Storm damage claim partly declined (bathroom damage excluded), roof tile damage, cash settlement amount, delay
Text of the determination
Determination
Case number 835486
Financial firm AAI Limited
Determination | Case number: 835486 Page 1 of 9
Case number: 835486 20 May 2022
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (the insurer).
On 18 August 2020, the complainant lodged a claim on the policy after his home was
damaged in a storm. The complainant said there was damage to the main bathroom and
ensuite (the bathroom damage), a bedroom and a granny flat.
The insurer agreed to partially cover the claim and offered a $13,456.54 cash settlement. The
insurer declined to cover the bathroom damage on the basis it was due to the excluded
causes of gradual deterioration, construction defects and ground movement.
The complainant disagrees. He wants the insurer to cover and repair all of the claimed
damage. The complainant also says that in assessing the claim, the insurer caused damage
to roof tiles. Finally, he wants the insurer to pay non-financial loss compensation for the stress
and inconvenience caused by its poor claim handling.
1.2 Issues and key findings
Is the bathroom damage to be covered?
No. On balance, the bathroom damage was due to the excluded causes of gradual
deterioration, and ground movement rather than a single insured event.
Is the insurer required to pay for the roof tile damage?
No. There was pre-existing damage and repairs to the roof tiles. A third party was on the roof
as well as the insurer’s trades. Further, the com plainant has replaced the damaged tiles.
Accordingly, it is not possible to determine if the insurer caused any damage to the roof tiles.
Is the insurer entitled to cash settle?
Yes. The policy gives the insurer the right to elect to cash settle. However, the cash
settlement amount it offered is to be increased by 30% to allow for price increases,
uncertainty on whether the underlying quotes are actionable and transfer of risk.
Is the complainant entitled to any other compensation?
Yes. The insurer has contributed to the delays experienced. It is to pay the complainant
$1,000 in non-financial loss compensation. However, it is not required to pay the cost of the
complainant’s expert report as it did not assist in showing a covered claim exists.
Why is the outcome fair?
The causes of the bathroom damage are excluded. It would be unfair for the insurer to have
to pay for that damage when the policy does not require it. However, fairness dictates that in
cash settling, the insurer pays a 30% uplift to allow for contingencies and transfer of risk. It is
fair that the insurer pays the complainant $1,000 in non-financial loss compensation for the
stress it has caused. The insurer is not required to pay costs or for the roof tile damage.
Determination | Case number: 835486 Page 2 of 9
1.3 Determination
This determination is partially in favour of the complainant.
Within 21 days of receiving notification that the complainant accepts this determination, the
insurer is to pay him:
$17,493.50, made up of a cash settlement of $13,456.54 plus a 30% uplift, and
$1,000 in non-financial loss compensation.
Determination | Case number: 835486 Page 3 of 9
2 Reasons for determination
2.1 Is the bathroom damage to be covered?
No. On balance, the bathroom damage was due to the excluded causes of gradual
deterioration and ground movement rather than a single insured event.
Complainant has shown a valid claim under the policy exists
The complainant is required to show on the balance of probabilities (that it is more likely than
not) that he suffered a loss caused by an insured event covered by the policy. This is known
as a valid claim.
The complainant holds a home and contents policy. Relevant extracts of the policy’s product
disclosure statement (PDS) are set out in section 3.2 of this determination. Subject to its
conditions and exclusions, the policy provides cover for loss or damage caused by the
insured events listed in the PDS , which include ‘storm’ and ‘escape of liquid’.
The available information shows that on 15 August 2020, a storm caused damage to the
insured property. The insurer has accepted and agreed to partially cover the claim.
In the circumstances, I am satisfied that the complainant has established a valid claim.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proof in
establishing that an exclusion applies. The standard of proof is the balance of probabilities .
The engineering experts disagree on the cause of the bathroom damage
The insurer appointed JH, engineers, to assist it in assessing the bathroom damage claim .
