Home / IAG / Determination 834647

Determination 834647

Settlement of building damage claims from leaking pipes

FirmIAG
Decided2022-10-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,400
Amount claimed—
SourceAFCA PDF

Summary

The complainant, represented by a builder, disputed the insurer's settlement and scope of works for leaking pipe damage to his home and sought a total loss finding. AFCA found the home repairable, ordered a drying-out period and reassessment with cash settlement at $230,000 if maintenance evidence is not provided, and awarded $4,400 non-financial loss plus waiver of the $1,000 excess.

Expert evidence indicates the damage is repairable and the scope of works should be reassessed after drying out, with poor claims handling warranting non-financial loss compensation.

Issues

Subjects and remedies

business interruptionhome or building damagethird party authoritypay non financial lossreassess claimrefund fees or charges

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 834647 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 834647 Page 2 of 8 Case number: 834647 15 September 2022 1 Determination overview 1.1 Complaint The complainant held a home building and contents insurance policy with the financial firm (the insurer). Two claims were lodged, in July 2020 and February 2021, for property damage caused by leaking pipes. The insurer accepted the claims. However, a dispute has arisen regarding the settlement of the claims. The complainant says the insurer’s settlement and scope of works do not accurately reflect the claimed losses. He says the home is not repairable and seeks AFCA to review the settlement offer and the quality of the insurer’s claim handling. A builder represents the complainant. For simplicity, this determination will collectively refer to the complainant and his builder as ‘ the complainant ’ . 1.2 Issues and key findings Is the insurer’s settlement offer appropriate? No. The insurer should follow its expert's recommendations and allow the home to dry out for 12-18 months. The insurer's engineer is to then reassess the home and draw up the appropriate scope of works and specifications after the soil has settled. The panel accepts the insurer has fulfilled its policy obligations for temporary accommodation. Is the complainant entitled to compensation? Yes. Overall, the available material shows a lack of ownership by the insurer, resulting in unwarranted stress and inconvenience. Therefore, the complainant is entitled to non-financial loss compensation for the poor claims handling. The insurer is required to waive the $1,000 excess and pay $4,400 to the complainant. Why is the outcome fair? The outcome is fair because the engineer's recommendations have formed a basis for the claim settlement. Before any engineer reassesses the home, the complainant must provide evidence that maintenance relating to water entry into the home is completed. If this evidence is not received, the panel considers it fair for the insurer to finalise the cash settlement for the repairs pursuant to the last settlement offer of $230,000. The insurer should also pay compensation for the poor claims experience. 1.3 Determination This determination is in favour of the complainant. The insurer is to:  settle the claim as directed in section 2.1 below  pay the complainant $4,400 as compensation for non-financial loss. Determination | Case number: 834647 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer’s settlement appropr iate? Parties disagree as to scope of works required to address damage The parties agree the property sustained damage due to leaking pipes. However, they disagree as to the scope of works necessary to address the claimed losses. The insurer first appointed structural engineer TE, who noted there were several causes of moisture, aside from the leaking pipes. The complainant disagreed with TE ’s findings and provided a list of inaccuracies. This resulted in the insurer discounting TE ’s findings. The insurer then appointed engineer ST to assess the loss. ST provided two causation reports and a scope of works to address the damage caused by the two leaks at the rear of the home building. A summary of ST’s findings are outlined in section 3.2 below. ST ’s most relevant points are:  a large amount of water has accumulated under the bathroom and toilet from the event  the affected area has not been able to dry out as there is limited air flow within the subfloor  moisture has started to affect part of the kitchen area, bedroom 4 and the stumps under the storage room  free water under the slab in bedroom 4 and passage will take a significant time to dry out  the slab needs to be removed to allow the soil to dry out and then monitored for settling  bedroom 1 has damage unrelated to the leaks, rather from initial construction of the home. ST concluded by saying drying out is required for 12-18 months before any work is undertaken, and this can be sped up by removing and replacing the soil if required. The insurer quoted on this scope of works and provided a cash settlement to the complainant. The complainant says the report and scope of works provided by ST are ‘balanced and fair’ . However, he questions why the insurer has largely ignored these recommendations, and failed to address his concerns, namely:  why the home was not allowed to dry out before a scope of works was agreed upon  the likelihood of adjustments to the scope of works after the repair works start  the repair methodology for the slab and the lack of engineering specifications/certifications  whether the mould remediation has mitigated the mould issues  the lack