Insurer limiting liability for building cracking/movement damage claimed after escape of liquid event

FirmXL Insurance Company Se
Decided2022-09-06
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$12,079
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for extensive building damage after a burst water main released about 600kL of water, and the insurer offered $12,078.83 limited to external EOL damage. AFCA found most damage was long-term ground movement excluded by the policy, but ordered the insurer to cover fresh internal cosmetic cracking, with a repair quote to be obtained and cash settled plus 20% contingency.

Under the policy's exclusions for normal settling, heave and ground movement, the EOL event was not the proximate cause of most of the damage, though fresh internal cosmetic damage was fairly attributed to it.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All XL Insurance Company Se determinations · Find similar determinations

Text of the determination

Determination Case number 833753 Financial firm XL Insurance Company Se Determination | Case number: 833753 Page 1 of 13 Case number: 833753 27 July 2022 1 Determination overview 1.1 Complaint The complainants ’ units (1,2 and 3) are covered under a residential strata insurance policy (policy) underwritten by the financial firm (insurer). A claim has been lodged against the policy for internal and external cracking/movement damage to the units, said to be due to a burst mains water pipe discovered in March 2020. The insurer accepts a valid exists under the policy for damage to the insured property. However, the insurer is seeking to limit its liability under the claim to damage it accepts to be due to the escape of liquid (EOL) event. The insurer has offered a cash settlement of $12,078.83, which has been rejected by the complainants. The complainants say there is extensive and significant damage to the units caused by the EOL event which allowed approximately 600kL of water to escape into the foundations of the units. The complainants maintain this has caused movement within the foundations resulting in internal and external damage to the units, which is covered under the policy. 1.2 Issues and key findings Is the insurer ’s assess ment of its liability under the claim reasonable? Yes. The information shows most of the damage claimed is not related to the EOL event. The damage for the most part relates to long term natural ground movement, which is excluded under the policy. Accordingly, the insurer is entitled to limit its liability under the claim in line with this determination. Why is the outcome fair? The outcome is fair as it is consistent with the more persuasive information which shows most of the damage to the units (main building) is due to long term ongoing natural ground movement, which is excluded. However, the outcome also fairly requires the insurer to increase the level of cover offered to include the recent internal cracking damage that appeared right after the EOL event. It would be unfair to require the insurer to cover all the damage claimed in the circumstances. 1.3 Determination This determination is substantially in favour of the insurer. The insurer can limit is liability under the claim. However, it is to increase the level of cover provided under the claim in line with this determination. Determination | Case number: 833753 Page 2 of 13 2 Reasons for determination 2.1 Is the insurer ’s assessment of its liability under the claim reasonable? Yes. The insurer’s decision to limit its liabili ty under the claim is reasonable. This is because the available information shows most of the damage claimed relates to long term and ongoing ground movement caused by various contributing factors, which is excluded under the policy. The policy is an accidental loss or damage contract of insurance The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the policyholder with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The complainants have established a valid claim There is no dispute the complainant s’ units suffered damage because of the EOL event discovered in March 2020. I am satisfied this was an unforeseen and unexpected (accidental damage) event under the policy. The onus, therefore, rests with the insurer to show an entitlement to decline or limit its liability under the complainants ’ claim in line with the policy provisions. The insurer says the policy excludes from cover loss or damage because of:  damage caused by wear, tear, fading, concrete or brick cancer, gradual deterioration or developing flaws  damage due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations/ footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements. The insurer maintains its assessment of the damage shows most of the damage claimed is excluded under the policy. Complainants say all the damage has occurred due an insurable event The complainants say all the damage claimed is because of the EOL event and therefore is covered under the policy. The complainants rely on the investigations and associated reports from engineering consultants ‘BE’ and an email from geotechnical engineer ‘SE’. BE’s report is based on a visual inspection performed of the insured property on 15 