Home / Allianz Australia / Determination 835735
Determination 835735
Storm-damaged swimming pool replacement versus repair and cash settlement
Summary
The complainant's storm-damaged swimming pool was replaced by the insurer, and he disputed the installation and sought full replacement and cash settlement. AFCA found the pool did not need full replacement, required a 20% contingency uplift, temporary fencing costs and $2,000 non-financial loss compensation.
The pool was installed within the acceptable parameters of the relevant standards and manufacturer's recommendations, so rectification rather than full replacement is the fair remedy, with non-financial loss awarded for the poor claim experience.
Issues
- Repairs or contractors primary · not upheld
“The swimming pool has been installed within the acceptable parameters of the Australian Standard AS/NZ 1839 and manufacturer's recommendations.”
- Claim amount dispute secondary · upheld
“It is fair that the insurer be required to increase the offer by 20% to allow for contingencies; temporary fencing of $1,770.97 to be included.”
- Delay secondary · upheld
“There were delays caused by the insurer over the life of the claim, such as the final scope of works not received until 10 May 2022.”
- Poor communication secondary · upheld
“but for the failure of the insurer's contractors and poor communication, the complainant would not have acted in the manner he did.”
Subjects and remedies
home or building damagemotor vehicle collisionnatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 835735
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 835735 Page 1 of 7
Case number: 835735 10 November 2022
1 Determination overview
1.1 Complaint
The complainant ’ s swimming pool (pool) was replaced by the insurer after it was damaged
during a storm in May 2020. The complainant says the pool was not installed correctly and
requires complete removal and replacement.
The insurer says the pool has been installed in line with the relevant standards. The insurer
accepts there are some further works and rectifications needed. The complainant has refused
to allow the insurer’s contractors on site and wants a cash settlement based on his
consultant’s ‘SR’ scope of works and quote. The complainant is also seeking compensation
for non-financial loss due to the stress, anxiety and delays experienced under the claim.
1.2 Issues and key findings
Is the insurer obliged to remove and replace the pool?
No. The swimming pool has been installed within the acceptable parameters of the Australian
Standard AS/NZ 1839 (standards) and manufacturer’s recommendations .
Has the insurer adequately identified the required rectification works?
Yes. The proposed rectifications work and associated scope of works are consistent with the
opinions provided by engineering consultants ‘SQ’ and builder ‘B’.
Is it fair to require the insurer to increase its cash settlement offer?
Yes. It is fair in all the circumstances that the insurer be required to increase the offer by 20%
to allow for contingencies in completing the repairs. The insurer is also required to include an
additional $1,770.97 for the cost of temporary fencing around the pool.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer is to pay the complainant $2,000 in non-financial loss compensation in line
with the AFCA Rules (Rules).
Why is the outcome fair?
The outcome is fair because the insurer is accepting of its obligations to complete and/or
cover the cost to complete the identified rectification works. Also, given the complainant’s
poor experience over the life of the claim, it is fair to require the insurer to pay him non-
financial loss compensation.
1.3 Determination
This determination is significantly in favour of the insurer.
Determination | Case number: 835735 Page 2 of 7
The insurer is required to increase the settlement offer to $27,658.33. This includes a 20%
uplift, $2,000 non-financial loss compensation and $1,770.97 towards temporary fencing.
Determination | Case number: 835735 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer obliged to remove and replace the pool?
No. The pool has been installed within acceptable parameters of the relevant standards and
manufacturer’s recommendations.
The complainant says the swimming pool was not installed correctly
The complainant says the site was not prepared correctly in line with the relevant standards.
Further, that the installation process was too quick given the insurer’s repairers completed the
pool’s installation in o ne day. The complainant also says the pool has a significant tilt and this
has caused the pool ’s shell to buckle, which in his opinion now requires complete
replacement.
The complainant says the contractors appointed by the insurer did not follow installation
guidelines for a semi above ground swimming pool. The complainant is no longer prepared to
accept the insurer’s contractors on - site and says he wants his consultants ‘SR’ to complete
the pools removal and replacement with a new pool.
The insurer says the pool does not require complete removal and replacement
The insurer does not dispute the installation of the pool requires some rectification works.
However, the insurer says the rectification works do not require the complete removal and
replacement with a new pool.
The insurer says it was not required to do most of the site preparation because it was able to
use the existing site of the damaged swimming pool and complete a swap over. The insurer
acknowledges the complainant’s reference to a tilt in the pool. However, says this is within the
acceptable parameters listed in the standards.
Several other issues have been identified which require rectification to ensure the outstanding
works can be completed. The insurer has submitted multiple expert reports, scope of works
and quotes in support of its position. The insurer remains committed to complete all required
rectification and outstanding works identified by the appointed consultants.
The pool was installed correctly despite the required rectification works
I acknowledge the complainants position that the pool has been incorrectly installed and
requires complete replacement. However, without persuasive qualified information to support
this opinion, I am not satisfied the complainant has shown the pool has been installed in
contravention to the relevant standards and manufacturer recommendations.
Based on the various reports from the appointed engineers SQ and builders B, I am satisfied
the recorded tilt is within the acceptable parameters listed in the standards. I am satisfied
there are rectification works required that can be completed without the need to completely
remove and replace the pool.
I note the scope of works and associated quote for repairs from the complain ant’s appointed
consultants SR. However, this information from SR does not provide any compelling
comment or opinion on the quality of the pool’s installation or the standards. Rather, the
scope of works and quote is based on the complainant’s instructions and what he be lieves
needs to be completed.
Determination | Case number: 835735 Page 4 of 7
Given this, I am not satisfied the complainant has provided sufficient information to
demonstrate the pool is buckled, its installation does not meet the standards or that it requires
removal and replacement.
