1.1 Complaint
The complainants hold a landlord insurance policy.
On 12 December 2018, the complainants lodged a claim for malicious damage and loss of
rent. This was after the property was raided by the police due to the tenant using it to
manufacture drugs.
The insurer accepted the claim and cash settled the complainants on 24 September 2019 in
lieu of undertaking repairs.
The complainants say the insurer ’ s offer of settlement is not sufficient. This is because it is
unlikely the insurer ’ s proposed remediation will remove all the contamination. The
complainants also say the insurer’s scope of works for the repairs are missing various items.
In addition, the complainants are dissatisfied with the insurer’s claims handling and are
seeking loss of rent beyond the 12 months paid by the insurer.
1.2 Issues and key findings
Is the insurer required to increase the amount offered?
Possibly. This is because the insurer’s testing should have included the cavities. Therefore,
the insurer should settle the claim in the manner set out in section 2.1.
Is the insurer required to pay more for loss of rent?
Not beyond that allowed in section 2.1.
Is the insurer required to pay legal costs?
No. The available information does not show these costs were incurred to allow the
complainants to establish their claim.
Is the insurer required to pay non- financial loss compensation?
Yes. There were aspects of the insurer’s claims handling which were unreasonable. The
insurer should pay $4,000 in non-financial loss.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer should settle the claim as set out in section 2.1.
The insurer should pay $4,000 in non-financial loss.
Determination | Case number: 836185 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer’s settlement fair in the circumstances ?
Parties dispute the remediation required to remove the contamination
There is no dispute the complainants have established a valid claim under the policy. The
insurer has accepted the claim for malicious or intentional damage by the tenant, which
includes widespread methamphetamine contamination.
However, the parties disagree on various points. The main issue in dispute is the extent of
remediation required for the contamination.
Insurer’s settlement is based on its experts’ scope of works
The insurer appointed HSE to conduct site testing and report on the decontamination required
to the property as a result of the tenant’s illicit activities.
HSE collected 14 qualitative samples, four quantitative surface samples and two soil
samples. 13 of the 14 qualitative samples were positive for contamination. All four quantitative
surface samples were positive. None of the soil samples tested positive for contamination.
Following this, HSE then set out a proposed remediation plan.
After the complainants raised conc ern with HSE’s proposed plan, the insurer appointed an
Occupational Hygienist (CJ) from G to provide a second opinion. CJ reviewed HSE’s report,
conducted a site inspection and produced an independent report with a Remediation Action
Plan. G reported:
sampling protocol undertaken by HSE was sufficient to identify the presence of
contamination and the subsequent extent of the contamination spread throughout
the property. Subsequently, no further sampling was conducted by G during the
visual inspection conducted with the property owner on 29 April 2019.
…
All surface samples collected, with the exception of the qualitative sample obtained
from the tiled splashback in the granny flat bedroom ensuite, returned results
indicating that methamphetamine residues remain throughout the property, above
the level of 0.5μg/100cm2
Complainants say more extensive scope of works are required
The complainants dispute the insurer’s position. They are concerned the insurer’s
remediation plan will not remove all the contamination in the property. This is because they
say the insurer’s testing was not sufficient to identify the extent of contamination. In particular,
it does not reveal or address any contamination that may have been absorbed beyond the
surfaces and into the inner core materials of the property.
They believe the safest way to proceed is to either demolish and rebuild the property.
Alternatively, they proposed a strip, wash-up and clean-out remediation method that is more
extensive than the insurer’s meth od and would likely remove all contamination.
Determination | Case number: 836185 Page 4 of 10
In support, the complainants have provided various reports from JW. JW did not inspect the
property or conduct any testing but did review the insurer’s expert reports.
JW confirms each property is different and research is still being done. However, in her
opinion, the remediation of only the surfaces can only remove contamination on the surface.
Further, she says this method cannot remove or remediate contamination absorbed into the
materials.
Insurer should have tested the cavities
Having carefully considered the expert evidence, as well as all the other material, the panel
notes the following.
JW’s evidence is limited in this case. She has not conducted any testing on the property or
provided any opinion about what she believes is a fair remediation plan for the property. For
instance, whilst she highlights the possibility for contamination to penetrate materials, she
does not say this has likely happened to the complainants’ home. Further, she does not say
the insurer’s proposed plan would not remediate the contamination. She simply says there is
insufficient testing or data to confirm this.
