Settlement of home insurance claim for escape of liquid damage and asbestos contamination
Text of the determination
Determination
Case number 832290
Financial firm AAI Limited
Determination | Case number: 832290 Page 1 of 10
Case number: 832290 28 June 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the
insurer) and lodged a claim on 31 March 2019 after his home was damaged by an escape of
liquid.
The insurer assessed and accepted the claim. While completing repairs, asbestos was
identified in the subfloor which required removal and expanded the scope of works (SOW).
During the removal of the asbestos, much of the property and the garden was contaminated.
The insurer finalised repairs, however, the complainant subsequently identified the need for
rectification repairs.
The complainant is dissatisfied with the progress of the claim and seeks:
either cash settlement of approximately $67,000 or for the insurer to engage its own
builder to complete repairs
$2,500 towards the removal of contaminated soil and the relaying of turf
cash settlement of $11,000 for appliance allegedly contaminated by asbestos
reimbursement of $27,000 in legal fees
$5,000 non-financial loss.
The insurer accepts repairs are required and offered the complainant approximately $14,000
towards remediation, $800 towards landscaping and $2000 non-financial loss.
1.2 Issues and key findings
Is the insurer’s offer fair and reasonable?
Partially. The insurer is to finalise the claim by:
either completing rectification work or at the discretion of the complainant, cash settling the
complainant $19,781.64 for repairs.
cash settle the complainant $1,013.85, being $872.30 for yard works, plus a 15% uplift
request itemised accounts for legal fees and cash settle the complainant for legal fees
incurred as result of pursuing the claim, up to $5,000.
pay the complainant $5,000 non-financial loss.
1.3 Determination
This determination is partially in favour of the insurer. The insurer is to settle the claim as
above.
Determination | Case number: 832290 Page 2 of 10
2 Reasons for determination
2.1 Is the insurer’ s offer for remediation work fair and
reasonable?
Parties agree property requires rectification work
There is no dispute the property requires rectification work. The substantive issues are
whether the insurer is required to settle the claim as requested by the complainant.
The insurer offered the complainant either:
a cash settlement of $14,653.07 for the rectification repairs; or
for its repairer DW to complete the work.
The complainant seeks:
cash settlement of GC’s quote of $63,767.00; or
for its repairer GC to complete the work.
Policy allows insurer to choose how it settles claims
The policy allows for the insurer to choose how it settles a claim. This includes choosing to
repair the damage or settle the claim for the cost in which it would cost the insurer to
complete the repairs.
The General Insurance Code of Practice requires insurers to act fairly to their customers.
When an insurer offers to cash-settle a claim rather than appointing a repairer, AFCA will
consider whether the proposed settlement is fair.
In comparing the insurer’s quote from DW against the complainant’s quote from GC, I
considered whether the insurer’s quote was actionable and included a con tingency to
compensate for the disadvantages of a cash settlement and whether it would be impractical
to repair the insured damage without repairing the uninsured damage.
Review of evidence
In comparing the quotes from GC and DW, I note that neither is itemised and neither include
a contingency. It is impossible to compare the costs of labour and materials.
The insurer’s offer is based on the scope of works completed by DW which was signed off by
the complainant. When the complainant became dissatisfied with the progress of the claim, it
submitted quotes from GC which significantly varies from the agreed SOW.
In support of its quote of, the complainant provided a letter from builder GC dated 29
November 2021.
GC advised given the nature of the work, its quotation reflected an entire strip out and redoing
of the bathroom. It says no builder could warrant partially completed works and it was likely
there would be unforeseen damage.
The insurer says the quote from GC includes non-insured works outside that approved as per
the SOW.
Determination | Case number: 832290 Page 3 of 10
Claim should be settled in this way
The complainant’s builder GC says because it cannot warrant previously completed works,
the entire bathroom would need to be redone. Given the entire bathroom does not require
replacement and th e insurer’s builder will warrant the works, I am not satisfied engaging the
GC to complete the works is a practical way to resolve the claim.
