Storm damage claim declined in most part due to pre-existing damage, wear and tear and soil movement exclusions

FirmAllianz Australia
Decided2022-07-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,500
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed storm damage to their home, including subfloor and foundation damage, and white marks on the roof caused by the insurer's make-safe contractors. AFCA found most damage pre-existed the policy and was excluded, but ordered the insurer to pay $1,000 for bedroom 1 repairs and $500 for removing roof marks.

Most damage was caused by pre-existing soil movement and subsidence and lack of maintenance, which are excluded and not shown to have occurred within 72 hours of the storm.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 834885 Financial firm Allianz Australia Insurance Limited Determination | Case number: 834885 Page 1 of 12 Case number: 834885 22 June 2022 1 Determination overview 1.1 Complaint Following a storm event in March 2021, the complainants lodged a claim under their home and contents insurance policy held with the financial firm (insurer), for storm damage. The insurer partially accepted the claim, by agreeing to accept damage to the ceiling and walls in bedroom 1. The insurer did not accept the other claimed damage. The insurer says it is entitled to decline the disputed damage as it pre-existed the commencement of the policy and/or was caused by wear and tear, gradual deterioration, lack of maintenance, inherent defects, and soil movement which causes are excluded from cover. The complainants disagree and say the claimed damage was caused by the storm. They require the insurer to accept the claim and repair the damage. The complainants also seek the costs associated with cleaning white marks off the roof which they say was caused by the insurer’s make safe contractors. 1.2 Issues and key findings Is the insurer entitled to decline the claim? The available evidence establishes on the balance of probabilities that the proximate cause of most of the claimed damage pre-dated the storm and the commencement of the policy. As the complainants have not established an insured event occurring after the commencement of the policy was the proximate cause of the claimed damage, the insurer is entitled to decline the claim save for payment for the cost of repairs to bedroom 1 and the cost to remove the white marks from the roof. Why is the outcome fair? The insurer is entitled to rely on the policy terms, and its expert opinion. As the expert opinion does not establish a valid claim occurred within the policy terms and establishes policy exclusions apply, it would not be fair to require the insurer to pay the claim. 1.3 Determination This determination is substantially in favour of the insurer. Should the complainants accept this determination then within seven days of notification of acceptance the insurer is to make the following payments to the complainants after deduction of the policy excess (if not deducted already):  $500 towards the cleaning the white marks on the roof   $1,000 for repairs to bedroom 1.  Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 834885 Page 2 of 12 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Complainants must establish a valid claim The complainants carry the initial onus to establish the claimed loss or damage falls within the scope of cover under the terms of the policy. This is known as a prima facie or ‘valid’ claim. Once this is established, the onus shifts to the insurer to show, on the balance of probabilities, that the damage was caused by a factor excluded under the policy or they are otherwise entitled to decline the claim. The policy provides cover for damage to buildings and contents caused by one or more of the insured events that take place during the period of insurance. Insured events include storm, rainwater, run-off, and soil movement (only if it occurs within 72 hours of an insured event) and water or other liquid damage. To show a valid claim, the complainants must show the claimed damage was caused by one of the listed insured events after the cover commenced on 1 October 2020. Extracts from the relevant policy terms are set out in supporting section 3.2 of this determination. Submissions and material considered The complainants say the house was well maintained and in reasonable condition. They rely on photographs which show the significant rain event which occurred over four days in March 2021. They say they had a pump running in the yard to combat the ground water build-up, but water ran under the house. They do not agree the laundry and WC pier foundation were compromised by the sewer pipe leak. They say the water runoff caused ground movement, damaged the pier which undermined the house causing cracking damage and subsequent damage to the sewer pipe. After the purchase of the property, they say all internal repairs and renovations were undertaken to the house. Photographs were provided. They also say the male complainant was under the house a few days before the storm event and noted no damage to the piers or effects of ground movement. They contend the ground movement following the storm event dislodged the sewer pipe. Because of the storm and water run-off, they say there has been significant movement to the house which has caused and is causing cracking damage. The insurer says the damage did not occur during the period of cover or from a single insurable event. It submits the claimed damage was caused by wear