Home / Youi / Determination 835765

Determination 835765

Water damage claim - insurer's assessment of liability and settlement offer

FirmYoui
Decided2022-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,500
Amount claimed$34,120
SourceAFCA PDF

Summary

The complainant claimed water damage from a leaking shower pipe and the insurer sought to limit cover, attributing damage to an excluded shower base leak. AFCA found the insurer had not shown an exclusion applied, ordered it to cover the full damage per CB's scope, obtain a fresh quote, and pay $1,500 non-financial loss plus up to $5,000 in consultant report costs.

The insurer bore the onus to show an exclusion applied under the escaping water provisions, and the evidence was more consistent with an ongoing covered pipe leak than an excluded shower base leak.

Issues

Subjects and remedies

health or medicalhome or building damagepay compensationpay non financial lossprovide documentsreassess claimrepair or rectify

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 835765 Financial firm Youi Pty Ltd Determination | Case number: 835765 Page 1 of 7 Case number: 835765 26 April 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On 30 July 2021, a claim was lodged for water damage noticed at the insured property on or about 22 July 2021. The insurer accepts a valid claim exists for water damage because of a leaking pipe found in the shower wall within the ensuite. However, it is seeking to decline cover for damage it has assessed to be because of a leaking shower base in the past. The insurer is of the opinion the cost of repairs put forward by the complainant through consultants ‘CB’ are not fair and reasonable. The complainant is seeking cover for all the water damage found. He is also dissatisfied with the insurer’s management of the claim and is seeking compensation for non-financial loss. 1.2 Issues and key findings Is the insurer’s assessment of its liability under the claim fair? No. The insurer’s assessment of its liability relating to the extent of water damage to the insured building is not fair. The insurer is to cover the complainant for the full extent of water damage as identified by consultants CB under the claim. Is the insurer’s final claim settlement offer reasonable? No. Given the insurer’s assessment of the full extent of water damage to the insured building is inaccurate, the associated final claim settlement put to the complainant does not fulfil its policy obligations. However, it is fair in all the circumstances, to allow the insurer to assess its liability under the claim and amend its final claim settlement offer in line with this determination. Is the complainant entitled to compensation? Yes. The insurer is to pay the complainant $1,500 in non-financial loss compensation in line with the AFCA Rules. 1.3 Determination This determination is in favour of the complainant. Within 14 days of the complainant’s acceptance for this determination, the insurer is to obtain a fresh repair quote from a suitably qualified consultant to repair the insured building based on the scope of works provide by CB. Within seven days of receiving this quote, the insurer is to either authorise repairs or cash settle the complainant under the claim. The insurer is to pay the complainant $1,500 in non-financial loss compensation. Subject to being provided with reasonable evidence, the insurer is to reimburse the complainant for expenses incurred in sourcing consultants’ reports up to a maximum of $5,000. Determination | Case number: 835765 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability fair? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Escape of liquid’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer is entitled to rely on the policy provisions The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The complainant has established a valid claim There is no dispute the insured building has suffered water damage because of a leaking pipe in the shower wall and as such a valid claim exists under the policy. However, given the insurer is seeking to limit its liability under the claim, it bears the onus to show, on balance, an entitlement to reduce its liability under the claim in line with the policy provisions or otherwise. Consultants have provided conflicting information On noting discolouration to the kitchen ceiling, the complainant appointed plumbing consultant ‘R’ to investigate. In its report dated 16 July 2021, R confirms locating and repairing a leaking water pipe behind the shower. R confirmed presence of water damage to the ceiling in kitchen/dining area, kitchen, timber framing behind the shower, yellow tongue flooring, insulation and mould. The insurer appointed consultants ‘X’ to investigate the cause and extent of damage. In its report dated 31 July 2021, X confirms the leaking pipe and associated repairs by R and elevated moisture levels in the various areas identified by R, however, says there was no mould. The insurer also appointed consultants ‘AE’ who arranged an escape of liquid assessment and for tiling specialists ‘T’ to complete an assessment. AE in its report of 5 August 2021, says in its opinion the leaking pipe was not the dominant cause for the resultant water damage. Rather, in its opinion the main cause for the damage will have been leaking of the shower base, which it noted had been recently re-grouted. Similarly, T having completed its assessment of damage to tiles in the kitchen says, in its report dated 13 August 2021, that reason for the damage was the leaking shower base and not the leaking pipe. I note most of the report from T, instead of focusing on the