Following an inspection of the property on 5 February 2021, JH concluded:
cracking and delamination of bathroom wall tiles and deteriorating grout is due to
construction defects, in particular, the lack of adequate expansion joints
the reactive clay founding soils, poor site drainage and proximity of trees to the house has
likely caused long-term foundation movement, which has contributed to the damage
the damage is not the result of a single event.
The complainant also engaged an engineer, DM. In its report dated 17 May 2021, DM agreed
with JH that there were notable moisture levels in the house. DM said this appeared to be
associated with subsurface water flow over the rock on which the building was apparently
situated. Run off from the road and front yard was also noted. However, DM said the moisture
was not the primary cause of the damage.
According to DM:
if moisture had caused footing movement, there would be damage to the external
brickwork, but none was seen
the bathroom tiles have moved away from the wall, which is not consistent with expansion
due to moisture absorption
the corners of the bathroom have silicon joints, an adequate allowance for expansion
it appears the damage to the bathroom walls is due to swelling of timber in the wall frame
the swelling has resulted from debris build up in the gutter caused by a poorly located
satellite receiver bracket, leading to water overflow across the eaves and down the frame.
The insurer obtained a further report from JH, dated 25 June 2021 . JH’s comments include :
Determination | Case number: 835486 Page 4 of 9
DM has not provided any evidence to support its causation theory
the bathroom ceiling did not have a high moisture content, the internal bathroom walls
(including those not abutting the external wall) had damage and there were high moisture
levels elsewhere in the house. These matters suggest DM’s theory is wrong
there is no evidence showing the building is founded on rock. In contrast, JH has relied on
a CSIRO database indicating that clay is to be expected on the site
there was cracking to a brick stump. In any event, cracking occurs after movement has
taken place, so lack of widespread cracking does not mean there has been no movement
tile movement away from a wall is consistent with tile expansion and silicon corner joints
do not ameliorate the lack of flexible joints between tiles and door and window frames
the satellite dish had been in place from at least October 2014. If the bracket had caused
the water ingress, it would have done so progressively over time rather than in one event.
The complainant has not provided any other engineering reports. However, he says that DM’s
opinion should be preferred over JH’s. According to the complainant, JH was disorganised
and unprepared when he inspected the property in February 2021 and has attributed
comments to him which he did not say.
He also says that he knows the house is built on bedrock because when he received a
development approval to construct decking, it was a requirement to dig foundations to
bedrock. In doing so, the bedrock was discovered to be less than a metre from the surface.
Insurer is entitled to deny the bathroom damage claim
On the available information, I am satisfied the insurer has established it is more likely than
not that the bathroom damage is due to causes excluded under the policy.
Overall, JH ’s reports are more persuasive than DM’s report . In particular, JH’s second report
provides grounds to reasonably conclude that DM’s causation theory is not correct.
DM has not provided any images or other evidence of the swollen timber wall frame. In
contrast, on 20 Novemb er 2020, the insurer’s builder ( KB) cut an opening into the
plasterboard wall lining of a bedroom located on the other side of the bathroom. KB did not
find any indication of water damage to or elevated moisture readings in the wall cavity framing
and linings.
I acknowledge that the complainant considers that JH was disorganised at the time of
inspection and has recorded him saying things he denies he said. However, I am not satisfied
the complainant’s criticisms mean JH’ s opinions should be rejected. JH reports are detailed
and well reasoned.
I also acknowledge the complainant’s statement concerning the deck being founded on
bedrock. However, that does not mean that is the case for the entire house or rule out as a
cause ground movement due to changing moisture content within reactive soil.
Further, the insurer does not say ground movement is the sole reason for the bathroom
damage. Rather, it says ‘ the damage is not resultant from a single insured event and has
occurred due to foundation movement, high moisture from the subfloor area over a period of
time, and incorrectly installed tiles. ’
In the circumstances, the insurer is entitled to rely on the policy exclusions relating to gradua l
deterioration and ground movement and on the lack of a single insured event to deny the
claim.
