Text of the determination
Determination
Case number 835038
Financial firm AAI Limited
Determination | Case number: 835038 Page 1 of 7
Case number: 835038 12 August 2022
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). He lodged a
claim for damage to the home in December 2014. Repairs were conducted, but a complaint
was brought to AFCA in August 2019 regarding the quality and scope of the repairs, as well
as delays and the handling of the claim by the insurer (the Previous Complaint). The Previous
Complaint was the subject of a preliminary assessment that was accepted by both parties.
The complainant now says the insurer has not complied with the agreed terms of that
preliminary assessment, which (amongst other things) required it to remediate earlier repairs
and rectify the front porch lacework; as well as to conduct a further assessment of the tuck-
pointing damage and repair the component of that damage attributable to the original insured
event and the repair work subsequently carried out.
The insurer says new information arose which prevented it from completing the repairs to the
front porch lacework, and no other repairs were able to proceed until that issue was resolved
with the complainant.
1.2 Issues and key findings
What is the extent of insurer’s liability for the repair and rectification work?
In response to the Previous Complaint, the insurer agreed to repair the veranda lacework.
The available evidence indicates, on balance, the work undertaken to date is inadequate to
return the lacework to its pre-loss condition. Having regard to relevant building standards and
Heritage considerations (and in consultation with the complainant and his engineer), the
insurer is required to replace the beam supporting the lacework, as set out in section 2.1
below.
The insurer is also required to complete all other outstanding rectification and repair work (as
agreed under the Previous Complaint), then obtain a quote for tuck-pointing repairs and cash
settle the complainant 40% of the quoted cost, increased by 20% to allow for contingencies
and the transfer of risk. That is because, on balance, 40% of the damage to the affected wall
is attributable to the initial incident or the insurer’s repairs to date (including delays in
completing the required work).
The insurer should also reimburse the complainant’s expert report fees (up to a maximum of
$5,000), together with statutory interest.
Has the insurer handled the claim reasonably?
The insurer did not take all reasonable action to complete repairs and resolve issues as they
arose. It has also provided inconsistent and contradictory responses regarding the status of
repairs and progress of the claim. The complainant has endured significant stress and
inconvenience over an unnecessarily protracted period as a consequence of the insurer’s
handling of the matter. Compensation for non-financial loss is warranted in the
circumstances.
Determination | Case number: 835038 Page 2 of 7
Why is the outcome fair?
It is now about eight years since the original incident. The evidence shows the insurer did not
do everything it reasonably could to attempt to resolve the issues raised in this current
complaint, and has not done what it agreed to do since July 2020, in response to the Previous
Complaint.
It would not be fair to allow the insurer to, in effect, resile from its agreed obligations under the
Previous Complaint, when the complainant has relied on that agreement and reasonably
expected the required work would be carried out promptly, professionally and in full.
It is fair that the insurer pay the complainant further compensation for non-financial loss (for
the period since July 2020), and rectify the outstanding issues as a priority.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to:
replace the front verandah beam in accordance with a detailed
recommendation/scope of work to be obtained by the complainant from an
appropriately qualified expert, and otherwise as set out in section 2.2 below
promptly complete all other outstanding remediation repairs and actions as identified
and agreed under the Previous Complaint
subject to the complainant providing reasonable evidence of the costs incurred, and
up to a total maximum of $5,000, reimburse the complainant’s cost s for his engineer ’ s
reports obtained since the Previous Complaint was closed (including the cost, if any,
of the recommendation/scope of work referred to above and still to be obtained)
pay the complainant $5,400 in compensation for non-financial loss, in respect of the
period since July 2020
after all other repairs are completed, obtain at least one quote (actionable by the
complainant as a retail customer) for the tuck-pointing repairs to the front of the
property and cash settle 40% of the quoted cost, plus a further 20% on this amount to
account for contingencies and the transfer of risk.
Determination | Case number: 835038 Page 3 of 7
2 Reasons for determination
2.1 What is the extent of insurer’s liability for repair and
rectification work?
Insurer has not adequately rectified the veranda lacework
The Previous Complaint was closed with the insurer undertaking to ‘complete remediation
repairs as already agreed includ ing… repairs to the verandah lacework’. However, the
complainant says no further work has been carried out by the insurer since July 2020.
The actual repair method for the lacework (needed to align it with the existing section) was
not specified, but was to be agreed between the parties. In order to return the lacework to its
pre-incident condition, that basically required the replacement of the supporting beam with
one of an appropriate width/size to allow secure and consistent fixing of the lacework to the
underside of the beam.
