Stormwater ingress damage to bathroom and wardrobe; insurer declined bathroom damage as gradual deterioration and increased wardrobe contents settlement
Text of the determination
Determination
Case number 831885
Financial firm AAI Limited
Determination | Case number: 831885 Page 1 of 8
Case number: 831885 30 June 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy (policy) with the financial firm
(insurer). On 18 December 2020, a claim was lodged for stormwater ingress damage to the
insured building and contents.
The insurer has accepted the claim, however, seeks to limit its liability regarding the damage
claimed in line with the policy provisions. The insurer says not all the damage claimed is the
result of a single insured event. Rather, there exists damage consistent with being because of
wear, tear and gradual deterioration which is excluded under the policy.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the policy reasonable?
Yes. The available information establishes, on the balance of probabilities, that the damage to
and around the bathroom has been occurring gradually over an extended period of time
because of issues excluded under the policy. Accordingly, the insurer is entitled to decline
cover for the damage to and around the bathroom in line with the policy.
However, the insurer is to increase its settlement towards its liability for the water ingress
damage to the wardrobe and contents within by $1,500 to $3,838.33, considering what is fair
in the circumstances.
1.3 Determination
This Determination is in favour of the insurer.
The insurer ’s is to increase its offer to settle the water ingress damage to the wardrobe and
contents within by an additional $1,500 to $3,838.33 less the applicable policy excess of
$600.
The insurer is entitled to decline the damage to and around the bathroom in line with the
policy exclusions specified in product disclosure statement (PDS).
Determination | Case number: 831885 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability reasonable?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Storm ’. Cover under these benefits is subject to the
conditions, limitations and exclusions specified in the PDS.
There is no dispute the insurer provided the complainant with the relevant policy
documentation including the PDS and certificate of insurance (COI). Therefore, I accept the
insurer is entitled to rely on the policy provisions to assess its liability under the claim.
Complainant bears the onus to establish a valid claim under the policy
It is established law that the insured has the onus to establish, on balance (that is, more likely
than not). that the loss claimed falls within the terms of the policy.
Once a valid claim is shown to exist, the onus shifts to the insurer to show, on balance, it is
entitled to decline the claim in line with the policy provisions or otherwise.
There is no dispute the complainant has established a valid claim for storm water ingress
damage to wardrobe and contents within under the policy. However, the dispute between the
parties relates to the damage noted in and around the bathroom.
The parties hold different opinions regarding cause for the damage claimed
The complainant says the water ingress damage noted tin and around the bathroom as well
as the wardrobe and contents within, is all due to the same storm event in December 2021.
Further, that it is possible that hail has collected on the roof during the storm event causing
the waterproofing elements to crack and allow the stormwater ingress through the roof.
The complaint disputes the findings of the consultants’ appointed by the insurer . He is of the
opinion the insurer has failed to complete an adequate investigation into the cause for the
storm water ingress. The complainant believes the insurer should be required to arrange
further invasive investigations to determine the cause for the water damage occurring at the
property.
I note the complainant has not provided any independent qualified information in the form of
an expert report or otherwise in support of his position.
The insurer accepts the water ingress into the bedroom wardrobe is, on balance, consistent
with being the result of a single insured event as required under the policy. Given, this it has
offered to cash settle this component of the claim based on a scope of works and quote from
consultants ‘HR’. This is in the amount of $2,338.33 less the applicable policy excess of
$600.00.
With respect to the water ingress damage in and around the bathroom, the insurer says the
water ingress has occurred over an extended period of time because of wear and tear
associated failure of the waterproofing. The insurer says the cost to repair this damage and
the waterproofing is not covered by the policy. This is because the policy excludes from cover
loss or damage due to gradual deterioration and wear and tear.
Determination | Case number: 831885 Page 3 of 8
Information form insurer is more persuasive and shows damage is not covered
I have reviewed all the information from the parties including the various consultants reports
and associated photographs. I find the information from the insurer to be the more compelling
and persuasive. Th is is because the insurer’s assessment of its liability under the claim is
consistent with the policy provisions and expert reports. The relevant policy provisions and
information from the expert reports has been provided in section 3 of this determination .