January 2021 and 22 March 2021. BE says:  it found substantial signs of subsidence external to the property  stress or foundational movement has occurred across both units 1 and 2 of the entire main building. This is evidenced by signs of cracking throughout, dislodgement of brick sills, cracking floor tiles, doors being out of square, and unlevel flooring observed  the stress or foundational movement across the main building caused by the EOL event which has moved the footings  before and after photographic evidence shows no signs of internal distress before the EOL event Determination | Case number: 833753 Page 3 of 13  while no inspection of unit 1 was performed, it is recommended that structural works are required (in the form of underpinning) across the entire main building to bring back structural adequacy by raising the foundation  after these works, then a builder can be appointed to complete more cosmetic type damage to the units. The email from SE consists of a single statement saying that given the amount of water which escaped from the leaking pipe, the escape of liquid will have impacted the footings causing movement. SE does not provide any further comment, analysis or supporting information. It is also not apparent from the email that any physical inspection of the property was performed by SE. The complainants say that the BE reports, when considered in combination with SE’s email, support a view that the damage noted to the insured units is likely the result of the EOL event. The complainants say due to the large volume of water escaping (600kl) over a relatively short amount of time, this placed additional saturation of the subsurface soils causing water erosion and associated movement of the footings. The complainants say this has compromised the structural integrity of the main building and caused subsidence damage . The complainants note BE’s findings say that beside the external repairs required, all three units need underpinning works to maintain structural adequacy. Insurer says only limited damage to the insured property relates to EOL event The insurer accepts the external damage to the main building was caused by the EOL event. However, the insurer says there is no damage to the main building because of the EOL event. Rather, the damage to the main building has occurred over time, due to natural foundational movement, which is excluded under the policy. The insurer relies on the various site inspections and associated reports from engineering consultants ‘F’, engineering geologist ‘SM’ and repair quote from builder ‘J’. F completed a site visit on 15 July 2020 and has provided several reports setting out its opinions as well as responding to BE’s information. F’s reports found:  the western wall and boundary wall between units 2 and 3 were previously underpinned in 2018. F says this shows the main building was subject to previous foundational movement  underpinning itself does not prevent future movement laterally or due to seasonal moisture changes. Underpinning also does not prevent movement between the underpinned section and non-underpinned section of the building, which can cause secondary cracking  previous signs of cracking damage to the main building which had been previously repaired  poor site drainage due to the absence of surface drainage provisions, poorly graded permeable perimeter ground between the driveway and the western external wall  the severity of cracking found throughout the main building was low with it generally limited to between 0.1 mm to 1 mm and 1 mm to 5 mm  no evidence of localised heave damage near EOL location  due to stiffness and permeability of the soils, water from EOL would not have penetrated to the depth of the footings and cause damage to the main building  elevated moisture levels at footing depth does not in itself mean that the building will move  floor level survey shows differential slab/footing movement across the slabs of the main building Determination | Case number: 833753 Page 4 of 13  the EOL event caused or contributed to the damage to areas immediately adjacent to the pipe location, that is the apron slab and boundary wall between units 1 and 2. SM was engaged by the insurer to perform a geotechnical survey of the property. This was performed on 9 August 2021. SM reported as follows:  the footings were at a founding depth of 900 mm  both surface and subsurface site drainage was classified as poor  the soil was classified as a problem site (P), due to the presence of 500 mm of filling, presence of adjacent vegetation and nearby structures  two bore samples were taken, a control bore sample from the western side of unit 1 and secondary bore sample from the area immediately adjacent to where the EOL occurred  the control sample (opposite side of EOL area) showed consistent moisture readings of around 22% across all depths (up to 1.3 meters)  the secondary bore sample (adjacent to EOL area) showed elevated moisture readings from 44.6% at footing level to 31.2% at 1.5 meters  although the weight and stiffness of masonry buildings reduces expansive clay movement, the sensitivity of this form of construction to small distortions can create special problems  the sedimentary nature of the Quaternary