tiles damage, seems to detail its opinion relating to the leaking pipe and ensuite shower base which is influenced by AE’s findings. The complainant appointed CB which attended the insured property on 1 October 2021. CB says it is clearly evident that the noted water damage was because of the slow leaking water pipe. CB says this is supported by the amount and presence of black mould in the sub-floor ceiling cavity areas. CB says it is evident water had travelled down the wall cavity onto the Determination | Case number: 835765 Page 3 of 7 bottom plate. From there it has flowed between the gyprock and onto the yellow tongue flooring and subsequently flowed through the yellow tongue joins into the ceiling cavity below and finally making its way into the kitchen wall. CB noted consistent water damage to the kitchen cabinets in the form of swelling as well as some tiles in the area. CB provides a scope of works and associated costs of repairs at $34,119.68 to repair the noted water damage to the insured building. The insurer had AE re- attend after CB’s assessment to complete an inspection of the insured building’s roof on the grounds that it is possible some of the water damage may be due to stormwater ingress. This inspection found some maintenance/cleaning issues with the roof, however, confirmed there was no evidence of stormwater ingress. In addition, the consultants’ reports the complainant has also provided signed statement from a friend ‘AK’. AK, an experienced builder, says he was the one to note the discolouration of the kitchen ceiling whilst visiting the complainant on 15 July 2021. AK says he had a look in the ceiling cavity and noted water tracking along the yellow tongue, mould and water damage to the kitchen ceiling. AK also inspected under the home and noted it was evident water had channelled down the wall, was building up and dripping from one of the bearers directly under the kitchen wall. There was visible water damage to the yellow tongue floor. He recommended the complainant appoint a plumber. Also, in the several visits since R repaired the leaking pipe, AK has not seen any further damage. Information from the complainant is more persuasive I acknowledge the insurer’s reference to and reliance on the opinion that that dominant and therefore proximate cause for most of the water damage is the leaking ensuite shower base. However, several flood tests completed by the various consultants appointed by the insurer as well as CB, all test results confirmed there was no water leaking from the shower base. The insurer’s position in this regard is based on opinion’s that the shower base did leak in the past causing most of the water damage but due to recent re-grouting, it no longer leaks. The complainant confirms his wife applied some re-grouting some months ago, but this was not because of any leaks or concerns of water damage. Th e insurer’s reference to a possible issue of stormwater ingress once investigated also proved to be inconsistent as a concern or cause for the damage. I note, at the time of AK’s assessment, R’s attendance, CB’s assessment as well as AE, the information sh ows elevated moisture levels, evidence of water flowing/tracking down from the ensuite all the way to the sub-floor floor bearers dripping. Given the above, I am convinced this is consistent with a leaking shower base which had been repaired several months prior and which as confirmed by all consultants was not leaking at the time of their assessments. Rather, on balance, I am satisfied the available information supports the noted water tracking and damage is consistent with the ongoing and present leaking pipe located in the shower wall. I am not satisfied the available information shows, on balance, the water damage to the various areas in the home was because of the claimed leaking shower base, stormwater ingress or any other cause which is excluded under the policy. The insurer has not been successful in showing that it is entitled to limit its liability under the claim in line with a policy exclusion or otherwise. I find the information from the complainant to Determination | Case number: 835765 Page 4 of 7 be more persuasive and consistent with the physical evidence and photographs provided by the various consultants. 2.2 Is the insurer’s final claim settlement offer reasonable? No. The insurer’s assessment of its liability under the claim for the water damage to the insured building is not consistent with the available information. Given this, its proposed scope of works (SOW) and associated cost of repairs do not fairly represent its liability under the policy. The scope of works put forward by CB are more accurate Having considered all the available information, including many photos of the damage in the various areas of the insured building, I find the scope of works and proposed repairs by CB to be accurate. The scope of works and associated estimated cost of repairs from the insurer are not reasonable in the circumstances. This is because, first the insurer’s scope of works are based on an inaccurate assessment of the extent of water damage that is to be accepted under the claim. Secondly, it is based on the insurer’s internal quote calculator as opposed to being a quote from a repairer which is prepared to complete the repairs. Therefore, I determine the SOW proposed by CB are the more accurate and fair representation of the insurer’s liability under the claim. It is fair to permit the insurer to source a quote based on CB’s SOW The complainant has provided an updated quote for repairs dated 11 February 2022 in the amount of $42,254.86 which is significantly higher than the