Storm damage claim declined in most part due to pre-existing damage, wear and tear and soil movement exclusions
Text of the determination
Determination
Case number 834885
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 834885 Page 1 of 12
Case number: 834885 22 June 2022
1 Determination overview
1.1 Complaint
Following a storm event in March 2021, the complainants lodged a claim under their home
and contents insurance policy held with the financial firm (insurer), for storm damage.
The insurer partially accepted the claim, by agreeing to accept damage to the ceiling and
walls in bedroom 1. The insurer did not accept the other claimed damage.
The insurer says it is entitled to decline the disputed damage as it pre-existed the
commencement of the policy and/or was caused by wear and tear, gradual deterioration, lack
of maintenance, inherent defects, and soil movement which causes are excluded from cover.
The complainants disagree and say the claimed damage was caused by the storm. They
require the insurer to accept the claim and repair the damage.
The complainants also seek the costs associated with cleaning white marks off the roof which
they say was caused by the insurer’s make safe contractors.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The available evidence establishes on the balance of probabilities that the proximate cause of
most of the claimed damage pre-dated the storm and the commencement of the policy. As
the complainants have not established an insured event occurring after the commencement
of the policy was the proximate cause of the claimed damage, the insurer is entitled to decline
the claim save for payment for the cost of repairs to bedroom 1 and the cost to remove the
white marks from the roof.
Why is the outcome fair?
The insurer is entitled to rely on the policy terms, and its expert opinion. As the expert opinion
does not establish a valid claim occurred within the policy terms and establishes policy
exclusions apply, it would not be fair to require the insurer to pay the claim.
1.3 Determination
This determination is substantially in favour of the insurer.
Should the complainants accept this determination then within seven days of notification of
acceptance the insurer is to make the following payments to the complainants after deduction
of the policy excess (if not deducted already):
$500 towards the cleaning the white marks on the roof
$1,000 for repairs to bedroom 1.
Otherwise, the insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 834885 Page 2 of 12
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Complainants must establish a valid claim
The complainants carry the initial onus to establish the claimed loss or damage falls within the
scope of cover under the terms of the policy. This is known as a prima facie or ‘valid’ claim.
Once this is established, the onus shifts to the insurer to show, on the balance of
probabilities, that the damage was caused by a factor excluded under the policy or they are
otherwise entitled to decline the claim.
The policy provides cover for damage to buildings and contents caused by one or more of the
insured events that take place during the period of insurance. Insured events include storm,
rainwater, run-off, and soil movement (only if it occurs within 72 hours of an insured event)
and water or other liquid damage.
To show a valid claim, the complainants must show the claimed damage was caused by one
of the listed insured events after the cover commenced on 1 October 2020.
Extracts from the relevant policy terms are set out in supporting section 3.2 of this
determination.
Submissions and material considered
The complainants say the house was well maintained and in reasonable condition. They rely
on photographs which show the significant rain event which occurred over four days in March
2021. They say they had a pump running in the yard to combat the ground water build-up, but
water ran under the house.
They do not agree the laundry and WC pier foundation were compromised by the sewer pipe
leak. They say the water runoff caused ground movement, damaged the pier which
undermined the house causing cracking damage and subsequent damage to the sewer pipe.
After the purchase of the property, they say all internal repairs and renovations were
undertaken to the house. Photographs were provided.
They also say the male complainant was under the house a few days before the storm event
and noted no damage to the piers or effects of ground movement. They contend the ground
movement following the storm event dislodged the sewer pipe. Because of the storm and
water run-off, they say there has been significant movement to the house which has caused
and is causing cracking damage.
The insurer says the damage did not occur during the period of cover or from a single
insurable event. It submits the claimed damage was caused by wear and tear, gradual
deterioration, inadequate maintenance, inherent defects, poor and faulty workmanship, and
soil movement which causes are expressly excluded from cover.
The insurer relies on a pre-purchase building inspection report dated 5 August 2020 (PPB
report) and reports from a roofer and a builder (CD).
A summary of the material relied on is set out in supporting section 3.3 of this determination.
Determination | Case number: 834885 Page 3 of 12
The findings in the PPB report were prepared from an inspection of the property on 5 August
2020.
The PPB report qualified its findings with regards to the sub floor by saying not all parts of the
sub floor could be viewed at the time due to reasons of accessibility.