aged soils and depth of Clay indicates a moderate soil reactivity and seasonal heave potential  the condition o f the founding level was very stiff with bearing pressure at founding depth of 100kPa in fair to good condition More detailed information from the consultants’ reports ha s been provided in section 3 of this determination. The insurer says it is clear from the reports provided by F and SM that the damage to the main building has occurred over an extended period because of the reactive clay soils the property is built on. The damage to the main building has occurred due to normal settling, heave and ground movement of the footings and foundations as opposed to a distinct single event. Given this, the insurer says it is entitled to rely on the policy provisions to limit its liability under the claim and decline cover for most of the damage claimed. Information from the insurer is more persuasive There is no dispute an EOL event occurred leaking a significant amount of water (moisture) and which has caused some damage to the external areas of the insured property. It is also not disputed that the main building on the property, which comprises units 1, 2 and 3, presents with evidence of previous ground movement damage and associated previous repairs. The information from the consultants provide photos of internal cracking to walls and cornices which appears fresh. The complainant from unit 2 purchased the property in 2019 where these current cracks were not present. I am satisfied it is reasonable to accept the main building does show evidence of and has been subject to ongoing long term natural ground movement and associated repairs. I am not satisfied all the damage to the main building is related to or caused by the EOL event. I accept the complainants’ opinion that F is incorrect in its assessment that the significant water leak event did not allow moisture to reach the founding level of the main building’s foundations. I also note both F and BE’s initial site assessments and a ssociated reports were based on investigations before SM’s attendance and geotechnical report. This report confirms higher moisture levels to the foundation materials. Determination | Case number: 833753 Page 5 of 13 However, based on SM’s report, I am satisfied it is fair to accept this introduction of moisture to the foundation clay soils did not result in all the damage claimed. The foundations were found to be in fair to good condition, very stiff and having a bearing pressure of 100kPa. This indicates the foundation materials and footings were in a stable condition despite elevated moisture levels. I note SM has said there may have been some localised heave around the leaking pipe which has since stabilized. SM says masonry buildings reduce expansive clay movement but the sensitivity of this form of construction can experience special problems through small distortions. SM’s report shows the i nsured property is constructed o n what is classed as a ‘P’ (Problem) site with the sedimentary nature of the quaternary aged soils to react moderately with seasonal heave potential. The fact the property is susceptible to normal seasonal movement is supported by the information which shows historical widespread minor cracking to the main building and associated repairs. Also, that the previous owner of unit 2 was required to complete underpinning works in 2018. Floor surface measurements support evidence of largely uniform movement which is not consistent with movement or damage from a single recent EOL event. I am of the opinion the available information suggests a historical vulnerability to foundational seasonal movement and associated damage. I accept there are some failings in F’s findings with respect to the levels to which moisture from the EOL travelled. However, given the analysis above, I am persuaded the EOL event is not responsible for all the damage claimed. Insurer is entitled to limit its liability under the claim The proximate cause of the loss is a question of fact, depending on the circumstances in each case. The proximate cause is not necessarily the first or the last or the sole cause of loss. It is the effective or dominant or operative cause of the loss. I am satisfied the insurer has established, on balance, the EOL event is not the proximate cause for all the damage claimed. The available information does not show the EOL event has caused movement or damage to the foundation and footings. Rather, that th e main building has been the subject of ongoing long term natural foundation movement which has continued to cause damage. However, in saying that, I am of the opinion it is fair in the circumstances to accept the fresh internal cosmetic damage to plaster walls and cornices etc, can be associated with the EOL event. Given this, I find the insurer is to increase the level of cover accepted under the claim to include the internal cosmetic damage to the main building. This does not include the flooring or any suggested underpinning works recommended by BE. The policy excludes damage caused due to normal settling, heave, shrinkage or expansion in the building, foundations, footings or walls. Accordingly, I am satisfied the insurer is entitled to limit its liability