and tear, gradual deterioration, inadequate maintenance, inherent defects, poor and faulty workmanship, and soil movement which causes are expressly excluded from cover. The insurer relies on a pre-purchase building inspection report dated 5 August 2020 (PPB report) and reports from a roofer and a builder (CD). A summary of the material relied on is set out in supporting section 3.3 of this determination. Determination | Case number: 834885 Page 3 of 12 The findings in the PPB report were prepared from an inspection of the property on 5 August 2020. The PPB report qualified its findings with regards to the sub floor by saying not all parts of the sub floor could be viewed at the time due to reasons of accessibility. Even with this caveat the PPB report makes several relevant findings and recommendations noting that stormwater/drainage updates were required. It was noted:  storm water is accessing the sub floor area and drainage should be improved to divert  stormwater run-off/drainage from accessing subfloor and foundations  evidence of leaking under wet areas with associated water damage/deterioration to timber minor to moderate   corrosion to some water lines   deterioration/some damage to sewer lines; the condition of sewer lines and stormwater should be assessed by plumber   all existing drainage should be kept clear and maintained for efficiency   deterioration with uneven settlement to areas showing cracks to brickwork and erosion/cracks/damage to some piers; monitor, future repairs will be required.  The insurer arranged for a roof inspection on 26 March 2021. The roofer highlighted areas of concern which included non-existent apron flashings, sealant deterioration, numerous broken tiles across the roof, deteriorated cement bedding on all elevations and inefficient stormwater and drainpipe drainage. The insurer arranged for the builder (CD) to inspect and photograph the property on 7 May 2021. His findings are set out in supporting section 3.3 of this determination. In short, he says the laundry floor subsided due to the undermining of the concrete pier which was undermined because of the broken sewer pipe. He says this occurred prior to the purchase of the property. He also says the cracking damage is old. Pre-purchase report establishes pre-existing movement and damage Relying on these reports, the insurer says the cracking damage to the laundry, kitchen and throughout the property was caused by wear and tear, lack of maintenance, soil movement and subsidence as opposed to the storm event. It says the cause of the soil movement and subsidence is a broken sewer pipe, which caused the pier under the laundry to be undermined. The insurer says the broken sewer pipe predates the storm event and the policy commencement. The complainants accept the damage was caused to the laundry room by reason of the pier dropping but disagree the cause for the pier dropping was an existing leak from a sewer pipe. The complainants contend the cause of the pier dropping was the strength and volume of water involved in the storm. They provided photographs of the stormwater inundation in support of this contention. The complainants also submitted photographs which detail renovation works performed by the complainants post purchase, which the complainants state has remedied issues with bathroom waterproofing and other internal damage identified in the pre-purchase report. A review of the meta-data for the photographs show they were largely created in or about October 2020 which is consistent with the complainants’ timeline. On balance, I accept some internal repairs were performed at the property after obtaining the pre-purchase report. Determination | Case number: 834885 Page 4 of 12 The complainants have provided no material to show they addressed the recommendations in the pre-purchase report to improve drainage or that they arranged an assessment by a plumber to review the condition of sewer lines and stormwater as was also recommended. The pre-purchase report references deterioration with uneven settlement to areas showing cracks to brickwork and erosion/cracks/damage to some piers. The complainants have provided no evidence they monitored this situation as recommended or undertook repairs. The male complainant says he was under the house a few days before the storm but saw no damaged piers. In the absence of corroborative material or expert opinion to rebut the expert material from the insurer I am not sufficiently persuaded of the complainants’ position. Having considered the pre-purchase report, I am satisfied on the balance of probabilities there was pre-existing movement damage and other damage to the property. This is because the report identifies:  storm water accessing the subfloor which may create additional movement to foundations   the requirement to investigate the condition of the sewer lines and stormwater   evidence of leaks under the bathroom/WC with associated deterioration   cracking damage in ceilings and walls and piers   undulations and movement to floors   cracked and drummy tiles in the bathroom and laundry   issues with the roof which required repairs  Most of the claimed damage was pre-existing Having considered the CD report and the PPB report, I am satisfied on the balance of probabilities the proximate cause (or the dominant, effective or operative cause) of the claimed damage was caused by a leak underneath the property which pre-existed the property purchase, the commencement of the policy and the storm, which caused soil