the complainant has suffered financial loss due to reasons beyond his control. I have sympathy for the position the complainant finds himself in. I have conducted an independent review of the material available to me. I find that the bank acted in accordance with its policy and procedures when assessing and approving loan 1 in so far as the complaint about the builder’s insurance is concerned. The bank is not Determination | Case number: 836457 Page 2 of 9 responsible for the actions of the builder. In these circumstances, it would not be fair to require the bank to compensate the complainant. 1.3 Determination This determination is in favour of the bank. The bank is not required to compensate the complainant for the loss of the deposit he paid to the builder. Determination | Case number: 836457 Page 3 of 9 2 Reasons for determination 2.1 Was the bank obliged to obtain a copy of the builder’s insurance when it approved loan 1? The complainant says the bank verbally told him loan 1 was in place The complaint against the bank is confined to the question of whether, according to its policy an d procedures, the bank should have obtained a copy of the builder’s insurance prior to approving loan 1. On 22 July 2019, the complainant paid the deposit to the builder. The complainant says the bank told him verbally that the loan was in place and that he could sign and return the building contract and pay the deposit. On the same day, the complainant paid the deposit to the builder. Later that week, the complainant forwarded the receipt for the deposit he received from the builder to the bank. The bank says that it is unable to locate any records that indicate a verbal approval for loan 1 was provided to the complainant. From the material that I have reviewed, loan 1 was signed by the complainant and his wife on 11 October 2019, three months after they paid the deposit. A screen shot from the bank ’ s systems indicate, that the file for the application of loan 1, was created on 23 July 2019. The bank in an email to AFCA dated 5 May 2022, states that they ‘they don’t offer verbal approvals for any type of loans.’ The bank’s policy and loan contract terms and conditions requires it to obtain the builder’s insurance before the first loan drawdown, not loan approval I have reviewed the available information provided to me including an extract form the bank’s construction lending policy (policy) and the terms and conditions of loan 1 and 2, which are identical. Based on the policy when providing funding for construction loans, the bank was not obliged to obtain a copy of the builder’s insurance at the approval stage of both loan 1 and 2. The extract below from the bank’s policy provides that a Certificate of Currency - Builder’s all r isk insurance is required only at the initial construction drawdown stage. Initial Construction Drawdown Requirements  Copy of signed building contract confirming the contract price  Copy of formal approved plans/drawings  Satisfactory Valuation Report confirming on-completion valuation and valuer has sighted relevant documentation including approved plans  Certificate of Currency- Builder’s all risk insurance  Copy of Home Warranty Insurance (where applicable) It is clear from the policy that obtaining a copy of the builder’s insurance is not a requirement at loan approval stage but rather a requirement prior to drawdown, which are two distinct points in time. Determination | Case number: 836457 Page 4 of 9 Clause 24 of the terms and conditions for both loans 1 and 2, provide that the complainant must give the bank, amongst other things, a copy of the insurance certificate before it makes any progress payments to the builder (see section 3.3 below for an extract of the terms and conditions). The complainant says that the builder’s insurance was required by th e bank at an earlier stage in loan 2 as opposed to loan 1 The complainant says the bank’s approval of loan 2 was subject to him providing a copy of the builder’s insurance. The bank says loan 2 was fully approved irrespective of the builder’s insurance. The banks has gone on further to explain the requirement for the builder’s insurance was made as a condition of settlement (funding) of loan 2, and not a condition of approval of loan 2. In an email dated 17 March 2020 from the bank to the complainant, the bank states t the insurance, amongst other things, is an ‘outstanding item’ and consequently, the booking of the settlement has been delayed (see section 3.2). This suggests the loan was already approved by the bank. The loan contract for loan 2 also included and highlighted the following additional conditions: ADDITIONAL CONDITIONS - Builders all risk insurance to cover fire, theft and public liabilities prior to funding with CUA noted as interested party is required prior to the first progress drawdown. The above establishes that the approval of both loans 1 and 2 were not conditional on the provision to the bank of the builder’s insurance. The terms and conditions of the loans and the bank’s construction policy also supports this view. I acknowledge that from the material available to me in relation to loan 2, it is confusing as to whether the builder’s insurance was required prior to settlement of the loan or the drawdown of the loan. This however does not change my