The policy provides as follows in situations where the insurer authorises repairs:
If we need to source material in order to repair or rebuild the building, we will do
our best to obtain new materials that are the same type, standard and
specification. If the same is not available, we will use new materials of a similar
type, standard and specification that are commercially available and compliant
with current building regulations.
The insurer replaced the beam with one which is not an exact match to the original timber
beam, in terms of its measurements or material. It explained that current building regulations
mean the original Oregon timber is no longer allowed to be used in an external setting; but
the replacement timber beam has been inspected by the relevant authorities and has been
passed as ‘compliant’. The insurer points out the complainant’s builder has also inspected it
and agreed it is ‘fit for purpose’.
The complainant maintains the lacework does not properly fit on the new beam (because the
beam is too small), and this needs to be rectified, including for reasons relating to the heritage
overlay of the building. He also notes the paint on the lacework is different to that used for the
timber.
The complainant provided a report from his engineer (RB), confirming the insurer’s repairs
have resulted in the screw support for the lacework attaching to the bevelled edge of the
replacement front beam, rather than the flat base, because the beam is not wide enough. RB
says that although this may be ‘ compliant ’ in terms of current building codes/standards, it is
not the functionality of it that is in question. Instead, RB says the issue is that it is visually
inconsistent with the adjoining property (where the lacework is not screwed into the bevelled
edge of the beam) and likely inconsistent with the original construction. RB has proposed the
replacement beam should be larger to support both screw holes of the lacework on the flat
underside of the beam, and says suitable wood could be sourced.
There has been commentary from both parties about the appropriate size of the beam. There
is no conclusive evidence of the size/condition of the beam or positioning of the lacework
before the replacement; or indeed from before the lacework itself was replaced some 30
years before. However, based on the available information, I am not satisfied, on balance, the
Determination | Case number: 835038 Page 4 of 7
insurer has repaired the verandah lacework appropriately or in accordance with its
obligations.
T he fact of the replacement beam being (as the insurer submits) ‘compliant with current
building regulations ’ is not sufficient, in itself, to establish the insurer has met its obligations
under the policy. Even though compliance with building regulations is a point of reference
stated in the relevant policy provision (quoted above), that does not mean it is the only
relevant benchmark. The repair work also needs to be considered in context: the property is
identified on the certificate of insurance as having been built in approximately 1890, and
having a ‘ Heritage T rust’ classification. That means it is fair and reasonable to expect the
heritage significance of the building will be taken into account in any repairs to be undertaken
in returning the property to its pre-loss condition, and that involves more than purely
functional and structural considerations.
In this case, the lacework has been fixed to the new beam, but in a manner which is, on
balance, not appropriate for a building of its age and style, or like-for-like with its pre-loss
condition.
In the circumstances, I am satisfied it is fair that the insurer replaces the beam with an
alternative which complies with both building and heritage standards, and which allows the
lacework to be affixed to the flat underside of the beam, and otherwise in a manner which
reflects the pre-loss condition of the building (including consistency with the adjoining
property).
In the interests of finalising this aspect of the repairs once and for all, the complainant should
obtain a detailed recommendation/scope for the work from an appropriately qualified expert
for the replacement beam and related work. If that expert charges the complainant a fee for
that, the insurer is responsible for reimbursing the fee (subject to the policy limit for
professional costs incurred, as discussed below).
The insurer is required to use that recommendation/scope as the basis for the repair. The
insurer must, in any case, consult with the complainant and his chosen builder/engineer
before work commences.
To be clear, the insurer remains fully responsible for that rectification work.
Insurer is required to cover 40% of the cost of tuck-pointing
I also consider the insurer’s repairs and delays in remediation to date have contributed to the
damaged tuck-pointing. The insurer is to contribute 40% of the repair cost for the tuck-
pointing, for the reasons below.
In response to the Previous Complaint, and at completion of all other repairs, the
insurer/insurer’s engineer was required to inspect the front wall and the insurer was then
required to repair any tuck-pointing damaged by the original incident or in the course of
repairs. It was not required to repair any tuck-pointing damaged by movement of the house
due to re-stumping that had been carried out.
The complainant’s engineer RB says the condition of the tuck-pointing has deteriorated
during the repairs and the entire front wall requires re-pointing to ensure a uniform look. RB
says, as the front walls were not tied together during repairs, the movement of the wall will
have contributed to the damage to the tuck-pointing. He also notes, however, that general
wear and tear would have contributed.
Determination | Case number: 835038 Page 5 of 7
RB recommends the claim- and repair-related damage would amount to approximately 40%
of the tuck-pointing repairs required.