movement in the property. This is because:  the CD report identified that the area where the broken sewer line was detected was near  the concrete pier which had rotated, and it had debris packed around it which may have been attributable to an attempt to conceal the issue with the pipe  the CD report identified the cause for subsidence was the undermining of the concrete pier beneath the laundry, which in turn was caused by the broken sewer pipe   the evidence of general cracking at the property pre-purchase highlighted existing issues  with subsidence and soil movement  the complainants have not made any submissions or provided any material to establish any of the issues identified in the pre-purchase report concerning the subfloor and drainage were addressed or investigated post purchase. The renovation works performed by the complainants appear to have been internal and purely cosmetic in nature.  PPB says there were pre-existing issues with the subfloor, foundations, and general cracking within the property. PPB directly references the existence of water in the subfloor at the time of inspection and recommends investigation work be performed. The complainants say the cracking only developed post the storm event and that at no time between the property purchase and the storm event had there been any issues with the drainage or any signs of issues. Based on the PPB report and CD’s own observations as to the debris surrounding the void, CD says the undermining was in existence pre-purchase. CD also identifies the cracking to the floor tiles within the kitchen, hallway, laundry and W/C appears old. Determination | Case number: 834885 Page 5 of 12 In the absence of any expert reports rebutting CD’s opinion, on balance, I am satisfied the available material supports the insurer’s position which is the claimed damage was caused prior to the subject storm event and prior to the commencement of the policy. Policy excludes certain circumstances The policy excludes damage caused by wear and tear and lack of maintenance. The policy also excludes damage caused by soil movement and subsidence except where it occurs within 72 hours of an insured event. On balance, the evidence presented in the CD and PPB reports show the damage to the laundry, kitchen, subfloor and general cracking at the property was caused over time by soil movement and/or subsidence. The evidence on balance, does not show that the soil movement or subsidence occurred within 72 hours of the storm. The insurer is therefore entitled to rely on the exclusion to deny the damage even if it were accepted that there were multiple causes of damage, one of which was the storm. This is because the available information establishes on the balance of probabilities the proximate cause (or the dominant, effective or operative cause) of the damage was not the storm. PPB advised of existing issues with the subfloor and recommended that investigation works be performed. The complainants were therefore on notice of the potential for an issue. The complainants have not provided any evidence to show they have undertaken any further plumbing assessment or investigation in accordance with the PPB report. On balance, I accept the available evidence establishes the claimed damage would have been prevented if the recommendations/investigations made in the pre-purchase report were instigated. On this basis I am satisfied the available material establishes on the balance of probabilities the claimed damage pre- existed the policy’s commencement and/or the proximate cause of the claimed damage arises from or is caused by the failure to maintain the foundations of the property. In these circumstances, and on this basis, I am satisfied the insurer is entitled to decline the claim for the claimed damage. Insurer to contribute $500 to the cost to remove the white marks on roof The complainants have supplied photographs created in or about January 2022, which display white marks on the roof. The complainants’ submission and photographs were exchanged with the insurer. The complainants say the white marks were tracked there by the make safe contractors engaged by the insurer. The insurer has not provided any response about the presence of the marks nor has it disputed causation. Neither the complainants nor insurer has provided any estimate on the cost to remove the white marks. Having reviewed the available material, I accept the white marks were caused by the insurer’s make safe contractors. Determination | Case number: 834885 Page 6 of 12 I consider it is fair and appropriate the insurer pays the complainants $500 towards the cost of cleaning/removing the white marks from the roof. Insurer to pay the complainants $1,000 for repairs to bedroom 1 The insurer has accepted it is liable for the damage to the walls and ceilings of bedroom 1 as damages consequential on the box gutter overflowing. The insurer submitted a quote from AJ (AJ quote) for $13,970.88 for the repair of the entirety of the damage to the property. The complainants have provided no information about the cost of repairs. In the quote, $514 is identified as being the value of the repairs for the ceilings and walls for bedroom 1. I have reviewed the quotation. I have made an allowance for items 23 –26 plus 20% builders’ margin plus GST. As the claim is to be cash settled I have also made a further allowance for an uplift for costs which may occur once repairs commence. I am satisfied it is fair the insurer pays the complainants $1,000 for repairs to the ceilings