Having considered the expert reports, I find all the consultants who attended the insured
property to investigate the cause and extent of damage have provide relatively consistent
findings and reasons for the water ingress damage. The available information shows the
damage in and around the bathroom has been occurring for an extended period of time. I
note during earlier investigations, even the complainant admits that the damage had been
occurring for around 12 to 18 months.
The photos of the damage also support a view that the damage in the bathroom is consistent
with gradual ongoing damage due to multiple water ingress events and not a single storm
event as required for cover under the policy. The consultants’ reports consistently found that
the waterproofing to the roof slab was subject to general deterioration resulting in cracking to
the membrane. This included long term weed growth within these cracks and associated
possible root penetration damaging the waterproofing.
Water ingress has been occurring through these cracks and cavities as shown by the leak
tests completed by ‘AQ’. This is further supported by the engineers ‘J’s findings which inform
that the damage claimed is not consistent with hail damage. This is because in J’s opinion,
hail would have to cool both the top concrete slab as well as the waterproofing membrane
below to such an extent that this damages the waterproofing, which J says is not possible.
With the respect to the waterproofing measures applied to surface of the concrete roof slab, J
says this is subject to long term degradation and also expresses concern regarding the
construction methodology of the insured building. I am not satisfied the available information
is enough to establish defects in the construction of the insured building. However, it is
adequate to support the findings relating to the degradation and associated failure of the
surface waterproofing to the roof area above the bathroom and bedroom in question.
The insurer is entitled to limit its liability under the claim
Without any information to the contrary, I am satisfied the insurer has been successful in
showing the damage excluded under the claim is not the result of a single insured event.
Further, that this damage is, on balance, because of the gradual deterioration of water
proofing over time due to general wear and tear.
Loss or damage in such circumstances is clearly excluded from cover under the policy.
Accordingly, I determine the insurer is entitled to decline cover for the water ingress damage
noted to the bathroom and surrounding areas.
I note the complainant has not provided any information in support of the extent of or value of
contents loss because of stormwater ingress into the wardrobe. However, considering the
phots and what is fair in the circumstances, I determine the insurer is to pay the complainant
$1,500 towards this loss.
Determination | Case number: 831885 Page 4 of 8
Why is the outcome fair?
Given the available information, I am of the opinion it is fair in the circumstances to permit the
insurer to rely on the opinions’ p ut forward by the appointed consultants. This is especially in
the absence of any qualified information contrary to the consistent findings of these
consultants. It would be unfair in the circumstances, to require the insurer to cover the
damage in and around the bathroom inconsistent with the policy provisions.
It is also fair to require the insurer to increase its settlement of the claim by $1,500 to cover
contents damaged in the wardrobe.
Determination | Case number: 831885 Page 5 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant information from consultants’ reports
Record Key points
R Make
safe
asse ssment
Report
29
December
2020
Attended site on 24 December 2020
No visible mould present
No elevated moisture levels not ed
No requirement for mak e safe works
Recommends appointment of a builder to assess the damage noted.
H Builder
Asse ssmen
t Report
5 January
2021
Attend 31 December 2020
Noted water ingress damage to ceiling and moulded timber cornice in wardrobe
consistent with storm damage
Complainant advised water ingress issue in bathroom area had been occurring
over previous 12 - 18 months. Also, water ingress occurs only aft er long periods wet
weat her
C onducted an inspec tion of the concrete roof deck and found no eve nt related
damages present
H found that the concrete edges where they hit the perimeter parapet walls ar e
cracked. Also, noted that large weeds are pres ent directly above the bedroom &
b athroom areas
These weeds had been in place for a long time as they appear heavy i n size with
thick woody trunks and root penetration
H formed the opinion that the water ingress experienced is a res ult of the general
deterior ation of the roof slab membrane
H recommend that fair and re asonable repairs including the b edroom robe joinery
repairs only, be included as insurable under a single insured event only
Determination | Case number: 831885 Page 6 of 8
Record Key points
The damages to the b athroom have been caused by multiple water ingress events,
and not from a single natural hazard event
H provided a report scope of works and associated quote for repairs to the wardrobe
only in the amount of $2, 338.33.
RP Builder
Report
1 March
2021
Completed a dual assessment with an internal assessor for the insurer on 1 March
2020
The roof wat erproofing multiple fatigue cracks around the entire perimeter with the
brickwork with weeds growing in some of these in areas
The areas of waterp roofing membrane installed in the drainage points through the
parapet wall above the bathroom had cracking.