decision. In both the cases of loan 1 and loan 2, the deposits were paid prior to the requirement by the bank for a copy of the builder’s insurance, whether it was at settlement of loan 2 or at drawdown of loan 1. With respect to the additional condition in loan contract 2, the bank is entitled to set additional conditions in the contract for subsequent lending as it sees appropriate. It appears to me, that all the bank was seeking to do by adding this additional condition in the contract, was to bring to the complainant’ s attention the requirement of condition 24 of the terms and conditions that govern the contract. The fact the bank sought and highlighted the insurance requirement at an earlier stage for loan 2 compared to loan 1 does not mean it breached any of its lending policies when approving loan 1. The bank says it highlighted the insurance for loan 2 after it became aware of the issue the complainant had with the first builder. The complainant did not raise the issues he had with the builder with the bank The complainant has raised concerns as to when and how the bank discovered the issue with the builder. Although he says he does not recall advising the bank about this, in my view, this does not change the outcome of the complaint. Determination | Case number: 836457 Page 5 of 9 From the material available to me, in its application notes for loan 2 under the heading ‘Recommendation for Approval’ the bank makes the following record which indicates that it knew about the issue the complainant had with the builder: However, the builder started playing up and was not in good terms. Member has found another builder (signed building contract attached to MAPS). The complainant did not receive a copy of the terms and conditions at the time of the ‘verbal loan approval’ for loan 1 It is true that the complainant did not receive a copy of the terms and conditions of loan 1 at the time he said he received verbal approval for Loan 1. This is consistent with the fact that at the time the complainant had paid the deposit, the loan had not been formally approved and the contract had not yet been accepted and signed by the parties. As stated above, a screen shot from the bank’s systems say that the file for the application of loan 1, was created on 23 July 2019, a day after the deposit was paid. It is not unusual for banks to provide an indication of pre-approval. This is not a guarantee that the application will be approved – it is simply an indication that the application fits the bank’s criteria. In my review of the material provided to me, the pre-approval of loan 1 was provided by the bank to the complainant on 26 July 2019, four days after the deposit was paid. Unconditional approval of loan 1 was provided on 23 September 2019. From the material available to me, it appears that, consistent with legal principles and good industry practice, the complainant did in fact receive the terms and conditions of both loan 1 and loan 2 when he and his wife executed the loan contracts. On both occasions they also received a copy of a brochure headed ‘Understanding LMI’. The complainant also appears to have signed a document headed ‘ Acceptance of Offer ’ dated 11 October 2019. The complainant and his wife in in this document acknowledge amongst other things, that:  they were recommended to seek legal and financial advice by the bank in relation to the offer and the loan contract and all the other documentation provided  they confirmed that they have read and fully understood their obligations under the offer and the loan contract, and all the other documentation provided. The builder was re quired to obtain the insurance under the builder’s contract The builder’s contract with the complainant (dated 17 July 2019) states the builder may not enter a contract with its customer until they obtain insurance (see section 3.4 below). It goes on further to state that ‘t he builder is not entitled to demand, receive or accept any payment under the contract, including the payment of any deposit money’ until it obtains amongst other things, the builder’s insurance. It is important to consider the relationship between a bank and its customer. In general, a bank is a lender or a credit provider and does not have a ‘fiduciary’ duty or responsibility to its customer. This means it is not obliged to advise a customer that a service or product is not in their best interests or that there may be other services that would better suit their needs. A fiduciary responsibility arises only where the bank’s role is seen to extend beyond that of finance provider and into the other area of advice. This happens if the bank provides advice Determination | Case number: 836457 Page 6 of 9 or otherwise causes the customer to reasonably believe the bank has assumed that responsibility. From my independent review of the material, the bank did not provide any form of advice to the complainant during the application and approval process. Rather it assumed (and maintained) its position as a lender assessing a credit application. The bank’s involvement extended to that of lender assessing and offering credit rather than that of advisor or project manager managing the construction of the complainan t’s home . The bank was not required to provide advice about the building contract and the