The insurer ’s building consultant says, in a report dated 31 August 2021, the tuck-pointing
damage is wear and tear only, and does not accept any part of the damage is from the
ongoing incomplete repairs or from the incident.
However, given the wall was not properly tied during the initial repair process so as to be
structurally secure, the other issues with initial repairs and the considerable time that has now
passed, I am satisfied the delay in remediation repairs is more likely than not to have
contributed to the tuck-pointing damage. RB has clearly explained their reasoning in
identifying and weighing the respective contributory causes of damage. I consider that
persuasive and reasonable in the circumstances.
Once all other repairs/rectification for which the insurer is responsible are completed, the
insurer is to obtain at least one quote for the entire front wall tuck-pointing repairs. It is then
required to cash settle the complainant by paying 40% of the quoted amount, increased by
20%. That 20% uplift is to account for any variations or contingencies that may occur, and to
reflect the transfer of risk to the complainant. To be clear, the quote(s) obtained by the insurer
must be actionable by the complainant as a retail customer.
Insurer is required to complete remediation/repair work as previously agreed
The insurer agreed, under the Previous Complaint, to repair/remediate a range of issues in
addition to those specifically addressed in this determination. It remains responsible for
competing all that work, as a priority.
Insurer required to reimburse com plainant’s expert report fee (s)
Under AFCA‘s Rules, the insurer may be required to contribute to the professional costs
incurred by the complainant in pursuing the complaint, up to a maximum of $5,000.
I am satisfied that is appropriate in this case, sinc e the complainant’s two engineer’s reports
(of August 2021) assisted in the resolution of this complaint. It is also fair in the circumstances
that the insurer cover the cost (if any) of the further recommendation/scope of work the
complainant needs to obtain from his expert for the verandah beam/lacework.
The complainant will need to provide the insurer with reasonable evidence of the costs
incurred (for example, copy of paid invoices), and the insurer is required to promptly
reimburse the relevant amount(s), up to the total maximum of $5,000; plus statutory interest
on the amount(s) already paid, calculated from the date the complainant paid to the date of
settlement.
2.2 Did the insurer handle the claim reasonably?
No, the insurer did not take reasonable steps to avoid further delay in remediating the
damage to the complainant’s home. The insurer is to pay the complainant $5,400 for non-
financial loss.
Compensation for non-financial loss is warranted
The insurer accepted, under the Previous Complaint, the lacework required rectification work.
Whilst the insurer did make suggestions for possible repair methods, I am not satisfied it took
all reasonable steps to resolve this issue appropriately. This resulted in the complainant
Determination | Case number: 835038 Page 6 of 7
needing to engage his engineer again, take additional time to communicate with the insurer
and its representatives, and again bring his concerns to AFCA.
The original incident which damaged the property occurred in 2014 and has now been the
subject of three AFCA complaints, which have all been found in the complainant’s favour.
(The first complaint required the insurer to undertake the claim-related repairs, rather than
cash settle.)
The insurer submitted in this current complaint that all remediation repairs had been
completed since the Previous Complaint (which was the second of the three brought to
AFCA). When questioned about what repairs had been done, the insurer then confirmed that
no repairs had been completed as it was unable to resolve the outstanding issues with the
complainant.
The complainant has experienced significant delays and upset as a result of the insurer’s
actions/inaction in response to the concerns he raised, which were already complicated. I
accept the repair requirements for the property have not been straightforward, but the insurer
is responsible for dealing with that efficiently, professionally and proactively, with the input of
appropriate experts. I am not satisfied the insurer has acted fairly or reasonably with regard to
the rectification/repairs. This has resulted in significant loss of time and peace of mind for the
complainant, and has contributed to an unusual additional level of stress.
The insurer is to pay the complainant $5,400 in non-financial loss compensation. That relates
to the period since the preliminary assessment for the Previous Complaint, and is in addition
to compensation required to be paid under the Previous Complaint.
2.3 Why is the outcome fair?
The claim was initially for a significant event that required extensive repairs. Over the
following years, the parties have continually encountered issues that could not be easily
resolved between them. Whilst the complainant has not immediately accepted solutions the
insurer suggested, he has regularly provided robust reasoning and supportive expert
evidence justifying his decisions not to accept the proposed solutions.
Overall, the insurer has not handled the claim in a robust and solution-focused manner, and
that has resulted in significant stress and inconvenience for the complainant.
It is fair the insurer accepts responsibility for that and proactively proceeds with the required
repairs, which it previously agreed to undertake.
Determination | Case number: 835038 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.