insurer’s proposed cash settlement of $16,936,54. As discussed above, I find the insurer’s quote does not cover all the water damage to the insured building and so CB’s proposed SOW are to be favoured. However, in saying that, having considered CB’s quote I note it lacks details regarding what hourly rate is to be charged, the cost of individual items to be used in repairs and other information relating to the cost of works that will be sub-contracted. I also note CB has only provided a provisional quote amount for mould remediation works. I acknowledge the i nsurer’s position that given the assessment of its liability under the claim, it did not arrange for a quote for repairs covering all the damage and did not complete a thorough assessment CB’s quote to determine its accuracy or whether it is fair in reasonable. I am of the opinion, moving forward the insurer should consider reviewing its process of reviewing information it receives from its customers and/or AFCA under complainants promptly. This will allow it to respond to this information in reasonable time and reduce the likelihood of further delays in terms of waiting for an outcome form AFCA before then seeking to review and respond to exchanged information. With respect to this complaint, I accept in the circumstances, it is fair to permit the insurer to obtain a fresh quote for repairs from a consultant of its preference in order to assess its liability under the claim. However, in saying that, the insurer:  Is to source this fresh quote based on CB’s proposed SOW  The quote is to be sourced from a consultant that is prepared to complete the repairs at the quoted costs regardless of whether the repairs are authorised by the insurer or if approached by the complainant after being cash settled under the claim Determination | Case number: 835765 Page 5 of 7  The cost of repairs are to include the cost to treat and remediate the mould infestation noted in the various consultants’ reports. Insurer is to increase its final claim settlement offer under the claim I determine, in the instance the insurer wishes to obtain a fresh quote from a repairer of its preference, this is to be arranged within 14 days of the complainant’s acceptance of this determination. The insurer is to then authorise repairs to the insured building or cash settle the complainant for the costs of repairs based on this quote, within seven days of receiving the fresh quote. If the insurer elects to cash settle the claim, it is to increase the final cash settlement by a further 15% to allow for contingencies and the transfer of risk to the complainant in arranging the repairs. Subject to the complainant providing the insurer with evidence of costs incurred in arranging the supporting consultants’ reports and quotes, the insurer is to reimburse the complainant for these expenses up to a maximum of $5,000. 2.3 Is the complainant entitled to compensation? Insurer is to pay the complainant $1,500 in non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. In this instance and considering AFCA’s approach to compensation, I accept the insurer’s overall management of the claim has resulted in undue delay, physical inconvenience, stress and anxiety for the complainant. This includes the complainant and his family having to reside with the effects of black mould for an unreasonable period. I am not satisfied the available information shows the insurer has failed to act with the utmost good faith or that the insurer did not make reasonable attempts to respond to the complainant’s concerns. I determine the insurer is to pay the complainant $1,500 within 14 days of the complainant’s acceptance of this determination. Why is the outcome fair? In in the absence of compelling information showing the claimed damage is the result of circumstances excluded by the policy, it is fair in the circumstances to require the insurer to accept liability for all the water damage found to the insured building. It is also fair in the circumstances to permit insurer an opportunity to determine what it would cost it to complete all the repairs to accepted under the claim in line with this determination. Given the complainant’s poor experience relating to the insurer’s management of this claim, I am of the opinion it is fair to require the insurer to pay the complainant non-financial loss compensation. Determination | Case number: 835765 Page 6 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy provisions 8 . Escaping Water What is covered? Loss or damage to the insured property caused by escaping water that occurred: • suddenly and without warning; or • slowly over a period of time and you could not reasonably have been aware of it. If you have buildings cover with us, we will organise and pay the cost of using the most appropriate method to locate the source of the escaping water, and we will repair any damage caused while doing so. What is not covered? Loss or damage which was: • caused by water escaping: - slowly over a period of time and you could reasonably have been aware of it; - from a leak in a shower base, recess or cubicle; Determination | Case number: 835765 Page 7 of 7 - from a bath, shower or basin as a result of splashing while in use; … General exclusions These general exclusions apply to all sections of your policy. • We will not pay for repair of any damage that existed prior to the start date of the policy. • We will not pay for loss, damage or legal liability mould, rot, damp, or the effects of the climate or weather, unless as a direct result of an incident for which we have accepted a claim. 3.3 Relevant AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.