Determination | Case number: 835486 Page 5 of 9
2.2 Is the insurer required to pay for the roof tile damage?
No. There was pre-existing damage and repairs to the roof tiles. A third party was on the roof
as well as the insurer’s trades. Further, the complainant has replaced the damaged tiles.
Accordingly, it is not possible to determine if the insurer caused any damage to the roof tiles.
The insurer is not required to pay for the roof tile damage
In January 2021, the complainant told the insurer that the its trades had cracked roof tiles
during the assessment process, leading to further water ingress and damage.
KB had inspected the roof on 8 September and 26 October 2020. KB observed that there
were many broken tiles that had been sealed previously. These were showing wear and tear.
On 15 February 2021, KB reattended the property. The complainant said he had replaced the
tile he said the insurer’s trades had cracked, to prevent further damage. However, he showed
KB a photograph of a cracked roof tile above the entry/hallway.
KB noted that there were still cracked roof tiles which had previously been silicone sealed and
that required replacing. KB agreed that further water ingress had occurred but could not say if
it was from the tile the complainant replaced or the old cracked tiles.
Nevertheless, the insurer arranged for make safe works to be undertaken by JL, builder. JL
confirmed that it found ‘multiple broken tiles spread over the roof with old silicone on them all.’
During the course of the claim, the complainant confirmed that a representative from the
provider of the satellite dish had been on the roof to move the dish.
In the circumstances, it is not possible to determine if the insurer caused any damage to the
roof tiles. Accordingly, the insurer is not required to pay for the resultant damage.
2.3 Is the insurer entitled to cash settle?
Yes. The policy gives the insurer the right to elect to cash settle. However, the cash
settlement amount it offered is to be increased by 30% to allow for price increases,
uncertainty on whether the underlying quotes are actionable and transfer of risk.
Policy permits the insurer to cash settle claims
The policy states that if the insurer agrees to pay a claim for loss or damage to the home, it
will decide whether to repair the damage or pay to the insured the amount the repairs would
cost the insurer.
Therefore, the insurer has the discretion to undertake covered repairs or to pay the
complainant (cash settle) what it would cost the insurer to attend to those covered repairs.
The insurer must nevertheless act reasonably in deciding what option to pursue and in
calculating a fair cash settlement amount.
According to the insurer, it cannot attend to repair of the covered damage due to the
presence of ongoing pre-existing defects and maintenance issues. On that basis, it has
elected to go down the cash settlement path.
I am not satisfied this shows the insurer’s election to cash settle is unreasonable.
A 30% uplift is to apply to the insurer’s cash settlement offer
When an insurer cash settles a claim, it transfers to the insured the risk that the cost of
Determination | Case number: 835486 Page 6 of 9
repairs may unexpectedly increase and/or that additional works not quoted are required.
Accordingly, it is important that the quotes the insurer relies on in calculating its offer are
reasonably recent and actionable by a retail customer.
The insurer has offered to cash settle the covered claim for $13,456.54. In doing so, it relies
on:
statements of work prepared by KB on 23 November 2020 and 22 February 2021
an un-itemised quote of $6,017.92 in KB’s building assessment report following a site
inspection on 20 November 2020
an un-ite mised further quote of $7,023.90 in KB’s building assessment report following a
site inspection on 22 January 2021
a quote of $414.72 for carpet replacement, received prior to 4 March 2021.
I do not consider the insurer’s cash settlement offer to be reason able. The offer is based on
quotes that were obtained more than 12 months ago. Inevitably, prices will have increased in
the intervening period. Further, the lack of itemisation in KB’s quotes means the extent to
which the quotes could be actioned by a retail customer such as the complainant cannot be
assessed.