2.2 Has the insurer identified all required rectification works?
Yes. The insurer’s proposed rectification works will fulfil its obligations under the claim.
The insurer has accurately identified required rectification works
The insurer accepts it is required to authorise several additional works to rectify and/or
complete the pool replacement works accepted under the claim. As noted, some of these
works arise from the complainant not allowing the insurer’s contractors to complete repairs a s
well as rectification of some of the works completed to date under the claim.
The insurer relies on several reports provided by engineering consultants SQ, loss adjuster
‘S’ and building consultants B. I am satisfied SQ’s investigations into the concerns raised by
the complainant and ass essment of the pool’s installation are reasonable and supported by
persuasive information.
SQ’s reports detail the rectification works required and provide the appropriate methodology
to complete the works. The insurer has provided scopes of work and associated quotes
prepared by B, in line with the instructions and recommendations of the engineers.
I accept the quotes do no refer to the misaligned skimmer box. However, I am of the view,
this will be addressed as part of the proposed rectification of the backfill compaction works,
which do form part of the proposed rectification works. If this is not the case, then the insurer
is to insure that rectification of the skimmer box is included in the works to be authorised
under the claim.
The complainant has not submitted any persuasive information that shows the insurer’s
proposed rectification works are inadequate or the methodology is insufficient. As noted
above, he has provided a scope of works and quote from SR, but this information provides no
view or comment about the repairs completed or reports from S, SQ or B.
Without information to the contrary, I am satisfied the insurer has identified the required
rectification works and determined the most appropriate methodology for the completion of
these works.
2.3 Is the insurers cash settlement offer fair and reasonable?
No. The insurer is to increase the final cash settlement offered in line with this determination.
Complainant, if he wishes, can still allow the insurer to complete the works
I acknowledge, given the complainant’s loss in trust of the insurer’s contractors’ abilities, has
requested that the claim be cash settled. I note this request is based on his opinion that the
insurer be required to cover the costs proposed by SR to completely remove and replace the
pool.
Given this determination does not accept the pool requires complete replacement, and
considering what is fair in all the circumstances, I believe the complainant should be
permitted to reconsider his demand to be cash settled. This is because of the complexity
involved in the required rectification works and potential for possible additional works.
Determination | Case number: 835735 Page 5 of 7
However, if the complainant wishes to maintain his request for the claim to be cash settled,
the claim can be settled as set out below. The complainant must inform the insurer within 14
days of his acceptance of this determination of his preference.
Cash settlement offer to be increased in the circumstances
The insurer relies on the scope of works provided by its builder B and has offered to pay the
complainant $19,906.14. The complainant has not provided an alternative quote to complete
the rectification works. Rather, the quote from SR relates to a full replacement of the pool
which I find excessive and not reasonably supported by the available information.
I accept it is fair that the insurer be permitted to rely on the information from its appointed
engineers and builder to assess its liability under the claim. This means the insurer is not
obliged to cover a full replacement of the pool and its liability is limited to the rectification
works and outstanding repairs accepted under the claim.
In saying that, given the complexity of the works, potential for additional works and the
transfer of risk associated with arranging the works, I determine is it fair that the insurer
increase the settlement offer by a further 20% contingency payment ($3,981.22).
The insurer is liable for the temporary fencing
The complainant has submitted multiple invoices for the hiring cost of temporary fencing
around the incomplete pool works at the property. The complainant says the insurer should
be liable for this cost as it is a legal requirement to have a fence around a swimming pool and
the safety of his family.
The insurer says it should not be liable for this cost because the swimming pool did not have
a fence installed prior to the original damage occurring.
It is not disputed that there was no fencing installed around the swimming pool prior to being
damaged by the falling tree. However, as per the consultants’ information, it is likely that at
the time the original pool was constructed, a pool fence was not a requirement.
Regardless, it is not in dispute that fencing is required under the current building regulations. I
am satisfied it is reasonable to require the insurer to cover the cost of the temporary fencing
for the period the site has been subject of the claim and an additional three-month period at
$99.72 per month to allow for the rectification works to be completed.
The insurer is required to include $1,770.97 for the cost of temporary fencing around the
swimming pool in the settlement.
2.4 Is the complainant entitled to compensation?
Yes. The insurer is to pay the complainant $2,000 in non-financial loss compensation in line
with the AFCA Rules (Rules).
The insurer is to pay $2,000 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Determination | Case number: 835735 Page 6 of 7
The complainant says the insurer has caused significant delays in the management of his
claim. The complainant says the insurer conducted several assessments and provided him
with incorrect or incomplete information on several occasions.
The insurer refutes the complainant’s positio n and maintain its management of the claim was
reasonable with any delays experienced being the fault of the complainant. This relates to the
complainant refusing access to the site and refusing to allow its contractors to complete the
required works.
I ac knowledge the insurer’s position, however, I am of the opinion but for the failure of the
insurer’s contractors and poor communication, the complainant would not have acted in the
manner he did at the time. Further, I am satisfied the available information shows there were
delays caused by the insurer over the life of the claim, for example the insurer received the
final SQ report in late November 2021 but a final scope of works including the provision for
the asbestos fencing was not received until 10 May 2022.
Given the complainant’s poor experience, I accept this will have caused the complainant to
experience an unreasonable degree of stress and anxiety as well as delays over the life of
the claim. Accordingly, in line with the Rules, I determine the insurer is to pay the complainant
$2,000 in non-financial loss compensation.
2.5 Why is the outcome fair?
The outcome is fair because the insurer is accepting of its obligations to complete and/or
cover the cost to complete the identified rectification works. Also, given the complainant’s
poor experience over the life of the claim, it is fair to require the insurer to pay him non-
financial loss compensation.
Therefore, I consider the settlement of $27,658.33 to be fair and reasonable.
Determination | Case number: 835735 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.