under the claim in line with this determination. Insurer to increase payment for internal cosmetic repairs The insurer accepted liability for damage external to the main building as arising from the EOL event and provided a quote from J for those works in the amount of $12,078.83. I have not been provided with any information to show that this quoted amount is incomplete or inadequate. Determination | Case number: 833753 Page 6 of 13 Within 21 days of the insurer receiving notice of the complainants’ accepta nce of this determination, the insurer is to arrange for J (or an adequately qualified builder) to provide an actionable quote for repairs to the fresh internal cracking/cosmetic damage that became apparent shortly after the EOL event. Within 7 days of receiving this quote, the insurer is cash settle the claim based on this quote, in addition to the $12,078.83 for external repairs. The insurer should also pay an additional 20% on these settlement amounts to allow for contingencies (such as potential variances in the works) and the transfer of risk to the complainants in arranging the repairs. 2.2 Why is the outcome fair? The outcome is fair in all the circumstances because the information provided indicates the property has subsided due to normal settlement over time and not due to the EOL event. It would be unfair to require the insurer to cover all of the claimed damage. Equally, it is fair in the circumstances that the fresh cracking damage to the units which appeared after the EOL event to be covered. Determination | Case number: 833753 Page 7 of 13 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant information from the consultants Record Key points Financial firm’s expert ( F ) Report 13 August 2020  Site is on relatively flat land which is generally consistent with the natural topography of the surrounding land  Poor site drainage due to presence of poorly graded permeable(unpaved) perimeter ground between the driveway, western external wall and absence of active form of surface drainage provisions, su ch as pits, cut - off drains Determination | Case number: 833753 Page 8 of 13 Record Key points  Signs of settlement of the eastern external wall, apron slabs, boundary wall between units 1 and 2 and step between the kitchen floor of unit 2 and adjacent paved apron areas  Signs that crack developed between external and bounda ry wall, with previous repairs evident  Apron slab has been undermined  Cracks observed in units 1, 2 and 3  Floor level survey conducted of units 2 and 3, which showed a total variance from 0 to + 120 mm.  General pattern of relative settlement towards the entrance of unit 2  Expects that the foundation soil would be classed as highly reactive, class H1/H2 reactivity expected in accordance with AS2870 - 2011  When buildings founded on reactive clay soils, differential variations in the foundation soil moisture content can result in building movement related damage , that is if the moisture content increases, heave damage expected, and if moisture content decreases clay soil tends to shrink and settlement of the footings occur  Underpinning works undertaken to unit 2 during 2018. Underpinning was performed to the western wall and boundary wall between units 2 and 3 only. The design required 6 pins to be installed below the strip footing,  Nature of obs erved internal and external damage consistent with building damag e associated with long - term differential foundation/ footing movement of buildings on reactive clay soils, which in this case exacerbated by poor ground surfac e drainage adjacent to the building and presence of substantial trees/ vegetation near. Nat ure of observed building damage consistent with footing movement indicated by the general/overall pattern of the floor level surveys.  Severity of cracking to building fabric limited to very slight (0.1mm to 1 mm) to slight (1 mm to 5 mm).  This is categorised as non - structural and so requires repairs after adverse site conditions addressed  EOL has released significant volume of water below the eastern side of the unit, causing observed saturation and partial erosion of the soils underside of the slab. The washout/ erosion of the soils underside of the slab pavement has resulted in local bearing failure of the founding soils at this location causing the observed subsidence of the pavement and crack to the boundary wall between Units 1 and 2  Slabs and boundary wall a t site of EOL were observed to be showing signs of long term damage with evidence of previous repairs. F’s opinion that subject area had been subject to long term movement which has been exacerbated by EOL.  EOL has caused saturation soils in immediate vici nity , the Determination | Case number: 833753 Page 9 of 13 Record Key points subsequent wash - out was limited to the localised areas Of the top soil of the eastern yard. No damage caused to the main building due to the EOL.  