Home / Suncorp Group / Determination 836233
Determination 836233
Cash settlement amount for storm and malicious damage claims and handling delays
Summary
The complainant sought $80,000 more in cash settlement for storm and malicious damage to his home after AAI Limited paid a cash settlement. AFCA found the settlement reasonable but found avoidable delays in remediation and ordered $4,500 for non-financial loss.
The complainant did not establish that the cash settlement, based on scopes of work and a 15% contingency allowance, was unreasonable, but avoidable delay in remediation caused upset warranting compensation.
Issues
- Claim amount dispute primary · not upheld
“The available evidence shows, on balance, the cash settlement amount already paid was fair and reasonable in the circumstances (including a 15% allowance for contingencies).”
- Poor claim handling secondary · upheld
“Particularly given the complainant's personal circumstances, the insurer's handling of the claim has caused him significant upset and concern.”
- Delay secondary · upheld
“There were, however, avoidable delays by the insurer in attending to remediation after the storm claim was lodged.”
Subjects and remedies
health or medicalhome or building damagemental healthpay non financial loss
Text of the determination
Determination
Case number 836233
Financial firm AAI Limited
Determination | Case number: 836233 Page 1 of 5
Case number: 836233 4 August 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
He lodged a claim in July 2020 for storm damage. While that was being assessed, he lodged
another claim in November 2020, for malicious damage.
The insurer accepted both claims. In July 2021 it cash settled for the claim-related damage
(but did not cover maintenance and other excluded issues), and made a further payment in
September 2021. It has also paid temporary accommodation for a significant period.
The complainant is unhappy with the cash settlement amount. He says that was not enough
to allow him to complete all repairs (in particular the kitchen and bathroom). He is seeking
$80,000.
He is also unhappy with the way the insurer has handled the claims. He says that has had an
adverse impact on his physical and mental health.
1.2 Issues and key findings
Is the insurer required to increase the cash settlement?
No. The available evidence shows, on balance, the cash settlement amount already paid was
fair and reasonable in the circumstances (including a 15% allowance for contingencies). To
be clear, the insurer is not liable for maintenance or other issues not arising from the claimed
events.
There were, however, avoidable delays by the insurer in attending to remediation after the
storm claim was lodged. Particularly g iven the complainant’s personal circumstances, the
insurer’s handling of the claim has caused him significant upset and concern. Compensation
for non-financial loss is warranted.
Why is the outcome fair?
It would not be fair to require the insurer to increase its cash settlement, when the evidence
shows it was reasonable by reference to the claim-related damage and scope of works, and
when it included an allowance for contingencies.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to pay $4,500 compensation for non-financial loss. It is not required to
take any other action.
Determination | Case number: 836233 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer required to increase the cash settlement?
Insurer’s s cope of works reflects claim-related damage
When assessing the claims, the insurer identified a number of maintenance issues which also
needed to be attended to. Maintenance is the responsibility of the complainant, and the policy
does not cover other wear and tear or age-related damage.
So the insurer proposed to cash settle, which is reasonable in the circumstances. It obtained
a scope of works and quote from both builder BBS, and building consultant S. The final cash
settlement paid (in September 2021, after an initial payment in July 2021) effectively reflected
the average of those quotes, but also included an uplift of 15% to allow for contingencies and
the transfer of risk to the complainant. I note the insurer also waived the $1,000 policy excess
which would normally be payable for the malicious damage claim.
I have seen nothing to suggest the scopes of work were inadequate or did not otherwise
reflect the claim-related damage for which the insurer is responsible. While the complainant
has provided quotes, they are not sufficiently detailed to allow for a clear comparison. They
also include excluded work, not covered under the claims.
Insurer’s cash settlement was reasonable in the circumstances
The complaina nt has not established the insurer’s cash settlement was unreasonable or that
it should otherwise be increased.
I note the insurer also increased the temporary accommodation payment, to allow for the
anticipated repair time but with an additional two weeks, and at a higher weekly rate to take
account of the complainant’s personal circumstances. That was in addition to the temporary
accommodation (and accommodation for his pet) which the insurer had already been
providing.
Compensation for non-financial loss is warranted
The evidence indicates the insurer did attempt to take account of the complainant’s personal
and health circumstances in dealing with the claim. At the same time, however, it is clear that
some of its delays caused significant avoidable upset and inconvenience.
The storm claim was lodged in July 2020. At that time water had entered the property and
damaged the building and contents. However, it appears that it was not until October 2020
that any remediation was carried out, during which time mould had developed.
Such a long delay in attending to drying out a water-damaged property and contents (which
then exacerbated the original damage) is not reasonable. It understandably added to the
complainant’s already difficult situation.
I consider an award of $4,500 compensation for non-financial loss is fair in the particular
circumstances.
Determination | Case number: 836233 Page 3 of 5
2.2 Why is the outcome fair?
The onus is on the complainant to establish, on balance, the insurer’s scope of works and
cash settlement was unreasonable. Based on the evidence provided, he has not done so.
It would not be fair to require the insurer to pay for damage which has not been shown to
have been caused by an insured event, or for which it should otherwise be held responsible.
It is, however, fair that the insurer compensate the complainant for the significant avoidable
upset and inconvenience caused by its handling of the claims.
Determination | Case number: 836233 Page 4 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy extracts
General exclusions
You are not covered under any section of this policy for damage, loss, cost, or legal liability
that is caused by, arises from, or involves:
Wear, tear, mould, gradual deterioration, and other conditions
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric
or climatic conditions or gradual deterioration such as, but not limited to :
• tiles and the ir adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete ...
Determination | Case number: 836233 Page 5 of 5
Well maintained and in good condition
means your home or unit and contents do not have any faults or defects that might cause loss
or damage to your home or unit or contents, loss or damage to property of others or injury to
people. This includes but is not limited to the following:
• the roof does not leak when it rains;
• there are no areas of the roof that are rusted through;
• there is no wood rot, termite or white ant damage to your home or unit…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.