In her latest report, whilst she says it is reasonable for the complainants to ‘use the
precautionary principle in re quiring a higher level of remediation’, she does not say this is her
recommended remediation plan.
Whilst JW’s evidence is limited about what is an appropriate scope of works, she raises
legitimate concerns the testing done has not identified the extent of contamination. In
particular, the lack of testing of the internal cavities to identify whether these were
contaminated.
The insurer has provided two expert opinions of the required remediation. This followed both
of them physically inspecting the property and one of them conducting a range of testing.
Importantly, neither of them tested the wall cavities.
In terms of sampling internal cavities, the insurer’s experts note this is destructive and
expensive and not generally warranted for short term manufacture with the following points
noted:
the property was occupied by the accused for a short period of time.
the property is a brick structure and the contamination identified (from quantitative
sampling) is mid-range.
mid - high level contamination is required over an extended period of time (the lower the
contamination, the longer period of time) to result in structural contamination of buildings.
However, in expanding on this, CJ said:
Assuming the property is intended for future rental accommodation, it is not
reasonably expected that tenants will be demolishing the wall linings or flooring to
gain access to the building cavities. Legal advice regarding whether this type of
activity would void any hypothetical future tenancy agreement should be sought.
Where occupants are not accessing building cavities, they are not coming into
direct contact with hypothetical contamination and hence, will not be exposed.
Such a comment misconceives the insurer’s obligations under the policy. The policy requires
the insurer to restore the property back to its pre-incident condition. It has not done so if there
is contamination in the internal cavities. It also puts the complainant, or any contractors it may
Determination | Case number: 836185 Page 5 of 10
have, at risk if they do undertake works to the property in future that may result in them
accessing the internal cavities.
On this point, the panel is not persuaded by the insurer’s experts. An assumption is made the
internal cavities are not contaminated which is not supported by JW or confirmed by any
testing. JW al so raises several legitimate arguments to test the insurer’s experts’ assumption
against this, including the fact they did not identify the type of chemicals used or the level of
production.
In this regard, the panel accepts the complainants’ position that the insurer’s testing of the
property was not extensive enough. Instead, the insurer ought to have tested the internal
cavities too to ensure the contamination was not more extensive.
The panel is also concerned the current remediation plan should have included replacement
of the oven.
JW said all the kitchen appliances should be replaced. CJ disagreed noting it is unlikely the
oven was used in the drugs production. However, this was not confirmed by the insurer.
Neither was the oven tested. The insurer has also agreed to replace other appliances in the
kitchen, such as the rangehood. This indicates there is a risk the oven could be contaminated
and posing a risk to the tenant. The replacement of the oven should be included in the current
scope of works.
Various items sought by the complainants are not substantiated
In terms of the repair scope of works, the complainants said there are about 40 items missing.
During the complaints process, the insurer adjusted its settlement to account for several
items. The complainants still maintain items are still missing.
The panel notes various items being sought by the complainants are not substantiated. This
includes the following.
The complainants have sought removal of a tree. They note the tree damaged a fence, which
is contaminated, as well as a shed which is being replaced. The panel disagrees. Soil
sampling did not reveal any contamination. There is no evidence the fence, or the tree, have
been contaminated. Whilst the small shed needs removal, the panel does not accept this cost
should include removal of the tree. The tree falling is a separate incident and not part of this
claim.
The complainants provided various submissions about why the electricals all need to be
replaced based on the male complainant’s expe rience as an electrician. However, the current
information does not show they all need to be replaced due to contamination. The insurer’s
experts (HSE and CJ) do not say this. JW has not recommended any remediation plan
specific to the property. The compla inants’ position on this is not substantiated. This applies
similarly to the plumbing.
For the pond, there is no evidence this has been contaminated. Sampling done of the front
and backyard soil did not reveal any contamination.
Whilst the complainants say the fireplace and timber architraves should be replaced due to
contamination, for reasons already expressed the panel is not persuaded the available
information shows the contamination embedded itself into the materials or is more
widespread than identif ied by the insurer’s experts.
Determination | Case number: 836185 Page 6 of 10
The insurer has adjusted its initial scope of works to address other items it accepted from the
complainants’ submission. This resulted in an increase by over $11,500. The panel
acknowledges there may be some items missing. For instance, fixed speakers outside.