Fact that underpinning performed in 2018 indicates the building has been subject to foundation move ments and remedial works were required to stabilise and prevent long term foundation movements,  Underpinning does not necessarily prevent further movement as it does not fix an inadequate foundation system or remove ongoing seasonal changes in soil conditi ons. Furthermore, as in this case, where the building has been partially underpinned, differential movement expected to occur between the underpinned and non - underpinned areas, as underpinning of localised area would cause other parts of building to move d ifferentially leading to further secondary cracking damage to building. Underpinning also does not prevent lateral movement.  Locations and pattern of wall cracks is typical of damage caused by differential movement. The wall cracking pattern and floor lev el surveys indicate relative settlement towards the north and west of the site, which are in the general directions towards where substantial trees/ veget ation located in close proximity, and where there is no protective paving adjacent to, sloping away fr om , the external walls/ footings of the building, causing accent uated fluctuation of moisture levels  Floor level survey of Unit 2 indicat e settlement of approximately 60 mm toward the northeast region. Similar patterns of magnitude of the floor movements were also observed in Unit 3, which is 15 m away from EOL, This suggests he general movement behaviour of both units consistent even though Unit 2 was subject to pipe burst  Movement to main building caused by: > > Soil drying caus ed by trees in close proximit y to house, combined with relatively low rainfall > Seasonal changes in soil moisture content, amplified by nearby trees > Reactive clay founding soils > Poor site drainage  That if the damage to main building was caused by EOL, F would have expected to observe: > Distinct localised raised floor levels in areas adjacent to EOL > Localised damage consistent with heave in vicinity of EOL > Severity of damage closest to EOL and reducing in severity the further way it is from ponding location  F says: > Floor level survey re sults indicate differential slab/ footing Determination | Case number: 833753 Page 10 of 13 Record Key points movement across entire building slab, not localised > Similar levels of int ernal/ external cracking damage observed throughout main building. No greater severity of building damage observed at location of EOL. > Observ ed varying degrees and patterns of previously repaired cracks, indicating that cracking has been present for an extended period of time > EOL did not cause the damage to the main building. All the observed differential footing movement and associated damage to the floors and wall of the mina building are caused by long term foundational movement, > Underpinning works in 2018 had no bearing on EOL > Recommended that in order to reduce future foundational movement that footings of external walls need to be protected against moisture variation by making them impervious and the garden bed/ unpaved areas immediately adjacent to the main building be paved with 50 mm fall over the first 1 m away from the main building, > EOL did caus e/ contribute to the damage to t he area immediat ely adjacent to EOL, that is the apron slabs and the boundary wall between Units 1 and 2 Financial firm’s expert ( F ) Report 29 September 2020  Bearing capacity of soil beneath footings not comprised as: > Floor level survey results showed no distinct pattern of localised settlement in vicinity of affected footings > Building damage would have been localised to the adversely affected sections of the building and in close vicinity to the affected locations and not widespread throughout the buil ding. This was not obs erved .  While plausible EOL has caused wash out of the top soil, it is not expected to have affected the natural founding soils of the footings  Topsoils which is of silty and sandy materials, are permeable and able to allow water to pa ss through it quickly, without causing damage to footings. Based on floor level surveys , no significant localised subsidence of footings occurred  Relatively stiff and impermeable underlying clay soils directly below the topsoils at the subject site would have prevented the escaping water physically undermining the footings of the main building  Based on the reactivity of the clay and its stiff to very stiff consistency, it is F’s experienc e that the water would not ingress to depths that would compromise th e founding soils of the footings  Any water flowing on the surface would not penetrate downwards to depths that would cause significant foundation movement in the form of heave or compromised bearing capacity.  Expected the majority of the surface water woul d have eit her drained way relatively quickly or locally saturated the ground within Determination | Case number: 833753 Page 11 of 13 Record Key points the upper disturbed soil layer without affecting the moisture content of the underlying clay soils below the footings Complainant’s expert ( BE ) Report 12 April 2021  Report compiled from visual ins pection on units 2 and 3  Photographs taken showed cracking throughout units 2 and 3  Unit’s 2 and 3 have experience movement in the footings. Subsidence has created several areas of distress and have partially compromised the structural integrity of the building. It is highly likely that the subsidence damage has been caused by the significant escape of water  The main building is structurally safe