requirement of the builder’s insurance at the time the deposit was paid by the complaint. This was a matter entirely for the complainant. The bank cannot be held responsible for the investment risk of the complainant – this includes his choice of builder. It was the complainant ’ s responsibility to undertake his own research about the builder and to understand the terms and conditions of the building contract. The bank was not a party to the building contract. In this case, the builder was required to obtain the builder’s i nsurance before it even entered the building contract with the complainant, let alone, accept the deposit money from the complainant. Whilst the complainant has been successful in obtaining judgment against the builder for the loss of his deposit and costs, it is very unfortunate that the complaint has been unsuccessful in enforcing the judgment against the builder. I have sympathy for the complainant ’ s position, but the bank cannot be held liable for the builder’s failure to obtain the builder’s insurance. The bank has a contractual relationship with the complainant in relation to the financial services it provides the complainant. The bank’s duty to the complainant does not extend to the complainant’s building contract with the builder and anything that flows from it. Ultimately, the onus is on the complainant to do his own due diligence in this regard. 2.2 Why is the outcome fair? The available information does not show the bank has made an error The outcome is fair in all the circumstances because in so far as the builder’s insurance is co ncerned, the bank was only required to obtain a copy of the builder’s insurance at drawdown stage of the loan. The bank did not require a copy of the builder’s insurance when it assessed and approved loan 1 or loan 2 for that matter. I acknowledge the com plainant’s unfortunate situation; however, the bank cannot be held liable in circumstances where the bank had no obligation to ask for this information at the time of the loan approval. It was only required to obtain this information before it made the initial progress payment to the builder. The bank is therefore not liable to pay the complainant any compensation for the loss of the deposit money. Determination | Case number: 836457 Page 7 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Email from the bank to the complainant 17 March 2020 Hi [complainant], The below items are outstanding and have delayed settlement booking. For Construction only: Determination | Case number: 836457 Page 8 of 9 Builders All Risk Insurance Council Approved Plans Acceptance of offer received looks digitally signed (fade). [Bank] required this documents to be signed by members. (Pls have members to sign this document again as we can badly see their signatures. Thanks & Regards, [NG] Home & Investment Loan Specialist 3.3 Terms and conditions 24. CONSTRUCTION LOAN 24.1 Things You Need To Do Before we will make any Progress Payments to the builder by drawing on the Loan, you must give us the following: (a) a copy of the building contract executed by you and the builder and in a form satisfactory to us; (b) a copy of the building plans approved by the relevant authorities; (c) a copy of the building specifications; (d) a certificate of currency of the builder’s Contract Works & Public Liability Insurance (Builders All Risk Insurance) Policy in Queensland, or the equivalent insurance policy in the State or Territory where the construction is to take place or if the builder has a blanket/master policy a certificate of currency of the policy (where possible the copy should identify the construction property on the policy); and (e) confirmation that you have paid to the builder, your contribution towards the cost of construction . 3.4 Extract from the Builder’s contract 5. INSURABLE DOMESTIC BUILDING CONTRACTS (WARRANTY INSURANCE) … 5.3 Before the Builder may enter an insurable domestic building contract Except as set out in clause 5.4 below, the Builder may not enter an insurable domestic building contract unless and until the Builder has a) Obtained a complying warranty insurance policy; and b) the policy covers the building work to be carried out under the contract; and c) the Builder has provided a copy of the above policy to the Owner. 5.4 Alternative to clause 5.3 Determination | Case number: 836457 Page 9 of 9 5.4.1 Despite the provisions of clause 5.3 above, a Builder may enter this Contract before obtaining the required policy, but only on the following conditions: a) the Builder must obtain a complying warranty insurance policy ; and b) the policy must cover (or must be extended to cover) the building work to be carried out under the Contract ; and c) until the complying warranty insurance policy (or extension) has been issued by the Insurer no domestic building work is carried out under the Contract ; and d) the Builder must provide to the Owner a copy of the policy within seven (7) days of the date on which the policy (or the extension) is issued. 5.4.2 Whenever clause 5.4.1 is relied upon, the Builder is not entitled to 1) demand, received or accept any payment under the Contract (including the payment of any deposit money); or 2) enforce any other provision of the Contract until all of the conditions of Clause 5.4.1 have been satisfied.