However, the panel accepts most of the substantive items sought by the complainants have
either been included or are not substantiated. Further, the panel notes the insurer’s
settlement included a 15% contingency to address possible variances or missing items. The
panel considers any missing items are unlikely to be major and the contingency allowed in the
determination should address this.
The claim should be settled in this way
The complainants have provided various quotes. However, this is based on a more extensive
scope of works for the remediation. As the panel has not accepted this is substantiated, the
complainants’ quotes cannot be relied upon.
It is also not clear if the insurer’s scope of works for the remediation and repairs is fair
because it has not verified if the internal cavities have been contaminated.
Given this, the claim should be resolved in this way.
The insurer should engage an expert to do appropriate testing of the cavities. The expert is to
determine what areas, and how many samples, should be obtained. The expert should be not
one previously engaged by the parties.
In the event no contamination is identified in the cavities, then the insurer can rely on its
scope of works and repairs subject to including replacement of the oven and making good
any damage caused by this testing. The insurer should also include a 25% contingency
towards the total repair costs. This is to account for the following:
it is not clear the quotes are actionable
the complainants have shown the scope of work s were incomplete even on the insurer’s
own assessment
it is likely the cost of materials and trades has substantively increased
the complainant loses any guarantee of the works
If contamination is identified within the cavities, then the insurer must obtain a new scope of
works to both remediate all affected areas and repair the outstanding damage. This may
require more testing to identify the extent of contamination.
Once it does, the insurer is to obtain new and actionable quotations for those works and the
outstanding repairs. Those actionable quotes should also include the estimated time to repair
all the damage. The panel notes the cost of repairs should be updated because with the more
extensive remediation required in these circumstances, it will likely impact the remaining
repairs to be completed.
The insurer is then to cash settle the complainant based on these quotes along with a 15%
contingency. The lower contingency is because the quotes should be actionable and current
compared to the alternative method set out above.
The panel does acknowledge the insurer can consider whether the property is a total loss and
settle the claim in this way if it is more economical to do so.
Importantly, any cash settlement for the remediation and repairs is subject to the relevant
policy limits that were applicable at the time of the claimed event.
Determination | Case number: 836185 Page 7 of 10
The insurer should also pay additional loss of rent if contamination is found within the cavities.
This should be paid from when the insurer receives notice the determination is accepted until
the earliest of the following:
the repairs are completed by the complainants
the estimated timeframe for repairs has lapsed after the insurer issues the cash settlement
for the remediation and repairs
12 months have passed
The panel acknowledges the policy contains a 12 month limit for loss of rent and the insurer
has paid out this limit already. However, the panel does not accept this limit applies in
circumstances when these costs have been incurred due to the insurer’s conduc t rather than
the claim. The panel considers the former applies because:
the insurer has incorrectly assessed its liability under the policy (if contamination is
identified in the cavities), and
the complainant has lost this benefit having to challenge the insurer’s position (and
ultimately done so successfully).
Instead, the panel consider it fair the policy limit should only apply once the insurer has begun
assessing the full extent of works required to repair the claim related damage. This will be
when it receives notice the complainant accepts this determination.
2.2 Is the insurer required to pay more for loss of rent?
Insurer not required to pay more loss of rent
The complainants are seeking loss of rent during the whole dispute period and beyond that
paid by the insurer. They say the insurer wasted their maximum benefit on various things
during the claim. These included the following:
four weeks to dispose of contents
the incompetence of the loss adjuster
improper remediation of the contamination
not acting on their submissions
incorrectly assessing their claim
As stated above, there is scope for the insurer to pay more loss of rent following this
determination. However, the panel does not accept more loss of rent should be paid due to
the following.
The co mplainants’ position about the extent of works required for remediation has not yet
been substantiated. Whilst their concerns about the insurer’s testing was supported, the panel
does not accept this shows they are entitled to loss of rent beyond that allowed in the
determination. This is because they could have reasonably mitigated their situation by
undertaking the testing themselves to support the outcome they sought. They did not.
Therefore, the panel does not accept all the time spent disputing and ch allenging the insurer’s
position on this can be attributed to the insurer’s mishandling of the claim.
For the disposal of the tenants’ contents, the panel considers the insurer’s position was
reasonable. The tenants’ belongings were not insured by the pol icy. Whilst the complainants
say they should be considered abandoned, the evidence was far from clear this was the case
at the relevant time.