Further, the quote from GC includes the complete strip out and replacement of the bathroom
which is only required if GC completes the work. Given the quote is not itemised it is not
possible to compare it for like for like to the DW quote. Therefore, it is also not possible to
determine which quote is a truer reflection of the cost of the work, however, it is clear work in
the GC quotes includes significant unnecessary work. I am not satisfied the complainant has
shown the GC quote should be preferred over that of DW.
Given t he insurer’s contractor commenced the initial work and the insurer is willing to
complete the rectification work, I consider it fair that the insurer has the opportunity to
complete the required rectification. In view of the circumstances of the dispute, the alternative
of a cash settlement should be available to the complainant.
The offer based on DW quote is outdated and does not appear to include a contingency.
Since both parties agreed on the DW SOW, it is fair to rely upon this to finalize the claim. The
quote from GC continues which surpasses the agreed rectification, therefore, I am not
satisfied the insurer is required to settle the claim based on this quote.
While I consider it fair and reasonable the insurer relies upon the DW SOW to settle the
claim, given the nature of the repairs, the transfer of risk in cash settling and the volatility of
the market, a substantive contingency of 35% should be added to the initial offer of
$14,653.07 to account for this risk.
If the complainant chooses to be cash settled over having the insurer complete repairs, the
insurer is to cash settle the complainant $19,781.64.
2.2 Is the insurer liable for yard works?
Complainant dissatisfied with offer for yard works
The complainant seeks for the insurer to cash settle it approximately $2500 for the excavation
of topsoil and supply and placement of turf underlay and turf.
The insurer offered the complainant $872.30 towards the supply and installation of topsoil and
lawn mix where topsoil was removed when it was contaminated with asbestos.
The complainant says the offer is insufficient because it fails to return the property to the
condition it was in before the insurer’s contra ctors dumped asbestos into the garden. The
complainant provided photos of the garden showing patchy lawn growth and weeds.
Having reviewed the exchanged information, I am not satisfied the complainant has shown
the insurer’s offer is insufficient or that the lawn needs to be fully excavated and re-laid.
I accept the lawn is patchy, the topsoil is hard and there is weed growth, but the presence of
these things does not mean the entire lawn requires excavation and relaying. The insurer’s
quote allows for topsoil which would allow turf to grow. I am not satisfied the complainant has
shown the insurer’s offer is insufficient or that the insurer’s method of restoration is
insufficient.
Determination | Case number: 832290 Page 4 of 10
The insurer’s offer of $872.30 is fair and reasonable and the complainant is not entitled to
$2500 for yard works. However, in recognition of increasing costs it is appropriate that the
insurer increase this amount by 15% to $1,013.15
2.3 Is the insurer liable for the cost of replacing appliances?
Contaminated appliances addressed in previous Determination
The complainant seeks for the insurer to accept liability for appliances it says was
contaminated by asbestos.
The insurer’s liability for the appliances has been addressed under a previous Determination
issued by the Authority. The Determination was in the insurer’s favour which found the
available evidence did not establish the appliances were contaminated, or otherwise
damaged by the insurer’s contractors.
Given the issue has been previously addressed, it cannot be re-addressed in this
Determination.
2.4 Is the insurer liable for legal fees?
The complainant seeks for the insurer to reimburse it for legal fees incurred in managing the
claim and pursuing the complaint.
The insurer says it is not liable for legal fees because they are specifically excluded by the
policy.
The policy says it does not cover:
consequential loss (financial and non-financial loss) or extra costs following an
incident covered by your policy, such as professional, expert, legal, consulting or
valuation costs unless you obtained prior written authority to incur these costs
(emphasis added).
It is not in dispute that:
the complainant incurred legal costs with AS in disputing the proposed cash settlement of
the claim
the complainant did not have the insurer’s approval at the time it incurred the costs.