In the circumstances, and taking into account contingencies and the transfer of risk to the
complainant, I am satisfied that it is appropriate that a 30% uplift should apply to the insurer’s
cash settlement offer. This increases the cash settlement payable to $17,493.50.
2.4 Is complainant entitled to any other compensation?
Yes. The insurer has contributed to the delays experienced. It is to pay the complainant
$1,000 in non-financial loss compensation. However, it is not required to pay the cost of the
complainant’s expert report as it did not assist in showing a covered claim exists.
AFCA may award non-financial loss compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the broker’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has caused stress and inconvenience
The complainant says that the insurer continually delayed progression of the claim. He also
says that he and his family have been forced to live in a house that has some rooms in an
unliveable condition. He says the insurer has caused significant stress and inconvenience,
compromising his mental well being and ability to manage his pre-existing systemic disease.
Having reviewed the insurer’s claim notes and communications with the complainant, I am
satisfied that the insurer has contributed to the delays experienced. While I accept that there
were challenges in contacting the complainant from time to time, there is a discernible pattern
of the complainant being forced to chase the insurer for updates.
It also appears that the insurer did not make a decision on the bathroom damage claim within
the standard time frame outlined in the General Insurance Code of Practice.
I accept that the complainant has experienced stress and inconvenience due to the insurer’s
handling of the claim. The insurer is to pay him $1,000 in non-financial loss compensation.
Determination | Case number: 835486 Page 7 of 9
Costs award not justified
The AFCA rules enable AFCA to require the insurer to contribute to the professional costs
incurred by the complainant. When considering whether to require a financial firm to make a
costs contribution, AFCA takes into account the complexity of the complaint and whether the
particular complainant needed to incur costs to understand or establish their claim.
I acknowledge that the complainant incurred professional costs of around $1,200 in obtaining
an expert report from DM.
However, DM’s report has not assisted in establishing a covered claim exists relating to the
bathroom damage. Accordingly, I am not satisfied that the insurer should make a contribution
towards DM’s costs.
2.5 Why is the outcome fair?
The causes of the bathroom damage are excluded. It would be unfair for the insurer to have
to pay for that damage when the policy does not require it. However, fairness dictates that in
cash settling, the insurer pays a 30% uplift to allow for contingencies and transfer of risk. It is
fair that the insurer pays the complainant $1,000 in non-financial loss compensation for the
stress it has caused. The insurer is not required to pay costs or for the roof tile damage.
Determination | Case number: 835486 Page 8 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 PDS extracts
Pages 22, 26 and 27
Storm
We cover
Loss or damage caused by a storm
We do not cover
… loss or damage caus ed by erosion, vibration, subsiden ce, landslip, landslide, mudslide,
collapse, shrinkage or any other earth movement, but we will cover loss or damage
Determination | Case number: 835486 Page 9 of 9
caused by a landslide or subsidence proved to have occurred within 72 hours of, and
directly because of, a storm and not because of erosion over time, structural fault or
design fault;
Escape of liquid
We Cover
Loss or damage caused by liquid leaking, overflowing or bursting from any … any drain,
fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage
systems;
We do not cover
wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual
process of leaking, splashing, dripping or overflowing over a period of time when you
could reasonably be expected to be aware of this condition;
Pages 75, 76 and 79
General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
Defect, structural fault or design fault: a defect, structural fault or design fault that you
knew about (or should reasonably have known about) and did not fix before the loss or
damage occurred (e. g. if there are signs that a defect previously caused damage, we will
not pay a later claim for further damage from this defect).
Ground movement: erosion, vibration, subsidence, landslip, landslide, mudslide, collapse,
shrinkage or any other earth movement
Wear, tear and gradual deterioration: wear, tear, rust, fading, rising damp, mould, mildew,
corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration
such as but not limited to … tiles and their adhesive or grouting breaking down;
Page 99
Insured event … an insured event is always a single event, accident or occurrence whic h
you did not intend or expect to happen.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.