Even with this caveat the PPB report makes several relevant findings and recommendations
noting that stormwater/drainage updates were required. It was noted:
storm water is accessing the sub floor area and drainage should be improved to divert
stormwater run-off/drainage from accessing subfloor and foundations
evidence of leaking under wet areas with associated water damage/deterioration to timber
minor to moderate
corrosion to some water lines
deterioration/some damage to sewer lines; the condition of sewer lines and stormwater
should be assessed by plumber
all existing drainage should be kept clear and maintained for efficiency
deterioration with uneven settlement to areas showing cracks to brickwork and
erosion/cracks/damage to some piers; monitor, future repairs will be required.
The insurer arranged for a roof inspection on 26 March 2021. The roofer highlighted areas of
concern which included non-existent apron flashings, sealant deterioration, numerous broken
tiles across the roof, deteriorated cement bedding on all elevations and inefficient stormwater
and drainpipe drainage.
The insurer arranged for the builder (CD) to inspect and photograph the property on 7 May
2021. His findings are set out in supporting section 3.3 of this determination. In short, he says
the laundry floor subsided due to the undermining of the concrete pier which was undermined
because of the broken sewer pipe. He says this occurred prior to the purchase of the
property. He also says the cracking damage is old.
Pre-purchase report establishes pre-existing movement and damage
Relying on these reports, the insurer says the cracking damage to the laundry, kitchen and
throughout the property was caused by wear and tear, lack of maintenance, soil movement
and subsidence as opposed to the storm event.
It says the cause of the soil movement and subsidence is a broken sewer pipe, which caused
the pier under the laundry to be undermined. The insurer says the broken sewer pipe
predates the storm event and the policy commencement.
The complainants accept the damage was caused to the laundry room by reason of the pier
dropping but disagree the cause for the pier dropping was an existing leak from a sewer pipe.
The complainants contend the cause of the pier dropping was the strength and volume of
water involved in the storm. They provided photographs of the stormwater inundation in
support of this contention.
The complainants also submitted photographs which detail renovation works performed by
the complainants post purchase, which the complainants state has remedied issues with
bathroom waterproofing and other internal damage identified in the pre-purchase report.
A review of the meta-data for the photographs show they were largely created in or about
October 2020 which is consistent with the complainants’ timeline. On balance, I accept some
internal repairs were performed at the property after obtaining the pre-purchase report.
Determination | Case number: 834885 Page 4 of 12
The complainants have provided no material to show they addressed the recommendations in
the pre-purchase report to improve drainage or that they arranged an assessment by a
plumber to review the condition of sewer lines and stormwater as was also recommended.
The pre-purchase report references deterioration with uneven settlement to areas showing
cracks to brickwork and erosion/cracks/damage to some piers. The complainants have
provided no evidence they monitored this situation as recommended or undertook repairs.
The male complainant says he was under the house a few days before the storm but saw no
damaged piers. In the absence of corroborative material or expert opinion to rebut the expert
material from the insurer I am not sufficiently persuaded of the complainants’ position.
Having considered the pre-purchase report, I am satisfied on the balance of probabilities
there was pre-existing movement damage and other damage to the property. This is because
the report identifies:
storm water accessing the subfloor which may create additional movement to foundations
the requirement to investigate the condition of the sewer lines and stormwater
evidence of leaks under the bathroom/WC with associated deterioration
cracking damage in ceilings and walls and piers
undulations and movement to floors
cracked and drummy tiles in the bathroom and laundry
issues with the roof which required repairs
Most of the claimed damage was pre-existing
Having considered the CD report and the PPB report, I am satisfied on the balance of
probabilities the proximate cause (or the dominant, effective or operative cause) of the
claimed damage was caused by a leak underneath the property which pre-existed the
property purchase, the commencement of the policy and the storm, which caused soil
movement in the property. This is because:
the CD report identified that the area where the broken sewer line was detected was near
the concrete pier which had rotated, and it had debris packed around it which may have
been attributable to an attempt to conceal the issue with the pipe
the CD report identified the cause for subsidence was the undermining of the concrete pier
beneath the laundry, which in turn was caused by the broken sewer pipe
the evidence of general cracking at the property pre-purchase highlighted existing issues
with subsidence and soil movement
the complainants have not made any submissions or provided any material to establish
any of the issues identified in the pre-purchase report concerning the subfloor and
drainage were addressed or investigated post purchase. The renovation works performed
by the complainants appear to have been internal and purely cosmetic in nature.
PPB says there were pre-existing issues with the subfloor, foundations, and general cracking
within the property. PPB directly references the existence of water in the subfloor at the time
of inspection and recommends investigation work be performed.