and walls for bedroom 1. From that amount, if not deducted already, the insurer may deduct the policy excess of $600. Beyond paying for the damage to bedroom 1 and the cost to remove the white marks on the roof the insurer is not required to do anything further. Insurer entitled to decline most of the claim The complainants have not established on the balance of probabilities, the claimed damage was caused by an insured event, that is either a storm, or subsidence/soil movement which has occurred within 72 hours of the storm. The insurer has established the damage occurred over time and before the policy commenced and that there were pre-existing maintenance issues with the property which were the proximate cause of most of the claimed damage. As gradual deterioration, lack of maintenance and soil movement (outside the 72 period of a storm) is excluded from cover, the insurer is entitled to deny the claim. 2.2 Why is the outcome fair? The insurer is entitled to rely on the policy terms, and its expert opinion. As the expert opinion does not establish a valid claim occurred within the policy terms and establishes policy exclusions, it would not be fair to require the insurer to pay the claim. Determination | Case number: 834885 Page 7 of 12 3 Supporting information 3.1 Process AFCA’s approach to this complaint As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.   If there are several causes operating contemporaneously, each must be examined for the  qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause.  Determination | Case number: 834885 Page 8 of 12 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainants. Definitions Period of insurance The period of time commencing on the effective date stated in the current schedule and ending on the expiry date stated in the current schedule or the date of cancellation, whichever is the earlier The Insuring Clause In return for paying or agreeing to pay us your premium, the policy covers loss or damage to your buildings and/or contents caused by one or more of the following insured events that take place during the period of insurance. Your policy schedule will show if you have cover for buildings contents or both. What’s covered Buildings and/or contents Loss or damage caused by:  Storm  Cyclone  Rainwater  Run-off (provided run-off is not combined with flood waters) Loss or damage caused by or arising from:  Soil movement, including erosion  Landslide  Mudslide  Subsidence If it is caused directly by and occurs within 72 hours of a storm. Exclusions specific to insured event Loss or damage caused by:  rainwater, run-off, hail, wind or water that enters your buildings through an open door, window or other opening (excludes openings made by the storm or cyclone). General exclusions Things we don’t cover We want to be clear about what you’re covered and not covered for. In addition to any other exclusions listed for an event or cover section – here’s a list of things we won’t cover under any section of the policy. Always excluded Loss, damage, injury or legal liability as a result of, caused by or arising from:  Wear and tear – including depreciation, gradual deterioration, wear and tear or lack of maintenance. Determination | Case number: 834885 Page 9 of 12  Inherent defects including faulty design, structural defects or poor workmanship  Soil movement- including erosion, landslide, mudslide or subsidence unless it is directly caused by or occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood (where your policy shows you have optional cover for flood).  Anything not directly related to one of the insured events 3.3 Extracts from material relied on by the parties Record Key points Roof inspection (AJ) Report 26 March 21  Inspected and photographed roof and house.  Summary included: 1. Apron flashings non - existent at metal roof sheets & dwelling external wall junction point. Existing cable stays for original TV Ariel anchor have signs of sealant deterioration. 2. Numerous broken roof tiles across entire tiled roof area. 3. Hip/Ridge/Barge Cement bedding det eriorated on all elevations of the roof area. 4. Junction of garage & dwelling metal roofing concealing standard quad gutter below. Stormwater would find diffic ulty in being drained e fficiently. Detached drainpipe to north - east corner of house. No downpipe evident over rear metal skillion below gutter of tiled roof skillion Insurers expert builder (CD) Report 17 June 2021  Inspected and photographed property 7 May 21.  Bedroom 1: blistered paint to the wall lining under valley gutter which has overflowed. More than 10 broken roof tiles which have been sealed  Bedroom 2: popped nail in the ceiling and horiz ontal crack in the wall lining at back of BIR  Kitchen: several cracked floor tiles which appear old and horizontal crack in the wall lining above the splashback tiles  Laundry floor had several cracked tiles, with an appearance of old cracking  Subfloor area beneath the laundry had a concrete pier which had subsided and rotated.  Debris in the form of timber off cuts, insulation and rubbish having been placed around the piers and behind drainage pipes. Upon removal, it was observed ground slab to office had been undermined adjacent to where pier has subsided and rotated.  Sewer pipe from laundry and WC was observed around that area. Engaged plumber who observed following CCTV inspection that sewer line had dropped causing joint to open.  