AQ Leak
Detection
Report
4 March
2021
R an a hose around the third outlet only and found water to be escaping through the
brick weep hole after about 2 minutes. This weep hole is below gutter height
Within 10 minutes AQ found water showing on the lintel and entering inside of the
window
S pray tested around the first drain and water showed again through the same weep
hole
AQ tried several others a nd had the same result
AQ spray tested at the ent ryway to the roof as this is above the wardrobe but were
unable to see water. However, there is further cracking and the step looks to have
been painted
W ater is entering the cavity of the parapet wall at the drain outlets. AQ found this to
be a waterproofing fail .
J
(Engineers)
Site
Inspection
Report
19 March
2021
Site inspection 5 March 2021
The flat concrete roof appeared to be quite aged with the surface seal being
mouldy, cracked and in several areas containing vegetation growth
The moisture meter found that the walls presented moisture, increasing
towards the rear external wall
The cause of the seepage is the absence, poor installation, or long - term
degradation of a damp - proof course (DPC) or waterproofing
Given the occurrence of moisture in the walls, the site conditions and the
building construction are conducive for seepage. This is believed t o be an issue due
to construction methodology and wear of weatherproofing materials and is not due to
a single event.
AS 4654.1 (Waterproof Membranes) stipulates that waterproofing membranes shall
comply as follows:
Considering the hail would have had to cool both the topping slab and then
subsequently the waterproofing membrane, it is not plausible that a build - up of hail
had caus e the membrane to crack
The weather - resisting coating applied to the roof had mostly deteriorated. Where it
had been applied in thicker layers near the edge drainage, the coating started
Determination | Case number: 831885 Page 7 of 8
Record Key points
cracking . Such coatings typically onl y provide a life expectancy of around 7 years.
Inspection and re - application are recommended after such a period has passed.
The vegetation growth will act to reduce the life expectancy of the waterproofing
layers. Root growth from these weeds can enter f ine cracks and expand producing
a means of water to bypass the protective layers.
Regarding the closet mould specifically, the exposed slab edge as shown in Figure
21 does not have any weatherproofing attached. During rain events it would be
exposed to mo isture which may seep through the slab horizontally.
The connections on the roof may have breached the waterproofing membrane
underneat h. However, this cannot be determined without invasive investigation .
The AS 4654.2 stipulates that the waterproofing me mbrane ought to continue up
the side of the wall, which was not observed on site.
CONCLUSIONS
High moisture levels were confirmed throughout the rear, second storey section
of the walls and ceiling of the bathroom and bedroom, respectively.
The damp ingress identified to the ceiling and external wall appeared to be
moisture seepage. These issues generally occur due to a faulty and deficient
waterproofing system from installation or maintenance issues. The moisture entry
occurs over an extended period and is not caused by a single event.
The available evidence indicates that the superficial waterproofing coatings
sustained the wat er tightness of the roof. However, over time, as these layers
have failed, the moisture has been able to bypass the underlying protective
membranes due to an inadequate construction methodology. AS 4654.2
stipulates that the waterproofing membrane ought to continue up the side of the
wall, which was not obs erved on site.
The available evidence indicates that the hail has not adversely affected the
waterproof membrane becaus e Australian Standards require the membranes
to be capable of handling extremes of temperat ure and the topping slab
would have served as insulation to protect the membrane.
Thus, the available evidence indicates the damage is not due to a single event.
3.3 Relevant policy provisions
What we do not cover - general exclusions (cont’d)
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not limited
to:
• tiles and their adhesive or grouting breaking down;
Determination | Case number: 831885 Page 8 of 8
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
Defect, structural fault or design fault
A defect, structural fault or design fault that you knew about (or should reasonably
have known about) and did not fix before the loss or damage occurred (e.g. if
there are signs that a defect previously caused damage, we will not pay a later
claim for further damage from this defect).
Failing to take care of the building or contents
your failure to:
• take reasonable care of the building and contents;
• keep the buildings and contents well maintained and in good condition. For the
meaning of ‘well maintained and in good condition’ see the ‘What do we mean by
that?’ se ction on pages 53 to 55;
• fix faults and defects as soon as you become aware of them.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.