The complainants say the cracking only developed post the storm event and that at no time
between the property purchase and the storm event had there been any issues with the
drainage or any signs of issues.
Based on the PPB report and CD’s own observations as to the debris surrounding the void,
CD says the undermining was in existence pre-purchase.
CD also identifies the cracking to the floor tiles within the kitchen, hallway, laundry and W/C
appears old.
Determination | Case number: 834885 Page 5 of 12
In the absence of any expert reports rebutting CD’s opinion, on balance, I am satisfied the
available material supports the insurer’s position which is the claimed damage was caused
prior to the subject storm event and prior to the commencement of the policy.
Policy excludes certain circumstances
The policy excludes damage caused by wear and tear and lack of maintenance.
The policy also excludes damage caused by soil movement and subsidence except where it
occurs within 72 hours of an insured event.
On balance, the evidence presented in the CD and PPB reports show the damage to the
laundry, kitchen, subfloor and general cracking at the property was caused over time by soil
movement and/or subsidence.
The evidence on balance, does not show that the soil movement or subsidence occurred
within 72 hours of the storm.
The insurer is therefore entitled to rely on the exclusion to deny the damage even if it were
accepted that there were multiple causes of damage, one of which was the storm. This is
because the available information establishes on the balance of probabilities the proximate
cause (or the dominant, effective or operative cause) of the damage was not the storm.
PPB advised of existing issues with the subfloor and recommended that investigation works
be performed. The complainants were therefore on notice of the potential for an issue.
The complainants have not provided any evidence to show they have undertaken any further
plumbing assessment or investigation in accordance with the PPB report.
On balance, I accept the available evidence establishes the claimed damage would have
been prevented if the recommendations/investigations made in the pre-purchase report were
instigated.
On this basis I am satisfied the available material establishes on the balance of probabilities
the claimed damage pre- existed the policy’s commencement and/or the proximate cause of
the claimed damage arises from or is caused by the failure to maintain the foundations of the
property. In these circumstances, and on this basis, I am satisfied the insurer is entitled to
decline the claim for the claimed damage.
Insurer to contribute $500 to the cost to remove the white marks on roof
The complainants have supplied photographs created in or about January 2022, which
display white marks on the roof. The complainants’ submission and photographs were
exchanged with the insurer.
The complainants say the white marks were tracked there by the make safe contractors
engaged by the insurer.
The insurer has not provided any response about the presence of the marks nor has it
disputed causation.
Neither the complainants nor insurer has provided any estimate on the cost to remove the
white marks.
Having reviewed the available material, I accept the white marks were caused by the insurer’s
make safe contractors.
Determination | Case number: 834885 Page 6 of 12
I consider it is fair and appropriate the insurer pays the complainants $500 towards the cost of
cleaning/removing the white marks from the roof.
Insurer to pay the complainants $1,000 for repairs to bedroom 1
The insurer has accepted it is liable for the damage to the walls and ceilings of bedroom 1 as
damages consequential on the box gutter overflowing.
The insurer submitted a quote from AJ (AJ quote) for $13,970.88 for the repair of the
entirety of the damage to the property.
The complainants have provided no information about the cost of repairs.
In the quote, $514 is identified as being the value of the repairs for the ceilings and walls for
bedroom 1.
I have reviewed the quotation. I have made an allowance for items 23 –26 plus 20% builders’
margin plus GST. As the claim is to be cash settled I have also made a further allowance for
an uplift for costs which may occur once repairs commence. I am satisfied it is fair the insurer
pays the complainants $1,000 for repairs to the ceilings and walls for bedroom 1. From that
amount, if not deducted already, the insurer may deduct the policy excess of $600.
Beyond paying for the damage to bedroom 1 and the cost to remove the white marks on the
roof the insurer is not required to do anything further.
Insurer entitled to decline most of the claim
The complainants have not established on the balance of probabilities, the claimed damage
was caused by an insured event, that is either a storm, or subsidence/soil movement which
has occurred within 72 hours of the storm.
The insurer has established the damage occurred over time and before the policy
commenced and that there were pre-existing maintenance issues with the property which
were the proximate cause of most of the claimed damage.
As gradual deterioration, lack of maintenance and soil movement (outside the 72 period of a
storm) is excluded from cover, the insurer is entitled to deny the claim.
2.2 Why is the outcome fair?
The insurer is entitled to rely on the policy terms, and its expert opinion. As the expert opinion
does not establish a valid claim occurred within the policy terms and establishes policy
exclusions, it would not be fair to require the insurer to pay the claim.