I accept in these circumstances the relevant post contractual act is the appointment of AS
without the approval of the insurer at the time the appointment was made.
However, AFCA can award up to $5,000 in costs.
The manner which the insurer dealt with the repairs and contamination, meant that it was
appropriate for the complainant to seek legal assistance.
The complainant is to provide an itemised account for the incurred fees, so the insurer can
assess the legal fees and ensure they were incurred as result of pursuing the claim. They are
to pay up to $5,000.
Determination | Case number: 832290 Page 5 of 10
2.5 Is the insurer’s offer for non -financial loss fair?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer acknowledges claim could have been managed better
The insurer offered the complainant $2,000.00 compensation for non-financial loss
recognising the claim could have been managed better.
The complainant is dissatisfied and seeks $5,000 non-financial loss in recognition of their
claims experience. It says the actions of the insurer delayed the claim and severely impacted
their mental health. They provided a medical certificate from a doctor showing they
experienced stress and anxiety due to the claim,
The insurer accepts the claim could have been managed better and empathises with the
complainant, however, is not satisfied the complainant is entitled to full non-financial loss.
I reviewed the claim file notes and submissions from both parties to determine whether the
actions of the insurer caused the complainant a disproportionate degree or extent of physical
inconvenience.
The claim was lodged on 31 March 2019. The property was assessed and on 15 May 2019,
asbestos was identified in the property.
The claim notes show the complainant was dissatisfied with the amount of time it took to
remove the asbestos. On 25 July 2019, the insurer contractors issued a clearance for the
asbestos.
On 6 August 2019, the insurer authorised repairs to the property. The complainant raised
concerns about contamination and the property was re-tested multiple times.
The insurer sought to complete repairs, however, the complainant continued to raise
concerns and would not agree to repairs. In November 2019, the lodged a complaint with the
insurer and an AFCA complaint was lodged regarding contents in January 2020.
Throughout 2020, the parties tried to resolve issues raised by the complainant. A
Determination was issued by the Authority in August 2020.
In September 2020, the complainant engaged AS who contacted the insurer seeking cash
settlement of the claim. The parties exchanged correspondence discussing various aspects of
the claim. Outstanding portions of the claim could not be resolved, and a second AFCA
complaint was lodged on 21 September 2021.
Offered non-financial loss is fair and reasonable
Having reviewed the exchanged information, it is clear the claim was complex and there were
multiple issues in dispute. The identification of asbestos itself did not cause delays, however,
Determination | Case number: 832290 Page 6 of 10
once the property had been contaminated, it is clear the complainant was not comfortable
with the remediation of the property and requested multiple re-testing.
I am most concerned that the insurer allowed asbestos contamination to occur in the
property. It is insufficient for the insurer to finally rectify the condition. The dangers of
asbestos are well documented.
I acknowledge the stress and anxiety suffered by the complainant and while I accept the
claim was protracted, I am not satisfied the insurer’s offer of $2000 non -financial loss fairly
recognises the complainant’s claim experiences .
An appropriate award of non-financial loss is $5,000.
Determination | Case number: 832290 Page 7 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 832290 Page 8 of 10
3.2 Relevant expert evidence
Record Key points
Financial firm’s exp ert (PCA )
Report
12 - 08 - 2019
Th e inspection within the house found no visible asbestos
containing material debris or other debris from the
demolition and asbestos removal work to be resent. The
swab sample analysis results show no asbestos
contamination to be present in these areas. N o
decontamination work is required in these areas.
Within the laundry and bathroom and in the rear yard area
there is debris from the asbestos removal and demolition
work. The sample of debris that was provided by the
insured (taken from the grassed area in the rear yard) was
analysed and found to contain chrysotile asbestos amongst
the debris.
To enable a clearance report confirming all the asbestos
and demolition materials have been satisfactorily removed,
the remaining debris within the laundry and ba throom, on
the framing and ground surface below these rooms is to be
removed.
All debris on the rear landing and ramp and on the
concrete paving on the southern side of the house is also
to be removed.