of action having caused more damage to the home over time. Both parties have provided quotes to reflect ST’s scope of works. However, the complainant says his quote of $251,665.48 is only an estimate, as drying out is required, and there are no engineering design specifications or certifications, meaning this may not reflect the actual cost of repair. The complainant considers the repair of the home could exceed $350,000. The insurer’s quote on ST’s scope of works was initially $116,926.43. It was later increased to $189,805 ($94,902.50 per claim), as the insurer deemed its builder’s quotes were inadequate. The panel notes the insurer has since increased its offer to $230,000 to resolve the complaint in its entirety. However, this was rejected by the complainant. Complainant has not established property is a total loss The complainant and his builder CB say the house has deteriorated due to the i nsurer’s inaction. The complainant says the condition of the house is such that it should be considered a total loss. Determination | Case number: 834647 Page 4 of 8 The panel accepts the leaks have contributed to significant building damage and the repair is complex in nature. However, the panel is not persuaded by the complainant's view the house should be deemed a total loss. He has not provided any compelling evidence to confirm this and, further, the expert evidence to hand indicates the damage is repairable. Reassessment is required after maintenance and drying out is finalised The panel considers the report by ST is the most persuasive. ST also addresses issues that are not claim related. TE ’s report also raised several concerns about the home which are not event related, but maintenance issues. The insurer says the complainant has an obligation to complete the maintenance issues at the home to mitigate further water entry. The complainant says all the maintenance issues raised with him through the engineer have been completed. However, despite the complainant’s assurances, no invoices or any other evidence has been found to confirm this. Considering this, the panel is concerned there may be ongoing maintenance issues which may prevent the drying-out period to commence. Accordingly, within seven days of acceptance of this determination, the complainant is required to provide the insurer with evidence showing the maintenance works have been completed. The insurer is entitled to appoint an assessor to confirm completion of the works. If this evidence is not received, and the assessor cannot confirm the works have been completed, the panel considers it fair for the insurer to finalise the cash settlement for the repairs pursuant to its last settlement offer of $230,000. However, should the insurer receive evidence of maintenance, the panel accepts the drying-out period is required and, it is fair and reasonable the insurer reassesses the damage after an 18-month period or when the property is considered sufficiently dry to carry out repairs. The insurer should reassess the property as follows:  at its expense, the insurer is to arrange for ST (or similarly qualified engineer) to attend the property and provide a scope of works for the accepted damage  the insurer is required to reassess the mould remediation carried out at the home and confirm this has been adequately completed and if not obtain a scope of works for further mould remediation  within 14 days from provision of the new scope of works, the insurer is to obtain an actionable quotation for the cost of repairs as per the engineer’s new scope of works , together with a quote for mould remediation. Should the insurer then elect to cash settle the claim, it is fair in the circumstances that it settles the complainant for the agreed cost of repairs plus a further 15% for any unforeseen contingencies which may occur during repairs, and to address the transfer of risk to the complainant for undertaking the repairs. Two lots of temporary accommodation applies The policy covers temporary accommodation if the home is not liveable and if this directly results from an insured event. It pays up to 12 months from when the listed event took place. The insurer says it acknowledges its errors and the ongoing delays it has caused. In recognition of this, it has extended the temporary accommodation benefit by a further 12 months. The insurer says this forms part of any compensation to the complainant, as the Determination | Case number: 834647 Page 5 of 8 complainant is only entitled to one lot of temporary accommodation. The complainants say he is entitled to two lots of accommodation under the policy, as there are two separate leaks and claims. Therefore, it should cover two lots of accommodation and should not form part of any compensation AFCA may award. Given there are two separate leaks and two separate claims, the panel accepts the complainant is entitled to two lots of temporary accommodation which arise directly from the corresponding policy benefit. The second leak was discovered in February 2021. One could argue the insurer would be paying 12 months of temporary accommodation up to February 2022. Given the insurer has paid well past this date (September 2022), the panel accepts the insurer has fulfilled its policy obligations for temporary accommodation. This determination does not address contents component The complainant has intermittently raised general concerns about the contents. When asked to articulate these concerns, the complainant has failed to do so. In the absence of any specific information, the panel has not addresses the contents component of the claim. 