Determination | Case number: 834885 Page 7 of 12
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
As advised to the parties, we have considered it appropriate to expedite this complaint in
accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the
complaint. Accordingly, this complaint has not been the subject of a recommendation and has
proceeded directly to determination.
This complaint has been determined based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry practice and
previous relevant determinations of AFCA or predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective parties.
Each party has had the opportunity of addressing any issues raised. All the provided
information has been reviewed and considered. The parties have raised numerous issues in
their submissions to AFCA. However, commentary in this determination is restricted to those
issues considered relevant to the outcome.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
Caselaw and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of the loss
whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be examined for the
qualities of reality, predominance and efficiency as the active, efficient cause that sets a
relevant chain of events in action. If one cause would have caused the harm in any case,
and the other would not have done so in the absence of the first, the first is the proximate
cause.
A common-sense approach is taken to determine proximate cause.
Determination | Case number: 834885 Page 8 of 12
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainants.
Definitions
Period of insurance
The period of time commencing on the effective date stated in the current schedule and
ending on the expiry date stated in the current schedule or the date of cancellation,
whichever is the earlier
The Insuring Clause
In return for paying or agreeing to pay us your premium, the policy covers loss or
damage to your buildings and/or contents caused by one or more of the following
insured events that take place during the period of insurance. Your policy schedule will
show if you have cover for buildings contents or both.
What’s covered
Buildings and/or contents
Loss or damage caused by:
Storm
Cyclone
Rainwater
Run-off (provided run-off is not combined with flood waters)
Loss or damage caused by or arising from:
Soil movement, including erosion
Landslide
Mudslide
Subsidence
If it is caused directly by and occurs within 72 hours of a storm.
Exclusions specific to insured event
Loss or damage caused by:
rainwater, run-off, hail, wind or water that enters your buildings through an open door,
window or other opening (excludes openings made by the storm or cyclone).
General exclusions
Things we don’t cover
We want to be clear about what you’re covered and not covered for. In addition to any other
exclusions listed for an event or cover section – here’s a list of things we won’t cover under
any section of the policy.
Always excluded
Loss, damage, injury or legal liability as a result of, caused by or arising from:
Wear and tear – including depreciation, gradual deterioration, wear and tear or lack of
maintenance.
Determination | Case number: 834885 Page 9 of 12
Inherent defects including faulty design, structural defects or poor workmanship
Soil movement- including erosion, landslide, mudslide or subsidence unless it is
directly caused by or occurs within 72 hours of an explosion, earthquake, tsunami,
storm or flood (where your policy shows you have optional cover for flood).
Anything not directly related to one of the insured events
3.3 Extracts from material relied on by the parties
Record Key points
Roof inspection (AJ)
Report
26 March 21
Inspected and photographed roof and house.
Summary included:
1. Apron flashings non - existent at metal roof sheets &
dwelling external wall junction point. Existing cable stays for
original TV Ariel anchor have signs of sealant deterioration.
2. Numerous broken roof tiles across entire tiled roof area.
3. Hip/Ridge/Barge Cement bedding det eriorated on all
elevations of the roof area.
4. Junction of garage & dwelling metal roofing concealing
standard quad gutter below. Stormwater would find diffic ulty in
being drained e fficiently.
Detached drainpipe to north - east corner of house. No downpipe
evident over rear metal skillion below gutter of tiled roof skillion
Insurers expert builder
(CD)
Report
17 June 2021
Inspected and photographed property 7 May 21.
Bedroom 1: blistered paint to the wall lining under valley gutter
which has overflowed. More than 10 broken roof tiles which
have been sealed
Bedroom 2: popped nail in the ceiling and horiz ontal crack in the
wall lining at back of BIR
Kitchen: several cracked floor tiles which appear old and
horizontal crack in the wall lining above the splashback tiles
Laundry floor had several cracked tiles, with an appearance of
old cracking
Subfloor area beneath the laundry had a concrete pier which
had subsided and rotated.
Debris in the form of timber off cuts, insulation and rubbish
having been placed around the piers and behind drainage pipes.
Upon removal, it was observed ground slab to office had been
undermined adjacent to where pier has subsided and rotated.
Sewer pipe from laundry and WC was observed around that
area. Engaged plumber who observed following CCTV
inspection that sewer line had dropped causing joint to open.