and appears to have stabilised, rectification works in required to bring back str uctural adequacy prior to EOL. Unit 2 observed to have a significant number of defects, while unit 1 is not inspected  Movement in the internal and external walls is extensive and is not isolated to any one area, structural alignment needs to be addressed t o prevent further distress  Saturation of foundations in the main building would have needed to be considerable and so movement related to the EOL  Engineering underpinning design needed to re - establish dwelling alignment  Raising of the foundation, re - levell ing and re - s upport of the main building required to fix subsidence  Sagging of roof over window (roofline bowing) potentially caused by defect i n construction, not EOL related. This has contributed to the foundational movement  Terrace slab at rear of Unit 3 has illustrated subsidence via soil erosion  Complaints expert ( BE ) Report 14 April 2021  Report delivered in respons e to F’s report of 13 August 2020  F made assumption that volume of liquid restricted to subject localised area. Assumption is disputed, as impractical to assume this volume would not have affected a larger area than reported. The absorption rate of the soil would mean that saturated soils would be affected in a larger area and exacerbated by the fact that the water leak was over a relative ly short period of time.  Some localised heave evident in the kitchen and bathroom area, which is localised to the origin of the event where clay has swollen  Referred to photos which BE said was taken in early 2020 which evidenced no signs of internal distr ess prior to the EOL  Floor level survey comprised only two measurements which is inconclusive  Agreed some repairs had been observed throughout the property. However, the current distress throughout only reoccurred since the EOL.  Determination | Case number: 833753 Page 12 of 13 Record Key points Financial firm’s expert ( F ) Report 23 August 2021  Geo technical investigation performed by L  Site was classified as classified as class P due to: > Presence of filling up to 500 mm over site in general > Presence of vegetation on the subject and adjacent sites > Susceptible nature of the clayey silt to water inundation] > Presence of existing structures, paving and services > In the absenc e of the above conditions, Class M would have been appropriate for the site due to the sedimentary nature of the quaternary alluvial soils and depth of c lay  Two bore samples were taken which showed: > Founding material was natural clay with condition and moisture at founding depth classified as very stiff and moist > Bearing pressure of 100 kpa > The bore sample adjacent to the EOL showed moisture readings of 44 .6 at footing depth (900mm) and 31.2% at 1.5 meters > The bore sample for the control sample taken from the opposite side of the EOL showed readings between 22% to 24% ac ross all depths  No bearing pressure failure of footings Complainants expert ( BE) Report 1 February 2022  Estimate of $118,146.87 for remediation of each unit Email from G 9 February 2022  Given the amount of water that escape from the leaking pipe and the large variation in moisture content from the provided Geotech report, it is our opinion that the escape of liquid will have impacted the footings and caused movement Financial firm’s expert ( F ) Report 18 February 2022  L report they agree shows elevated moisture levels of the soil in affected areas, However, exacerbated/ fluctuated moisture content of soils does not always translate to building movement when loading effects from the presence of a building are considered  That if the elevated moisture would have affected the footings to cause heave, they would have expected to see: > Uplifting of footings near vicinity of the EOL, F says this was not observed > Bearing pressure of the soils at founding level was classified as very stiff with bearing pressure of 100 kpa. AS287 Residential slabs and footings requires that the allowable bearing pressure of natural soils for the constructio n of residential building shall be 50kPa – 100kPa, suggesting that the identified bear ing capacity of the soil beneath subject footings is sound and no bearing capacity failure or alleged “washout” Determination | Case number: 833753 Page 13 of 13 Record Key points of founding soils has occurred as a result of the pipe burst event.  The EOL has caused/ contributed to the damage adjacent to the EOL but not th e main building. 3.3 Relevant policy wording Page Wording 14 Loss or damage Means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded under policy ‘ 21 Section 1 - Buildings What is covered We insure you up to the sum insured shown on the schedule for Section 1, against accidental Loss or Damage to your insured property which occurs during the period of ins urance. 27 What is not covered? We will not pay for loss and damage: Caus ed by wear, tear, fading, concrete or brick cancer, gradual deterioration or developing flaws Due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations/ footings, walls, bridges, roadways, kerbing, driveways , paths, garden borders and other structural improvements.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.