2.2 Is the complainant entitled to compensation? Complainant entitled to $4,400 compensation for non-financial loss AFCA may award an amount of compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind by the insurer. There is no dispute between the parties that the complainant suffered from the insurer's inability to assess the claim and make decisions efficiently. This resulted in uncertainty, unnecessary stress and inconvenience, over and above which would reasonably be expected. Overall, the available material shows a lack of ownership on the insurer's behalf. The insurer has previously offered to waive the $1,000 excess and pay an additional $4,400 to the complainant in non-financial compensation. The panel agrees with the insurer’s offer and that it should pay the additional $4,400 directly to the complainant in compensation for non-financial loss. 2.3 Why is the outcome fair? The outcome is fair because ST’s recommendations form a base to progress the claim towards finalisation, and its recommendations should be followed. However, before any further Engineering reassessment occurs, the complainant must provide evidence that the maintenance issues have been rectified. If not, the insurer may cash settle the claim for $230,000. It is fair in all the circumstances that the complainant be compensated for his poor experience and the ongoing inconvenience caused by the insurer. Determination | Case number: 834647 Page 6 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Key findings on relevant expert reports Record Key findings Insurer ’ s e ngineer (ST) Report 18 - 05 - 2021  Most of the flooring and a portion of the floor joists had been removed from the bathroom floor. There were several portions of new floor joist installed.  The stumps and wall bearers (sitting on the ground) were in poor condition. Determination | Case number: 834647 Page 7 of 8 Record Key findings  T imber work had signs of termite attack.  D ifficult to determine what the support system around the kitchen area is , as the floor joist appeared to be cast into the concrete slab.  Outside the laundry wall, the insured’s plumber had exposed the sewer line where it was leaking. He indicated the leak had been occurring for some time , given the damage.  A large quantity of water has accumulated under the bath room and toilet area from the leaking pipes.  The limited air flow i n this area has made it difficult for the soil to dry.  The kitchen, passage and bedroom 4 have a concrete slab floor . T he enclosed veranda and adjoining walkway ha ve a paving slab against the wall.  It is better to replace the floor [in the storage room] with a concrete slab. This work cannot commence until the soil has dried out, which will take 12 - 18 months. Insurer ’ s e ngineer (ST) Report 19 - 05 - 2021  Due to moisture under the slabs, the timber stumps, floor bearers, and the concrete slab (within the area of leaks) have heaved.  The slabs are not conventional but have been poured around the stumps and bearers , supporting the walls without any traditional edge o r internal ribs.  Although they are not conventional, the slabs are performing adequately in the portion of t he kitchen, living and bedroom 3 .  The a ffected portions of the slabs should be removed and allowed to dry out .  In the kitchen, living room, bedroom s 3 & 4 , and adjoining passage the floor system had been removed except for stumps and bearers supporting wall . Pl astic placed, and concrete poured to create a new floor.  There were no edge beams visible from outside the building , and the slab did not exte nd to the outside edge of the bottom plate.  The insured’s builder had drilled several holes through the slab in various rooms to determine the slab thickness. The thickness varied but it was never less than 150mm. T here was no evidence of slab reinforcemen t.  The test hole in bedroom 4 found free water under the slab.  A rea under the storage room was wet, with the stump showing signs of decay.  Along the passage wall , a timber member was decayed and easily broken .  The internal damage to the walls, doors and cupboards was limited , with the doors in the cupboards in the kitchen sticking and difficult to close.  In bedroom 1 there was a crack running down the northwest corner. The rest of the rooms had minor cracking . T he wall lining was in panels and covered by timber strapping which allows the wall to move without significant damage.  There has been a significant amount of water accumulated from the leaking pipes under the bathroom and toilet. This water has migrated under the adjacent sl abs and stumped areas .  W ater has been able to move along the bearers and stump lines , which were not removed when the slab was poured.  This moisture has started to affect a portion of the kitchen area, the passage slab , a section of bedr oom 4 , and the stum ps under the storage room.  The damage at the northwest corner of bedroom 1 is not from a water leak .  Free water under the slab in bedroom 4 and passage will take a significant amount of time to dry out.  It i s recommended the affected slab is removed to allow for the soil to dry out . Determination | Case number: 834647 Page 8 of 8 Record Key findings  The kitchen slab can be left in place and monitored to determine if it is settling , as the surrounding soil is drying out.  As the floor in the storage room is so close to the ground, it is not realistic to repair the exis ti ng sub - floor structure using tradition al stumps, bearers and floor joists and create adequate air flow to ensure its structural life.  It is better to replace the floor system with a concrete slab.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.