The panel acknowledge there were aspects of the insurer’s claims handling that could have
been improved upon. These include the following:
Determination | Case number: 836185 Page 8 of 10
the insurer was seeking to pay only the loss of value in the property in circumstances when
this would likely leave the complainants out of pocket
the scope of works and cash settlement did miss items and provided no contingency
However, the panel does not accept these issues were the main cause of the complainants
sustaining loss of rent benefit beyond the policy terms. Instead, it is clear the main reason for
this loss was due to the complainants’ decision to seek a greater settl ement, which remains
unsubstantiated as no testing to the cavities were done.
Accordingly, the panel is not satisfied it is fair for the insurer to compensate the complainants
for any further loss of rent beyond that allowed in the determination.
2.3 Is the insurer required to pay legal costs?
Insurer not required to pay legal costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The complainants are seeking to be reimbursed $1,155 for legal costs incurred.
The panel is not satisfied the legal costs incurred assisted them to establish their position.
The main issue involved the proper remediation of the contamination. The expert they
engaged for this point, JW, did not charge them a fee for this. The legal costs they incurred
did not assist them on this point, or any other matter raised in this complaint.
Therefore, the insurer is not required to pay for their legal costs.
2.4 Is the insurer entitled to compensation for non-financial
loss?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a
complainant suffered an unusual degree of stress, inconvenience, or delay because an
insurer mishandled a claim.
We will not award compensation for the usual amount of inconvenience involved in making a
claim or when a problem arises. We will not award compensation for delays caused by the
complainant, or other factors outside the insurer’s control.
Insurer’s failure to test the cavities caused stress and inconvenience
The panel accepts the main reason this claim has been substantively delayed was due to the
complainants disputing the remediation plan. Whilst the complainants’ position about the
amount required has not been substantiated, their concerns about the insurer ’s testing has
been supported. It is plain this omission led to substantive stress and inconvenience. The
panel does not accept the insurer’s position that the extent of testing done was reasonable.
The complainants raised various other concerns about the insurer’s claims handling. This
included the following:
not having all possible settlement methods discussed with them
Determination | Case number: 836185 Page 9 of 10
never being consulted about their claim before being presented with options
financial threats (loss of rent) to compel them to accept th e insurer’s proposed remediation
not communicating with them in a reasonable manner
the IDR not being independent
failing to remove the loss adjuster as requested
The panel does not accept these points are substantiated.
The available information shows the insurer, or its loss adjuster, did communicate the options
of settlement and considered their concerns. This included the engagement of CJ to review
the proposed remediation plan after they raised concerns with this.
The panel does not accept the loss of rent reference was a threat. Instead, the insurer could
legitimately limit its liability for loss of rent if the complainants unreasonably delayed the claim.
It was therefore reasonable to flag this with them, particularly in circumstances when they
were disputing the remediation without any expert in support at that time. In this regard, the
panel notes the complainants did not engage JW until early 2020, being after the IDR process
was completed.
Further, the panel notes the insurer did not limit its liability despite these factors and opted to
pay out the full policy benefit.
Whilst the complainants believed more regular communication and interaction was required,
the panel does not accept the insurer’s failure to meet their standard was unreasonable. The
insurer did communicate and present its position several times. The panel also does not
accept the IDR process was biased as the complainant has not shown its position was
unsubstantiated.
Regarding the removal of the loss adjuster, the panel does not accept the insurer was
required to do this. The loss adjuster was the insurer’s agent. It was therefore at the insurer’s
discretion as to who they appoint and retain. Further, the panel has not identified any
egregious conduct to warrant their removal. In addition, the panel notes a change in loss
adjuster can create further delays and issues whilst the new adjuster comes up to speed.
Insurer to pay $4,000 in non-financial loss
The panel accepts there were aspects of the insurer’s claims handling that coul d have been
improved. This includes the inadequate testing, the calculation of the settlement being too low
and looking to utilise a method of settlement that would leave the complainants in a worse
position (loss of value).
The panel was concerned that the use of a cash settlement without adequate testing was
inappropriate as the extent of the damage had not been fairly established.
However, the panel does not accept all of the issues identified by the complainants have
been substantiated.
Considering t his and AFCA’s conservative approach, the panel accepts it is fair to award
$4,000 in non-financial loss.
Determination | Case number: 836185 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in general insurance
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.