Downpipes not connected to servic eable stormwater drains and discharge water ont o the ground  Waste pipe loose and lifted away from sewer connection and could not freely drain  Fibre cement packing was installed between piers and floor bearers Determination | Case number: 834885 Page 10 of 12  Laundry floor has subsided due to the undermining of the concrete pier beneath the Laundry. T he pier has been undermined due to the broken sewer pipe in this location as confirmed by CCTV inspection  Undermining existed prior to the Owner purchasing the property, due to the pieces of timber and debris that were us ed to conceal the void and the aged appearance of the cracks.  Cracking to the floor tiles within the Kitchen, Hallway, Laundry and W/C appear old and weathered  Pre - purc hase inspection report provided by the Owner confirms several issues and highlighted many concerns with stormwat er on site drainage and confirmed uneven settlement of the foundations and cracked tiles, wall linings and ceiling linings.  Pre - purc hase report does not comment on the complete undermining of the pier and subsidence of the laundry floor  While complainants made aware of the drainage movement and cracking issues prior to purchase not fully aware of the broken pipe and subsequent undermining of the pier and footing  Report recommended repairs to the sewer and stormwater system and site drainage, but no work has been completed  Differential settlement of the foundations and footings has been occurring for many years with evidence presented in the pre - purchase inspection report  Large volumes of rain worsened the pre - existing issues.  Packing of up to 30mm seen between piers and bearers which confirms long - term and pre - existing settlement of the piers. Pre - purchase Building (PPB) Report 5 August 2020  Building inspection 5 August 2020  Home in average condition compared to similar homes of same age but requires some maintenance/ repairs  Significant items which may be of conc ern are:  Storm wat er/drainage updates are required to the property. The overall condition of storm water and sewer lines should be assessed by a plumber.  Storm wat er is accessing the sub floor and may create additional/excess settlement/movement to foundations.  There is evidence of leaks under bathroom/WC with associated deterioration to the area; repairs/waterproofing/sealing required.  Ceilings in fair condition, there are cracks, damage, visible joins and paint deterioration and undulations and sagging to sections  Walls are in fair to good condition there are minor cracks, visible joins and marks  Floors are in fair to good condition, undulations and movement cracking, cracked drummy tiles  Kitchen there is wear and tear, evidence of wat er leak damage to rear panel under sink, splashback being in fair condition  Bathroom evidence of leak visible to underside of shower and evidence of past possible leak to underside of WC. General deterioration to tiles with drummy tiles in parts Determination | Case number: 834885 Page 11 of 12  Cracked and drummy floor tiles in the laundry area  Roofing and flashing: general weathering deterioration and cracked pointing to some roof tiles; There are undulations to roof sections; There is weathering deterioration/corrosion/rust to fixings of metal skillion roof; The roof flashings appear to be in fair to good condition; There is maintenanc e repair required to flashings of skillion roof connections. Corrosion visible in valleys deterioration and rust in parts in gutters. Deterioration/damage with repairs required to connections of downpipes and weat hering paint det erioration and rust to some eave vents; General deterioration to tiles and split rafter requires strengthening  Sub floor space: Storm water is accessing the sub floor area and drainage should be improved to divert water from the sub floor. There is evidence of leak under wet area with associated water damage/ deterioration to timber minor to moderate. There is corrosion to some water lines. There is deterioration/some damage to sewer lines; the condition of sewer lines should be assessed by plumber. There is old borer marks/deterioration of some timbers in parts. There is some perimeter timber screening in contact with the ground  Foundations: There is deterioration with uneven settlement to areas showing cracks to brickwork and erosion/cracks/damage to some piers; monitor future repairs will be required. There are undulations and movement/creaking to timber floor. Drainage updates required to property to help divert storm wat er runoff/drainage from accessing sub floor and foundations.  Surface water/drainage Storm water/drainage updates are required to the property. The overall condition of storm water and sewer lines should be assessed by a plumber. Storm water is accessing the sub floor and may create additional/excess settlement/movement to foundations. The site/existing drainage in general should be monitored during heavy rainfall to ensure adequacy of drainage and improved if necessary/required. All existing drainage should be kept clear and maintained for efficiency.  An engineer’s opinion should be sought out in accordance with the 1990 AS.2870.1 residential slab footing codes regarding any cracks found to the building structure as there may be hidden or latent defects that may have an effect on the structural adequacy of the building. 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails.   Insurer’s reports   Complainants’ pre-purchase report.   Photographs.  Determination | Case number: 834885 Page 12 of 12  Correspondence between the parties. 