The debris within the grass in the rear yard area is to be
removed and disposed of as asbestos contaminated
waste. In these areas, the grass and sufficient surface soil
is to be removed to ensure that all demolition debris is
removed.
At the completion of the above listed work, a visual
clearance inspecti on is to be carried out to verify that all
remaining debris has been removed. A clearance report
detailing the findings of the clearance inspection and
confirming that the laundry and bathroom and rear yard
areas may be accessed without the use of asbesto s PPE is
to be compiled.
Financial firm’s exp ert (PCA )
Report
06 - 09 - 2019
The site inspection undertaken on 3 August 2019 found
there to be some debris on the timber framing within the
laundry and bathroom area, debris on the ground surface
below the floor framing in these rooms, and some visible
settled dust within the rooms in the house, mostly in areas
that would not be regularly cleaned. Within each of the
rooms in the house (except the laundry and bathroom), no
visible asbestos containing material debris or other debris
from the work was sighted.
There was also debris from the work on the grassed
backyard area adjacent to the house and on the concrete
paving on the southern side of the house. This debris
Determination | Case number: 832290 Page 9 of 10
Record Key points
included small pieces of plaster, concrete, glass and
insulation material from the roof space over the bathroom
and laun dry. This debris was from the demolition work
completed in the bathroom and laundry.
The visual inspection within the house found no visible
asbestos containing material debris or other debris from
the demolition and asbestos removal work to be present.
The inspection of the ground areas in the rear yard at the
site found the exposed soil and concrete and tiled surfaces
to be free of asbestos material debris from the work.
The analysis results of the swab samples collected from
within the house show no a sbestos contamination to be
present in these areas.
Based on the findings of the visual clearance inspection
and the swab sample analysis results, the internal areas of
the house and the rear yard areas have been satisfactorily
cleaned of materials and de bris that were present during
our site inspection on 3 August 2019.
Financial firm’s exp ert (ES )
Report
24 - 09 - 2019
Information provided indicated that previous works in the
laundry and bathroom areas liberated fibres that were
reported to be asbestos. Further anecdotal evidence
indicated the property was cleaned by an asbestos
removal contractor however, the owner of t he property was
not satisfied due to the presence of dust on many
horizontal surfaces and of concern, on clothing in
wardrobes.
The three - stage approach should determine if asbestos
fibres were present in the atmosphere within the property
or within the d usts laden on horizontal surfaces. Overall,
twenty - one (21) adhesive tape & and one (1) bulk sample
were obtained and supplemented by six (6) background air
samples. All samples including the background air
monitoring analysed, recorded ‘No Presence of Asb estos’,
therefore the property is considered safe for occupancy
and no other remediation works should be required in
relation to asbestos contamination.
Complainant’s expert (GC )
Report
21 - 11 - 2021
T o effectively install the cavity slider for the Bthrm , the tiles
and wet area sheeting must be removed from both side of
the timber - framed wall.
However, if this process is executed by a different builder
to the initial contractor, there is an opportunity for
complications to arise down the track;
If any iss ues surface during the warranty period. E.g. If
cracks develop in tiles adjacent to the rectification works.
Or if a water leak is identified below the bathroom flooring
via a visual inspection. Then there is then the potential for
Determination | Case number: 832290 Page 10 of 10
Record Key points
the two builders to argu e over who is responsible. A further
complication is that to definitively identify the cause of such
issues, tiles and linings often need to be demolished to
enable a visual inspection and evaluation to take place.
In my opinion, responsible builders do no t put themselves
in this position. The only way to avoid it, is for the bathroom
to be completely stripped and redone from scratch by the
second construction party.
Further, it is very likely that a floor tile or tiles could be
damaged in the removal of th e wall linings for both cavity
sliders. Therefore, the quote from Gratitude Constructions
allows to remove all floor tiles in the Bthrm/WC area, re -
bed, re - w aterproof and retile said area.