Downpipes not connected to servic eable stormwater drains and
discharge water ont o the ground
Waste pipe loose and lifted away from sewer connection and
could not freely drain
Fibre cement packing was installed between piers and floor
bearers
Determination | Case number: 834885 Page 10 of 12
Laundry floor has subsided due to the undermining of the
concrete pier beneath the Laundry. T he pier has been
undermined due to the broken sewer pipe in this location as
confirmed by CCTV inspection
Undermining existed prior to the Owner purchasing the property,
due to the pieces of timber and debris that were us ed to conceal
the void and the aged appearance of the cracks.
Cracking to the floor tiles within the Kitchen, Hallway, Laundry
and W/C appear old and weathered
Pre - purc hase inspection report provided by the Owner confirms
several issues and highlighted many concerns with stormwat er
on site drainage and confirmed uneven settlement of the
foundations and cracked tiles, wall linings and ceiling linings.
Pre - purc hase report does not comment on the complete
undermining of the pier and subsidence of the laundry floor
While complainants made aware of the drainage movement and
cracking issues prior to purchase not fully aware of the broken
pipe and subsequent undermining of the pier and footing
Report recommended repairs to the sewer and stormwater
system and site drainage, but no work has been completed
Differential settlement of the foundations and footings has been
occurring for many years with evidence presented in the pre -
purchase inspection report
Large volumes of rain worsened the pre - existing issues.
Packing of up to 30mm seen between piers and bearers which
confirms long - term and pre - existing settlement of the piers.
Pre - purchase Building
(PPB)
Report
5 August 2020
Building inspection 5 August 2020
Home in average condition compared to similar homes of same
age but requires some maintenance/ repairs
Significant items which may be of conc ern are:
Storm wat er/drainage updates are required to the property. The
overall condition of storm water and sewer lines should be
assessed by a plumber.
Storm wat er is accessing the sub floor and may create
additional/excess settlement/movement to foundations.
There is evidence of leaks under bathroom/WC with associated
deterioration to the area; repairs/waterproofing/sealing required.
Ceilings in fair condition, there are cracks, damage, visible joins
and paint deterioration and undulations and sagging to sections
Walls are in fair to good condition there are minor cracks, visible
joins and marks
Floors are in fair to good condition, undulations and movement
cracking, cracked drummy tiles
Kitchen there is wear and tear, evidence of wat er leak damage
to rear panel under sink, splashback being in fair condition
Bathroom evidence of leak visible to underside of shower and
evidence of past possible leak to underside of WC. General
deterioration to tiles with drummy tiles in parts
Determination | Case number: 834885 Page 11 of 12
Cracked and drummy floor tiles in the laundry area
Roofing and flashing: general weathering deterioration and
cracked pointing to some roof tiles; There are undulations to roof
sections; There is weathering deterioration/corrosion/rust to
fixings of metal skillion roof; The roof flashings appear to be in
fair to good condition; There is maintenanc e repair required to
flashings of skillion roof connections. Corrosion visible in valleys
deterioration and rust in parts in gutters. Deterioration/damage
with repairs required to connections of downpipes and
weat hering paint det erioration and rust to some eave vents;
General deterioration to tiles and split rafter requires
strengthening
Sub floor space: Storm water is accessing the sub floor area
and drainage should be improved to divert water from the sub
floor. There is evidence of leak under wet area with associated
water damage/ deterioration to timber minor to moderate. There
is corrosion to some water lines. There is deterioration/some
damage to sewer lines; the condition of sewer lines should be
assessed by plumber. There is old borer marks/deterioration of
some timbers in parts. There is some perimeter timber
screening in contact with the ground
Foundations: There is deterioration with uneven settlement to
areas showing cracks to brickwork and erosion/cracks/damage
to some piers; monitor future repairs will be required. There are
undulations and movement/creaking to timber floor. Drainage
updates required to property to help divert storm wat er
runoff/drainage from accessing sub floor and foundations.
Surface water/drainage Storm water/drainage updates are
required to the property. The overall condition of storm water
and sewer lines should be assessed by a plumber. Storm water
is accessing the sub floor and may create additional/excess
settlement/movement to foundations. The site/existing drainage
in general should be monitored during heavy rainfall to ensure
adequacy of drainage and improved if necessary/required. All
existing drainage should be kept clear and maintained for
efficiency.
An engineer’s opinion should be sought out in accordance with
the 1990 AS.2870.1 residential slab footing codes regarding any
cracks found to the building structure as there may be hidden or
latent defects that may have an effect on the structural
adequacy of the building.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails.
Insurer’s reports
Complainants’ pre-purchase report.
Photographs.
Determination | Case number: 834885 Page 12 of 12
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.